You are on page 1of 56

GOVERNMENT OF INDIA

MINISTRY OF RAILWAYS
(RAILWAY BOARD)
*****

N0.97AV-I/NL/NF/12 . New Delhi, dated: 11,.10.2019

The General Manager(Con.),


Northeast Frontier Railway,
Maligaon,
Guwaliati - 781011.

Sub: Revised Estimate of Bhairabi-Sairang(51.38 km)new line project.


Ref: N.F. Railway's letters No. W/98/CON/Bhairabi-Sairang/l'* RE dated
27.11.2018,20.05.2019,26.08.2019 & 17.09.2019.

Sanction of the President is hereby communicated for the Revised Estimate of Bhairabi-
Sairang (51.38 km) new line project amounting to ^5021.45 crore (Rupees five thousand twenty one
crore and forty five lakh only) with the following break-up:
S.No. Departments Cost(Rs. in Cr.)
1. Civil Engg. 4682.26
2. Elect. Engg.(0) 108.41
3. Elect. Engg.(TRD) 52.18
4. S&T Engg. 45.00
5. Mech. Engg. 59.39
6. Security 74.21
Total; 5021.45

2. This issues with the concurrence ofthe Finance Directorate ofthe Ministrv of Railways

Hi?
(PanI aj Kufnar)
Director Works-Il
Railway Board
No.97/W-1/NL/NF/12
New Delhi, dated: I ^ -.10.2019
Copy to:

(i) The FA&CAO/Con.,Northeast Frontier Railway, Maligaon, Guwahati


(ii) Principal Director of Audit. Northeast Frontier Railway, Maligaon,Guwahati.
(iii) Dy. Comptroller & Auditor General ofIndia(Railways),224,Rail Bhawan,New Delhi

for Financial Commissioner(Railways)


Copy forwarded to:

flit
(u) Maligaon, Guwahati.
WDO,F(X)-II and Budget Branches, Railway Board
(ill) PS/MR-for kind information of Hon'ble MR as per Office Order No.37 of2019.
(NFR/Sanctian Letters)
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)

No. 2017/w^W^CTR/Bongaigaon-Agthori \(K ^/New Delhi, dated: o3^.08.2019


The General Manager (Con.),
N.F. Railway,
Maligaon, Guwahati.

Sub: Sanction of New Bongaigaon - Agthori via Rangiya doubling (142.97 km)
included in Budget 2013-14.

Competent authority has accorded sanction to New Bongaigaon - "Agthori via Rangiya
doubling (142.97 km), included in.Budget 2013-14 as per the details given below:

Name of the Project Department Estimated cost Expenditure


(? in crore) chargeable to
Civil 1558.90
Electrical 192.40
'

Signal & Telecom 195.76


New Bongaigaon - Mechanical 45.63 Gross
Agthori via Rangiya Environmental charges 29.89 Budgetary
doubling (142.97 km) Security 19.93 Support(GBS)
Total 2042.51
-
(^ Two thousand forty two
crore and fifty one lakh only)

2. This issues with the concuiTence o^jje Finance Directorate of the Ministry of Railways.

(Pankaj Kumar)
Director Works-II
Railway Board
No. 2017/W-I/NFR/DPR/Bongaigaon-Agthori New Delhi, dated: -08.2019

Copy to:

(i) The FA&CAO/Con.,N.F. Railway, Maligaon, Guwahati.


(ii) The Principal Director of Audit, N.F. Railway, Maligaon. Guwahati. . " -.
(iii) The Deputy Comptroller and Auditor General of India (Railways), KotsmlNo. 224, Rail
Bhavan, New Delhi.

for Financial Commissioner / Railways


Copy forwarded to:

The Chief Administrative Officer (Con.)-II, N.F. Railway, Maligaon. Guwahati.


(ii) WDO,F(X)-II and Budget Branches of Railway Board.
(iii) PS to MR for kind information of Hon'ble MR.

{NFR/Sanction Letters)
cElc.\a.
g^MENT OF INDIA
llY OF RAILWAYS lA.a«
AVAY BOARD)
StyrVcikA

New Delhi, daledi ^5..08.2019

|\gthori via Rangiya doubling (142.97 km)

iion to New Bongaigaon - Agthori via Rangiya


|4 as per the details given below:
i Estimated cost Expenditure
K In crore) chargeable to
1 1558.90
f 192.40
1 195.76
\ 45.63 Gross
1 29.89 Budgctaiy
19.93 Support(GBS)
2042.51
Two thousand forty two
crore and fifty one lakh only) 1

fpinancc Directorate of liie Ministry of Railways,

(PankaJ^Kumar)
Director Works-ll
Railway Board

Dn New Delhi, dated: ^>^8.2019

jiWoiflNXRaihvay.Maligaon. Gu\rahati.
TnT" The Principal Director of Audit, N.F. Railway, Maligaon. Guwahati. on t d -i
(iii) The Deputy Comptroller and Auditor General of India (Railways), Room No. 224, Kan
Bhavan, New Delhi.

for Financial Commissioner / Railways

Copy forwarded to:


(i) The Chief Administrative Officer(Con.)-II, N.F. Railway, Maligaon. Guwaltali.
(ii) WOO,FpC.)-lI and Budget Branches of Railway Board.
(iii) PS to MR for kind information of Hon'ble MR.
N. F. RAILWAY
ABSTRACT COST OF WORK.
(Outer Sheet)
OFFICE OP THE OM/CON/MLO
ipartmont: Engineering(Con.) N.F.Reflway, Mallgabn
itlnitte No: CE(CON/04 Of 2019-20
amedby: B.8MEENA Designation: CE/CON/3 Station or Milage
iglon: N.F.Railway Dlvfelon - Katlhar Reference-P.B. Item No 117 of 2016-17
ima of Work:- Detailed Estimate for ROB In lieu of level crossing gate no NC-S In between stations Rangapanl and New Jalpalgurl

ESTIMATED COST Original total ALLOCATION


Work Material Stores In Stores Total in case of Capital D.F. D.R.F. O.L.W.R. Ordy. Deposit Misc. Total
ub Heads
QfWorit Stock to be revised revenue Adv.
Durchased estimate

an Head-3000

iflfoeable to Capital
Civil Engineering
Electrical S&T Grand Total
State Engineering Engineering (In Eto.)•
Railway
PW(Road)
Gross Cost 107091060/'476216441 2301687./^ 686608058 7^^

inds: To be provided from budgetfor 2019-20 Pink Book Item No. 102 of 2019-20 Direct or by re-approprlatlon

ipoft and Justification


«clfiCBtlon.... Signature
B.8.MEEr

awing and annexure Designation CE/CON/III

Dated Sanction registered as

^idence and ailocaQon verified (Subject to the Ched( note attached). No. Dated...
Is requires sanction of the CAO/CON/1.
Sanctioned

'd^
FJK&CJLOlCOm CAO/CON/1 (
N.F.Rallway.Mallflaon. N,F.Rallway,Mallgaon,
."3GOVERNMENT OF INDIA ^,
^^"NISTRY OF RAILWAYS -
(RAILWAY BOARD) ^
/\0 *****

7 No.2017/W-l/NFi arghat-Agartala New Delhi, dated: 0^ .04.201^

General Manager/Const.,
Northeast Frontier Rmlway,
Guwahati.

iSub: Completion Estimate for new line between Kumarghat - Agartala(109 km).
Ref: N.F. Railway's letters No.
(i) W/98/CON/KUGT-AGTL/2°'^ Revised dated 18.07.2017 and
(ii) W/98/CON/KUGt-AGTL/2'"^ R.E. dated 16.07.2018.

Completion Estimate for new line between.Kumarghat - Agartala (109 km) amounting to
^1733.20 crore has been pruned down to 1 1731.78 crore, as per list of deletion/reductions enclosed
as Annexure-I; ' , .

2. Accordingly, sanction of the President is hereby communicated to the Completion Estimate


for new line between Kumarghat - Agartala (109 km) at a cost of ^ 1731.78 crore (Rupees one
thousand seven hundred thirty one crore arid severity eight lakh only). The department-wise bre^-
up of cost is as unden-
S.No. Departments Cost(Rs. in Cr.)
1.- Civil Engg. i 1526.45
'2\ - Elect. Engg. 58.12
3. S&T Engg. - 59.65
4. Mech. Engg. • 61.97
5. Security Cost 25.59'
Total: 1731.78

3. This issues with the concurrence ofthe Finance Directorate ofthe Ministry of Rmlways.
DA : Deletion List. ^^ ^
(Dhananjaya Singh)
Director Works-II
Railway Board

No. 2017/W-1/NFR/2"'' RE/Kumarghat-Agartala New Delhi, datMi C'-^.04.2019


Copy to:
(i) The FA&CAO/Con.,Northeast Frontier Railway, Maligaon, Guwahati
(ii) Principal Director of Audit,Northeast Frontier Railway, Maligaon, Guwahati.
(iii) Dy. Comptroller & Auditor General ofIndia(Railways), 224,Rail Bhawan,New Delhi.

for Financial Commissioner(Railways)

Copy forwarded to:


(i) The CAO/Con., N.F. Railway, Guwahati.
(ii) WDO,F(X)II and Budget Branches, Railway Board.
(iii) PS/MR-for kind information ofHon'ble MR.
(NFR/Sanction Letters)
ANNEXURE-I

Nn.2017AV-1/NFR/2"'' RF/TCmnarghat-Agartala
CompletioD Estimate for new line between Kumarghat - Agartala(109 km).
/r T.TST OF DET.ETTQNS / REDUCTION

(1) Electrical Sub-Estimate


Item No.7 - Head of Allocation: 1161 (Office / Service Building)
Total Cost as Total Cost as
Description ofItem Ate proposed
proposed by )roposed by proposed by
by Railway
Railway Electrical lectrical Dte
Dte. of Board of Board

717172 27000 27000


717172
Dv. CSTE's Office 150000 150000
227808 227808
AEN/XEN office
166375 665500 120000
SEfP-Wa office 360000
166375 499125 120000
SE(Works) 120000 120000
166375 166375
SI office 120000
166375 166375 120000
Tunnel inspector.
office 120000
166375 166375 120000
BRI office complex 120000 240000
166375 332750
TXR office 240000
166375 332750 120000
166375 332750 100000
00 RPF office
166375 332750
OC GRPF office
166375 166375 100000
Goods office cum
Merchants room 100000.
166375 166375 ..-100000
Parcel office
166375 166375
TCI office 2800000
4438855
1638855
Net Reduction Amount in Rs.
D-F
Sav Rs. 0.16 Cr.

6 - Hea^ Allnnatinn: 1 Electrification ^ T^esidBntial Building)


Rate Total Cost as
S.No. Type of Quarter Qty late proposed Total Cost as
proposed by proposed by
by Railway proposed by
Railway Electrical Electrical Dte.
Dte. of Board of Board
D E
B
24066 1588356 24066
66
65782 30588630 50699
Type-n 465
4983788 53907 3665676
Type-ni 68 73291
5955600 71140 2134200
Type-IV 30 198520
212837 425674 85000
Type-V
43542048 31133267
Total
12408781
Net Reduction Amount in Rs.
(P-F)
Say Rs.

(2) Security Cost(@ 1.5% oftotal cost) has been reduced proportionately.
*****

(NFR/Sanction Letters)
OVERNMENT OF INDIA
NISTRY OF RAILWAYS
(RAILWAY BOARD)
1.®"!
\

NO.2017/W-1/NF arghat-Agartala New Delhi, dated: 0^ .04.201^

he General Manager/Const.,
Northeast Frontier Railway,
Guwahati.

Sub: Completion Estimate for new line beDveen Kumarghat - Agartala (109 km).
Ref: N.F. Railway's letters No.
(i) W/98/CON/KUGT-AGTL/2"''Revised dated 18.07.2017 and
(ii) W/98/CON/ KUGT-AGTL/2"''R.E. dated 16.07.2018.

Completion Estimate for new line between Kumarghat - Agartala (109 km) amounting to
^1733.20 crore has been pruned down to ^ 1731.78 crore, as per list of deletion/reductions enclosed
as Annexure-I.

2. Accordingly, sanction of the President is hereby communicated to the Completion Estimate


for new line between Kumarghat - Agartala (109 km) at a cost of? 1731.78 crore (Rupees one
thousand seven hundred thirty one crore and seventy eight lakh only). The department-wise break
up of cost is as under:-
S.No. Departments Cost(Rs. in Cr.)
1. Civil Engg. 1526.45
2. Elect. Engg. 58.12
3. S&T Engg. 59.65
4. Mech. Engg. 61.97
5. Security Cost 25.59
Total: 1731.78

3. This issues with the concurrence of the Finance Directorate of the Ministry of Railways.

DA:Deletion List.

(Dhananjaya Singh)
Director Works-II
Railway Board

No. 2017/W-l/NFR/2"° RE/Kumarghat-Agartala New Delhi, dated: 0.S .04.2019

Copy to:
(i) The FA&CAO/Con.,Northeast Frontier Railway, Maligaon, Guwahati
(ii) Principal Director of Audit, Northeast Frontier Railway, Maligaon, Guwahati.
^ii) Dy. Comptroller & Auditor General of India(Railways), 224, Rail Bhawan,New Delhi.
let
for Financial Commissioner(Railways)

Copy forwarded to:


(i) The CAO/Con.,N.F. Railway, Guwahati.
(ii) WDO,F(X)II and Budget Branches, Railway Board.
(iii) PS/MR -for kind information of Hon'ble MR.

(NFR/Sanction Letters)

i
ANNEXURE-I

No. 2017AV-l/NFR/2"^ RE/Kumarghat-Asartala

Completion Estimate for new line bet^veen Kumarghat - Agartala(109 km).

