MINISTRY OF RAILWAYS
(RAILWAY BOARD)
*****
Sanction of the President is hereby communicated for the Revised Estimate of Bhairabi-
Sairang (51.38 km) new line project amounting to ^5021.45 crore (Rupees five thousand twenty one
crore and forty five lakh only) with the following break-up:
S.No. Departments Cost(Rs. in Cr.)
1. Civil Engg. 4682.26
2. Elect. Engg.(0) 108.41
3. Elect. Engg.(TRD) 52.18
4. S&T Engg. 45.00
5. Mech. Engg. 59.39
6. Security 74.21
Total; 5021.45
2. This issues with the concurrence ofthe Finance Directorate ofthe Ministrv of Railways
Hi?
(PanI aj Kufnar)
Director Works-Il
Railway Board
No.97/W-1/NL/NF/12
New Delhi, dated: I ^ -.10.2019
Copy to:
flit
(u) Maligaon, Guwahati.
WDO,F(X)-II and Budget Branches, Railway Board
(ill) PS/MR-for kind information of Hon'ble MR as per Office Order No.37 of2019.
(NFR/Sanctian Letters)
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
Sub: Sanction of New Bongaigaon - Agthori via Rangiya doubling (142.97 km)
included in Budget 2013-14.
Competent authority has accorded sanction to New Bongaigaon - "Agthori via Rangiya
doubling (142.97 km), included in.Budget 2013-14 as per the details given below:
2. This issues with the concuiTence o^jje Finance Directorate of the Ministry of Railways.
(Pankaj Kumar)
Director Works-II
Railway Board
No. 2017/W-I/NFR/DPR/Bongaigaon-Agthori New Delhi, dated: -08.2019
Copy to:
{NFR/Sanction Letters)
cElc.\a.
g^MENT OF INDIA
llY OF RAILWAYS lA.a«
AVAY BOARD)
StyrVcikA
(PankaJ^Kumar)
Director Works-ll
Railway Board
jiWoiflNXRaihvay.Maligaon. Gu\rahati.
TnT" The Principal Director of Audit, N.F. Railway, Maligaon. Guwahati. on t d -i
(iii) The Deputy Comptroller and Auditor General of India (Railways), Room No. 224, Kan
Bhavan, New Delhi.
an Head-3000
iflfoeable to Capital
Civil Engineering
Electrical S&T Grand Total
State Engineering Engineering (In Eto.)•
Railway
PW(Road)
Gross Cost 107091060/'476216441 2301687./^ 686608058 7^^
inds: To be provided from budgetfor 2019-20 Pink Book Item No. 102 of 2019-20 Direct or by re-approprlatlon
^idence and ailocaQon verified (Subject to the Ched( note attached). No. Dated...
Is requires sanction of the CAO/CON/1.
Sanctioned
'd^
FJK&CJLOlCOm CAO/CON/1 (
N.F.Rallway.Mallflaon. N,F.Rallway,Mallgaon,
."3GOVERNMENT OF INDIA ^,
^^"NISTRY OF RAILWAYS -
(RAILWAY BOARD) ^
/\0 *****
General Manager/Const.,
Northeast Frontier Rmlway,
Guwahati.
iSub: Completion Estimate for new line between Kumarghat - Agartala(109 km).
Ref: N.F. Railway's letters No.
(i) W/98/CON/KUGT-AGTL/2°'^ Revised dated 18.07.2017 and
(ii) W/98/CON/KUGt-AGTL/2'"^ R.E. dated 16.07.2018.
Completion Estimate for new line between.Kumarghat - Agartala (109 km) amounting to
^1733.20 crore has been pruned down to 1 1731.78 crore, as per list of deletion/reductions enclosed
as Annexure-I; ' , .
3. This issues with the concurrence ofthe Finance Directorate ofthe Ministry of Rmlways.
DA : Deletion List. ^^ ^
(Dhananjaya Singh)
Director Works-II
Railway Board
Nn.2017AV-1/NFR/2"'' RF/TCmnarghat-Agartala
CompletioD Estimate for new line between Kumarghat - Agartala(109 km).
/r T.TST OF DET.ETTQNS / REDUCTION
(2) Security Cost(@ 1.5% oftotal cost) has been reduced proportionately.
*****
(NFR/Sanction Letters)
OVERNMENT OF INDIA
NISTRY OF RAILWAYS
(RAILWAY BOARD)
1.®"!
\
he General Manager/Const.,
Northeast Frontier Railway,
Guwahati.
Sub: Completion Estimate for new line beDveen Kumarghat - Agartala (109 km).
Ref: N.F. Railway's letters No.
(i) W/98/CON/KUGT-AGTL/2"''Revised dated 18.07.2017 and
(ii) W/98/CON/ KUGT-AGTL/2"''R.E. dated 16.07.2018.
Completion Estimate for new line between Kumarghat - Agartala (109 km) amounting to
^1733.20 crore has been pruned down to ^ 1731.78 crore, as per list of deletion/reductions enclosed
as Annexure-I.
3. This issues with the concurrence of the Finance Directorate of the Ministry of Railways.
DA:Deletion List.
(Dhananjaya Singh)
Director Works-II
Railway Board
Copy to:
(i) The FA&CAO/Con.,Northeast Frontier Railway, Maligaon, Guwahati
(ii) Principal Director of Audit, Northeast Frontier Railway, Maligaon, Guwahati.
^ii) Dy. Comptroller & Auditor General of India(Railways), 224, Rail Bhawan,New Delhi.
let
for Financial Commissioner(Railways)
(NFR/Sanction Letters)
i
ANNEXURE-I
S.No. Description of Item Qty Rate proposed Total Cost as Rate Total Cost as
by Railway proposed by proposed by proposed by
Railway Electrical Electrical Dte.
Dte. of Board of Board
17
A B C D E X-
S.No. Type of Quarter Qty Rate proposed Total Cost as Rate Total Cost as
by Railway proposed by proposed by proposed by
Railway Electrical Electrical Dte.
Dte. of Board of Board
A B C D E F
1 Tvpe-I 66 24066 1588356 24066 1588356
2 Type-II 465 65782 30588630 50699 23575035
3 Type-Ill 68 73291 4983788 53907 3665676
4 Type-rV 30 198520 5955600 71140 2134200
5 Type-V 2 212837 425674 85000 170000
Total 43542048 31133267
Net Ret uction Amount in Rs. 12408781
(D-F)
Say Rs. 1.24 Cr.
(2) Security Cost (@ 1.5% of total cost) has been reduced proportionately.
(NFR/Sanctlon Letters)
(Woo
WrfcW.
^nfePM. Uc(i^|(0-11
^.W/98/CON//KUGT-AGTiy2nd RE(Modified) Dated; 26.04.2019.
1) Dy.Chief Engineer/CON-l/AGTL
N.F. Railway, Agartala,
2) Dy.CEE/CON/AGTL,
N.F. Railway, Agartala
3) Dy.CSTE/CON/AGTL
N.F. Railway, Agartala
4) Dy.CME/PLG/MLG
N.F. Railway, Maligaon
5)Dy.CSC/CON/MLG
N.F. Railway, Maligaon
■5.
copy to:-
1. CE/C0N-8/MLG :-for kind information please.
OVERNMENT OF INDIA
STRY OF RAILWAYS
OEIAILWAY BOARD)
\
S/-
No. 2017/W-I/NF: arghat^Agartala ■ V . New Delhi, dated: 0^ .04.201^
Sub: Completion Estimate for new line between Kuinarghat - Agartala(109 km).
