Professional Documents
Culture Documents
Draft Print: Draft HRM PTO Generated On: 23 Mar 2022 09:44 AM
Draft Print: Draft HRM PTO Generated On: 23 Mar 2022 09:44 AM
T
Rejoining Date is 04/03/2022
KOTHALI
12/03/2022 Gtd 1 day EL upto 12/03/2022.
IN
13 Mar 2022 being sunday
Sh LAXMAN
Rejoining Date is 01/03/2022
MALLAPPA KURBAR
04/03/2022 Gtd 2 days EL upto 05/03/2022.
06 Mar 2022 being sunday
A
PART-IV -NIL-
( HL Guddadamani)
AE (Civ)
AGE 'Tech'
for Garrison Engineer
Distribution:-
1) HQ CESC Pune 2) HQ CECZ Chennai
3) PCDA Bangalore 4) CWE No.2 Secunderabad
5) CWE (Navy) Vasco 6) AO GE Belgaum
7) LAO Panaji
Certified that all the individuals who are/were granted leave in PTO are/were likely to return, on expiry of their
leave to the station from the where they proceeded on leave.
Draft HRM PTO generated on: 23 Mar 2022 09:44 AM AE (Civ) Continued...