LIST OF DELETIONS / REDUCTION

(1) Electrical Sub-Estimate

Item No. 2 - Head of Allocation: 1161 COffice / Service Buildingl

S.No. Description of Item Qty Rate proposed Total Cost as Rate Total Cost as
by Railway proposed by proposed by proposed by
Railway Electrical Electrical Dte.
Dte. of Board of Board
17
A B C D E X-

a Dy. CSTE's Office 1 717172 717172 27000 27000


b AEN/XEN office 1 227808 227808 150000 150000
c SE(P-Way office) 4 166375 665500 120000 480000
d SE(Works) 3 166375 499125 120000 360000
e SI office 1 166375 166375 120000 120000
■f Tunnel inspector 1 166375 166375 120000 120000
office
BRI office complex 1 166375 166375 120000 120000
Ii TXR office 2 166375 332750 120000 240000
i SE (Elect.) 2 166375 332750 120000 240000
k DC RPF office 2 166375 332750 100000 200000
1 OC GRPF office 2 166375 332750 100000 200000
m Goods office cum 1 166375 166375 100000 100000
Merchants room
n Parcel office 1 166375 166375 100000 100000
0 TCI office 1 166375 166375 100000 100000
Total 4438855 2800000
Net Rec uction Amount in Rs. 1638855
(D-F)
Say Rs. 0.16 Cr.

Item No. 6 - Head of Allocation: 1165 fElectrification & Residential Buildins")

S.No. Type of Quarter Qty Rate proposed Total Cost as Rate Total Cost as
by Railway proposed by proposed by proposed by
Railway Electrical Electrical Dte.
Dte. of Board of Board
A B C D E F
1 Tvpe-I 66 24066 1588356 24066 1588356
2 Type-II 465 65782 30588630 50699 23575035
3 Type-Ill 68 73291 4983788 53907 3665676
4 Type-rV 30 198520 5955600 71140 2134200
5 Type-V 2 212837 425674 85000 170000
Total 43542048 31133267
Net Ret uction Amount in Rs. 12408781
(D-F)
Say Rs. 1.24 Cr.

(2) Security Cost (@ 1.5% of total cost) has been reduced proportionately.

(NFR/Sanctlon Letters)
(Woo

WrfcW.
^nfePM. Uc(i^|(0-11
^.W/98/CON//KUGT-AGTiy2nd RE(Modified) Dated; 26.04.2019.

1) Dy.Chief Engineer/CON-l/AGTL
N.F. Railway, Agartala,
2) Dy.CEE/CON/AGTL,
N.F. Railway, Agartala
3) Dy.CSTE/CON/AGTL
N.F. Railway, Agartala
4) Dy.CME/PLG/MLG
N.F. Railway, Maligaon
5)Dy.CSC/CON/MLG
N.F. Railway, Maligaon

f^W:-Completion Estimate for construction of New Line from Kumarghat to Agartala.


Railway Board has accorded Sanction of Completion Estimate for construction of
New Line from Kumarghat to Agartala and communicated vide Letter No.2017/W-l/NFR/2ndRE/
Kumarghat-Agartala dated 05.04.2019 amounting to Rs. 1731.78 Crores. Department wise

SL NO. Department Proposed Cost SantlonedCost


in crore) [R in crore)
1 Civil Engineering. 1526.45 1526.45
2 Elect. Engineering. 59.52 58.12
3 S&T Engineering. 59.65 59.65
4 IVIech. Engineering. 61.97 61.97
5 Security. 25.61 25.59
Total:- 1733.20 1731.78
DA:- Copy of Sanctioned letter as above in the overleaf.

■5.
copy to:-
1. CE/C0N-8/MLG :-for kind information please.
OVERNMENT OF INDIA
STRY OF RAILWAYS
OEIAILWAY BOARD)
\
S/-
No. 2017/W-I/NF: arghat^Agartala ■ V . New Delhi, dated: 0^ .04.201^

^^/fhe General Manager/Const.,


Northeast Frontier Railway,
Guwahati. • ,

Sub: Completion Estimate for new line between Kuinarghat - Agartala(109 km).
Reft' N.F. Railway's letters No. , -
(i) W/98/CON/KUGT-AGTL/2"'^ Revised dated 18.07.2017 and
(ii) W/98/CON/I^GT-AGtL/2"^ kE.dated IW^ .

Completion Bstimate for new line between Kumarghat - Agartala (109 km) ainoimting to
^1733.20 crore hasSedh pruhed down to? 173-1.78 crore, as per list of deletidnyreductions enclosed
as Annexure-I. ^ .v

2. Accordingly, saiibtibn of the President is hereby communicated to the Completion Estimate!


for new line between Kumarghat - Agartala (109 km) at a cost of ^ 1731.78 .crore (Rupees,,one
thousand seven himdred thirty one crore and seventy eight lakh only). The diepartment-\wse bre^-
up of cost is as under:-
S.No. Departments Cost inCr.)
Civil-Engg; 1 . ; ' . 4' 1526.45
: 2. Elect.,Enjgg.x. : ...58.12
3. ■ ■ S&TEnag. '■ ., / 59.65
: '4. ■ -Mech.Ehgg.' • 61.97
; •- SecurityCost 25.59'-
Total: 1731.78

3. This issues vdth the concurrence of the Finance Directorate ofthe Ministry ofRmlways.
DA:Deletion List.

(Dhananjaya Singh)
Director Works-II I
Railway Board

No.2017/W-1/NFR/2'"'RE/Kumarghat-Agartala New Delhi, dated: cif'.04.2019


Copy to:
(i) The FA&CAO/Con.,Northeast Frontier Railway, Maligaon, Guwahati ,
(ii) Principal Director of Audit, Northeast Frontier Railway, Maligaon, Guwahati.
(iii) Dy. Comptroller,& Auditor General ofIndia(Railways),224,Rail Bhawan,New DeM.

for Financial Commissioner(l^ilways)


Copy forwarded to:
(i) The CAO/Con., N.F. Railway, Guwahati.
(ii) WDO,F(X)II and Budget Branches, Railway Board.
(iii) PS/MR-for kind information ofHon'ble MR.

(NFR/Sanction Letters)
OVERNMENT OF INDIA
STRY OF RAILWAYS
(RAILWAY BOARD)
0 >(f A***

No. 2017/W-l/NF arghat-Agartala New Delhi, dated: 0S» .04.201^

General Manager/Const.,
Northeast Frontier Railway,
Guwahati.

! Sub: Completion Estimate for new line between Kumarghat - Agartala(109 km).
Ref: N.F. Railway's letters No.
(i) W/98/CON/KUGT-AGTL/2°''Revised dated 18.07.2017 and
(li)!w/98/CON/KUGT-AGTL/2"''R.E. dated 16.07.2018. i

Completion Estimate for new line between Kumarghat - Agartala (109 km) amounting to
?1733.20 crore has been pruned down to ? 1731.78 crore, as per list of deletion/reductions enclosed
as Annexure-I. • ■

2. Accordingly, sanction of the President is hereby communicated to the Completion Estimate


for new line between Kumarghat - Agartala (109 km) at a cost of 1731.78 crore (Rupees one
thousand seven hundred thirty one crore arid seventy eight lakh only). The department-wise breg^-
up of cost is as under:-
S.No. Departments Cost(Rs.in Cr.)
1. Civil Engg. 1526.45
2. Elect. Engg.: 58.12
3. S&T Engg. 59.65
4. Mech. Engg. 61.97
5. Security Cost 25.59'
Total: 1731.78

3. This issues with the concurrence ofthe Finance Directorate ofthe Ministry ofRailways.

DA ; Deletion List. ^ ^
(Dhananjaya Singh)
Director Works-II
, Railway Board

No..2017/W-1/NFR/2"'' RE/Kumarghat-Agartala New Delhi, datedroi .04.2019

Copy to:
(i) The FA&CAO/Con.,Northeast Frontier Railway, Maligaon, Guwahati
(ii) Principal Director of Audit, Northeast Frontier Railway, Maligaon, Guwahati.
(iii) Dy. Comptroller & Auditor General ofIndia(Railways), 224,Rail Bhawan,New Delhi.

for Financial Commissioner(Railways)

Copy forwarded to:


(i) TheCAO/Con.,N.F. Railway, Guw^ati.
(ii) WDO,F(X)II and Budget Branches, Railway Board.
(iii) PS/MR-for kind information of Hon'ble MR.

(NFR/Sanction Letters) xV
government of INDIA
ministry of railways
(RAILWAY BOARD)
•iSr«S:TiS!4r:ilr

New^^^hi,dated
No.97/W-1/GC/NF/4

;he General Manager(Con.),


Northeast Frontier Railway,
Maligaon,
Guwahati - 781011-

Sub: Completion Estimate ofKatakhal-Bhairabi GC project(84.15 km.


Ref: (i) N.F. RaUway's letter No. W/98/GON/KTX-BHRB/Rev. Estt-
H/Pt-I/Z"*^ RE)dated 14.02.2017.
(ii) N.F. Railway's letter No. W/98/CON/Katakhal-Bliairabi dated
14.12.2018.

Sancta of.h. «ia


Bhairabi (84.15 km) GC project amountmg to ^508.97 crore (Rupees nve ^
ninety seven lakh only) with the foUowmg break-up:
Cost(Rs.in crore)
S.No, Departments
444.64
1. Ciyil Engineering 20.88
Electrical Engineering
3. S & T Engineering
508.97
Total:

This issues with the concurrence ofthe Finance Directorate ofthe Ministry ofRailways.
(Dhananjaya Singh)
Director Works-II
Railway Board

New Dellu, dated: .02.2019


No.97/W-1/GC/NF/4
Copy to:
rn The FA&CAO/Con.,Northeast Frontier Railway,Maligaon,Ouwahati.

for Financial Commissioner(Railways)


New Delhi, dated: .02.2019
No.97/W-1/GC/NF/4
y<'

vjpF-
c'^
OF INDIA
ISTRY ILWAYS
8 ILWA ARD)

No. 88/W-1/CNL/NF/12 New Delhi, dated: io^2.2019

he General Manager (Con.),


Northeast Frontier Railway,
Maligaon, 8-
Guwahati -781011.

Sub: 2""" Revised Estimate of Dudhnoi-Mendipathar (19.47 km)new line project.


Ref: (i) N.F. Railway's letter No. W/98/CON/DDNX-Mendipathar/Pt.IV(2"*' RE) dated
05.12.2016.

(ii) N.F. Railway's letter No. W/98/CON/DDNI-MDPRZ/Pt.IV dated 23.05.2018.


(iii) N.F. Railway's letter No. W/98/CON/Dudhnoi-Mendipathar/Pt.IV dated
17.12.2018.

Sanction of the President is hereby communicated for the 2"'' Revised Estimate of Dudhnoi-
Mendipathar (19.47 km) new line project amounting to ^315.63 crore (Rupees three hundred fifteen crore and
sixty three lakh only) with the following break-up:

S.No. Departments Cost(Rs. in crore)


1. Civil Engineering 293.71
2. Electrical Engineering 5.08
3. 8 & T Engineering 10.82
4. Security cost 6.02
Total: 315.63

2. This issues with the concurrence ofthe Finance Directorate of the Ministry of Railways.

(Dhananjaya Singh)
Director Works-U
Railway Board

No.88/W-1/CNL/NF/12 New Delhi, dated: .02.2019

Copy to:
(i) The FA&CAO/Con.,Northeast Frontier Railway, Maligaon, Guwahati.
(ii) Principal Director of Audit, Northeast Frontier Railway, Maligaon, Guwahati.
(iii) Dy. Comptroller & Auditor General ofIndia(Railways), 224, Rail Bhawan, New Delhi.

for Financial Commissioner(Railways)

No. 88/W-1/CNL/NF/12 New Delhi, dated: !l^j.02.2019


The CAO/Con.-III, Northeast Frontier Railway, Maligaon, Guwahati.
WDO,F(X)-II and Budget Branches, Railway Board.

(NFR/Sanction Letters)
GOVERNMENT OF BVDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
ie-k*ie*

N6.9»Wrl-)NI^|Ei New Delhi, dated: .11.2018

The'^ieii ,er (Con.),


;^draieast Frontier Railway,
Maligaon,
Guwahati - 781011.

Siib: Revised Estimate of Agarl^a-Sabrdom (114.134 km) new BG


tine project.
Ref: (i) N.F. Railway's letter No. W/98/CON/AgartaIa-Sabroom/?t.n
(r* RE)dated 23.05.2017. I
(ii) N.F. Railway's letter No. W/98/CON/Agartala-Sabroom/PtII
(I'^RE) dated 03.08.2018.

Sanction of the President is hereby communicated for the Revised Estima te of Agartala-
Sabroom (114.134 km)new BG line project amounting to ^407.03 crore(Rupees thr^ thousand four
hundred seven crore and three lakh only) with the following break-up:
S.No. Departments Cost^in crore)
1. Civil Engineering 3065.74
2. Electrical Engineering 99.58
3. S&T Engineering 83.11
4. Mechanical Engineering 75.50
5. Security Cost@ 1.5% 49.86
6. Environmental Charges(^1% 33.24
Total: 3407.03

2. This issues with the concurrence ofthe Finance Directorate ofthe Ministry ofRailways.

(Dhananjaya Smgh)
Director Works-II
Railway Board
No.98/W-1/NL/NF/6 New Delhi, dated: 12^.II.2018
Copy to:
(i) The FA&CAO/Con.,Northeast Frontier Railway, Maligaon, Guwahati.
(ii) Principal Director of Audit,Northeast Frontier Railway, Maligaon, Guwahati. j
(iii) Dy. Comptroller & Auditor General ofIndia(Railways),224, Rail Bhawan,New Delhi.

for Financial Commissioner(Railways)


No.98/W-1/NL/NF/6 New Delhi,
'
dated:j 13, .11,2018
v(iT The CAO/Con.-in,Northeast Frontier Railway, Maligaon, Guwahati.
(ii) WDO,F(X)-n and Budget Branches, Railway Board.
(NFR/Sanction Letters)
/ .•
o.