Reft' N.F. Railway's letters No. , -
(i) W/98/CON/KUGT-AGTL/2"'^ Revised dated 18.07.2017 and
(ii) W/98/CON/I^GT-AGtL/2"^ kE.dated IW^ .
Completion Bstimate for new line between Kumarghat - Agartala (109 km) ainoimting to
^1733.20 crore hasSedh pruhed down to? 173-1.78 crore, as per list of deletidnyreductions enclosed
as Annexure-I. ^ .v
3. This issues vdth the concurrence of the Finance Directorate ofthe Ministry ofRmlways.
DA:Deletion List.
(Dhananjaya Singh)
Director Works-II I
Railway Board
(NFR/Sanction Letters)
OVERNMENT OF INDIA
STRY OF RAILWAYS
(RAILWAY BOARD)
0 >(f A***
General Manager/Const.,
Northeast Frontier Railway,
Guwahati.
! Sub: Completion Estimate for new line between Kumarghat - Agartala(109 km).
Ref: N.F. Railway's letters No.
(i) W/98/CON/KUGT-AGTL/2°''Revised dated 18.07.2017 and
(li)!w/98/CON/KUGT-AGTL/2"''R.E. dated 16.07.2018. i
Completion Estimate for new line between Kumarghat - Agartala (109 km) amounting to
?1733.20 crore has been pruned down to ? 1731.78 crore, as per list of deletion/reductions enclosed
as Annexure-I. • ■
3. This issues with the concurrence ofthe Finance Directorate ofthe Ministry ofRailways.
DA ; Deletion List. ^ ^
(Dhananjaya Singh)
Director Works-II
, Railway Board
Copy to:
(i) The FA&CAO/Con.,Northeast Frontier Railway, Maligaon, Guwahati
(ii) Principal Director of Audit, Northeast Frontier Railway, Maligaon, Guwahati.
(iii) Dy. Comptroller & Auditor General ofIndia(Railways), 224,Rail Bhawan,New Delhi.
(NFR/Sanction Letters) xV
government of INDIA
ministry of railways
(RAILWAY BOARD)
•iSr«S:TiS!4r:ilr
New^^^hi,dated
No.97/W-1/GC/NF/4
This issues with the concurrence ofthe Finance Directorate ofthe Ministry ofRailways.
(Dhananjaya Singh)
Director Works-II
Railway Board
vjpF-
c'^
OF INDIA
ISTRY ILWAYS
8 ILWA ARD)
Sanction of the President is hereby communicated for the 2"'' Revised Estimate of Dudhnoi-
Mendipathar (19.47 km) new line project amounting to ^315.63 crore (Rupees three hundred fifteen crore and
sixty three lakh only) with the following break-up:
2. This issues with the concurrence ofthe Finance Directorate of the Ministry of Railways.
(Dhananjaya Singh)
Director Works-U
Railway Board
Copy to:
(i) The FA&CAO/Con.,Northeast Frontier Railway, Maligaon, Guwahati.
(ii) Principal Director of Audit, Northeast Frontier Railway, Maligaon, Guwahati.
(iii) Dy. Comptroller & Auditor General ofIndia(Railways), 224, Rail Bhawan, New Delhi.
(NFR/Sanction Letters)
GOVERNMENT OF BVDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
ie-k*ie*
Sanction of the President is hereby communicated for the Revised Estima te of Agartala-
Sabroom (114.134 km)new BG line project amounting to ^407.03 crore(Rupees thr^ thousand four
hundred seven crore and three lakh only) with the following break-up:
S.No. Departments Cost^in crore)
1. Civil Engineering 3065.74
2. Electrical Engineering 99.58
3. S&T Engineering 83.11
4. Mechanical Engineering 75.50
5. Security Cost@ 1.5% 49.86
6. Environmental Charges(^1% 33.24
Total: 3407.03
2. This issues with the concurrence ofthe Finance Directorate ofthe Ministry ofRailways.
(Dhananjaya Smgh)
Director Works-II
Railway Board
No.98/W-1/NL/NF/6 New Delhi, dated: 12^.II.2018
Copy to:
(i) The FA&CAO/Con.,Northeast Frontier Railway, Maligaon, Guwahati.
(ii) Principal Director of Audit,Northeast Frontier Railway, Maligaon, Guwahati. j
(iii) Dy. Comptroller & Auditor General ofIndia(Railways),224, Rail Bhawan,New Delhi.
^^5
u (i()vi:uNMi:Nr<)iMNi)iA
MIMSno (M-UAIIAVA>.S
(HAIIAVAV IIOAUP)
2. Accordtnoly. soncilun of llie Prcsidcni is hereby communicalcd lo the Revised Estimate for
net
patch doublinti of Luinding-Hojoi (46.12 km) ut u cost off 614.81 crorc (Rupees six hundred
:is
fourteen crorc and eighty one lakh only). Tlic deparimeni-wisc brcrik-up ofcost is as under.'
s. S.No. Pcoarlmcnls Cost(7 In crorel
1. Civil Enng. 519.75
rum
2. Elect. Ennr*. 28.47
3. S&T Ennr;, 51.59
.*11 U]
4. Enviroiuncnial works 6.UU
5. Security gnn
led
Total:
liny 6I4.HI
3. Tliis issues with Ihu concurrence ofthe I'innncc Dlrccloralc ofthe Ministry of Rnilways,
(UhananjayS^lnRli)
ill v#> DIreelor Works-ll
Uullw.iy Donrd
t 10
y; No-20I2/W-1/NF/DL/Hojai-Lumding New Dcllji. dated: .09.2018
^ }ii') Oy.Con.p.roiler&Audito;Oeneru...ri„diu;uH:^^^^
(Hi) ouwahati.
Wf
I
(i) TheCAO/Con.,N.F. Railway, Ouwahati
(H) WDO. F(X)II and Oudget Branches. Railway Board.
■"i
n*'VU«(iiiRUiun|
A
ItXl'
Scanned by CamScanner
'
:J
OF INDIA
MlMSTR-i Oi" :iAH.\VA\'S
(HA1}.\Vay HOaUD}
i n iyr A
No. 20)
■f fM ■IStijiii-! uiiuiiaj:
New LVfiii, JaiL-ti; 06.09.3018
Ml,,,;,p,
NohIk'jim I.h„„„.,
Qm
prc'^
cms
'^uiric;sure>I. .21
as
2
P«cl) doDblir.y o(- f Mmmimicaled to [|ic Revised E-iinai f
\L't
d 5. yecnritv
y
ToCaJr
'i® V=-.
(Efimii;njaj.a Singh)
director Vi^orlic^n
K:!i%ny Board
C/r (I^NCopyiK New Delhi, daicd: .09.2018
tl.p''' ...•
w Delhi.
^Yl ^
Copy forvmrdcd so: fO'-WnandnlComnnV
"■commissioner {ft,
CO HieCAO/Con NF ^
1-i.ijivvay Board,
rHFRy-i^CtKsiLftTJfrrj)
5
GOVERNMENT OF INDL
MINISTRY OF RAILWAYS
cM,
(RAILWAY BOARD)
2.- This issues with the concurrence of Finance Directorate of Ministry of Railways.
