Table of Contents
1. GENERAL ..................................................................................................1
1.1. Introduction ......................................................................................1
1.2. Roto-Jet Pump Design .....................................................................1
1.3. Pump Identification ..........................................................................2
2. DISASSEMBLY/ASSEMBLY ......................................................................2
2.1. General ............................................................................................2
2.2. Recommended Tools.......................................................................3
2.2 Recommended Tools, continued. ....................................................4
2.3. Disassembly/Assembly Stands ........................................................5
2.4. RO/ROH 3x2 Pump Section Drawing ..............................................6
2.4.1. Parts List - RO III & ROH III 3 x 2 Pump ...............................7
2.5. RO/ROH III Rotor Assembly Section Drawing ...............................10
2.5.1. Parts List - RO III & ROH III 3x2 Rotor Assembly ...............11
2.6. Seal Parts Lists ..............................................................................13
2.6.1. Parts List - Stationary Single Seal - 3x2 Pump ...................13
2.6.2. Parts List - Rotating Single Seal 3x2 Pump ........................14
2.6.3. Parts List - Double Seal - 3x2 Pump ...................................15
2.7. Cautions.........................................................................................16
2.8. Seal Replacement .........................................................................16
2.9. Pick Up Tube Replacement ...........................................................22
2.10. Bearing Replacement ....................................................................23
2.11. Rotating Component Replacement ................................................27
i
ROTO-JET PUMP
DISASSEMBLY/ASSEMBLY
Table of Contents
Continued
6. PARTS ..................................................................................................... 31
6.1. Minimum Recommended Spare Parts........................................... 31
6.2. Parts List - Auxiliary Equipment ..................................................... 32
6.3. Ordering Parts ............................................................................... 32
7. MAINTENANCE RECORD....................................................................... 33
8. APPENDIX A ……………………………………………………………………..34
ii
ROTO-JET PUMP
DISASSEMBLY/ASSEMBLY
1. GENERAL
1.1. Introduction
This manual has been prepared to assist you in understanding the construction and
the correct methods of disassembly and assembly for your new Roto-Jet pump.
The Roto-Jet pump is the simplest and most reliable high pressure pumping device
ever invented. The design, material and workmanship incorporated in the
construction of Roto-Jet pumps makes them capable of giving long, trouble free
service. The life and satisfactory service of any mechanical unit, however, is
dependent upon correct application, proper installation, periodic inspection and
careful maintenance.
We urge you to read and follow all of the directions in this manual. If additional
copies are required or other detailed instructions are needed, the information may
be obtained upon request.
The exclusive patented Roto-Jet pump has only two basic working parts...a rotating
case and a stationary pick-up tube collector arm within the rotating case. The
Roto-Jet design completely eliminates the need for packing glands, wear rings or
multiple stages as used in conventional centrifugal pumps, and also eliminates the
complex pistons, rods, valves and springs required in reciprocating pumps.
The Roto-Jet operates in the following manner: Liquid enters the intake manifold
and passes into the rotating case where centrifugal force increases the pressure of
the liquid and at the same time its velocity is increased. The velocity of the liquid in
the rotor is converted into additional pressure as it jets into the pick-up tube.
RO/ROH 3x2 1
1.3. Pump Identification
Roto-Jet pumps are designated by a series of letters and numbers, such as ROA-
S484. The first group, ROA, is an indication of the basic mechanical configuration
and the second group, S484, designates the pick-up tube size. The pump
nameplate gives both the pump model designation and the pump serial number.
Permanent records for this pump are kept by the serial number and it must
therefore be used with all correspondence and spare parts orders. This will ensure
replacement of components in the original materials of construction.
2. DISASSEMBLY/ASSEMBLY
2.1. General
The following are recommended dismantling and assembly instructions for your
Roto-Jet pump. We urge that the instructions be read thoroughly before attempting
to dismantle the unit. The component parts must be handled with care during the
dismantling and assembly process. The work area should be clean and be
equipped with the required tools.
Depending on the accessibility of the pump and the extent of the repair or
inspection required, the pump can be dismantled in place on its foundation.
However, to facilitate the disassembly procedure, it is recommended that the pump
be removed from its foundation and placed securely into a position in which the
pump shaft is facing downward and the manifold is facing upward. Roto-Jet pumps
offers assembly stands for mounting the unit during disassembly and assembly.
