You are on page 1of 7

1 Data

volume v 314 m3
height 4 m
unit weight of water gw 10 KN/m3
concrete grade fc 20 N/mm2
permissible tensile stress of steel fs 100 N/mm2
ft 1.2 N/mm2
fv 1.7 N/mm2
Es 200000 N/mm2
Solutions

2 Horizontal steel reinforcement design for tank wall (0.3H to 0.8H)

assume thickness of wall t 200 mm


Find Tank Dimensions V=pD2H/4
D=sqrt(4V/pH) 10 m
Find the value of H2/Dt 8
Find the coefficient for hoop tension from the table cmax 0.697
Calculate the maximum hoop tension
Tmax=coeff*gw*H*D/2 per meter height 139.4 KN/m
Find areas of steel reinforcement Ast 1394 mm2
Choose fmm bar & Ab from rebar table 12 mm
Ab 113.10 mm2
Find the spacing between horizontal steel reinforcement Ab mm2

Sreq=2000*Ab/Ast then find the actual area of reinforcement Aact<=300mm 162.3 160mm ok

Find the actual areas of steel reinforcement


Aact=2000*Ab/Sact 1413.7 mm2
Use f @ Sact c/c in two layers (start from 0.3H to 0.8H 12mm bar @ 160mm c/c
Check thickness of wall t by tensile stress of concrete
n=ES/EC (modular ratio) =ES/5000*sqr(fc) 8.9 8.94
ft=Tmax/((n-1) As act+1000t) 0.660 N/mm2 thickness is safe
Check thickness of wall t by shear stress of concrete fv for tank wall
fv=v/1000t=coeff*gw*H^2/1000*t
coeff 0.174
n 27.84 KN/m
fv=v/1000t 0.1392 N/mm2 thickness is safe
Find reinforcement ratio
%rmin=0.3-0.1*((t-100)/350) 0.271
Find minimum areas of steel reinforcement
As min=%rmin*t*1000 542.86 mm2 ok
Horizontal Steel Reinforcement Design for Tank Walls (from O to0.3H, from
3 0.8H to H).
find coefficient c at 0.3H 0.324
Tmax=coeff*gw*H*D/2 per meter height 65 KN/m
Find areas of steel reinforcement Ast 648 mm2 ok
Choose fmm bar & Ab from rebar table 10 mm
Ab 78.5 mm2
Find the spacing between horizontal steel reinforcement Ab mm2

Sreq=2000*Ab/Ast then find the actual area of reinforcement Aact<=300mm 242.4 240mm ok

Find the actual areas of steel reinforcement


Aact=2000*Ab/Sact 654.5 mm2
Use f @ Sact c/c in two layers (start from 0.3H to 0.8H 10mm bar @ 240mm c/c

4 Design of Internal Vertical Steel Reinforcement for Tank Walls

Find the negative Bending Moment


max -ve BM coeff -0.0146
max -ve BM 9.34KN-m/m
Assume concrete cover 50mm
design Constants
r=fs/0.35fc 14.286
k=n/(n+r) 0.385
j=1-k/3 0.872
Rb=k*j*fc/2 1.175
Find the effective depth {d}=(2Mmax/fc*k*j*b)^0.5 89.19
Check Wall thickness t=d+c 139.19 ok
dreq=tass-cc 150.00

Find the Area of Internal Vertical Steel Reinforcement.Ast=BMmax/fs*j*dreq) 1201.9mm2

Choose f and Ab from Rebar Table. 14mm bar 153.9mm2


Find the Spacing between The Internal Vertical Steel Reinforcement

Sreq=2000*Ab/Ast then find the actual area of reinforcement Aact<=300mm 120mm ok

Find the Actual area of Internal vertical Steel Reinforcement


Aact=1000*Ab/Sact 2565.6mm2 ok
Use f @ Sact mm c/c in one-layer, Internal Vertical Steel Reinforcement. 14mm bar @ 120mm c/c

5 Design of external Vertical Steel Reinforcement for Tank Walls

Find Positive negative Bending Moment


the max positive Coefficient 0.0038
max +ve BM 2.43KN-m/m
Find the Area of External Vertical Steel Reinforcement. 312.8mm2 not ok
As=Asmin 542.9mm2
Choose f and Ab from Rebar Table. 12mm bar 113.1mm2
Find the Spacing between The Internal Vertical Steel Reinforcement

Sreq=1000*Ab/Ast then find the actual area of reinforcement Aact<=300mm 200mm ok

Find the Actual area of Internal vertical Steel Reinforcement


Aact=1000*Ab/Sact 1131.0mm2 ok

Use f @ Sact mm c/c in one-layer, Internal Vertical Steel Reinforcement. 12mm bar @ 200mm c/c
1 Data
volume v 200 m3
height 3.7 m
Free Board 0.4 m
dead storage 0.15 m
unit weight of water gw 10 KN/m3
concrete grade fc 30 N/mm2
permissible tensile stress of steel fs 115 N/mm2
ft 1.2 N/mm2
fv 1.7 N/mm2
Es 200000 N/mm2
Solutions