Copy to: (i) The Chief Admn. Officer (Construction), N.F. Railway, Guwahati
(ii) F(X)II, (iii) Budget, & (iv) WDO Branches, Railway Board.
Jf-
■
N. F. RAILWAY
ABSTRACT COST Or WORK.
(Oute!- Sheet)
Ofnce of the GM/CON/MLG
Department: Engineering (Con.)
Estimate No: CE/CON/il Of 2017-18 N.F.Rallway, Maiigaon
Framed by Sri Anil Kurrlar Designation: CE/CON/5 Station/ Mileage. 142.97 Km.
Region: Assam.
Name of Work;- Modified Pt.-I Detailed Estimate for Final Location, Pre Construction Activities, Geo-Technical Investigation and Detailed Design of Bridgesfor Doubling of B G Line from
BengaigaontoAgthorl ViaRangia. ■ » • •
Plan No,
Reference Pink book Item No.35 of 2016-17
ESTIMATED COST Original total ALLOCATION
Sub Heads Work Materia Stores in Stores total in case of Capital D.F. D.R.F. O.L.W.R. Ordy. Deposit Misc. Total
of Work Stock to be revised revenue Adv.
purchased estimate
Funds: To be provided from budget for 2017-18 Pink Book Item No. 35 of 2017-18 Direct or by re-appfopriation - — Direct
DSted
Sanction registered as
incidence and allocation Verified (Subject to the Check note attached). No Dated
Approved
v.
Mechanical 38.50
Total 602.27
(Rupees six hundred two crore and twenty seven lakh only)
Estimates are included in the Detailed Project Report of the aforesaid
M Estimates
No.F(X)ll/2016/PW/3/Pt.3 also stand as
dated 06.01.2017 sanctioned in terms of cost
per department-wise Railway
givenBoard's
above.letter No.
o if ^°st of the project as authorised vide Railway
abovethe
project should be taken as base cost of the project for deciding estimated costauthority.
competent of the aforesaid
4. This issues with the concurrence of the Finance Directorate of the Ministry of Railways.
(DhananjayT^gh)
Director(Works-ll)
Railway Board
No. 2016/W-II/NCR/NL/36
New Delhi, dated 08.2017
Copy to:
i) The FA & GAO(C), Northeast Frontier Railway, Maligaon,Guwahati
ii) The Principal Director of Audit, Northeast Frontier Railway, Maligaon,Guwahati
iii) The Deputy Comptroller & Auditor General of India (Railways), Room No 224
Rail Bhawan, New Delhi. '
V ■ ■
i.
'0^
m
N. F. RAILWAY
ABSTRACT COST OF WORK.
(Outer Sheet)
OFFICE OF THE GM/CON/IVILG
Engineering (Con.) N.F.Railway, Maligaon
Estimate Wo: CE/CON/7 Of 2015-16
Framed by : B.S iVlEENA Designation : CE/CON/3 Length^ 110.15 Km
Region: N. F. Railway Division - Lumding Reference- Original Pink Book item No 8 of 2007-08'
Name of Work:- Ist Revised Estimate for Construction of new B.G. railway line from Arrarlya to Galgalla (Thakurganj) CurrentP.B. item No 8 of 2017-18
•>
Plan No
ESTIMATED COST Original total ALLOCATION
Sub Heads Work Material Stores in Stores Total in case of Capital D.F. D.R.F. O.LW.R. Ordy. Deposit Misc. Total
of Work Stock to be revised revenue Adv.
purchased estimate
Funds : To be provided from budget for 2017-18 Pink Book Item No. 8 of 2017-18 Direct or by re-appropriation
Incidence and allocation verified (Subject to the Check note attached). No Dated ..
This requires sanction of the Railway Board.
proyjed
-.A&C.A.O/COh!/l[ )/CON/ll
.F.Railway,i\/ialigaon. M.F.Railway.IVIaliqaon.
1 i.-j
ABSTRACT COST OF WORK.
(Outer Sheet)
OFFICE OF THE
General Manager(Construction)
Department: Engineering (Con.)
N.F.Rallway, Mallgaoh
Estimate No: CE/CON/7 of2015-16 Designation: CE/CON/3
Framed by : B.S.Meena. Station or Milage =110.15 Km
iReglon: ,o,,„„s.ruo.,c„ c„sw B.G. Ra.lwayllna ,rona ARARIVAGALGALIA(THAKURGANJ)naw
ESTIMATED COST
Original tota!
Ordy.reve Deposit Mlsc.Adv. Total
Stores In case of D.R.F. O.L.W.R.
Sub Heads Stores In Capital D.F. nue
Total revised -
Work Material to be
of Work Stock estimate
purchased
iPlan Head • 100
Icharaeablfl to Capital Amount as per Amount as per Variation
Department. Sanctioned Estimate proposed in Rs.
Revised Estimate.
Funds:
To be provided from budget for Pink book item No.8 of 2015-16
Signature
Report and justification:
Specification....
B.S^eena.
Designation: CE/CON/3
Sanction registered as
Dated
No.
Dated..
Incidence and allocation verified (Subject to the Check note attached). Approved
This requires sanction of the Railway Board.
V
N.F.Railway
ABSTRACT COST OF WORK
(Outer Sheet)
Office of the Dy.CE/CON-ll/LMG
N.F.Railway, Lumding
Department: Engineering/CON
Estimate No: CE/C0N/^(7 of 2017-18
Framed by:J.K. Choudhary Designation: Dy.CE/C0N-li/LM6
Region: N.F.Rly District: Lumding Division
Station of Mileage: 180.00 km.
Name of work Reconnaissance Engineering cum Traffic survey for new B6 line from Chaparmukh to Jowai (180.00 Km.)
Reference:- RIy Boards l/No. 2013/W-i/Genl./Survey New Delhi dt. 21.12.2016
Plan No
Sub Estimated Cost Original total incase ALLOCATION
Heads of Work Material Stores in Staff Stores to be purchased Total of revised estimate Capital D.F. D.R.P O.L.W.R Ordy. Deposit Misc. Adv. Total
work Revenue
345.A
Indian Riy. Policy Formulation
Direction Research and other Misc.
Organisation Commercial lines Gross 5376236.00
Demand No. 2 Credit 0.00
Survevs Net 5376236.00
Specification Designation:
Dy.FA&C.A.O/CON/MLG -i
u\
SN--23
N.F.Railway
ABSTRACT COST OF WORK.
(Outer Sheet)
OFFICE OF THE
GENERAL MANAGER
Department; Engineering (Con.) N.F.Railway, Maligaon
Estimate No: CE/CON/28 of 2016-17
Framed by : Niimani Brahma Designation : CE/CON/9 Station or Milages 19.100 KM
Region: N.F.R. Division : Lumding
Name of Work:- Part •![ Revised Estimate for the Construction of New B.C. line from Byrnihat to Lailad (19.10 Km)as a part of New B.G line from Byrnihat to Shillong (108.36 Km)
Reference :• Original Pink Book item No.16 of 2010-11
Plan No. Current Pink Book item No 16 of 2016-11
Chargeable to Capital Department Cost as per Part-! &1I Cost as perPart-ll Variation
sanctioned Detailed Estimate 1st Revised Estimate t
Incidence and allocation verified (Subject to the Check note attached). No. Dated
This requires sanction of the General Manager/construction fN.F.Railway
Approved Sanctioned
-V
F.AfiC.A.O/CON/I Chief Administrative Officer/CON/i General Managet/CON
N.F.Railway,Maligaon.. ..Vtv / N.F.Railway,Maligaon. N.F.Railway,Maligaon.