RO/ROH 3x2 2
2.2. Recommended Tools
SPECIAL TOOLS
Alignment Tool-Pick-Up Tube (5/16" - 24) 1 060582064
PURCHASED TOOLS
Eyebolt - 1/2" - 13 x 1-1/2" Lg. Shank 3 060055411
RO/ROH 3x2 3
2.2 Recommended Tools, continued.
ACCESSORIES *
Pump Assembly Stand Kit (Includes stand & swivel hoist ring) 1 060580652-K1
* Note: Accessories are not included with special tools or purchased tools and must
be ordered separately.
RO/ROH 3x2 4
2.3. Disassembly/Assembly Stands
CAUTION
When lifting the pump
into the vertical
position with or
without the assembly
stand a swivel hoist
ring shall be used in
place of the lifting eye
bolt.
RO/ROH 3x2 5
2.4. RO/ROH 3x2 Pump Section Drawing
Torque Table
45 175 237
55 26 35
57 10 14
58 54 73
60 104 141
61 104 141
62 139 188
63 104 141
64 26 35
71 20 27
72 28 38
74 10 14
80 6 8
Figure 2.4
RO/ROH 3x2 6
2.4.1. Parts List - RO III & ROH III 3 x 2 Pump
Item Part
No. Qty. Description Number
1 1 Pick-up Tube: (1) 17.4 PH
S-266 0656030
S-375 0656031
S-484 0655625
D-484 0658202
S-600 0655626
D-600 0655627
29 1 Hub, Seal
Single Rotating Seal 0662849-1
Single Stationary and Double Seal 0662567-1
31 1 Case, Rotor
Standard 0653206
High Speed Option 0655589
RO/ROH 3x2 7
2.4.1 Parts List - RO III & ROH III 3 x 2 Pump, Continued
Item Part
No. Qty. Description Number
36 1 Manifold
Threaded:
Ductile Iron 0662850-1
Stainless Steel 0662850-2
Flanged:
Steel 0662577-01
Stainless Steel 0666243-1
Flanged-High Speed Option:
Steel 0662577-03
Stainless Steel 0662577-04
37 1 Nameplate 0660681
RO/ROH 3x2 8
2.4.1 Parts List - RO III & ROH III 3 x 2 Pump, Continued
Item Part
No. Qty. Description Number
59 8 Capscrew, Hex Head Pedestal Foot (Not Shown) 060088814
RO/ROH 3x2 9
2.5. RO/ROH III Rotor Assembly Section Drawing
Torque Table
Item
No. Ft-Lbs N.M
7 100 136
8 13 18
46 175 237
47 400 542
Figure 2.5
RO/ROH 3x2 10
2.5.1. Parts List - RO III & ROH III 3x2 Rotor Assembly
0661853-001
0661853-005
0661853-004
0660088578
060083904
060068656
060068677
0656217
0656756
0655555
0681810
0659627
0661853
0659204
Part No.
O-ring, Rotor
Rotor, Steel
Description
Driveshaft
Capscrew
CD4MCU
CA6NM
CA6NM
Steel
Qty
22
1
2
Item No.
3C
3D
4C
4D
3A
3B
3E
4A
4B
4E
8A
8B
5
RO/ROH 3x2 11
Parts List - RO III & ROH III 3x2 Rotor Assembly, Continued
060052138
060052138
060052243
060081346
060081348
060098229
0655492
0655544
0655545
0655546
0655891
0655550
0659206
0659205
Part No.
Slinger, Shaft
Sleeve, Shaft
Description
Qty
2
Item No.