^^5
u (i()vi:uNMi:Nr<)iMNi)iA
MIMSno (M-UAIIAVA>.S
(HAIIAVAV IIOAUP)

No.20U'\V.ini' til 'Itiijiii-I uimlliit! New iK'llii.t'lilfil;

'llK*(tm'nil MmmiU'i CoiM..


Ninttu'iiM l ioiiiii-i
tiiiwiiji.iii.

Suli: Rcilsvil IMIimilc nirimU'li iliiiililli)|{Mf l.iimilioK-'H"'


Rvf: N.l*'. Kiillo ii> *f( It'tlvi's Nil.
01 WON/lliiJni-l.itmilii)K/r' Rrviuil iliiUtl 15.12.2017 iind
01) NN79H/('ON/lliiJiii-l.iiiiiiliiiK/l)iHil)tfiiK/r' K.K. diilvil 20.0'1.2»IH,

Revi.^fJ UsiimaiL* Inr palcli tlinilillny of Lumdinij-llujiii (46,12 km)Dmouniin];f lo Z 610,21


crore hos been pruned down lu Z 614.81 crorc, iis per litK of dclelion/rcduuliuns cncloicd ui
Annexure*].

2. Accordtnoly. soncilun of llie Prcsidcni is hereby communicalcd lo the Revised Estimate for
net
patch doublinti of Luinding-Hojoi (46.12 km) ut u cost off 614.81 crorc (Rupees six hundred
:is
fourteen crorc and eighty one lakh only). Tlic deparimeni-wisc brcrik-up ofcost is as under.'
s. S.No. Pcoarlmcnls Cost(7 In crorel
1. Civil Enng. 519.75
rum
2. Elect. Ennr*. 28.47
3. S&T Ennr;, 51.59
.*11 U]
4. Enviroiuncnial works 6.UU
5. Security gnn
led
Total:
liny 6I4.HI

3. Tliis issues with Ihu concurrence ofthe I'innncc Dlrccloralc ofthe Ministry of Rnilways,

(UhananjayS^lnRli)
ill v#> DIreelor Works-ll
Uullw.iy Donrd
t 10
y; No-20I2/W-1/NF/DL/Hojai-Lumding New Dcllji. dated: .09.2018

^ }ii') Oy.Con.p.roiler&Audito;Oeneru...ri„diu;uH:^^^^
(Hi) ouwahati.
Wf
I
(i) TheCAO/Con.,N.F. Railway, Ouwahati
(H) WDO. F(X)II and Oudget Branches. Railway Board.
■"i
n*'VU«(iiiRUiun|
A

ItXl'
Scanned by CamScanner
'
:J
OF INDIA
MlMSTR-i Oi" :iAH.\VA\'S
(HA1}.\Vay HOaUD}
i n iyr A

No. 20)
■f fM ■IStijiii-! uiiuiiaj:
New LVfiii, JaiL-ti; 06.09.3018
Ml,,,;,p,
NohIk'jim I.h„„„.,

^lih: Rt'vjs-ui Kfdtmiili' nii-mi(r|i djHjI.HnM f r


f .ir?'

m '-'.-.icd IS.12.Z0I7 :,nO


j.ni

Qm
prc'^
cms

'^uiric;sure>I. .21
as
2
P«cl) doDblir.y o(- f Mmmimicaled to [|ic Revised E-iinai f
\L't

[H ' rounccjKTomjnd c9-h?v^one ,aU,


t i r onl^ 3a The deper,n.em-.Re;Sl
co.s{ of ? 614 ?] /i^ t^.timatc lor
S.No. . ^epertn7Pni.'.-
'm 1. Civil En's
2. hit'ci. Encp.
IU[ 3.
r1~j tnvM'onmcniaf
cnpp-

d 5. yecnritv
y
ToCaJr

Tbra issues with the concumnce of tfie [••imnce Di

'i® V=-.
(Efimii;njaj.a Singh)
director Vi^orlic^n
K:!i%ny Board
C/r (I^NCopyiK New Delhi, daicd: .09.2018
tl.p''' ...•

w Delhi.

^Yl ^
Copy forvmrdcd so: fO'-WnandnlComnnV
"■commissioner {ft,
CO HieCAO/Con NF ^
1-i.ijivvay Board,
rHFRy-i^CtKsiLftTJfrrj)
5
GOVERNMENT OF INDL
MINISTRY OF RAILWAYS
cM,
(RAILWAY BOARD)

at lViC*« JO. 2016/W-l/Gen!/Agartala-Akhaura/Est New Delhi, dated 2(.03.2(^


v/4'he General Manager(Construction),
N.F. Railway,
Guwahati

Sub: Sanction of Detailed Estiamte for rail link between Agartala(India)-


Akhaura (Bangladesh) under GOI Grant Assistance(Funde^by MDoNER)
Ref: NFR's letter No W/98/CON/Agartala-Akhaura dated 22M2OI7
Sanction of the President is hereby communicated to the Detailed Estimate for rail link between
Agartala(India)- Akhaura (Bangladesh) under GOI Grant Assistance amounting to
Rs.569.63 crore (Rupees Five Hundred Sixty Nine " Crore and Sixty Three Lakh only) as per
department-wise break-up given below:-

Department Amount(Rs in Crore)


Civil Engg 511.59
Electrical 31.23
S&T Engg 12.92
Foreign Tour cost .5.56
Security Cost . 8.33
Total 569.63

2.- This issues with the concurrence of Finance Directorate of Ministry of Railways.

\u> (Dhananjaya Singh)


I '■ DirectorAVorks-n/Railway Board
^ I

No. 2016/W-l/Genl/Agartala-Akhaura/Est New Delhi, dated 'X\ .03.2018


Copy to:
i) The FA & CAO(C), N.F. Railway, Guwahati.
ii) The Principal Director of Audit, N.F.Railway, Guwahati
iii) The Deputy Comptroller & Auditor General of India (Railways), Room No.224,
Rail Bhawan, New Delhi.

for Financial Commissioner/Railway:

Copy to: (i) The Chief Admn. Officer (Construction), N.F. Railway, Guwahati
(ii) F(X)II, (iii) Budget, & (iv) WDO Branches, Railway Board.

Jf-

N. F. RAILWAY
ABSTRACT COST Or WORK.
(Oute!- Sheet)
Ofnce of the GM/CON/MLG
Department: Engineering (Con.)
Estimate No: CE/CON/il Of 2017-18 N.F.Rallway, Maiigaon
Framed by Sri Anil Kurrlar Designation: CE/CON/5 Station/ Mileage. 142.97 Km.
Region: Assam.

Name of Work;- Modified Pt.-I Detailed Estimate for Final Location, Pre Construction Activities, Geo-Technical Investigation and Detailed Design of Bridgesfor Doubling of B G Line from
BengaigaontoAgthorl ViaRangia. ■ » • •
Plan No,
Reference Pink book Item No.35 of 2016-17
ESTIMATED COST Original total ALLOCATION
Sub Heads Work Materia Stores in Stores total in case of Capital D.F. D.R.F. O.L.W.R. Ordy. Deposit Misc. Total
of Work Stock to be revised revenue Adv.
purchased estimate

Deptt. Amount as per Modified Pdrt. 1 D.E.


Charaeable to Canltal
Civil Enqq. 215770361

Gross Total 215770361

Funds: To be provided from budget for 2017-18 Pink Book Item No. 35 of 2017-18 Direct or by re-appfopriation - — Direct

Report and justification:


Specification ....
yV
Drawing and annexure;
Designation: CE/CON/5 \y

DSted
Sanction registered as
incidence and allocation Verified (Subject to the Check note attached). No Dated

Approved

v.

Dy,F:A & c.Sio/coN/iE' CAO/COW/2


N.F.Rallwav.Mallaaon. N.F.Rallwav.Mallaaon
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
NO.2016/W-II/NCR/NL/36 New Delhi, dat^ lft:08.2017
The General Manager(Con),
Northeast Frontier Railway,
Maligaon
Guwahati -781011

Sub: Sanction of doubling of New Maynaguri- Gumanlhat) (51.65 Km) project


'(M, (remaining sectlonjtncluded in Budget 2016-17.
■ Ar/
Cornpetent authority has accorded sanction to doubling of New Maynaguri- Gumanihat
i rsl' 5 Km) project(remaining section) included in Budget 2016-17 as per the details given

Name of Project Department Cost Expendture


(Rs In Chargeable to
crore)
Doubling of New Maynagurl- Civil 486.10 Gross Budgetary
Gumanihat (remaining S&T 55.19 Support(GBS)
section)(51.65 Km)
Electrical 22.48 I

Mechanical 38.50
Total 602.27
(Rupees six hundred two crore and twenty seven lakh only)
Estimates are included in the Detailed Project Report of the aforesaid
M Estimates
No.F(X)ll/2016/PW/3/Pt.3 also stand as
dated 06.01.2017 sanctioned in terms of cost
per department-wise Railway
givenBoard's
above.letter No.
o if ^°st of the project as authorised vide Railway
abovethe
project should be taken as base cost of the project for deciding estimated costauthority.
competent of the aforesaid
4. This issues with the concurrence of the Finance Directorate of the Ministry of Railways.

(DhananjayT^gh)
Director(Works-ll)
Railway Board
No. 2016/W-II/NCR/NL/36
New Delhi, dated 08.2017
Copy to:
i) The FA & GAO(C), Northeast Frontier Railway, Maligaon,Guwahati
ii) The Principal Director of Audit, Northeast Frontier Railway, Maligaon,Guwahati
iii) The Deputy Comptroller & Auditor General of India (Railways), Room No 224
Rail Bhawan, New Delhi. '

for Financial Commissioner/Railways


Copy to: (i) The Chief Admn. Officer (Construction),Northeast Frontier Railway
Maligaon,Guwahati
(ii) F(X)llj Budget & WDO Branches, Railway Board.

V ■ ■
i.

'0^
m
N. F. RAILWAY
ABSTRACT COST OF WORK.
(Outer Sheet)
OFFICE OF THE GM/CON/IVILG
Engineering (Con.) N.F.Railway, Maligaon
Estimate Wo: CE/CON/7 Of 2015-16
Framed by : B.S iVlEENA Designation : CE/CON/3 Length^ 110.15 Km
Region: N. F. Railway Division - Lumding Reference- Original Pink Book item No 8 of 2007-08'
Name of Work:- Ist Revised Estimate for Construction of new B.G. railway line from Arrarlya to Galgalla (Thakurganj) CurrentP.B. item No 8 of 2017-18
•>
Plan No
ESTIMATED COST Original total ALLOCATION
Sub Heads Work Material Stores in Stores Total in case of Capital D.F. D.R.F. O.LW.R. Ordy. Deposit Misc. Total
of Work Stock to be revised revenue Adv.
purchased estimate

Deptt. Amount as per Amount as per Variation


Plan Head-1100 Sanctioned proposed 1st
Detailed Estimate Revised Estimate
Chargeable to Capital 4771742519
Civil Engineering 21444917732 16673175213

Electrical Engg. 160986157 217331312 56345155

S & T Engineering 274968844 364790541 89821897

iVlechanical Engg. 91091480 96291000 5199520

Grand Total 5298789000 22123330585 16824541535

Funds : To be provided from budget for 2017-18 Pink Book Item No. 8 of 2017-18 Direct or by re-appropriation

Report and justification


Specification .... Signature
pR'
B.S.MEENA
Drawing and annexure: Designation CE/CON/III

No Dated Sanction registered as

Incidence and allocation verified (Subject to the Check note attached). No Dated ..
This requires sanction of the Railway Board.

proyjed

-.A&C.A.O/COh!/l[ )/CON/ll
.F.Railway,i\/ialigaon. M.F.Railway.IVIaliqaon.
1 i.-j
ABSTRACT COST OF WORK.
(Outer Sheet)
OFFICE OF THE
General Manager(Construction)
Department: Engineering (Con.)
N.F.Rallway, Mallgaoh
Estimate No: CE/CON/7 of2015-16 Designation: CE/CON/3
Framed by : B.S.Meena. Station or Milage =110.15 Km
iReglon: ,o,,„„s.ruo.,c„ c„sw B.G. Ra.lwayllna ,rona ARARIVAGALGALIA(THAKURGANJ)naw
ESTIMATED COST
Original tota!
Ordy.reve Deposit Mlsc.Adv. Total
Stores In case of D.R.F. O.L.W.R.
Sub Heads Stores In Capital D.F. nue
Total revised -
Work Material to be
of Work Stock estimate
purchased
iPlan Head • 100
Icharaeablfl to Capital Amount as per Amount as per Variation
Department. Sanctioned Estimate proposed in Rs.
Revised Estimate.

4771742519 21444917732 16673175213


Civil Engineering
160986157 217331312 56345155
Eiectrlcal Engineering
274968844 381933030 106964186
S & T Engineering
91091480 96291000 5199520
Mechanical Engineering
5298789000 22140473074I 16841684074
Total

Funds:
To be provided from budget for Pink book item No.8 of 2015-16
Signature
Report and justification:
Specification....
B.S^eena.
Designation: CE/CON/3

Sanction registered as
Dated
No.
Dated..
Incidence and allocation verified (Subject to the Check note attached). Approved
This requires sanction of the Railway Board.

I / <vf 1 b General Manager/CON


Chief Administrative(^fRcwW N.F.Railwav.Maligaon.
F.A & C.A.O/CON/11 N.F.Railwav.Maligaon.
N.F.Railwav.Maligaon.