\
N. F. RAILWAY
ABSTRACT COST OF WORK.
(Outer Sheet)
OFFICE OF THE GWI/CON/IVILG
Department: Engineering (Con.) N.F.Railway, Maligaon
Estimate No: CE/CON/2/t-of 2016-17
Framed by : B.S. MEENA Designation t CE/CON/3 Length= 36.52Km
Region: N.F.R. District : Division: KIR-APDJ Reference- Pink Book item No 31 of 2016-17
Name of Workilst Revised Estimate for Construction of Double line from Ambari Falakata to New Mainagurl.(36.52km) Original P.B.item No 29 of 2011-12
Plan No
ESTIMATED COST Original total ALLOCATION
Sub Heads Work Matenal Stores in Stores Total in case of Capital D.F. D.R.F. O.LW.R. Ordy. Deposit Misc. Total
of Work Stock to be revised revenue Adv.
purchased estimate
Plan Head •1500
Funds: To be provided from budget for 2016-17 Pink'Book Item No. 31 of 2016-17 Direct or by re-appropriation • Direct
No
Sanction registered as
Incidence and allocation verified (Subject to the Check note attached). No Dated.
This requires sanction of CAO/GON.
anctio
K
■ "f"
N. F. RAILWAY
ABSTRACT COST OF WORK.
(Outer Sheet)
ABSTRACT COST OF WORK.
OFFICE OF THE GM/CON/IVILG
Department; Engineering (Con.) N.F.Railway, Maligaon
Estimate Nc CE/CON/22 of 2016-17
Framed by : B.S. MEENA Designation: CE/CON/3 Station or Milage = 3.5 Km
Region: N.F.R. District :
Name of Work:- The Detailed Estimate for Construction of a new Railway line from Haldibari to Bangladesh Border for connection with Chiiahati(Banqiadesh)
Plan No * ^ 'Reference :- P.B item No.22 of 20ie-17
ESTIMATED COST Original total ALLOCATION
Sub Heads Work Material Stores In Stores Total in case of Capital 1 D.F. D.R.F. O.L.W.R. Ordy. Deposit Misc.
of Work Stock to be revised revenue Adv.
purchased estimate
Chargeable to Capital
Funds: To be provided from budget for 2016-17 Pink Book Item No.22 Director by re-appropriation DIrecL--—— *\ \\f\A\ V il \
Report and Justification
Specification ....
Signature
B.S.MEENA
Drawing and annexure: Designation : CE/CON/3
No..^.A^./..c^^rvi..i■..■?..c./..df:.f^.0.kv^^^^../^.5^■.?r^/^ Dated Sanction registered as
Incidence and allocation verified (Subject to the Check note attached). No Dated
This requires sanction of CAO/CON/II
A111If
F.A & C..A.O/cbN'/ll
N.F.Railwav.Mallqaon. N.F.Railwav.Mallqaon.
LA
■•v.
M ^.
V. <1} GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
Sub: Sanction of Haldibari - Chilahafi (Bangladesh) new BG line (3.5 km) included in
Budget 2016-17.
Competent authority has accorded sanction to Haldibari - Chilahati (Bangladesh) new BG line (3 5
km) included in Budget 2016-17 as per the details given below:
2 As Detailed Estimate H included in the Detailed Project Report of the aforesaid project, Detailed
06 m 2017 sanctioned in terms of Railway Board's letter No. 2015/W-I/Gen./Corr.GM/Pt.n dated
revision is to be carried out in the cost of the project as authorized vide Railway Board's letter
Tslf^
as base cost;"cm
of the project for deciding the competent authority. 'he aforesaid project LuTd be taken
4. This issues with the concurrence of the Finance Directorate of the Ministry of Railways.
(Dhananjaya Singh)
Director Works-II
■ rS ^ Railway Board
No. 20I7AV-]/NFR/Haldibari
New Delhi, dated: .06.2017
Copy to:
(i) The FA&CAO/Con., N.F. Railway, Maiigaon, Guwahati.
(ii) The Principal Director of Audit, N.F. Railway, Maiigaon. Guwahati.
Comptroller and Auditor General of India (Railways), Room No. 224, Rail Bhavan, New
A Railway portion :
1 Construction of ROB (Railway portion only) Civl Enqq. portion 47549272.50 47549272.50
95098645.00
Contingencies charges @ 1.00% 950985.00 475492.50 475492.50
(Outer Sheet)
OFFICE OF THE
ent: Engineering (Construction)
No; CE/CON/17 of 2016-17
General Manager(Construction)
by : Shri B.S.Meena Designation :CEyCON/3 N.F.Rallway, Mallgaon
N.F.Rallway.
e of Work:- Part Detailed Estimate for Geo-technlcal and Sub-soil Investigation Work for road over bridge (ROB) In lieu of level crossing No. NC-5 In between
stations RangapanI - New Jaipalguri of Katihar Divlsjon.
Reference:- Pink Book Item No.117 of 2016-17
s: Available To be provided from budget for 2016-17 Pink book Item No. 117 of2016-17 Direct or by re^appropriation
port and justification:
Specification .... Signature
(Shri B.STf
Drawing and annexure: Designatfon: CE/CON/3
■X.
i
FA&CAO/CON-II, Chief Adrtostrativ^fflcer/CON-2
N.F.Railway.Maliga'on. N.F.Rltiway;Ma|jgaon.
N. F. RAILWAY
ABSTRACT COST OF WORK.
(Outer Sheet)
Office of the GM/CON/MLG
Department: Engineering/Con. N.F.Railway, Maligaon
Estimate No: CE/CON/10 of 2016-2017
Framed by : Anil Kumar Designation: CE/CON-5
Region :Assam District : Station of Mileage: 142.97 Km.
Name of Work.-Part Detailed Estimate of Final Location Survey for Construction of BG Double line Prom New Bongaigaon to Kamakhaya Via Rangiya.
Funds: Available To be provided from budget for Pink Book Item No.35 of 2016-17 Direct or by re-appropriaticn
Sanctioned
GOVERNMENTOF INDIA
MINISTRY OF RAILWAYS
(RAILWAVBOARD)
. Compelent ati'thoriiy h^ accoided sanction to New Bongaigaon - Kam&kHya via Goalpara doubling
(i76 km)included in Budget•1015^16 as i^rtlie [details-.given beioV: ■ • ''.
Name of . the. Pep^irtmeut • 1 I.. '. .-..sEsti'matedcpst' Expenditure '
Piroiect . ;. • (Y in crtfre) chargeable to
New Bongaigaon Civil •,->- 1.951.15 • Gross Budgetaf)'
Karaaichya- via' ■Elecmcal'. 3 ' 111.25 Support(GBS);
Goalpara doubling .Siaiar& Telecom 135.08
1.85-
I
projMt(176 kn\} " " Mechanical " "
i
Security 32.99
. ! •
Total ■ . - ■ 2232.32
Two" thousand two hundred thirty
two crdre ahd'lHiftV two lakli only) . I - . *
'2.' ■ ■ As Detailed -Esliraatc-.i^ included in. tJi® Detailed Project Report, of the aforesaid jsroject, Detailed
Esiitnale'also stands "sanctioned in.temx"? of Raihvay 'Boafd'S. letter Mb. 20I5/WI/Gen./CorT.GM/Pt.m dated
03.08.2015. ■ ■ , ■ . . " ■ . . '
• 3; If any revision is to be carried out in tlie'cosl of the-projeci as authorized vide Railway Board's letter.