13A
13B
11
12
15
19
20
21
23
25
27
28
46
47
66
RO/ROH 3x2 12
2.6. Seal Parts Lists
Item
No. Qty. Description Part Numbers
1 Seal Kit - Pusher - Carbon (Standard) 0661130-001
Seal Kit - Bellows - Carbon 0661267
Seal Kit - Pusher - Tungsten Carbide 0661268
Consisting Of:
75A 1 Seal - Pusher - Carbon 060087015W
Seal - Bellows - Carbon 060087016
Seal - Pusher - Tungsten Carbide 060087031
RO/ROH 3x2 13
2.6.2. Parts List - Rotating Single Seal 3x2 Pump
Item
No. Qty. Description Part Numbers
1 Seal Kit - Bellows - Carbon (Standard) 060087002
Seal Kit - Bellows - Carbon 060087027
Seal Kit - Bellows - Tungsten Carbide 060087018
Consisting Of:
75C 1 Seal - Bellows - Carbon 060087022
Seal - Bellows - Carbon 060087022
Seal - Bellows - Tungsten Carbide 060087030
RO/ROH 3x2 14
2.6.3. Parts List - Double Seal - 3x2 Pump
Item
No. Qty. Description Part Numbers
1 Seal Kit - Pusher - Carbon (Standard) 0658301
Seal Kit - Bellows - Carbon 0658302
Seal Kit - Pusher - Tungsten Carbide 0659523
Consisting Of:
75B 2 Seal - Pusher - Carbon Face 060087015W
Seal - Bellows - Carbon Face 060087016
Seal - Pusher - Tungsten Carbide 060087031
RO/ROH 3x2 15
2.7. Cautions
2.7.1. Do not re-use o-rings on components during reassembly as they lose their seal
integrity and may leak.
2.7.2. When replacing pick up tube, always replace pick up tube capscrews to avoid
attachment complications.
2.7.3. Never re-use bearing locknuts when replacing bearings as they lose their positive
locking capability when removed.
2.7.4. During rotor cover removal mark location of cover on rotor and location of each
capscrew so that they can be assembled in same location. Failure to do this may
create an out of balance condition making pump susceptible to vibration damage.
2.7.5. Replacement of major rotating component such as rotor or cover will require
rebalancing of rotating assembly.
2.7.6. Be sure all parts are free of dirt, stray metal chips or any foreign matter and have
been thoroughly cleaned.
2.7.7. All torque values given assume lubrication with an anti-seize agent to threads and
underside of bolt heads.
2.7.8. WARNING: When lifting the pump into the vertical position with or without the use of
the assembly stand a swivel hoist ring shall be used in place of the lifting eye.
Reference APPENDIX A Drawing.
WARNING: Before lifting the pump into the vertical position first remove the
lifting eye and install the swivel hoist. When tightening the swivel hoist ring,
torque to 100ft-lbs. Once the pump is re-assembled and in the horizontal
position remove the swivel hoist and re-install the lifting eye. Reference
APPENDIX A Drawing.
2.8.1.3. Remove inlet and discharge lines from manifold. Remove seal flush
lines and drainage piping if applicable.
RO/ROH 3x2 16
2.8.1.4. Seals may be changed with pump in horizontal (mounted) position or
removed from mount and secured in position in which pump shaft is
facing downward. The steps for replacing seal remain the same.
However, extreme care must be taken to avoid face damage during
handling of pump components in the horizontal position.
2.8.2.1. (Flanged manifold only) Remove 4 bolts (61) from the end of the
manifold (36). Now the plug (33) can be removed.
2.8.2.2. Remove the 8 socket head capscrews (64) which secure the pick up
tube (1).
2.8.2.3. Push pick up tube (1) inward until free of o-ring (49). Recommended
use of pick up tube guide (P/N 0600580574).
2.8.2.4. Remove 4 hex nuts (45) which mount manifold (36) to endbell (26).
2.8.2.5. Pull manifold (36) away from endbell (26). When manifold (36) is free of
studs (32) remove pick up tube o-ring (49) and place manifold (36)
aside.
RO/ROH 3x2 17
Figure 2.8
2.8.3.3. Remove 3 set screws (80) and 4 socket head capscrews (71), then
remove the seal plate (70) and seal (75) from the endbell (26).
2.8.3.4. Remove seal cartridge (75) and o-ring (44) from seal plate (70). Clean
seal cavity.
2.8.3.5. Replace seal hub (29), if required seal hub radial runout must be
checked and adjusted as required. Reference section 2.8.6 for seal hub
replacement.
2.8.3.6. Install new o-ring (44) in seal plate (70). Apply light oil to seal cavity.
2.8.3.7. Install and seat seal (75) in seal plate (70). Caution to be taken to avoid
chipping face.