V
N.F.Railway
ABSTRACT COST OF WORK
(Outer Sheet)
Office of the Dy.CE/CON-ll/LMG
N.F.Railway, Lumding
Department: Engineering/CON
Estimate No: CE/C0N/^(7 of 2017-18
Framed by:J.K. Choudhary Designation: Dy.CE/C0N-li/LM6
Region: N.F.Rly District: Lumding Division
Station of Mileage: 180.00 km.
Name of work Reconnaissance Engineering cum Traffic survey for new B6 line from Chaparmukh to Jowai (180.00 Km.)
Reference:- RIy Boards l/No. 2013/W-i/Genl./Survey New Delhi dt. 21.12.2016
Plan No
Sub Estimated Cost Original total incase ALLOCATION
Heads of Work Material Stores in Staff Stores to be purchased Total of revised estimate Capital D.F. D.R.P O.L.W.R Ordy. Deposit Misc. Adv. Total
work Revenue
345.A
Indian Riy. Policy Formulation
Direction Research and other Misc.
Organisation Commercial lines Gross 5376236.00
Demand No. 2 Credit 0.00
Survevs Net 5376236.00

To be provided from budget for...2017-18.. Item Nol6 Direct or by re- appropriation.

Report and Justification Signature:..

Specification Designation:

Drawings and annuxure Dy.ChiefEngineer/CON-il/LMG


No Dated A(}^ved
incidence and allocation verified(subject to the check note attached) No.....^ Da^..
This required the sanction of the ...CAO/CON

Dy.FA&C.A.O/CON/MLG -i

u\
SN--23
N.F.Railway
ABSTRACT COST OF WORK.
(Outer Sheet)
OFFICE OF THE
GENERAL MANAGER
Department; Engineering (Con.) N.F.Railway, Maligaon
Estimate No: CE/CON/28 of 2016-17
Framed by : Niimani Brahma Designation : CE/CON/9 Station or Milages 19.100 KM
Region: N.F.R. Division : Lumding
Name of Work:- Part •![ Revised Estimate for the Construction of New B.C. line from Byrnihat to Lailad (19.10 Km)as a part of New B.G line from Byrnihat to Shillong (108.36 Km)
Reference :• Original Pink Book item No.16 of 2010-11
Plan No. Current Pink Book item No 16 of 2016-11

ESTIMATED COST Original total ALLOCATION


Sub Heads Work Material Stores in Stores Total in case of Capitai D.F. D.R.F. O.L.W.R. Ordy. Deposit Misc. Total
of Work Stock to be revised revenue Adv.
purchased estimate

Chargeable to Capital Department Cost as per Part-! &1I Cost as perPart-ll Variation
sanctioned Detailed Estimate 1st Revised Estimate t

Civil Engg. 876.8934.925 11727660386 2958725461


Electrical Engg. 179700000 i797oqooo 0
S S T Engg. 115979405 115979405 0
Mechanical Engg. 0 ''0' 0
Security Cost 0 0 0
Grand Total 9064614330 12023339791'^ 2958725461
CRM 780000 780000 0
Net cost 9063834330 12022559791 2958725461

Funds; To be provided from budget for....2016-17 Direct or by re-appropriation Direct


Report and justification:
Specification.... Signature .-...
NllmanI Brahma
Drawing and annexure : Designation: CE/C0N-9/MLG
No Dated Sanction registered as

Incidence and allocation verified (Subject to the Check note attached). No. Dated
This requires sanction of the General Manager/construction fN.F.Railway

Approved Sanctioned

-V
F.AfiC.A.O/CON/I Chief Administrative Officer/CON/i General Managet/CON
N.F.Railway,Maligaon.. ..Vtv / N.F.Railway,Maligaon. N.F.Railway,Maligaon.

\
N. F. RAILWAY
ABSTRACT COST OF WORK.
(Outer Sheet)
OFFICE OF THE GWI/CON/IVILG
Department: Engineering (Con.) N.F.Railway, Maligaon
Estimate No: CE/CON/2/t-of 2016-17
Framed by : B.S. MEENA Designation t CE/CON/3 Length= 36.52Km
Region: N.F.R. District : Division: KIR-APDJ Reference- Pink Book item No 31 of 2016-17
Name of Workilst Revised Estimate for Construction of Double line from Ambari Falakata to New Mainagurl.(36.52km) Original P.B.item No 29 of 2011-12
Plan No
ESTIMATED COST Original total ALLOCATION
Sub Heads Work Matenal Stores in Stores Total in case of Capital D.F. D.R.F. O.LW.R. Ordy. Deposit Misc. Total
of Work Stock to be revised revenue Adv.
purchased estimate
Plan Head •1500

Amount as per Amount as per Total variation


Chargeable to Capital Department. Sanctioned Detailed proposed 1st
Estimate Revised Estimate Amount.
Civil Engineering 2564436601 3956291705 1391855104

Electrical Engineering 202011682 349386346 147374664


S & T Engineering 364783037 563938594 209155557
Mechanical Engineering 0
Grand Total 3121231320 4869616645 1748385325

Funds: To be provided from budget for 2016-17 Pink'Book Item No. 31 of 2016-17 Direct or by re-appropriation • Direct

Report and justification:


Specification
Signature
B.S.MEENA
Drawing and annexure: Designation: CE/CON/3

No
Sanction registered as

Incidence and allocation verified (Subject to the Check note attached). No Dated.
This requires sanction of CAO/GON.

anctio

F.A & C.A.O/CON/11


iCON/l u
laiw.
N.F.Rallway.lVlallgaorv. N.F.Railway,EJartgaon

K
■ "f"
N. F. RAILWAY
ABSTRACT COST OF WORK.
(Outer Sheet)
ABSTRACT COST OF WORK.
OFFICE OF THE GM/CON/IVILG
Department; Engineering (Con.) N.F.Railway, Maligaon
Estimate Nc CE/CON/22 of 2016-17
Framed by : B.S. MEENA Designation: CE/CON/3 Station or Milage = 3.5 Km
Region: N.F.R. District :
Name of Work:- The Detailed Estimate for Construction of a new Railway line from Haldibari to Bangladesh Border for connection with Chiiahati(Banqiadesh)
Plan No * ^ 'Reference :- P.B item No.22 of 20ie-17
ESTIMATED COST Original total ALLOCATION
Sub Heads Work Material Stores In Stores Total in case of Capital 1 D.F. D.R.F. O.L.W.R. Ordy. Deposit Misc.
of Work Stock to be revised revenue Adv.
purchased estimate

Chargeable to Capital

CIVIL ELECTRICAL S &T MECHANICAL Environmental GRAND TOTAL


ENGINEERING ENGINEERING ENGINEERING ENGINEERING related works ( In Rs]
565984963 58335702 194688287 0 8190090 827199042

Funds: To be provided from budget for 2016-17 Pink Book Item No.22 Director by re-appropriation DIrecL--—— *\ \\f\A\ V il \
Report and Justification
Specification ....
Signature
B.S.MEENA
Drawing and annexure: Designation : CE/CON/3
No..^.A^./..c^^rvi..i■..■?..c./..df:.f^.0.kv^^^^../^.5^■.?r^/^ Dated Sanction registered as
Incidence and allocation verified (Subject to the Check note attached). No Dated
This requires sanction of CAO/CON/II

A111If
F.A & C..A.O/cbN'/ll
N.F.Railwav.Mallqaon. N.F.Railwav.Mallqaon.
LA
■•v.

M ^.
V. <1} GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)

No.20l7/W-]/NFR/Haldibarl \c\ New Delhi, dated: S^{.06.2017


,ythe General Manager (Con.),
N.F. Railway,
Maiigaon, Guwahati.

Sub: Sanction of Haldibari - Chilahafi (Bangladesh) new BG line (3.5 km) included in
Budget 2016-17.

Competent authority has accorded sanction to Haldibari - Chilahati (Bangladesh) new BG line (3 5
km) included in Budget 2016-17 as per the details given below:

Name of the Project Department Estimated cost Expenditure


^ in crore) chargeable to
Haldibari - Chilahati Civil Engineering
(Bangladesh) new BG
56.60 Gross Budgetary
Electrical Engineering 5.83 Support (GBS).
line (3.5 km Signal & Telecom Engineering 19.47
Environmental charges 0.82
Total
82.72
^ eighty two crore and
seventy two lakh only)

2 As Detailed Estimate H included in the Detailed Project Report of the aforesaid project, Detailed
06 m 2017 sanctioned in terms of Railway Board's letter No. 2015/W-I/Gen./Corr.GM/Pt.n dated
revision is to be carried out in the cost of the project as authorized vide Railway Board's letter
Tslf^
as base cost;"cm
of the project for deciding the competent authority. 'he aforesaid project LuTd be taken
4. This issues with the concurrence of the Finance Directorate of the Ministry of Railways.

(Dhananjaya Singh)
Director Works-II
■ rS ^ Railway Board
No. 20I7AV-]/NFR/Haldibari
New Delhi, dated: .06.2017
Copy to:
(i) The FA&CAO/Con., N.F. Railway, Maiigaon, Guwahati.
(ii) The Principal Director of Audit, N.F. Railway, Maiigaon. Guwahati.
Comptroller and Auditor General of India (Railways), Room No. 224, Rail Bhavan, New

for Financial Commissioner / Railways


Copy forwarded to:
(i) ■ The ChiefAdministrative Officer (Con.), N.F. Railway, Maiigaon. Guwahati.
(ii) WDO, F(X)-II and Budget Branches of Railway Board.
sic ;{s
ABSTRACT OF THE COMBINED ESTIMATE BY P.W.(ROADS) & RAILWAYS
Detailed Estimate for construction of ROB in replacement of existing level crossing Gate no. - NC/5 at km 7/9-8/0 between stations Rangapani-
Nijbari
Railway share State share
SI. No. Description Total cost In "
in * In' Remarks

A Railway portion :
1 Construction of ROB (Railway portion only) Civl Enqq. portion 47549272.50 47549272.50
95098645.00
Contingencies charges @ 1.00% 950985.00 475492.50 475492.50

D&G charges @9.13% 8682497.00 4341248.50 4341248.50

Total 104732027.00 52366013.50 52366013.50

Add departmental Charges @12.5% 13091503.00 6545751.50 6545751.50


Geotechnical investigation sanctioned by CA0/C0N-2/MLG as per
estimate no. CE/CON/17 of 2016-17.
1408047.00 704023.50 704023.50

("a") Sub Total = 119231577.00 59615788.50 59615788,50


2 S & T'Engineering cost 2003509.54 1001754.77 1001754.77

C_ Railway portion 121235086.54 60617543.27 60617543.27


B State Govt. portion :
Cost for Civil works of approach viaduct as submited by SE/State 447383241.00 223691621 223691621
Highway, Design & Planning Circle, P.W. (Roads) Dlrectororate,
3 Siliguri vide memo no:33/W-348, dated 16.01.2019.(A)

Labour welfare cess (2) 1% 4473832.00 2236916.00 2236916.00


Cost of Civil Enqineerinq works includinq labour welfare (B) 451857073.00 225928537 225928537
Contlnqencies charqes (3) 1.00% on (A) 4473832.00 2236916.00 2236916
Supervision consultancy charqe(®3% 13421497.00 6710748.50 6710749
Total 469752402.00 234876201.00 234876201.00

Provision of Street Liqht 6463038.00 3231519.00 3231519


Total 476215440.00 238107720.00 238107720.00
r

Grand Total C't' 595447017.00 297723508.50 297723508.50


iairjiwria-

ABSTRACT COST OF WORK.

(Outer Sheet)

OFFICE OF THE
ent: Engineering (Construction)
No; CE/CON/17 of 2016-17
General Manager(Construction)
by : Shri B.S.Meena Designation :CEyCON/3 N.F.Rallway, Mallgaon
N.F.Rallway.
e of Work:- Part Detailed Estimate for Geo-technlcal and Sub-soil Investigation Work for road over bridge (ROB) In lieu of level crossing No. NC-5 In between
stations RangapanI - New Jaipalguri of Katihar Divlsjon.
Reference:- Pink Book Item No.117 of 2016-17

ESTIMATED COST ALLOCATION


Original total
eads Stores In case of Ordy.
Stores In Misc.
to be Total revised Capital D.F. D.R.F. O.L.W.R. Revenu Deposit Total
fork Work Material Adv.
Stock e
purchased estimate

Amount as per Detailed


Plan Head - 3000 Department.
Estimate.
I^OB
Chargeable to Civil Engineering 14,08,047.00

Total In Rs. 14,08,047.00

s: Available To be provided from budget for 2016-17 Pink book Item No. 117 of2016-17 Direct or by re^appropriation
port and justification:
Specification .... Signature
(Shri B.STf
Drawing and annexure: Designatfon: CE/CON/3

■. Dated Sanction registered as

ce and allocation verified (Subject to the Check note attached), No /iC\Dated


quires sanction of the CA0/C0N-2/MLG

■X.

i
FA&CAO/CON-II, Chief Adrtostrativ^fflcer/CON-2
N.F.Railway.Maliga'on. N.F.Rltiway;Ma|jgaon.
N. F. RAILWAY
ABSTRACT COST OF WORK.
(Outer Sheet)
Office of the GM/CON/MLG
Department: Engineering/Con. N.F.Railway, Maligaon
Estimate No: CE/CON/10 of 2016-2017
Framed by : Anil Kumar Designation: CE/CON-5
Region :Assam District : Station of Mileage: 142.97 Km.
Name of Work.-Part Detailed Estimate of Final Location Survey for Construction of BG Double line Prom New Bongaigaon to Kamakhaya Via Rangiya.

Plan No. Reference Pink book Item No. 35 of 2016-17

ESTIMATED COST Original total ALLOCATION


Sub Heads Work Material Stores in Stores Total in case of Capital D.F. D.R.P. O.L.W.R. Ordy. Deposit Misc. Total
of Work Stock to be revised revenue Adv.
purchased estimate

PLAN HEAD - 1500

Department Amount In Rs.

Civil Engineering 64960230.00

Funds: Available To be provided from budget for Pink Book Item No.35 of 2016-17 Direct or by re-appropriaticn

Report and justification


Specification.... Signature
(Anil Kumar)
Drawing and annexure: Designation: CE/CON-5

Dated Sanction registered as

Incidence and allocation verified (Subject to the Check note attached).