No. FCX)ir-20l4/'PW/l Pr.n dated 30.1Q.:^15, above estimated cost of the aforesaid project should bs takcn_
as base^cosi ofthe,project for deciding the competent.authoriiy.
.-4. This issues with the con'cun-ence.cf the Finance Directorate of the Ministry. oFlUilways.
(Dfaananjaya Singh).
Director Works-ll
RailM'ay Board
N,o, 2015/W-l/NFR/DPR/bL/New Bongaigaoh-Ka;makhya ■ ' C'O ' ■ New Delhi, Dated: ;i>5, .09.2016
/Copyto; ■ ■ " • . ' ■■
/i) The FA&GAO/'Con.,N.F: Railway, M:a!igaon,.Guv\^hati. ■ i
l(ii) • ThePrincipalI>irectprbfAuditjK.F..Raihvay,MaligaonLGuwahati. * L.
(lii) The Deputy Comptroller and'Aiiditbr Gerieral.of India (Railways), Room No. 224,9lajl-Bhavan, New
t . forFinancial Commissioner/Railways
i
GOVERNMENT OF INDU
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
32.99
1 . .
Security . !
Total , • 2232.32
Two" thousand two hundred ^rtj'
two drore arid thirty two lakli only) .
2. ■ As I^tailcd Estimate,is incjuded in the Detailed Project Report of the aforesaid jjioject, Detailed
Estimate also stands 'sanctioried in.terras of Railway'Boaid's letter-NO. 2015/WI/Gen./CorT.GM/Pt.m dated
03.08.2015. ■ ■ : - .
3; . If any revision is to be carried out in tliecosl of the project as authorized vide Railway Board's letter
No. FOTII-2014/ipW/l Pt.II dated 30.10.2015, above estimated cost of 'the aforesaid project should be taken^
as base cost of the project for deciding the coini^tent authority.
4. This issues with the cbhcurrence.of the Einarics Directorate of the Ministry of Railways.
- . . . . . V . • . (Dhananjaya Singh)..
• • Director Worte-II
Railway Board
Sanction of tht: President is hereby communicated to the Revised Estimate for construction
' khundred seventy three crore
Jogbani-Biratnagar (18.60
and eighty seven lakh km)
only).at The
a cost of Rs.373.87 crore
department-wise (Rupees
break-up ofthethree
cost
IS as unden
(Dhananjaya Singh)
Director Works-U
^ Railway Board
No.2016/W-l/NF/RE/Jogbani.Biratnagar New Delhi,dated: 22.06.2016
Copy to:
(NFR/SancBon Letters)
^ .... . >>-iP
; „s>V^ .^' -'"j'^t\-J^\-rJf4
GOVERNMENT OF INDIA
CH'
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
»**♦*
Sub: Sanction of Final Location Survey of Dimapur-Tizit (257 km) New Line on N.F.
Railway.
2. The work of Dimapur-Tizit (257 km) new line has already been included in Budget 2013-14
subject to requisite approvals. In order to process for further approvals, DPR has to be prepared.
; .in .,-11 :.i-v-.j 3. ."-The expenditure isich^argeable to the Head.345.,.;A'. Indian Raita^
eedizadq.ss ^.l^DirMtiQn,:Researcb^h3 pffi Coi^erciaj: l^rparwlTJ6.2'-^ ,
4. In terms of Para D.2 (d) of Railway Board's letter No. 2011-B-174 dated 03.07.2015,
Railway may re-appropriate from one survey to another subject to not reducing to 'NIL' the specific
outlay (BE outlay) as per Budget Order.
5. This issues with the concurrence of Finance Directorate of the Ministry of Railways.
(Dhananjaya Singh)
Director Works-II
Railway Board,
Copy to:-
(i) The FA&CAO(Con.), Northeast Frontier Railway, Maligaon, Guwahati.
(ii) The Principal Director of Audit, Northeast Frontier Railway, Maligaon, Guwahati.
(iii) Deputy Comptroller and Auditor General of India (Railways), Room No. 224, Rail Bhavan,
New Delhi.
^ . . ,. en
' riU &J . ^ <■-!' a-'- .24
<^f. /6-n[6'» j^f q^Icc^/^IL
(LL^ ^
>- ^ J)^
0M,a^|/4^ npVo"^.y ov ^u- Vu^v
• ^
^E-|^\(L-| Svvw-j^-^
20Jun 16 15:30 Jt. Dir.(Works), RIy.Bd.
23070335 p.i P
?Z>3
(Dhananjaya Singh)
" Wrector Works-II
No.2007m-l/NL/NF/4>t.] " ■ " Railway Board
Copyto: . ' New Delhi, dated: .06.2016
91 FA&CAO/Con.,Northeast Fjdmier Railway, Maligaon Guwahali
^ ay
I
I
GOVERNMENT OF INDIA
MNIStRY OFmlLWAYS
(RAILWAY BOARD)
Ko.2009/M(W)/964/22
"New Delhi, dated 6 -03-2016
General Manager,
Northeast Frontier Railway,
Guwahati.
This issues with the concurrence of the Finance Directorate of the Ministry of
Railways. . U
(Jayant Kumar)
Director Mech.Engg.(W)
Railway Board.
Mechanical Engineering 0
Total - 105416452
Funds; To be provided against Deposit Estimate Direct or by re-appropriation •
Report and justification:
m, A
Specification.... Signature.... mMu
R.Ram
Drawing and annexure: Designation: CE/CON/4
'ated rrr-.- Sanction registered as
No Dated
Sanctioned
'DV
F.A & C.A.O/CON/ 5AO/CON///
N.F.Railwav.Maiigaon. N.F.Railway,Maligaon.
9^
©
b
Mechanical Engineering 0
Total
156425260
No Dated
Sanctioned
./
;ao/co
F.A &tC.A.O/CON/
N.F.Rallway,Mallgaon. N.F.Railway,Mal
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
*****
Sub; 2"'' Revised Estimate for construction of new BG line from Harnnsti-
Naharlagun (21.758 km).
Ref: N.F. Railway's letter No. W/98/CON/Harmuti-Naharlagun/2"'' Revlsed/PtV
dated 10.09.2015.
Sanction of the President is hereby communicated to the 2"^^ Revised Estimate for
construction of new BG line from HarmutiTNaharlagun (21.758 km) at a cost of Rs.612.92 crore
(Rupees six hundred twelve crore and ninety two lakh only). The department-wise break-up of the
cost is as under:-
2. This issues with the concurrence of Finance Directorate ofthe Ministry of Railways;
(Dhananjaya Singh)
Director Works-II
Railway Board
No. 96/W-1/NL/NF/14 New Delhi, dated: .04.2016
Copy to:
(i) 'The FA&CAO/Con.,Northeast Frontier Railway, Maligaoh, Guwahati
(ii) Principal Director of Audit, Northeast Frontier Railway, Maligaon, Guwahati.
(iii) Dy. Comptroller & Auditor General of India(Railways),224, Rail Bhawan, New Delhi.