RO/ROH 3x2 18
2.8.3.8. Slide seal plate (70) into the endbell (26) with seal outward and drain
hole to bottom of pump. Install 4 socket head capscrews (71) and hand
tighten. Mount dial indicator on the seal hub to measure radial runout of
the seal plate register diameter (see Figure 2.8 "B"). Max TIR = .002
inch (.051 mm). Slowly turn hub using pump shaft. Adjust the seal plate
by gently tapping it on O.D. until the runout is to spec. Then tighten the
4 socket head capscrews (71) to 20 ft. lbs. (27 mm), then tighten the 3
set screws (80) to 6 ft. lbs. (8mm). Recheck runout, repeat if necessary.
2.8.3.9. Slide mating ring (78) and o-ring (69) on hub (29) and install nut (55).
Torque nut to 26 ft. lbs. (left hand thread)
2.8.4.1. Threaded manifolds - turn manifold (36) so the 2" NPT discharge is
facing downward.
Flanged manifolds - turn the manifold (36) so the 2" port for the
plug (33) is facing downward.
2.8.4.2. Remove seal spacer (76), seal (75) and o-ring (44) from manifold (36).
Clean seal cavity.
2.8.4.4. Apply o-ring lube to new o-ring (44) and in install manifold (36).
2.8.4.5. Install and seat seal (75) in manifold cavity. Caution to be taken to avoid
chipping seal face. Install spacer (76).
2.8.4.6. Remove seal hub nut (55) from seal hub (29) (left hand threads).
2.8.4.7. Remove mating ring (78) and o-ring (69) from hub (29).
2.8.4.8. Remove 3 set screws (80) and 4 socket head capscrews (71), then
remove the seal plate (70) and seal (75) from the endbell (26).
2.8.4.9. Remove seal cartridge (75) and o-ring (44) from seal plate (70) and
clean seal cavity.
2.8.4.10.Apply o-ring lube to new o-ring (44) and install in seal plate (70).
2.8.4.12.Install and seat seal (75) in seal plate (70). Caution to be taken to avoid
chipping seal face.
RO/ROH 3x2 19
2.8.4.13.Replace seal hub (55), if required seal hub radial runout must be
checked and adjusted as required. reference section 2.8.6 for seal hub
replacement.
2.8.4.14.Slide seal plate (70) into endbell (26) with seal outward and drain hole to
bottom of pump. Install 4 socket head capscrews and hand tighten.
Mount dial indicator on seal hub to measure radial runout of the seal
plate register diameter (see figure 2.8 "B"). Max TIR = .002 inch (.051
mm). Slowly turn hub using pump shaft. Adjust the seal plate by gently
tapping it on O.D. until the runout is to spec. Then tighten the 4 socket
head capscrews (71) to 20 ft. lbs. (27 mm), then tighten the 3 set screws
(80) to 6 ft. lbs. (8mm). Recheck runout, repeat if necessary.
2.8.4.15.Slide mating ring (69) and o-ring on hub (29). Install hub nut (55) and
torque to 26 ft. lbs. (left hand thread).
2.8.5. Rotating Single Seal 3x2 Pump (standard seal configuration, reference figure
2.6.2)
2.8.5.3. Remove (4) socket head capscrews (18) and then remove seal mating
plate (70)/mating ring (78) assembly from endbell (26).
2.8.5.4. Remove mating ring (78) and o-ring (69) from seal mating plate and
clean mating ring cavity.
2.8.5.6. Install new o-ring (69) in seal mating plate (70) and apply light oil to seal
cavity.
2.8.5.7. Install seal mating ring (78) in seal mating plate (70). Caution to be
taken to avoid chipping face.
2.8.5.8. Slide seal mating plate (70) into endbell (26) with seal facing outward.
1/2" hole to bottom of pump. Install 4 socket head capscrews (71),
torque to 20 ft. lbs.
2.8.5.9. Slide seal (75) onto hub (29) and set to previous setting or
manufacturer's recommended height. Using set screws, torque to 40 in.
lbs.
RO/ROH 3x2 20
2.8.5.10.On 3-1/2" seals install balance sleeve and o-ring simultaneously with
seal. On 3-1/4" seals install o-ring and seal.