This requires sanction of CA0/C0N/2/MLG

Sanctioned

P") F.A&C.A.O/CON/II Chief Admitristrative


5Sep.16 1.1:51 ■ , Jt. Dtr.:(V'Vo(ks), Rly.Bd. ...Ij230^335 p.1

GOVERNMENTOF INDIA
MINISTRY OF RAILWAYS
(RAILWAVBOARD)

No. 201 S/W-l I'NFR/DPR/DL.'Kew Bongaigabn-Kamakhya. New Dellii, Dated: Oa..p9.2016

The General Manager(Con.), • '• . .' .; •


N.F. Railway," / - " ' ■ ■
MaUgapn, Guwdhati.;'

Sub: SancfioD of^^ew Bongaigaon - Kamaktiya-via Goalpara doubling-(126 km)included In


■ Budget 2015-16. ■ .

. Compelent ati'thoriiy h^ accoided sanction to New Bongaigaon - Kam&kHya via Goalpara doubling
(i76 km)included in Budget•1015^16 as i^rtlie [details-.given beioV: ■ • ''.
Name of . the. Pep^irtmeut • 1 I.. '. .-..sEsti'matedcpst' Expenditure '
Piroiect . ;. • (Y in crtfre) chargeable to
New Bongaigaon Civil •,->- 1.951.15 • Gross Budgetaf)'
Karaaichya- via' ■Elecmcal'. 3 ' 111.25 Support(GBS);
Goalpara doubling .Siaiar& Telecom 135.08
1.85-
I
projMt(176 kn\} " " Mechanical " "
i
Security 32.99
. ! •
Total ■ . - ■ 2232.32
Two" thousand two hundred thirty
two crdre ahd'lHiftV two lakli only) . I - . *

'2.' ■ ■ As Detailed -Esliraatc-.i^ included in. tJi® Detailed Project Report, of the aforesaid jsroject, Detailed
Esiitnale'also stands "sanctioned in.temx"? of Raihvay 'Boafd'S. letter Mb. 20I5/WI/Gen./CorT.GM/Pt.m dated
03.08.2015. ■ ■ , ■ . . " ■ . . '
• 3; If any revision is to be carried out in tlie'cosl of the-projeci as authorized vide Railway Board's letter.
No. FCX)ir-20l4/'PW/l Pr.n dated 30.1Q.:^15, above estimated cost of the aforesaid project should bs takcn_
as base^cosi ofthe,project for deciding the competent.authoriiy.
.-4. This issues with the con'cun-ence.cf the Finance Directorate of the Ministry. oFlUilways.

(Dfaananjaya Singh).
Director Works-ll
RailM'ay Board

N,o, 2015/W-l/NFR/DPR/bL/New Bongaigaoh-Ka;makhya ■ ' C'O ' ■ New Delhi, Dated: ;i>5, .09.2016
/Copyto; ■ ■ " • . ' ■■
/i) The FA&GAO/'Con.,N.F: Railway, M:a!igaon,.Guv\^hati. ■ i
l(ii) • ThePrincipalI>irectprbfAuditjK.F..Raihvay,MaligaonLGuwahati. * L.
(lii) The Deputy Comptroller and'Aiiditbr Gerieral.of India (Railways), Room No. 224,9lajl-Bhavan, New

t . forFinancial Commissioner/Railways

Copy forvvardsd to: . • ^•


(i) The Chief AdmintstrauvsOfriceF.(Con,},N-.F. Railway/Maligabii. Guwahati. ■
(ii) WpO,F(^-nandBudgetBranches ofRailway-Board. '
i
•5S©p:i611:51 ■ Jt.Dir.:(V'Vo(ks).Biy.Bd.
J23070335 . p.1

i
GOVERNMENT OF INDU
MINISTRY OF RAILWAYS
(RAILWAY BOARD)

No. 201 S/W-rl/NFR/DPR/OL.'New.Bongaigabn-Kamakhya. New Dellii,' Dated: C>X.p9^01G

The General Manager(Con.), - . •


N.F. Railway,- *:• • . '
Maiigapn, Guwahati. ■ '

Sub: . Sanctido of^evv Bongaigaon - Kamakhya-via Goalpara doubling(176 km)included in


Budget 2015-16. . . /
. Competent authority has accorded section to Nesv Bongalgaoti - Karaakhya via Goalpara doubUr.g
(1761ot)included JnBudgEt-20.15-16 as per the details-given belbV: • ■ ' .
Name ' of . the. Department - Estimated cost' Expenditure '
Protect • ^in crOrc) chargeable to
New Bcngaigaon - Civil • Y 1-951.15 • Gross Budgetar)'
Karaakhya- Via' •Electrical' . - 111.25 Support (GBS);
Goalpara doubling .Si^r& Telecom 135.08
project(176 km}-■ Mechanical 1.85
1

32.99
1 . .
Security . !
Total , • 2232.32
Two" thousand two hundred ^rtj'
two drore arid thirty two lakli only) .

2. ■ As I^tailcd Estimate,is incjuded in the Detailed Project Report of the aforesaid jjioject, Detailed
Estimate also stands 'sanctioried in.terras of Railway'Boaid's letter-NO. 2015/WI/Gen./CorT.GM/Pt.m dated
03.08.2015. ■ ■ : - .

3; . If any revision is to be carried out in tliecosl of the project as authorized vide Railway Board's letter
No. FOTII-2014/ipW/l Pt.II dated 30.10.2015, above estimated cost of 'the aforesaid project should be taken^
as base cost of the project for deciding the coini^tent authority.
4. This issues with the cbhcurrence.of the Einarics Directorate of the Ministry of Railways.

- . . . . . V . • . (Dhananjaya Singh)..
• • Director Worte-II
Railway Board

2015/\V-l;^FR/DPR/bL/New Bongaigaori-Kamakhya ' 'C '■ New Delhi, Dated: .09.2016


Copy to:
(i) The FA&GAO/'Con.,N.F: Railway, Ma!igaon,.Guv^hati. i
(ii) TTie Principal Director of AuditjN.F..RaiUvay, MaligaomGir\vaHati. " L.
(iiij The Deputy Comptrolief and'AiKfltbr General.of liidia (Railways), Room No. 224,RaU-Blwvari;'New
': .V " ' . '
. for Finandal Commissioner / Railways

Copy forwarded to: . • • ^ . , *


(i) The Chief Adrainistrat"vyeOfIiceF.(Cbn.),N.F. Railway/Maligabn, Guwahati,
(il) WpO,F(X)-n and Budget Branches of Railway-Board. -
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
*****

No.2016/W-l/NF/RE/Jogbani-Biratnagar New Delhi, dated: 22.06.2016

The General Manager/Const.,


Northeast Frontier Railway,
Guwahati.

Sub: Revisetl Estimate for construction of new EG line from Jogbanl-Biratnaear


(18.60 km).
Ref: N.F. Railway's letter No. W/98/CON/Jogbani-Biratnagar (l" Rev E^tt) dated
02.02.2016.

Sanction of tht: President is hereby communicated to the Revised Estimate for construction
' khundred seventy three crore
Jogbani-Biratnagar (18.60
and eighty seven lakh km)
only).at The
a cost of Rs.373.87 crore
department-wise (Rupees
break-up ofthethree
cost
IS as unden

S.No. Departments Cost(Rs.in crore)


1. ' Civil Engineenng 311.47
2. Elect Engineering 11.18
3. S&T Engineering - 29.46
4. Contract addition ofIRCON 21.76
Total: 373.87

Affairs'Dep^osit'Tork.®'"'"^®" through EBR - Ministry of External


3. This issues with the concurrence ofFinance Directorate ofthe Ministry of Railways:

(Dhananjaya Singh)
Director Works-U
^ Railway Board
No.2016/W-l/NF/RE/Jogbani.Biratnagar New Delhi,dated: 22.06.2016
Copy to:

-^eFA&CAO/Con.,Northeast Frontier Railway, Maligaon. Guwahati


(iii) D7compSi'& '' Ra''way, Maligaon. Guwahati.
y. Comptroliei & Auditor General ofIndia(Railways),224, Rail Bhawan,New Delhi,

Copy forwarded to: (Railways)


00 WOO,F(X)II and Budget Branches, Railway Board.
Guwahati.

(NFR/SancBon Letters)
^ .... . >>-iP
; „s>V^ .^' -'"j'^t\-J^\-rJf4
GOVERNMENT OF INDIA
CH'
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
»**♦*

No. 2011/W-l/NF/NL/Dimapur-Tizit New Delhi, dated: i 2- .09.2016

The General Manager (Con.),


Northeast Frontier Railway,
Maligaon,
Guwahati - 781 011.

Sub: Sanction of Final Location Survey of Dimapur-Tizit (257 km) New Line on N.F.
Railway.

Sanction of Ministry of Railways is hereby communicated for conducting Final Location


Survey of Dimapur - Tizit (257 km) New Line as per details below:
S.No. Name of Survey Type of Length (km) Plan Head Cost (Rs. in
Survey crore)
1. Dimapur - Tizit FLS 257 New Line 2.57*
♦Rupees two crore and fifty seven thousand only)

2. The work of Dimapur-Tizit (257 km) new line has already been included in Budget 2013-14
subject to requisite approvals. In order to process for further approvals, DPR has to be prepared.
; .in .,-11 :.i-v-.j 3. ."-The expenditure isich^argeable to the Head.345.,.;A'. Indian Raita^
eedizadq.ss ^.l^DirMtiQn,:Researcb^h3 pffi Coi^erciaj: l^rparwlTJ6.2'-^ ,
4. In terms of Para D.2 (d) of Railway Board's letter No. 2011-B-174 dated 03.07.2015,
Railway may re-appropriate from one survey to another subject to not reducing to 'NIL' the specific
outlay (BE outlay) as per Budget Order.
5. This issues with the concurrence of Finance Directorate of the Ministry of Railways.

(Dhananjaya Singh)
Director Works-II
Railway Board,

No. 2011/W-l/NF/NL/Dimapur-Tizit New Delhi, dated: IA .09.2016

Copy to:-
(i) The FA&CAO(Con.), Northeast Frontier Railway, Maligaon, Guwahati.
(ii) The Principal Director of Audit, Northeast Frontier Railway, Maligaon, Guwahati.
(iii) Deputy Comptroller and Auditor General of India (Railways), Room No. 224, Rail Bhavan,
New Delhi.

for Financial Commissioner (Railways)

Copy forwarded to:-

(i) CAO(Con.), Northeast Frontier Railway, Maligaon, Guwahati. ^ ^


(ii) F(X)-n, Budget and WDO Branches, Railway Board. ^ (5
At „ r^-
{NFR/Sanction Letters)
—T**- r " y*

^ . . ,. en
' riU &J . ^ <■-!' a-'- .24
<^f. /6-n[6'» j^f q^Icc^/^IL
(LL^ ^

>- ^ J)^
0M,a^|/4^ npVo"^.y ov ^u- Vu^v
• ^
^E-|^\(L-| Svvw-j^-^
20Jun 16 15:30 Jt. Dir.(Works), RIy.Bd.
23070335 p.i P

?Z>3

government ofINDIA ^^.1 ^


MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No.20Q7/W-1/NL/NF/4 Pt.I
New Delhi,dated: 0.o .06.2016
The General Manager/Const.,
Northeast Frontier Railway, ,
Guwahatt.

Sub: Estimate for construction of new EG linf^ frhn. K.T i


(26.15 km). ^ Mnrkongselek-Pasighat

croreand e.ghty five kkh only). The department-wise br^.k-urofthacoJLaTunder.'''^''


Departments Cost(Rs. in crore)
Civil Eng^.
370.27
Elect. Engg.
S&T.Engg.
Mech. Engg.
Security
Total :
414.85

Ministryto^^^tX?''' f™ded through EBR (PPP) _ Defence


3. This issues with the concurrence pfFinance Directorate ofthe Ministry ofRailways.

(Dhananjaya Singh)
" Wrector Works-II
No.2007m-l/NL/NF/4>t.] " ■ " Railway Board
Copyto: . ' New Delhi, dated: .06.2016
91 FA&CAO/Con.,Northeast Fjdmier Railway, Maligaon Guwahali

Copy foavarded to:, f"'"!''"''-"'" Commissioner(Railways)


r^\
(ii) Railway,
WDO,F(X)1I and Budget Guwafaati.
Branches, Railway Board.
(MFR/Sanctign Letrersl ... 0^

^ ay
I
I

GOVERNMENT OF INDIA
MNIStRY OFmlLWAYS
(RAILWAY BOARD)

Ko.2009/M(W)/964/22
"New Delhi, dated 6 -03-2016

General Manager,
Northeast Frontier Railway,
Guwahati.

Sub: Karaakbya - Development of infrastructure for maintenance of coaching


depot ^Revised Estimate.

Ref: N.F. Railway's letters No.W/98/Con>T:^GC{Ph.n) dated 01-04-2009 and


13.01.2016.

^ Sanction of Ministry of Railways is hereby communicated to the Revised Estirnate


amounting to ?21.38 crores (Rupees Twenty one crore thirty eight laldi oiily) for
"Kamakhya - Development of infi-asUucture for maintenance of coaching depot .
Department-wise break-up of the cost is as under:

Civil Engg. ? 14.20 crore


Mech. Engg. t 1.23 crore
Elect. Engg. ? 5.65 crore
S&T t 0.30 crore
Total ? -21.38 crore

This issues with the concurrence of the Finance Directorate of the Ministry of
Railways. . U

(Jayant Kumar)
Director Mech.Engg.(W)
Railway Board.

No.2009/M(W)/964/22 New Delhi, dated -03-2016

Copy to:(i)FA&CAO/Northeast Frontier Railway/Guwahati


. . (ii) Principal Director of Audit,Northeast Frontier Railway/Guwahati
(hi)Deputy Comptroller and Auditor General ofIndia/Railways,
Room No.224,Rail Bhavan,New Dellii.