^ /
for Financial Commissioner(Railways)
Copy forwarded to:
(i) The CAQ/Con., N.F. Railway, Guwahati. '
(ii) WDO,F(X)II and Budget Branches, Railway Board.
{NFR/Sanctlon Letters)
\
N. F. RAIUVAY
ABSTRACT COST OF WORK.
(Outer ShfrBt)
Departmcint; ENGINEERING (CON) Office of the GM/CON/MLG
Estimate iWo: CEyCON/2 of 2015-16 N.F,Railway, Maligaon
Framed ty ; S.C.RAJAK Designation; CE /CON/5
Regeion : ASSAM Station or Milage :21.753 Km RNY Division
N/..ME OF WORK:- 2nd REVISED ESTIMATE CONSTRUCTION OF NEW BO LINE FROM HARMUTI-NAHARLAGUN INCLUDING M.Ms'
Reference
ESTIMATED COST Original total
Sub Heads Work Material Stores in[ ALLOCATION
Stores Total in case of
of Work Capital D.R.P, O.L.W.R. Ordy.
Slock to be revised
Deposit Misc. Total
purchased revenue Adv.
estimate
Department. 2nd Revised estimate Amount as perMM- Amount as per Total cost including
for the construction of '^Road Bridge)
fyiM-2(F|tjsh Butt Present M.M.
PLAN HEAD - new BG line from
1100 Joint)
Harmuti to
Naharlagun(Excluding
MM)
Chargab'!to Capital Civil Engg
4593048926 467842905 75246010
Electrical Engg 5136137843
479673935 0
S & T Engg 479673935
154380379 ._0
Mechanical Enoa 154380379
375182650 0.00 q
Gross 375182650
5602285892 467342905 75248010 6145374807
Approved
cgi^/c i
le GOVGRNMICN'r OF INDJA
ra,t_osfca5
il \ li MINISTRV OF RAILWAYS
(RAILWAY BOARD)
*****
Sub; Part Revised Estimate for land cost of Arraria-Calgalia (110.15 km)
new I'G line project.
Sanction of the Piesideht i.s hereby communicated for the Pait Revised Estimate amounting
to Rs.855 Crore (Rupees eight hundred fifty five crore only) for laud cost of Arraria-Clalgalia
(110.15 km) new.BG Iiiic project.
2. With this, the lotul .sanctioned co.st of Arraria-Gaigalia (ll'U.l."S km) new RG line project
would become Rs.l384.}>8 crore.
3. This issues with tic concurrence of the Finance Directorate of the Ministry of Railways.
-■ : . ' ■. - : - . ..
■•'. for Financial Commi.ssloncr (Railway.s).^
Copy forwarded to:
(i) The CAO/Cor)., N-F^Riithvay, Guwahati.
.(ii)- WDO,.F(X)ll.andBudgct.BranchcWRailway Board.
(NFfi/Sancrion Letters)
.A
(KAILWAV
***** '
No.20I2/W-l/NF/DL/Hojai-Lun,din8
Tiie Genenil Manag<.T/Const New Delhi, dated; Cf^ .03.2016
Northeast Frontier Railway '
Giiwahati.
^ "ojai-Lumding/Doubling/Pt.I
"'"^*"8'^oub]ing/PU da
dated 24.12.20J5.
nfnPt of^Lnnid^nT-X^a^i f46^ '? communicated to the Detailed Estimate for
Z7- th^eVlaWt on,vf' Th?ddepartment-Wise break-up of the cost is as
S.No. PepartmenK
Civil Enpp. Cost(Rs. in crore) I
.i. Elect. Enpe. 3^.92
3. S&T EnRg. 17.2'5
4. Security Arranpempnt 50.86
5.90
Total:
2. This issues .i,h .he concurrence of Finance Directorate ofthe Ministry of Railway
398.93
(Dhananjaya Singh)
Director \Vork.s-l!
Railway Board
No. 20I2/VV-I/NF/DL/Hojai-Lumding
New Delhi, dated: 07.03.2016
Copy to:
(i) The FA&CAO/Con., Northeast Frontier Railway Malinnnn r- , •
(ii) Principal Director of Audit. Northeast Frontier Railway Maligaon r" i •
(iii) Dy. Contptroller & Auditor General ofIndia(Railways)'. 224. RaH'shawt New Delhi.
or Financial Commissioner(Railways)
Copy forwarded to:
(i) The CAO/Con., N.F. Railway, Guwahali.
(ii) WDO,F(X)II anti Budget Branches, Railway Board.
ic.
f;(j^
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
I (RAILWAY BOARD)
*****
(i) The FA & CAOs(C),Northeast Frontier Railway, Maligaon, Guwahati & North
Western Railway, Jaipur.
(ii) The- Principal Director of Audit, Northeast Frontier Railway Mallqaon
Guwahati & North Western Railway, Jaipur.
(Ill) The Deputy Comptroller & Auditor Genera! of India (Railways), Room No 224
Rail Bhawan, New Delhi. '
(Dhananjaya Singh)
Director Works-II
2014/NWR/letter
AsAiissy -j'
C)sr/vo-'/
• \'
r . . ■
.;■ IsJew Delhi, dated: • A.01.^2016
/^o.95
2. TTiis issues with the concunence of Fmance Directorate ol the Minify of RatKvays.
- (DbKUiinjnya Sihgh)
'■ Director-V/orks^lI.
Railway Board
(NFP/S3na«ori iciten)
,*
^ *1^ 1
07:34 From:.
T0;0361£'370705 P.l'
C
Of
COVERiNM'.ENT OF INDIA
MINISTRY OF RAILWAYS
RAILWAY board
CL^/C- 4
V" V"
r,.
No,96/Wl/t3C/NF/4 few Delhi, Dt. 196/)13'
/r f ■ > > •
(Dhtinanjaya Sin'gh)
Director Work.s-Tr
Railway Board
No.96A\G/GC/NF/4 New DeDii, Dt. ■ 12.2015 J
Copy to :(i) The FA&CAO/Con.j Northeast Frontier Railway, Maligaon, Guwaliati.
(ii)' llic Principal Director" of Audit,^.Northeast Frontier Railway, Maligaon,
Guwahati. , -
(iii) Tlic Deputy Comptrollcf and Auditor General of India(Railways), 224, Rail
'Bhavan, New Delhi.
G0VERNM1^>NT of INDiA
MINISTWY OF RAILWAYS
RAIIAYAY BOARD CAo/c~Q_
No. 2015/Wl/NF/NL/Sivok-Rangpo New Delhi, Dt. Z-12.2015
Sub: Detailed estimate for vSivoh-Rangpo new BG liu<5 (44.90 J.On), -\vu' i
Ref:' Railway's letter No. ^V/98/Cou/Sivol<-Rangpo/]RCON/Pf.l dated
t6.3.2015 and No. W/98/Con/Sivok-l<angpo/'mCON/Pt.TT dated 17.9.2015
& 02.10.2035. ■ '
1. This issccj v.Tth the Gono'irrence of the.Finance Directorate of the Ministry i.d'
Railways.
(Apisu^iJLeltrtTan)
pirccior Works-ll
■ Railway Board
No. 2015/WI/NF/NL/Sivo|o-Rangpy .New Delhi, Dl& ^.:12.201.5 p] C.
Copy to : (i) The FA&CAO/Con., Northeast Frontier. Railway, Maiigaon, Giiwahati.
(ii) The Pnncipal Directoj'.oF Audit, Northeast Frontier Railway, Maligabh,
ti •
Guwahali.