2.8.6.1. Remove the 5 set screws (74) and 5 socket head capscrews (72) that
attach hub (29) to rotor cover.
2.8.6.2. Remove o-ring (51) and clean mating surface on rotor cover (4) figure
2.5.
2.8.6.3. Lubricate and place new o-ring (51) on seal hub (29). Apply light oil.
2.8.6.5. Mount dial indicator on endbell (26) to measure radial runout of seal hub
(29) (see figure 2.8 "A"). Max TIR - .002 inch (.051 NM). Slowly turn
hub using pump shaft. Adjust the hub by gently tapping the flange O.D.
until the runout is to spec. Then tighten the 5 socket head capscrews to
28 ft. lbs. (38 NM). Recheck runout of hub and repeat if necessary.
Tighten 5 set screws to 10 ft. lbs. (14 NM).
2.8.7.1. Clean cavity, lubricate new pick up tube o-ring (49) with o-ring lube and
install in manifold (36).
2.8.7.4. Install 4 nuts (45) on studs and torque to 175 ft. lbs.
2.8.7.5. Using pick up tube pull up tool - (P/N 0600580633), seat tube in o-ring
(49) and install the 8 socket head pick up tube capscrews (64) and
torque to 26 ft. lbs.
2.8.7.6. (Flanged pumps only) install manifold plug (33) and o-ring (48) into
manifold (36). Install 4 bolts (61) torque to 104 ft. lbs.
RO/ROH 3x2 21
2.8.7.7. If pump has been turned vertical, (shaft pointed down) at any time the
pedestal cover (18) should be removed and the oil rings (22) be placed
on their respective slingers (19 and 20). Remount cover (18) on
pedestal.
2.9.1. Preparation. Remove manifold and seals per section 2.8.1 - 2.8.5.
2.9.2.1. Remove the two of nine endbell socket head capscrews (63) which
straddle the vertical centerline. Install the two endbell alignment tools
(P/N 0600580573) in place of the two capscrews. Remove remainder of
the socket head capscrews (63).
2.9.3.1. Remove the two rotor cover drain plugs (8). Inspect and replace if
necessary.
2.9.3.2. Identify rotor cover capscrews (7) to their location so that they may be
re-assembled in same location.
2.9.3.3. Remove the sixteen rotor cover socket head capscrews (7). Thread
three jackscrews evenly into the three tapped jackscrew holes in the
rotor cover until it is released from the rotor.
2.9.3.4. Replace the three jackscrews with three 1/2" eyebolts (P/N 060055411)
and remove the rotor cover (4). Remove the pick up tube (1) and the
rotor o-ring (6).
Lubricate and install o-ring (6) on the lip of the rotor (3). Place the pick tube
(1) in the rotor. Lubricate the o-ring bore in the rotor cover (4) which engages
the o-ring. Place the rotor cover on the rotor. Be sure all holes in the rotor,
as the hole pattern is not symmetrical. Make sure rotor capscrews are
installed in the same location from which they were removed. Tighten evenly
the sixteen rotor cover capscrews to draw the rotor down. It is important that
RO/ROH 3x2 22
the rotor cover does not cock, as the o-ring might be damaged. Torque the
capscrews to 100 ft. lbs.
2.9.6.1. Install alignment tools (P/N 0600580573) in rotor case (31) for
endbell/rotor case alignment. Align endbell so that the 1/2" drain hole is
at the bottom. Carefully slide the endbell (26) into place. Lubricate and
install the nine endbell socket head capscrews (63) and torque to 104 ft.
lbs.
2.9.7. Completion. Re-assemble seals and manifold per section 2.8.1 - 2.8.7.
WARNING: Before lifting the pump into the vertical position first remove the
lifting eye and install the swivel hoist. When tightening the swivel hoist ring,
torque to 100ft-lbs. Once the pump is re-assembled and in the horizontal
position remove the swivel hoist and re-install the lifting eye. Reference
APPENDIX A Drawing.
2.10.2.3.Remove the self locking nut (46) using a bearing locknut torque wrench
adaptor and place bearing locknut aside to be use4d in bearing
installation 2.10.4.
Remove bearing cap slinger (27) and the three hex head bearing
retainer capscrews (58) which secure bearing retainer to the
pedestal (58) figure 2.4.