For Financial Commissid^r/i^^'^

Copy to F(X)n and Budget Branches of Railway Bpaih.' , YssusWiu'- I

c/V^ - J-" '. \ Ir


at
.0
1^':

ABSTRACT COST OF WORK.


(Outer Sheet)
OFFICE OF THE
Department; Engineering (Con.)
Gonoral Manager(Construction)
Estimate No: CBCON/2 of 2016-17
Designation: CE/CON/4 N.F.Railway, Mailgaon
Framed by ; Ravindra Ram
Region; N.F.Railway. Station or Milage - At Ramnagar
Name of Work:- Conversion of IOC siding at Ram Nagar(from M.G to B.G)

ESTIMATED COST Oriainal total ALLOCATION


Stores in Stores Total In case of Capital D.F. D.R.F. O.L.W.R. Ordy. Deposit Misc. Total
Of Works Work Material
Slock to be revised revenue Adv.
Durchased estimate

Chargeable to Deposit tVllscellaneous Department. Detailed Estimated


Cost
Civil Engineering 47827573

Electrical Engineering 22295302

S&T Engineering 23580633

Mechanical Engineering 0

Sub Total 93703S13

Departmental Charges @ 12.50% 11712939

Total - 105416452
Funds; To be provided against Deposit Estimate Direct or by re-appropriation •
Report and justification:
m, A
Specification.... Signature.... mMu
R.Ram
Drawing and annexure: Designation: CE/CON/4
'ated rrr-.- Sanction registered as

No Dated

Sanctioned

'DV
F.A & C.A.O/CON/ 5AO/CON///
N.F.Railwav.Maiigaon. N.F.Railway,Maligaon.

9^

©
b

ABSTRACT COST OF WORK.


(Outer Sheet)
Office of the
Department: Engtneering (Con.)
General Manager(Construction)
Estimate No: CE/CON//of 2016-17
N.F.Rallway. Mallgaon
Framed by : Ravindra Ram Designation: CE/CON/4
Region: N.F.Rallway. Station or Milage -AtDharmaNagar
Name of Work:- Conversion of IOC siding at Dharmanagar(from M.G to B.G)

ESTIMATED COST Ungmai total ALLOCATION


Sub Heads
Capital D.F. D.R.F. O.LW.R. Ordy. Deposit Misc. Total
of Works Work Material Stores in Stores Total in case of
to be revised revenue Adv.
Stock
Durchased estimate

Chargeable to Deposit Miscellaneous DepartmenL Detailed Estimated


Cost
Civil Engineering 113586865

Electrical Engineering 22295302

S & T Engineering 3162500

Mechanical Engineering 0

Sub Total 139044667

Departmental Charges @ 12.50% 17380583

Total
156425260

Funds: To be provided against Deposit Estimate Direct or by re-appropriation


Report and justification:
Specification.... Signature
R.Ram

Drawing and annexure:


Designation: CE/CON/4
Sanction registered as

No Dated

Sanctioned

./

;ao/co
F.A &tC.A.O/CON/
N.F.Rallway,Mallgaon. N.F.Railway,Mal
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
*****

No. 96/W-1/NL/NF/I4 New Delhi, dated: ^6 .04.2016


The General Manager/Const.,
Northeast Frontier Railway,
Guwahati.

Sub; 2"'' Revised Estimate for construction of new BG line from Harnnsti-
Naharlagun (21.758 km).
Ref: N.F. Railway's letter No. W/98/CON/Harmuti-Naharlagun/2"'' Revlsed/PtV
dated 10.09.2015.

Sanction of the President is hereby communicated to the 2"^^ Revised Estimate for
construction of new BG line from HarmutiTNaharlagun (21.758 km) at a cost of Rs.612.92 crore
(Rupees six hundred twelve crore and ninety two lakh only). The department-wise break-up of the
cost is as under:-

S.No. Departments Cost(Rs. in crore)


1. Civil Engg. 513.61
2, Elect. Engg. 47.97
3. S&T Engg. 13.83
4. Mech; Engg. 37.51
Total: 612.92

2. This issues with the concurrence of Finance Directorate ofthe Ministry of Railways;

(Dhananjaya Singh)
Director Works-II
Railway Board
No. 96/W-1/NL/NF/14 New Delhi, dated: .04.2016
Copy to:
(i) 'The FA&CAO/Con.,Northeast Frontier Railway, Maligaoh, Guwahati
(ii) Principal Director of Audit, Northeast Frontier Railway, Maligaon, Guwahati.
(iii) Dy. Comptroller & Auditor General of India(Railways),224, Rail Bhawan, New Delhi.

^ /
for Financial Commissioner(Railways)
Copy forwarded to:
(i) The CAQ/Con., N.F. Railway, Guwahati. '
(ii) WDO,F(X)II and Budget Branches, Railway Board.

{NFR/Sanctlon Letters)
\
N. F. RAIUVAY
ABSTRACT COST OF WORK.
(Outer ShfrBt)
Departmcint; ENGINEERING (CON) Office of the GM/CON/MLG
Estimate iWo: CEyCON/2 of 2015-16 N.F,Railway, Maligaon
Framed ty ; S.C.RAJAK Designation; CE /CON/5
Regeion : ASSAM Station or Milage :21.753 Km RNY Division
N/..ME OF WORK:- 2nd REVISED ESTIMATE CONSTRUCTION OF NEW BO LINE FROM HARMUTI-NAHARLAGUN INCLUDING M.Ms'
Reference
ESTIMATED COST Original total
Sub Heads Work Material Stores in[ ALLOCATION
Stores Total in case of
of Work Capital D.R.P, O.L.W.R. Ordy.
Slock to be revised
Deposit Misc. Total
purchased revenue Adv.
estimate

Department. 2nd Revised estimate Amount as perMM- Amount as per Total cost including
for the construction of '^Road Bridge)
fyiM-2(F|tjsh Butt Present M.M.
PLAN HEAD - new BG line from
1100 Joint)
Harmuti to
Naharlagun(Excluding
MM)
Chargab'!to Capital Civil Engg
4593048926 467842905 75246010
Electrical Engg 5136137843
479673935 0
S & T Engg 479673935
154380379 ._0
Mechanical Enoa 154380379
375182650 0.00 q
Gross 375182650
5602285892 467342905 75248010 6145374807

Funds : Available To be provided from budget for • 2015-16


Direct
Report ai'd justification
Specificaiipn....
'. 1 L\ • n \ V

Drawing arid annexure : .


Designation : CE/Con/5
Sanction registered as
Incidence and allocation verified (Subject to the Check note attached),
No.
Dated
This requires the sanction of the Railway Board,

Approved

F.A & CAOiCGN"^ AO/CON/MLG'^''^//^ GM/C^N '


N.F/Rly /MLGl
mR-18-2016 14:31 From: To:03SlE570705 P.l''l

cgi^/c i

le GOVGRNMICN'r OF INDJA
ra,t_osfca5
il \ li MINISTRV OF RAILWAYS
(RAILWAY BOARD)
*****

■No,^i?7W-I/NF/KH/Anana-GaIgaiia New Ddhi, dated: 1*3" .03.2016

The General Manager/Const.., " .


Northeast Frontier RailWi'.y,
Guwahati.

Sub; Part Revised Estimate for land cost of Arraria-Calgalia (110.15 km)
new I'G line project.

Rcf: (1) N.F. Railway's'letter,. No. W/98/CON/Arrariya-GalgaIEa (!*' Rev.


EstO luted 02.02.2016.
(ii) N.K Railway's letter No, V//CON/Araria-GaIgaiia dated I9.0L20I6.

Sanction of the Piesideht i.s hereby communicated for the Pait Revised Estimate amounting
to Rs.855 Crore (Rupees eight hundred fifty five crore only) for laud cost of Arraria-Clalgalia
(110.15 km) new.BG Iiiic project.

2. With this, the lotul .sanctioned co.st of Arraria-Gaigalia (ll'U.l."S km) new RG line project
would become Rs.l384.}>8 crore.

3. This issues with tic concurrence of the Finance Directorate of the Ministry of Railways.

' (DhananjityH Singh)


Director Works-ll
• ,, Railway Board
No. 20l6/W-I/NF/RB'Ai""aria-Ga!galia ■ ' New Delhi, dated: ,03,2016
Copy to:
.. . (i) The fA&CAO/Cc h., Northeast Frontier Railway, Mallgaon, Guwaliaii
. 0') Principal Director of Aiidil, Northeast Frontier Railway, Maligaon, Guwahati.
(iii) py. Complrcjilertl; Auditor General of India (Railways), 224, Rail Bhawmi, New Delhi.

-■ : . ' ■. - : - . ..
■•'. for Financial Commi.ssloncr (Railway.s).^
Copy forwarded to:
(i) The CAO/Cor)., N-F^Riithvay, Guwahati.
.(ii)- WDO,.F(X)ll.andBudgct.BranchcWRailway Board.

(NFfi/Sancrion Letters)

«' V'fc '

.A
(KAILWAV
***** '

No.20I2/W-l/NF/DL/Hojai-Lun,din8
Tiie Genenil Manag<.T/Const New Delhi, dated; Cf^ .03.2016
Northeast Frontier Railway '
Giiwahati.

Subr E^ctaded F i'

... ^'fliers No.

(ii) Vl798/cONmojait""rt^^^ -o 15JJ.2013 jj.j anjj

^ "ojai-Lumding/Doubling/Pt.I
"'"^*"8'^oub]ing/PU da
dated 24.12.20J5.
nfnPt of^Lnnid^nT-X^a^i f46^ '? communicated to the Detailed Estimate for
Z7- th^eVlaWt on,vf' Th?ddepartment-Wise break-up of the cost is as
S.No. PepartmenK
Civil Enpp. Cost(Rs. in crore) I
.i. Elect. Enpe. 3^.92
3. S&T EnRg. 17.2'5
4. Security Arranpempnt 50.86
5.90
Total:
2. This issues .i,h .he concurrence of Finance Directorate ofthe Ministry of Railway
398.93

(Dhananjaya Singh)
Director \Vork.s-l!
Railway Board
No. 20I2/VV-I/NF/DL/Hojai-Lumding
New Delhi, dated: 07.03.2016
Copy to:
(i) The FA&CAO/Con., Northeast Frontier Railway Malinnnn r- , •
(ii) Principal Director of Audit. Northeast Frontier Railway Maligaon r" i •
(iii) Dy. Contptroller & Auditor General ofIndia(Railways)'. 224. RaH'shawt New Delhi.

or Financial Commissioner(Railways)
Copy forwarded to:
(i) The CAO/Con., N.F. Railway, Guwahali.
(ii) WDO,F(X)II anti Budget Branches, Railway Board.
ic.
f;(j^
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
I (RAILWAY BOARD)
*****

15AA/-l/NF/DPR/DL/Digaru-Hojai New Delhi/dated: 27.01.2016


The General Manager/Con. The General Manager,
N.F. Railway, North Western Railway,
IVIaligaon, Jaipur.
GuwahatI-781011.

Sub: Sanction of two doubling projects Included In Railway Budget 2015-16.


Competent authority has accorded sanction to the following two doublinq oroiects
Jn '^r\AiT a ■ . . .. . o r" J

S.No. Name of Project Railway Cost Rin crore)


1 Digaru-Hojai doubling (102kms) Northeast 870.96
Frontier
2 Phulera-Degana doubling (108.75 North Western 611.53
kms)
2. As Detailed Estimates are included in the Detailed Project Reparts of the
aforesaid projects, the Detailed Estimates also stand sanctioned in term^of Railway
Boards letter No. 2015/W-l/Gen/Corr.GM/Pt.lll dated 03.08.2015. The details of the
department-wise cost of the above projects are enclosed as 'Annexure'.
3. If any revision is to be carried out in the cost of the projects as authorised vide
Railway Board's letter No.F(X)ll-2014/PW/1 Pt.ll dt. 30.10.2015. above estimated costs
of tne aroresaid projects should be taken as base costs of the projects for decidina the
competent authority.
This issues with the concurrence of the Finance Directorate of the Ministry of
Railways. '
DA/As above. ^
(Dhananjaya Smgh)
Director Works-II
^^o.2015/W-!/NF/DPR/DI_/Digaru- Hojai New Delhi, dated: 27.01.2016
Copy to:

(i) The FA & CAOs(C),Northeast Frontier Railway, Maligaon, Guwahati & North
Western Railway, Jaipur.
(ii) The- Principal Director of Audit, Northeast Frontier Railway Mallqaon
Guwahati & North Western Railway, Jaipur.
(Ill) The Deputy Comptroller & Auditor Genera! of India (Railways), Room No 224
Rail Bhawan, New Delhi. '

. For Financial Commlssioner/Railwavs


Copy to: ■^ .
(i) The Chief Admn. Offecers (Construction), Northeast Frontier Railway
Maligaon, Guwahati & North Western Railway, Jaipur.
(ii) F(X)II, Budget & WDO Branches, Railway Board.
2014/NWR/letter
ANNEXURE

DETAILS OF , DEPAFRTMENT-WISE COSTS OF THE PROJECTS


INCLUCED IN THE F?AILWAY BUDGET 2015-16 AND SANCTIONED
VIDE RAILWAY BOARD LETTER No. 2015/W-l/NF/DPR/DL/Digaru- Hojai
DATED 27.01.2016.