(iii) The Deputy Comptroller and Auditor General of india(Railways), 224',. -Rail
Bhavan, New Delhi, I -
■ ■ 1',:,;^
. for Fiuancial Commissioner/Riiihvay.s
"61^
Copy to:- WDO, F(X)-n and Budget branches of Railway Board. !
Vy.'
R ■
%
15 0ct [6-!7;o6 Jt. Dir.(vVoiks), RifSd.
a 23070335 C^O/CrQ^
• ^7
government or Mia
MiNISTRy OF RAILWAY
(ItAILWAY BOARD)
No. 97/W-J/LCT/NF/3
New Delhi, dated; i% .10.2015
The General Manager/Const.,
Northeast Frontier Railway '
■GuwahaH - - -
S: Maynaguri to
(Atfe^tsraranj
Direcror WorJcs-f?
No. P7A^7-]/lcT/NF/3 Railxvay Board
Copy to: New Delhi; dated;' .10.2015
0
\ \ GAUGE CONVERSION (0^^ 0
22 22 Lumding - DBRT(62B Km)including link Branch lines of Halbargaon ■ Moirabari 1st RE sanctioned of Rs, 956.29 Cr. 2nd RE not processed.
(49Km)& Senchoa - Sllghat(56Km)\^ \ 679,67
23 23 Lumding - Sllchar Including MlgrendlsaN oitokcherra (108Km), extension from 2 nd R.Eof Rs, 6187.76 Cr sent to RIy, Bd. for sanction on 15,11,13. Dlrector/ProJ,(S&T)'s Observation
Badarpur• Baraoigram (44Km)and New liilaterlal Modification for Q.C\pf Baralgram dated5,2,15 has been compiled on 13,3.15, S&T offlcertoattend Boardforclaiiflcatlon of Signal
- Durlabcherra with bye-pass at Karimganj^(29.4Km) and KarlmganJ - Mahlsasan Directorate's observatlons.CSTE/C/ll Informed that matter has been discussed with Board and DY,CSTE/C
(10.30Km) \ ^ 2-//'. was sent to Board for clarlflcatl^. 4027.93
24 24 Katthar - JogbanI with extension upto Radhlkapur,Katlhar ■ Teznarayanpur and-New 1st R.E, of Rs. 1022:64 Cr sanrfloneci^y Rly.Board on 23,11.2011
Ox) Material Modification for palganj-Dalkhola (43.43Km) NL \ \ 1022.64
25/ Katakhal - Bhalrabl(64 Km). / 2nd Revised Estimate of Rs, 326,51 Cr sent to RIy, Bd, for sanction on 11,04,2014. Latest observation of
Riy,^d. dated 06,04.15 is under compliance from Civil Enog(fleld) since 23.04,2015, Estimate Is put up to
EDFV)^e,f.27.01,2015.
218.38
2^ /' "26 NJP-Slllgurl-NBQ line alongwlth Branch lines , MM forChalsa^Naksalbarl (16 Km^ 1st RE of Rs^4l.98 Cr sanctioned by Rly.Board on 27,02.2008 (a) MM-1; Chalsa -Naxal of Rs. 292,92 Cr
NL)and Ra]abhatkhowa-Jalnti.(15.13Km-NL) \ sanctioned.(b)iyiM-2; Rajabhatkhowa-Jalnti : abandoned by Railway Board. 641.96
27 27 RNY-MZS, alongwlth linked fingers (510,33 Km) ist RE of Rs. 2905^^ Cr sent to RIy. Bd. for sanction on 15,07,2013. RIy Bd's, observation dated on
11.03,2014 has beemcomplled & sent to Railway Board on 24.06,2014.As per Works Directorate position
on 22.12.14, on 0th DeV^d has advised to send concerned CE and DY CE to attend Bd for Discussion,
Reminder given on 10,04,lB\^ 1590.44
2e 28 Aluabarl Road ■Slllgurl(70Km) via Galgalla \_ Ist R.E, of Rs, 435,07 Cr on 03M4^2011.sanctioned by Railway Bd 435.87
DOUBLING \ 0
29 26 NGC-Dlgaru Patch Doubling (20,81 Km) (Phase-1) 2nd'REofRs, 100.08 Cr sent to RIy, Bd,fo(;sanction on 29,01,2015, Railway Bd's observation dated
5.02.15-wmplIed on 20.03.16 180.08
30 30 Ambarl Falakata • New Maynaguri (36.52Km) DE of Rs, 31,4,00Cr sanctioned by Board on 17,08.^012. 314
31 31 NewCoochbehar-Samuktala Road (29,02Km) DE of Rs. 209,77-Cr Sanctioned by Board on 17.07.2012. "1st RE returned unvetted with observation on 9.3.15. All
FUs asked for cort^ll^nce on 9.3.15 & 20,04.15 - 209.97
32 32 Lumding - Hojal Patch Doubling (44,02Km)
2B,04,15andsenttoRl ^^n29,04,15
DEcost Is Rs, 320.02'Qr, sent to RIy Bd on 16.11,2013. Boa>c|(s observation dated 8,01.2015 complied on
320.02
33 33 New Coochbehar - Gumanlhat (29,32 Km) DE of Rs, 273,15 Cr Sanctioned "byRly, Bd.on 12,11,2013,
273.16
34 34 New Bongalgaon - Ranglya ■ Kamakhya (142 Km) Pre-Constructlon survey 8 GeotechnlcaHnvestigatlon submitted by DY. CE/CQN/RNY. Estimate returned 0
unvetted with observation from Accounted 20,08,13. Letter Issued to field offlceTor compliance of A/C
observations on 20.08.13. Compliance aw^ed.
35 35 New Bongalgaon - Goalpara ■ GHY (176 Km) Project approved by Board In 2015-16, controlled b/(5E/C/9
0
36 36 DIgaru - Hojal (102Km) Project approved by Board In 2015-16, controlled by CE/Cf^ \ 0
WORKSHOP & ROB \ \ 0
37 261 EMD Locoshed for homing 50 Locos at Marian! Detailed estimate cost of Rs. 40,10 Cr Sanctioned by CAO/CON-llv^ 31,01.2012 ^ 40.1
38 258 TInsukia - DEMU Rolling Stock maintenance facility Detailed estimate cost of Rs, 14,06 Cr Sanctioned by CAO/CON-II on 1^02,2012 ^ 14.06
39 251 Slllourl - Extension of Diesel Loco shed to home 100 locomotives Ist R.E of R9.28,80Cr sanctioned bvCAO/CON-i! on 09,4,2014 \ ) 28.8
40 252 DEMU Car shed Including facilities for Rail, Car maintenance at Slllgurl. 1st REof Rs. 21.94 Cr sanctioned by CAO/CON-II on 09.4,2014 \.
21.94
41 87 Salsalabari (Allpurduar) ROB In lieu of Level Crossing No, SK-114, D.E of Rs. 49,91 Cr sanctioned by CAO/CON-II on 24.10.2013
49.91
"-t: 42 223 of 2005-06 Development of Infrastructure for Maintenance of Coaches (PH-II) shifted from 1st revesled Estimate of R9.2i.40Cr Sent to RIy Bd on 02,04.2008, Reminder sent to Mech"b(ilcal
NGC to KYQ Directorate of RIy. Bd, for sanction On 20.05.11 &29.07.13, Estimate lying under Mechanlc^ireotorate,
11.48
Total
■hY / . 32184.12
''• \ "'■■ ' "A'?'/ ' - 'cjr '^'A''fsJ\i^i>^c;6vERN^
" '''•.: ^J-- > •/- A •
- ^ ,
V'-A^V ✓c' ylViT>TTC-rr>v-rM7 n
OF INDIA .' •-: ■. ■> •? "-'.• , .- ; •
OO km).