Remove pedestal cover (18) and position oiler ring (22) to clear
bearings when rotor assembly is being removed, figure 2.4.
2.10.2.4.Thread the 1/2" eyebolts (P/N 060055411) into three evenly spaced
holes at the periphery of the rotor cover (4). Remove the rotor,
driveshaft (5) and bearings from the pedestal. Place the rotor assembly
on a flat surface. Remove eyebolts from the rotor cover and thread in
three 1/2" jackscrews to prevent damage. Install a 5/8" eyebolt into the
end of the shaft with the rotor facing downward and shaft facing up, then
place the rotor on flat surface.
RO/ROH 3x2 23
2.10.3. Bearing removal. Reference Figure 2.5
2.10.3.2.Apply a bearing puller under the drive end oil slinger (20). Remove the
radial bearing (13), the matched pair of bearing spacers (23), thrust
bearing (12), and the oil slinger (20).
2.10.3.4.Slide off the rotor end oil slinger (19). Install three jackscrews in the
tapped holes in the bearing retainer (15). Place a plate of steel under
each of the capscrews between the fins on the rotor (3) and bearing
retainer. Torque these three capscrews evenly until the rotor bearing
(11) and the bearing sleeve (25) comes loose from the driveshaft.
2.10.3.5.Lift off the bearing sleeve (25) with the rotor bearing, the wave spring
washer (66), shaft slinger (21) and bearing retainer (15). Push the rotor
bearing out of the bearing sleeve from the backside and discard.
2.10.4.2.Heat the shaft slinger (21) to 150°-175°F. Check the temperature with a
heat stick.
2.10.4.3.Place the slinger on the shaft (5) against the shoulder as shown in
assembly drawing (Figure 2.5).
2.10.4.5.Install the rotor end oil slinger (19). Use the slinger to tap the bearing
and sleeve down on the shaft.
2.10.4.6.Install a new bearing self-locking nut (47) using bearing locknut torque
wrench adapter, torque to 400 ft. lbs.
RO/ROH 3x2 24
2.10.4.7.Place the drive end oil slinger (20) on the shaft as shown in assembly
drawing (figure 2.5).
2.10.4.9.Install the inner spacer of the matched pair of bearing spacers (23).
2.10.4.10. For Model RO-A: Place the outer spacer of the matched pair of
bearing spacers (23) on the thrust bearing. Heat a new radial bearing
(13A) to 150°-175°F. Check the temperature with a heat stick. Then
place it on the shaft against the inner bearing spacer with the wide face
of the inner race facing away from the bearing spacer.
2.10.4.11. For Model RO-B: Heat the inner race of a new roller bearing (13B) to
150°-175°F. Check the temperature with a heat stick. Then place it on
the shaft against the inner bearing spacer.
2.10.4.12. For Model RO-B Only: Install the outer race of the roller bearing
(13B) in the pedestal bore against the bearing cap (14) Fig. 2.4. Place
the outer spacer of the matched pair (23) of bearing spacers on the
outer race of the roller bearing.
NOTE: Check to see if oil slinger (20) will rotate freely after bearings are
installed. If oil slinger (20) rotates freely, place the shaft sleeve (28),
bearing cap slinger (27) and the used bearing locknut (46) back onto
the shaft. Tighten locknut using the bearing locknut torque wrench
adaptor until the oil slinger (20) is secured. Do not exceed 400 ft.
lbs. (542 NM).
2.10.4.13. Position the two oiler rings (22) in pedestal (17) so that the shaft will
pass through them when the rotor assemble is installed.
2.10.5.2.Lubricate bearing cap O-ring (52) and place in grove in the bearing cap
(14). Install the bearing cap with the drain port down on the pedestal
with three hex head capscrews (60) and torque to 104 ft. lbs. (141 NM).
2.10.5.3.Replace jackscrews with three 1/2" eyebolts (P/N 060055411) into the
holes in periphery of the rotor cover. Lift the rotor assembly by the
eyebolts, and carefully slide the assembly into the pedestal. BE SURE
THAT:
C. The eyebolts have a long enough shank so that they will clear
the rotor housing (31) after the rotor (3) and shaft (5) are in
place.