S.No. Name of Project Department Cost (^in crore)


1 Doubling between Digaru-Hojai Civil Engg. 705.51
(102kms) S&T Engg. 112.43
Elect.Engg. 35.16
Mech.Engg. 4.99
Security 12.87
Total 870.96
2 Doubling between Phulera- Civil Engg. 535.53
Degana (108.75kms) S&T Engg. 61.82
Elect.Engg. 14.18
Total 611.53

(Dhananjaya Singh)
Director Works-II

2014/NWR/letter

AsAiissy -j'
C)sr/vo-'/
• \'

M government ov INDIA ^gyc-r,^a <o


r,<s3^inistryofrailvi'ays^^—^rz—
xrv/: ,
(HAH-WAYBOAHD) >^^4,
***««

r . . ■
.;■ IsJew Delhi, dated: • A.01.^2016
/^o.95

The Geneid ManagenCimst-,


Northeast FrottticrRaiiwiiy, —
Guwohati. fel'/vOj^
Sub: 2"^ Revised I'lstimalc for Lumding-Silchar Gauge Cooveraoa projecl including
branch 'lines (430-56 km).
iRcf: N;F/Raihvay> letters Nb. " . .
(i) ,\V;9SyG0N/LiyrG/SG]^ dated 15.11.2013 and
^iw79tI/CON/LumdmB-SUchar/iM.yi(2'^ Revised) duted 12.12.2014.
Sanction of thi: Pr^ident-is hereby communicated to the 2"^ Revised Esiimafe for "Gauge
% converaion of Lumding -- Sikhcir including branch lines (410.56 km)" at a cost of R^ol87.76 crate
(Rupees five.thoU^hd one hundred ei^iy seven cforc and seventy six lakli only). Ihe department-
wise break-up ofthe c jsl is as undcn-
SJ-lo; Dcoartments Cost (Rs. in crore)
Civil Engg. 4623:08
I.
140.19
2. Elect. Engg.
3- S&X Engg. . 287.24
Mcch.Enfic.- 60J8
A.
76.67
5. ' ■ Sccurhv ArranEement
Total: 5387.76

2. TTiis issues with the concunence of Fmance Directorate ol the Minify of RatKvays.

- (DbKUiinjnya Sihgh)
'■ Director-V/orks^lI.
Railway Board

Nq,95/W-I/NF/GCflia'0 ; ' ' New Delhi, dated: (4-.00016


Cc^y to: .
(i) The FA&CAO'Con., Nortlic^ Frontier Railway, Maligabn, Guwahati
fii1 Principal DiteetororAudit. Northeast Frontier RaUway.Matlgaoii, Guwahati.
fiii) Dy G^ptioU.-r & Auditor Gen^.onndia(Raaways), 224. Rail Bhawaii,New Delhi.

,* for Fhiancfal Commissioner (Railways)

Copy forwarded to: "


(j) mCAO/Con ,N.F. Railway, CuvVahari. (
' (iD WDO, F(X)n iind B.udgci Branchiss, Railway Board
Branches, Railway Board,

(NFP/S3na«ori iciten)

,*
^ *1^ 1
07:34 From:.
T0;0361£'370705 P.l'

C
Of
COVERiNM'.ENT OF INDIA
MINISTRY OF RAILWAYS
RAILWAY board
CL^/C- 4
V" V"
r,.
No,96/Wl/t3C/NF/4 few Delhi, Dt. 196/)13'

The General Manager/Con.,


Northeast Fronlicr Railway,
Maligaon,
Guwahali.

Sisb: Revised estimate fofgaugc Gosivcrsion of Raiigiyrt-JViurkoag-sclck section


including tiro branch lnic-s"(26.41 Km 34,04 Km)and one MM for bye-
pass Hue at Uangiya (0.74

... . \ v.i(r.v;;,.-(r:--.;Rof:it#aJ.bvay's letters No. W/^S/ConTLNY-MZSIPt-VCReviscd csfiniiiie) dated


V]V.(rL2014 ivnd 24,00.5^14, ' Vi ^ \M >

il- ;-.>,:^4jflnctiQn.of'.l}ic PfcsidentjTS hereby conVnVLinicatcd torthe^Reviscd cstiniaie^ftii-'gauge


iv/c ;-'/./;£l:.conYGr^p|i .-df ^iJ^^ya-Murkdngsclck section including two brhncli lines (26.41 Km &
34;.()4; imd, one.. MM ' ^ bye-pass line aYR^igiya (6:.74, Km) at a cost of.
-V:; c-i'... Rs.,2i^§^^^8.ci;qre;(Rupees twb tliousand nine hundred eighty five crore and tliirty eight lakh
only)...Dcpaitment-wisc breakup of(he cost is as under:- - ; "
Civil Engg. Rs. 2457,38 crore
StfeT Engg.. Rs. 251.2S crore
Electrical Engg. .R.s. 140..54erore
Mecb. Engg,' Ks. " 92.35 crore
Security cost , ,Rs, 43.83 crore . ,
Total jfe. 2985.38 cror^
2. This issues with the concurrence of the Finance Directorate of (he Ministiy of
Railways.

/r f ■ > > •
(Dhtinanjaya Sin'gh)
Director Work.s-Tr
Railway Board
No.96A\G/GC/NF/4 New DeDii, Dt. ■ 12.2015 J
Copy to :(i) The FA&CAO/Con.j Northeast Frontier Railway, Maligaon, Guwaliati.
(ii)' llic Principal Director" of Audit,^.Northeast Frontier Railway, Maligaon,
Guwahati. , -
(iii) Tlic Deputy Comptrollcf and Auditor General of India(Railways), 224, Rail
'Bhavan, New Delhi.

for Financial Commissioner/Raihvav.'^

Copy to;- WDO,F(X)-TT and Budget brandies of Railway Board.


T0:0-^6lc5 C0 C05 P.1^3
,DEC-03-E015 0U:i8 From:

G0VERNM1^>NT of INDiA
MINISTWY OF RAILWAYS
RAIIAYAY BOARD CAo/c~Q_
No. 2015/Wl/NF/NL/Sivok-Rangpo New Delhi, Dt. Z-12.2015

The Genci-al Manager/Con.,


Noitheast Froniicr Railway,
Maligaon,
Qj
Chivvahali.

Sub: Detailed estimate for vSivoh-Rangpo new BG liu<5 (44.90 J.On), -\vu' i
Ref:' Railway's letter No. ^V/98/Cou/Sivol<-Rangpo/]RCON/Pf.l dated
t6.3.2015 and No. W/98/Con/Sivok-l<angpo/'mCON/Pt.TT dated 17.9.2015
& 02.10.2035. ■ '

Sanction of the PreKident i.s hereby communicated to the Detailed Estimate


amounting lo Rs. 4084.69 crorc (Rs, Four thousand eighty four crore and sixty nine lakh
•/. o!iiy)Toi Sivok-Rangpo.hew BG line. Departinent-wisc breakup oft)ic cost is as nndcf:-i, j-. }

. CiyilDngg'. ! Rs; 3915.13 crore •


^&TEngg.- R.s. ■' 75.48 crore
Eiectrieal-F,riggv Rs.- . 90.49 cro'rc ,N.

r p. a" ■ , Mech. Engg.".- Rs; 0.28 crore


Security.cost.;.;; 1^:" ^ • 3.31 crore ■ 1
7 I■
Total Ri; 4084,69 crorc 4 ■'

1. This issccj v.Tth the Gono'irrence of the.Finance Directorate of the Ministry i.d'
Railways.

(Apisu^iJLeltrtTan)
pirccior Works-ll
■ Railway Board
No. 2015/WI/NF/NL/Sivo|o-Rangpy .New Delhi, Dl& ^.:12.201.5 p] C.
Copy to : (i) The FA&CAO/Con., Northeast Frontier. Railway, Maiigaon, Giiwahati.
(ii) The Pnncipal Directoj'.oF Audit, Northeast Frontier Railway, Maligabh,
ti •
Guwahali.
(iii) The Deputy Comptroller and Auditor General of india(Railways), 224',. -Rail
Bhavan, New Delhi, I -

■ ■ 1',:,;^
. for Fiuancial Commissioner/Riiihvay.s

"61^
Copy to:- WDO, F(X)-n and Budget branches of Railway Board. !
Vy.'

R ■

%
15 0ct [6-!7;o6 Jt. Dir.(vVoiks), RifSd.
a 23070335 C^O/CrQ^
• ^7

government or Mia
MiNISTRy OF RAILWAY
(ItAILWAY BOARD)
No. 97/W-J/LCT/NF/3
New Delhi, dated; i% .10.2015
The General Manager/Const.,
Northeast Frontier Railway '
■GuwahaH - - -

S: Maynaguri to

Md-lSlS.''" Revised) d,,feted 29.10.2013


I'C
':Rs
fe depamg^HtvteiiSeScI^bf^^
» ♦ '' . v..^
.S.No. f .r\ '•. *
tieparlments '
]•. CjviJ.Engp".
Cost-'(Rs.'aii ernmt
■ .2232:g6
Elect. Engg. 89.71.
.4. . Mech-Engp 197.19.
11.58
Total
253134
This issues with the conrirT.-,ir.. nPP-;.or,.-.-. -nl..
i ■ ■ ■ ■ dTx
- ■

(Atfe^tsraranj
Direcror WorJcs-f?
No. P7A^7-]/lcT/NF/3 Railxvay Board
Copy to: New Delhi; dated;' .10.2015

,. ■ 31!' . Principal Diic^^ofAuirii'''N^'I".iF ^alipaon. Guavahari


i <"0.
Delhi.

Copy forwarded to: ' Commissioner (Railways)


(iij WDo'p^rT ■ ' . , . '
■ ■f-fP'/SanaioiiLen^r) - . . ^ '
<
(Ir-t^J 2-^h ^'
Sn
P.B.
item No
(2015-16)
Name of Pr^c^ r. i.

0
\ \ GAUGE CONVERSION (0^^ 0
22 22 Lumding - DBRT(62B Km)including link Branch lines of Halbargaon ■ Moirabari 1st RE sanctioned of Rs, 956.29 Cr. 2nd RE not processed.
(49Km)& Senchoa - Sllghat(56Km)\^ \ 679,67
23 23 Lumding - Sllchar Including MlgrendlsaN oitokcherra (108Km), extension from 2 nd R.Eof Rs, 6187.76 Cr sent to RIy, Bd. for sanction on 15,11,13. Dlrector/ProJ,(S&T)'s Observation
Badarpur• Baraoigram (44Km)and New liilaterlal Modification for Q.C\pf Baralgram dated5,2,15 has been compiled on 13,3.15, S&T offlcertoattend Boardforclaiiflcatlon of Signal
- Durlabcherra with bye-pass at Karimganj^(29.4Km) and KarlmganJ - Mahlsasan Directorate's observatlons.CSTE/C/ll Informed that matter has been discussed with Board and DY,CSTE/C
(10.30Km) \ ^ 2-//'. was sent to Board for clarlflcatl^. 4027.93
24 24 Katthar - JogbanI with extension upto Radhlkapur,Katlhar ■ Teznarayanpur and-New 1st R.E, of Rs. 1022:64 Cr sanrfloneci^y Rly.Board on 23,11.2011
Ox) Material Modification for palganj-Dalkhola (43.43Km) NL \ \ 1022.64
25/ Katakhal - Bhalrabl(64 Km). / 2nd Revised Estimate of Rs, 326,51 Cr sent to RIy, Bd, for sanction on 11,04,2014. Latest observation of
Riy,^d. dated 06,04.15 is under compliance from Civil Enog(fleld) since 23.04,2015, Estimate Is put up to
EDFV)^e,f.27.01,2015.
218.38
2^ /' "26 NJP-Slllgurl-NBQ line alongwlth Branch lines , MM forChalsa^Naksalbarl (16 Km^ 1st RE of Rs^4l.98 Cr sanctioned by Rly.Board on 27,02.2008 (a) MM-1; Chalsa -Naxal of Rs. 292,92 Cr
NL)and Ra]abhatkhowa-Jalnti.(15.13Km-NL) \ sanctioned.(b)iyiM-2; Rajabhatkhowa-Jalnti : abandoned by Railway Board. 641.96
27 27 RNY-MZS, alongwlth linked fingers (510,33 Km) ist RE of Rs. 2905^^ Cr sent to RIy. Bd. for sanction on 15,07,2013. RIy Bd's, observation dated on
11.03,2014 has beemcomplled & sent to Railway Board on 24.06,2014.As per Works Directorate position
on 22.12.14, on 0th DeV^d has advised to send concerned CE and DY CE to attend Bd for Discussion,
Reminder given on 10,04,lB\^ 1590.44
2e 28 Aluabarl Road ■Slllgurl(70Km) via Galgalla \_ Ist R.E, of Rs, 435,07 Cr on 03M4^2011.sanctioned by Railway Bd 435.87
DOUBLING \ 0
29 26 NGC-Dlgaru Patch Doubling (20,81 Km) (Phase-1) 2nd'REofRs, 100.08 Cr sent to RIy, Bd,fo(;sanction on 29,01,2015, Railway Bd's observation dated
5.02.15-wmplIed on 20.03.16 180.08
30 30 Ambarl Falakata • New Maynaguri (36.52Km) DE of Rs, 31,4,00Cr sanctioned by Board on 17,08.^012. 314
31 31 NewCoochbehar-Samuktala Road (29,02Km) DE of Rs. 209,77-Cr Sanctioned by Board on 17.07.2012. "1st RE returned unvetted with observation on 9.3.15. All
FUs asked for cort^ll^nce on 9.3.15 & 20,04.15 - 209.97
32 32 Lumding - Hojal Patch Doubling (44,02Km)
2B,04,15andsenttoRl ^^n29,04,15
DEcost Is Rs, 320.02'Qr, sent to RIy Bd on 16.11,2013. Boa>c|(s observation dated 8,01.2015 complied on
320.02
33 33 New Coochbehar - Gumanlhat (29,32 Km) DE of Rs, 273,15 Cr Sanctioned "byRly, Bd.on 12,11,2013,
273.16
34 34 New Bongalgaon - Ranglya ■ Kamakhya (142 Km) Pre-Constructlon survey 8 GeotechnlcaHnvestigatlon submitted by DY. CE/CQN/RNY. Estimate returned 0
unvetted with observation from Accounted 20,08,13. Letter Issued to field offlceTor compliance of A/C
observations on 20.08.13. Compliance aw^ed.
35 35 New Bongalgaon - Goalpara ■ GHY (176 Km) Project approved by Board In 2015-16, controlled b/(5E/C/9
0
36 36 DIgaru - Hojal (102Km) Project approved by Board In 2015-16, controlled by CE/Cf^ \ 0
WORKSHOP & ROB \ \ 0
37 261 EMD Locoshed for homing 50 Locos at Marian! Detailed estimate cost of Rs. 40,10 Cr Sanctioned by CAO/CON-llv^ 31,01.2012 ^ 40.1
38 258 TInsukia - DEMU Rolling Stock maintenance facility Detailed estimate cost of Rs, 14,06 Cr Sanctioned by CAO/CON-II on 1^02,2012 ^ 14.06
39 251 Slllourl - Extension of Diesel Loco shed to home 100 locomotives Ist R.E of R9.28,80Cr sanctioned bvCAO/CON-i! on 09,4,2014 \ ) 28.8
40 252 DEMU Car shed Including facilities for Rail, Car maintenance at Slllgurl. 1st REof Rs. 21.94 Cr sanctioned by CAO/CON-II on 09.4,2014 \.
21.94
41 87 Salsalabari (Allpurduar) ROB In lieu of Level Crossing No, SK-114, D.E of Rs. 49,91 Cr sanctioned by CAO/CON-II on 24.10.2013
49.91
"-t: 42 223 of 2005-06 Development of Infrastructure for Maintenance of Coaches (PH-II) shifted from 1st revesled Estimate of R9.2i.40Cr Sent to RIy Bd on 02,04.2008, Reminder sent to Mech"b(ilcal
NGC to KYQ Directorate of RIy. Bd, for sanction On 20.05.11 &29.07.13, Estimate lying under Mechanlc^ireotorate,
11.48
Total
■hY / . 32184.12
''• \ "'■■ ' "A'?'/ ' - 'cjr '^'A''fsJ\i^i>^c;6vERN^
" '''•.: ^J-- > •/- A •
- ^ ,
V'-A^V ✓c' ylViT>TTC-rr>v-rM7 n
OF INDIA .' •-: ■. ■> •? "-'.• , .- ; •