(29.81 doubling between New Guwahati and Digaru
^
W doubling
Hn. m- between New Guwahati
President and Digarucommunicated
is hereby (29.81 km)" attoa cost of Rs.
the 2"'' 180.09Estimate
Revised crore (Rupees one
for "Patch
•"■ ■ hundrea eightYcrore and mne lakhohly). The department-(Gse break-up of the cost i's Sef -
S.No. Departments Cost (Rs. in crore^
1. Civil Engg. 153.98
2. Electrical Engg. 5.93
3. S&T Engg. 20.18
Total: 180.09
^ 'v>DExecutive DiirectoF/Proj.^^
'Tf r. :■ P: Raihvay Hoard
: ,, ,. ,p- tip;;,.n ....ft^ W :
Copy to: • . . . . . ...... • • -
'
\^7A^ /- /'
/ ., -■ '■ ' '-t t q hfy^
/#/>%.■ ^
' ■ -/ ■
^'., ■. " V?/V>^-■^0''^''^■■'>'■ //''c/^'''^MiNI^
Oj^ilMAY BOARD) ^
New Delhi, dated: 2-1.11.2015
.No. 97/W-1/LCT/NF/3 ,vV)
'7^ >Ar .
•j
/
/^he General Manager/Const.,
/t V
Northeast Frontier Railway,
Gnwahatl.
\^p-
—--A ^ ' i'' I
rOKTtTOENPTJM ^
Sub: 2"^ Revised Estimate for consiruetion of new BG line from New Maynaguri to
Jogighopa (285.124 km).
Ref: Board's letter of even number dated 16.10.2015. \
p + rvf ^Rr-v Vr^aQ and Elect. Enee. sub-estimates shown in the table under Para-
./vVl' I*.-". : -r.
r'bfBowSr^drf referencshave Wn.?^t>^at.ged ',.
S.No. Departments Cost (Rs. in crore)
2232.86
1. Civil Engg.
197.19
2. S&T Engg.
89.71
3. Elect. Engg.
11.58
4. "Mech. Engg.
2531.34
Total:
-
To:03612570705 P.l'-l
Oi, C£.\t{.P^
GOVKRNMKNT OF IlSDjA
MINISTRY OF KAILWAYS
(RAILWAY BOAIU))
M
Nu.lOIS/VZ-l/NFR/BogibccI Bridge Revised Estinintc New Ddiii; daicd: ^,0«.2015
The Genenil Manngcr/Cons',
Nor(heast FroiUier Railway,
Ciiiwahati.
Sub; Revised Estimate (or construction of BogibeeJ briiige with litikiiig lines between Dibrugarh &
North Bnnic line (71.474 km).
Rcf: N.F, Railway's lettjrs No. ■W/98/CON/BogibccFPt.VT(RE) dated 02.03.2013 and 24.09.2034.
•:
•} \
i Securty-cosf-' TA r^ -ATL.;:. 71,78,47,09Z
•V i'y Tdtul: '48F7,.l3,69,466 .(Say, Rs. 4857.14 cJ «ire)
(A n nr-Ueimniny*
Rii'cclor Woiks-Tl
Railway Board
kV ^ ^ i DirectorAVurks-lI
ft Board
(NPff/SanctioiilRfter)
./
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
*****
2, This is inclusive ofland cost estimate ofRs. 855 crore already sanctioned.
3. This issues witlHhe concurrence ofthe Finance Directorate ofthe Ministry ofRailways.
^ O ^ .-V r/
Phanahjaya Singh)
Director Works-II
Railway Board
No.20I6AV-1/NF/RE/Arraria-Galgalia xt
New Delhi, dated: .05.2018
Copy to:
rtiv Pnncipal
(u) FA&CAO/Con Northeast
Director ofAudit, FrontierFrontier
Northeast RaUway, Maligaon,Guwdhafi
RaUway -
(m) Dy.ComptroUer& AuditorOeneral ofIndia(RaUways)',224,'^FSSNew Delhi.
No. 20I6/W-I/NF/RE/ArTana-Galgalia
for Financial
vr
Commissioner(RaUways)
New Delhi datPH-
(i). The CAO/Con.-II,N.F. Railway, Guwahati. ' .05.2018
(ii) WDO,F(X)II and Budget Branches, Railij^y^ard
Letters]
■ Df
P.UG-e6-E015 1E:5B From:
To;0361S570705 P.1^3
GOVERNMKNT OF7lNj(>IA
lNj(>IA {/
MiNlS mY OF RAILWAYS
(RAILWAY BOARD)
Sub': Part-ll Dctailc< Estimate for constructiun of new BCi line from Dhunsiri-Suktiuvi-Zubrsi us u
|)artof Dimapur-Kolumu new line project (90.535 km). _
Rcf; N.F. Railway's etlersNo. W/98/CON/DiniupLr-Kohiina/FLI dated 26.04.2013 and 09.02.2015.
Sanction ofthe I 'rc.sidcnt is hereby comniunicaled'lo the Pari-I I (detailed Hsiimalc for constrv^eticn uf
newBG line front Dhaniiri-Sukhuvi-Zubfca us ii partof Dimupur- Kohima new line project (90..535 km)at e
^ cost of Kii.2309.96 cron;(Rupees two thousand three iiiindreid nine crorc and ninety bi;i lakhs only). The
' deparlmcnt-wiise brejik-up ofthe cost is a.s luider:-
S.No. Departments Cost(Rs. in crorc)
1. Civil F.nKK. 2209.90
■2. Electrical Cngg. 14.58
3. S&T HnKft. 36.86
4. Mechanical Kngg. « 14.48
5. , Security cost' " ■ •- ' 34.14
• Total: - 2309.96
2. Wilh this, thetclal .sanclioijed co-si for DiinapLfr-Kohimn new line project yoes to^Rs.-2315.30 crofc
(Rupees two thotisiuid tl ree hundred f fleen crorc andiltiity lakhs only).
3. ' Tliis issues with the concutTcnce of Finance DireciofHlc of the Ministry ofRailways. A\ \
(>s(inisitrrohman)
. , Director Works-11
Railway Board
(AaisiirRehinun)
Dircctur Works-ll
Kuilway Boai'd
(MrS/Sanctivn LcUcd
i . N. F.
ABSTRACT COST OF WORK.
(Outer Sheet)
Department; Engineering/Con.
Esiimate No: CE/CON/1- ofgQis. 9n-?« Office of the GM/CON/i\/ii ^
Framed by ; Shri Anil Kumar v N.F.railv/ay, Maligaon
D .
Region: Nagaland Designatton : CE/CON/6
Sub Heads Work tSTtlVlATED COST Reference .... Pink book Item No 10 of 2015-16
Material Stores in Original total in
of Work Stores Total
Stock to be case of revised allocation
purchased Estimate D-R.P, O.L.W.R. Ordy.
revenue
3>
Dy ^.A a c.A.o/coiy-11
%
CAO/COW/1