2.10.6.1.For proper bearing and seal location, dimension "B" (as shown in Figure
2.10.6) must be controlled. Use the shimming bar (P/N 060580635) and
a depth micrometer to measure the bearing & seal location. This
measurement is then subtracted from the number stamped on the
measuring bar. This will give you dimension "B". Refer to the shim
chart (figure 2.10.6) to find the box in which the measured value "B"
falls. (This shims chart is based on shims .015" thick, actual thickness
may vary.)
RO/ROH 3x2 26
Number of 0 or Required 1 2 3 4 5 6 7 8
Shims Required Setting
inches .408 .423 .438 .453 .468 .483 .498 .513 .528
B .422 .437 .452 .467 .482 .497 .512 .527 .542
mm 10.36 10.74 11.13 11.51 11.89 12.27 12.65 13.03 13.41
10.72 11.10 11.48 11.86 12.24 12.62 13.00 13.39 13.77
2.10.6.2.Tilt the pump from its vertical position to a horizontal position. Remove
the capscrews (60) and bearing cap (14), Install the required number of
shims (38) as shown in assembly drawings (Figure 2.4).
2.10.6.3.Replace the bearing cap (14) and the three capscrews (60) and torque
to 104 ft. lbs. Be sure the o-ring (52) is in place.
2.10.6.5.Place a dial indicator on the rotor cover seat (see Figure 2.10.6) and
rotate the assembly by hand. The runout of the seat must be within
.001" (.025 mm) T.I.R.
2.10.6.6.Return pump to horizontal position and install shaft sleeve (28). Put the
bearing cap slinger (27) in place and install a new self-locking nut (46).
Torque to 175 ft. lbs.
2.10.7. Completion.
2.11.1. Preparation. Drain rotor (3) by removing rotor cover drain plug (8). Remove
bearings per section 2.10.1 through 2.10.3.
2.11.2.1.Remove the six socket head capscrews (7) which secure the rotor (3) to
the driveshaft (5).
RO/ROH 3x2 27
2.11.2.2.Mark the driveshaft (5) and the rotor (3) so that they may be
reassembled with the same relative positions for balance
considerations. Thread two capscrews evenly into the two tapped
jackscrew holes in the driveshaft flange until the driveshaft is released
from the rotor.
2.11.3. Hydrostatic pressure test. Pressure test, if desired, can be performed per section
4.0.
Heat the driveshaft bore (1) in the rotor (3) to 140 - 160 degrees F. Check the
temperature with a heat stick. Insert the driveshaft (5) aligning the before-
disassembly alignment marks and driveshaft flange holes with the holes in
the rotor. Install the six socket head capscrews (7). Do not tighten the
screws until the driveshaft and the rotor have reached the same temperature,
then torque to 100 ft. lbs.
2.11.6. Balancing. If rotor has been removed or any rotating components, i.e. shaft, rotor,
or rotor cover replaced; rotor assembly must be balanced in accordance with section
5.0.
2.11.7. Completion. Complete assembly per sections 2.10.5 through 2.10.7. Install rotor
cover drain plug (8) and torque to 13 ft. lbs.
3.1.2.2. Apply a bearing puller under the drive end oil slinger (20). Remove the
radial bearing (13), the matched pair of bearing spacers (23), thrust
bearing (12) and the oil slinger (20).
3.1.2.3. Place the drive end oil slinger (20) on the shaft as shown in assembly
drawing (figure 2.5).
3.1.2.4. Heat a new thrust bearing (12) to 150-175 degrees F. Again, check the
temperature with a heat stick. Place the bearing on the shaft with the
wide shoulder of the inner race against the oil slinger.
RO/ROH 3x2 28
3.1.2.5. Install the inner spacer of the matched pair of bearing spacers (23).
3.1.2.6. Heat the inner race of a new roller bearing (13B) to 150-175 degrees F
and place it on the shaft against the inner bearing spacer.
3.1.2.7. Install the outer race of the roller bearing (13B) in the pedestal (17) bore
against the bearing cap (14). Place the outer spacer of the matched
pair of bearing spacers (23) on the outer race of the roller bearing (13B).
3.1.2.8. Position the two oiler rings (22) in the pedestal (17) so that the shaft will
pass through them when the rotor assembly is installed.