2 Horizontal steel reinforcement design for tank wall (0.3H to 0.8H)

assume thickness of wall t 300 mm


Find Tank Dimensions V=pD2H/4
D=sqrt(4V/pH) 8.3 m
total height of tank wall 4.25 m
Find the value of H2/Dt 7.258
Maximum Hoop Tension
Find the coefficient for hoop tension from the table cmax 0.6252
Calculate the maximum hoop tension
Tmax=coeff*gw*H*D/2 per meter height 110.20 KN/m
Find areas of steel reinforcement Ast 958.29 mm2
Choose fmm bar & Ab from rebar table 12mm 113.1mm2
Find the spacing between horizontal steel reinforcement Ab mm2

Sreq=2000*Ab/Ast then find the actual area of reinforcement Aact<=300mm 118.0 110mm ok

Find the actual areas of steel reinforcement


Aact=2000*Ab/Sact 1028.2mm2
Use f @ Sact c/c in two layers (start from 0.3H to 0.8H 12mm bar @ 110mm c/c
Check thickness of wall t by tensile stress of concrete
n=ES/EC (modular ratio) =ES/5000*sqr(fc) 9.333
ft=Tmax/((n-1) As act+1000t) 0.357 N/mm2 thickness is safe
Check thickness of wall t by shear stress of concrete fv for tank wall
fv=v/1000t=coeff*gw*H^2/1000*t
coeff 0.2115
n 28.950 KN/m
fv=v/1000t 0.096 N/mm2 thickness is safe
Find reinforcement ratio
%rmin=0.3-0.1*((t-100)/350) 0.243
Find minimum areas of steel reinforcement
As min=%rmin*t*1000 728.6mm2 ok
Horizontal Steel Reinforcement Design for Tank Walls (from O to0.3H, from
3 0.8H to H).
find coefficient c at 0.3H 0.3550
Tmax=coeff*gw*H*D/2 per meter height 54 KN/m
Find areas of steel reinforcement Ast 473.7mm2 0
728.6mm2
Choose fmm bar & Ab from rebar table 10 mm
Ab 78.5 mm2
Find the spacing between horizontal steel reinforcement Ab mm2

Sreq=2000*Ab/Ast then find the actual area of reinforcement Aact<=300mm 107.8 100mm ok

Find the actual areas of steel reinforcement


Aact=2000*Ab/Sact 785.4 mm2
Use f @ Sact c/c in two layers (start from 0.3H to 0.8H 10mm bar @ 100mm c/c

4 Design of Internal Vertical Steel Reinforcement for Tank Walls

Find the negative Bending Moment


max -ve BM coeff -0.02128
max -ve BM 10.8KN-m/m
Assume concrete cover 50mm
design Constants
for M30 concrete grade fc= 10
k=n/(n+r) 0.448
j=1-k/3 0.851
Rb=k*j*fc/2 1.905
assume f 12mm bar
Find the effective depth {d}=(2Mmax/fc*k*j*b)^0.5 73.40
Check Wall thickness t=d+c 129.40 ok
dreq=tass-cc-d/2 244.00

Find the Area of Internal Vertical Steel Reinforcement.Ast=BMmax/fs*j*dreq) 451.5mm2 not ok


728.6mm2
Choose f and Ab from Rebar Table. 12mm bar 113.1mm2
Find the Spacing between The Internal Vertical Steel Reinforcement

Sreq=2000*Ab/Ast then find the actual area of reinforcement Aact<=300mm 150mm ok

Find the Actual area of Internal vertical Steel Reinforcement


Aact=1000*Ab/Sact 754.0mm2 ok

Use f @ Sact mm c/c in one-layer, Internal Vertical Steel Reinforcement. 12mm bar @ 150mm c/c

5 Design of external Vertical Steel Reinforcement for Tank Walls

Find Positive negative Bending Moment


the max positive Coefficient 0.00592
max +ve BM 3.0KN-m/m
Find the Area of External Vertical Steel Reinforcement. 417.5mm2 not ok
As=Asmin 728.6mm2
Choose f and Ab from Rebar Table. 12mm bar 113.1mm2
Find the Spacing between The Internal Vertical Steel Reinforcement

Sreq=1000*Ab/Ast then find the actual area of reinforcement Aact<=300mm 150mm ok

Find the Actual area of Internal vertical Steel Reinforcement


Aact=1000*Ab/Sact 754.0mm2 ok

Use f @ Sact mm c/c in one-layer, Internal Vertical Steel Reinforcement. 12mm bar @ 150mm c/c
0.6289883
6 -0.011 0.103 0.223 0.343 0.463 0.566 0.639 0.643 0.547 0.327
7.258 -0.008484 0.1074 0.2324 0.3550 0.4756 0.5673 0.6252 0.6090 0.5005 0.2899

8 -0.015 0.096 0.208 0.324 0.443 0.564 0.661 0.697 0.621 0.386

6 0.197
958.285 0.2114667
8 0.174

6 0.0001 0.0008 0.0008 0.0019 0.0032 0.0046 0.0051 0.0029 -0.0041 -0.0187

7.258 0.0001629 0.0012403 0.0008 0.0025919 0.0042064 0.0057322 0.0059177 0.0029 -0.005295 -0.021279
8 0 0.0001 0.0008 0.0008 0.0016 0.0028 0.0038 0.0029 -0.0022 -0.0146