3.1.3.1. Repeat section 3.1.2 except replace section 3.1.2.6 with below.
3.1.3.2. Place both spacers of the matched pair of bearing spacers (23) on the
thrust bearing. Heat a new radial bearing (13A) to 150-175 degrees F
and place it on the shaft against the inner bearing spacer with the wide
face of the inner race facing away from the matched pair of bearing
spacers (23).
4.1. Hydrostatic pressure tests can not be performed on assembled pumps because of possible seal
damage. Hydrostatic pressure test, if desired, can be performed on the manifold, rotor and/or
rotor cover.
4.2. Manifold - Hydrostatic test suction to 1-1/2 times the maximum inlet pressure. Test outlet to 1-1/2
times the maximum discharge pressure shown on pump performance curves. Hold test for 10
minutes.
4.3. Rotor and rotor cover. Hydrostatic pressure test to 1-1/2 times the maximum inlet pressure. Hold
test for 10 minutes.
5.1. If rotor has been removed or any rotating components, i.e., shaft, rotor or rotor cover replaced, the
rotor assembly must be dynamically balanced in accordance with section 5.5.
RO/ROH 3x2 29
5.2. Rotor cover installation. Lubricate and install o-ring (6) on the lip of the rotor (3). Lubricate the o-
ring bore in the rotor cover which engages the o-ring. Place the rotor cover on the rotor. Be sure
all holes in the periphery of the rotor cover line up with the tapped holes in the rotor, as the hole
pattern is not symmetrical. Make sure rotor capscrews are installed in same location from which
they were removed. Tighten evenly the sixteen rotor cover capscrews (7) to draw the rotor cover
down. It is important that the rotor cover does not cock, as the o-ring might be damaged. Torque
the capscrews to 100 ft. lbs.
5.3. Completely fill rotor cavity with liquid of required specific gravity. Seal off.
5.5. Two plane dynamic balance using surface A and B shown on figure 2.5. Trim balance to 1/2 of
the out of balance by drilling as indicated on figure 2.5. Balance to within the following limits at
975 to 1000 RPM: Caution: Sufficient guarding should be used when balancing the rotating
assembly.
5.7. Remove rotor cover (3) to prepare for next assembly step. See section 2.9.4.
RO/ROH 3x2 30
6. PARTS
RO QTY
ITEM 3x2 REQUIRED
Bearing Kit
Direct Drive 06P661017 1
Belt Drive 06P661017-001 1
Seal Kit* (standard)
Single Rotating 060087002 1
Single Stationary 0661130-001 1
Double Stationary 0658301 1
Pick-up Tube Replacement Kit, 06P661017-003 1
Nitrile
Hub Nut/Stationary Seal 0655735 1
Pedestal Cover Gasket 0655601 1
Rotor Cover Drain Plug, Nitrile
Stainless Steel 060068677 2
Steel 060068656 2
* Pump may have been purchased with special seal kit. Be sure to
order correct seal kit. Refer to section 2.6.
RO/ROH 3x2 31
6.2. Parts List - Auxiliary Equipment
BYPASS ORIFICE
6.3.1. General - It is Roto-Jet Pump's policy to continually improve its products. Therefore,
specifications are subject to change without notice. Parts should be ordered as far in
advance of their use as possible since circumstances beyond our control may reduce
existing stock.
6.3.2. Placing Orders - The satisfactory ordering and receiving of parts is dependent upon
specific and correct information supplied by the purchaser. A specification sheet for
each unit manufactured is on file at the factory, and in case some special part is
needed, it can be provided if the correct model and serial number is given. Many
unnecessary errors and delays may be eliminated by observing the following
instructions.
With this assistance, the time required to expedite your order will be greatly
reduced.
6.3.3. Assistance - Should you need any assistance, please contact the factory or nearest
regional office listed on the back cover.
RO/ROH 3x2 32
7. MAINTENANCE RECORD
RO/ROH 3x2 33
8. APPENDIX A
RO/ROH 3x2 34
For optimum service and technical assistance,
please contact our factory for the distributor or representative
nearest to your project:
Excellent
Engineering
Solutions
Specifications in this manual are subject to change without prior notification Manual # RJ-DA-2 (09/14))
© 2013