; - 4 f -3/- ;y.'//'. " K /MUMISTRY OF RAILWAYS


^ (RAILWAY BOARD)
y ^ - y'A
Np;-2008/W-r/NFM3C-DGU"-" ■■ ' New Delhi, dated: 11 .10.2015"

The General Manager/Const.,


Northeast Frontier Railway,
Guwahati.

OO km).
(29.81 doubling between New Guwahati and Digaru
^

Ref: N.F. Railway's letter No. W/98/CON/NGC-DGU/Doubling dated 29.01.2015.

W doubling
Hn. m- between New Guwahati
President and Digarucommunicated
is hereby (29.81 km)" attoa cost of Rs.
the 2"'' 180.09Estimate
Revised crore (Rupees one
for "Patch
•"■ ■ hundrea eightYcrore and mne lakhohly). The department-(Gse break-up of the cost i's Sef -
S.No. Departments Cost (Rs. in crore^
1. Civil Engg. 153.98
2. Electrical Engg. 5.93
3. S&T Engg. 20.18
Total: 180.09

2.. .This issues with the concurrence of Finance.Directorate of the.Mpistry of Railways.

^ 'v>DExecutive DiirectoF/Proj.^^
'Tf r. :■ P: Raihvay Hoard
: ,, ,. ,p- tip;;,.n ....ft^ W :
Copy to: • . . . . . ...... • • -

(i) The FA&CAO/Con., Northeast Frontier Railway, Maligaon, Guwahati


O'i) Pnndpal Director of Audit,.Northeast Frontier Railway, Maligaon, Guwahati.
(iii) Dy. Comptroller & Auditor General of India (Railways), 224, Rail Bhawan, New Delhi

for Financial Commissioner (Railways)


Copy forwarded to:

The CAO/Con., N.F. Railway, Guwahati.


(n) WDO,F(X)n and Budget Branches, Railway Board

(NFR/Sanction Letter) f | "■ iPit Lo^ r^luOo ^


/ 6e/c-,^ P XrV
>A^.\7^ur
i ^ « . I '.Vn L
I (• •: A • ' •
A u
r - • r
'-1
v..

'

\^7A^ /- /'
/ ., -■ '■ ' '-t t q hfy^
/#/>%.■ ^
' ■ -/ ■
^'., ■. " V?/V>^-■^0''^''^■■'>'■ //''c/^'''^MiNI^
Oj^ilMAY BOARD) ^
New Delhi, dated: 2-1.11.2015
.No. 97/W-1/LCT/NF/3 ,vV)

'7^ >Ar .
•j

/
/^he General Manager/Const.,
/t V
Northeast Frontier Railway,
Gnwahatl.
\^p-
—--A ^ ' i'' I
rOKTtTOENPTJM ^

Sub: 2"^ Revised Estimate for consiruetion of new BG line from New Maynaguri to
Jogighopa (285.124 km).
Ref: Board's letter of even number dated 16.10.2015. \

p + rvf ^Rr-v Vr^aQ and Elect. Enee. sub-estimates shown in the table under Para-
./vVl' I*.-". : -r.
r'bfBowSr^drf referencshave Wn.?^t>^at.ged ',.
S.No. Departments Cost (Rs. in crore)
2232.86
1. Civil Engg.
197.19
2. S&T Engg.
89.71
3. Elect. Engg.
11.58
4. "Mech. Engg.
2531.34
Total:

2. .- This issues with the cohafrehce^fTinanceDireoto^ of the Ministry ofRaih^.,^^


A ik;'-.,:. (AaisuriRehm'S^
Dcr^'Mtr' Vi'.irl::;-'; ■ :. c v;v " 'Director Works-IX
k:!;'m'oV •
\ . ^ : :' Railway Board
--.-.n Ti.-lp'. - •\■' , ■ '- ■* liew Delhi, dated: 2.T.1^1.2015
" No. 97AV-1/LCT/NF/3
Copy to:
en The FA&CAO/Con„ Northeast Frontier Railway. Maiigaon Guwahati

for Financial Commissioner (Railways)

Copy forwarded to: • •; •


m The CAO/Con.,N.F. Railway, Guwahati. ^
(ii) WDO, F(X)n and Budget Branches, Railway Board.
(NFR/Sanction Letters)

-
To:03612570705 P.l'-l

Oi, C£.\t{.P^

GOVKRNMKNT OF IlSDjA
MINISTRY OF KAILWAYS
(RAILWAY BOAIU))
M
Nu.lOIS/VZ-l/NFR/BogibccI Bridge Revised Estinintc New Ddiii; daicd: ^,0«.2015
The Genenil Manngcr/Cons',
Nor(heast FroiUier Railway,
Ciiiwahati.

Sub; Revised Estimate (or construction of BogibeeJ briiige with litikiiig lines between Dibrugarh &
North Bnnic line (71.474 km).
Rcf: N.F, Railway's lettjrs No. ■W/98/CON/BogibccFPt.VT(RE) dated 02.03.2013 and 24.09.2034.

Sanction of (he Prjsidcnt is hereby'conimunicaltd" to (lie Revised F.stinialc for constriictiort of


Hogibeei hrldge With link iig lines belvvcen Dibruyarh & Ndith Bank line (74.474 ktn) at a cost of
Rs.4857.14 crorc (Rupeo.s fotir thousand elgiiL iiuMdred-fifty seven crore and fourteen lakhs only). The
departnient-wise brtrAkHipofihe cost is asundert-- ■ '•
• 'I w

'VS;N(,k! Deijiij tiiieritN. r, "--. :Co"st.(Kupccs)r


I:':'. .-Civll-liniiu. i- T-,' ' . 4597,63,J?|,47J:. ' - .s': ■
'■ /'i' S&'J-Lngg. ;• ' 2 .• • -'•'V.-.' .. . ■ 75,76,94,002"
Electr dai Du^k--. ■= k-.4, . _ 109,00,3.3,941 ./ ■ 2
Mechiinical.'EhgR..; . c' ■ .• ;; 2,26; 1 2,000
- ......

•:

•} \
i Securty-cosf-' TA r^ -ATL.;:. 71,78,47,09Z
•V i'y Tdtul: '48F7,.l3,69,466 .(Say, Rs. 4857.14 cJ «ire)

Tliis issues wlili tln-conciirrenoe jf Finance I'Directoiate cf liio Ministry ofRadways.

(A n nr-Ueimniny*
Rii'cclor Woiks-Tl
Railway Board

No. 2013/W-l/NKR/Bogj{>.:"el Bridge Revised Bslimatc New Delhi, dated: .0a.20l5


O\^oiJ^X0(S'
Copy to;
(i) The FA<S:CAO/Co t., Norlhcast Frontier Railway, Mallgdor), Guwidiati
Cii") ' Principal Director nf Audit, Northeast Frontier Railway, Maligaon, Oiiwaiiati-
(rii) Dy. Coiupirorjer Auditor Geiieral otTndia rRid.'vvays), 224, R.;:'! I'ihrovan, Nev.'

for Fiimndal Comniissioncr (KaiiWuys;

No. 2013/\V-1/NFK/Bogi{:eci Bridge R.evised Estimate Nesv Delhi, dated: • .08.201.1

Copy forwarded to:


(1) The CAO/Ckjit, N.K. Pail'.vay Ciuwaiiatf
(ii) V/D'O, FYXdl aiui Buduei iTrancties, Raiiw-ay Boaid.

kV ^ ^ i DirectorAVurks-lI
ft Board
(NPff/SanctioiilRfter)
./
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
*****

NOi 20I.6/W-l/NF/RE/Arraria-Galgalia New Delhi, dated; 2^ -05.12018


The General Manager(Coil.),
Northeast Frontier Railway,
Malieaon. Guwahati - 781011.

Sub: Revised Estimate of Arraria-Galgalia (110.15 km) new BG line


project.
Ref: (i>^.F. Railway's letter No. W/98/GON/Arrariya-GaIgalia (1"" Rev
^tt)dated 02.02.2016.
(ii) Railway's letter No. W/98/CON/Arraria-GalgaUa/Pt.-in
(Revised) dated 09.04.2018.

/11A 1 President is hereby communicated for the Revised Estimate of Arraria-Galgalia


I
. .thirty two crore and three lakh only)amounting
i ^ 7^ to ^132.03
with the following crore (Rupees two thousand one hundred
break-up:
S.No. Departments Cost(? in crore)
1. Civil Engg. 2064.19
2. S&T Engg. 36.48
3. Elect. Engg. 21.73
4. Mech. Engg. 9.63
Total: 2132.r«

2, This is inclusive ofland cost estimate ofRs. 855 crore already sanctioned.
3. This issues witlHhe concurrence ofthe Finance Directorate ofthe Ministry ofRailways.
^ O ^ .-V r/

Phanahjaya Singh)
Director Works-II
Railway Board
No.20I6AV-1/NF/RE/Arraria-Galgalia xt
New Delhi, dated: .05.2018
Copy to:

rtiv Pnncipal
(u) FA&CAO/Con Northeast
Director ofAudit, FrontierFrontier
Northeast RaUway, Maligaon,Guwdhafi
RaUway -
(m) Dy.ComptroUer& AuditorOeneral ofIndia(RaUways)',224,'^FSSNew Delhi.

No. 20I6/W-I/NF/RE/ArTana-Galgalia
for Financial
vr
Commissioner(RaUways)
New Delhi datPH-
(i). The CAO/Con.-II,N.F. Railway, Guwahati. ' .05.2018
(ii) WDO,F(X)II and Budget Branches, Railij^y^ard

Letters]
■ Df
P.UG-e6-E015 1E:5B From:
To;0361S570705 P.1^3

GOVERNMKNT OF7lNj(>IA
lNj(>IA {/
MiNlS mY OF RAILWAYS
(RAILWAY BOARD)

No. 2fl01AV-l/'KL/Nh72 Ke-w Delhi, dated: .08.2015

V^The General Manager/Cfinsi.,


Northeast Frontier Railway,
Giiwahati.

Sub': Part-ll Dctailc< Estimate for constructiun of new BCi line from Dhunsiri-Suktiuvi-Zubrsi us u
|)artof Dimapur-Kolumu new line project (90.535 km). _
Rcf; N.F. Railway's etlersNo. W/98/CON/DiniupLr-Kohiina/FLI dated 26.04.2013 and 09.02.2015.

Sanction ofthe I 'rc.sidcnt is hereby comniunicaled'lo the Pari-I I (detailed Hsiimalc for constrv^eticn uf
newBG line front Dhaniiri-Sukhuvi-Zubfca us ii partof Dimupur- Kohima new line project (90..535 km)at e
^ cost of Kii.2309.96 cron;(Rupees two thousand three iiiindreid nine crorc and ninety bi;i lakhs only). The
' deparlmcnt-wiise brejik-up ofthe cost is a.s luider:-
S.No. Departments Cost(Rs. in crorc)
1. Civil F.nKK. 2209.90
■2. Electrical Cngg. 14.58
3. S&T HnKft. 36.86
4. Mechanical Kngg. « 14.48
5. , Security cost' " ■ •- ' 34.14
• Total: - 2309.96

2. Wilh this, thetclal .sanclioijed co-si for DiinapLfr-Kohimn new line project yoes to^Rs.-2315.30 crofc
(Rupees two thotisiuid tl ree hundred f fleen crorc andiltiity lakhs only).
3. ' Tliis issues with the concutTcnce of Finance DireciofHlc of the Ministry ofRailways. A\ \

(>s(inisitrrohman)
. , Director Works-11
Railway Board

No.2(K)l/W-I/NiyNFy2 . New Delhi, dated: .08.2015


Copy to: " ■ . , " '
(j) ■ The FA&CAO/i.-on., Northeast Froniier-Rallwoy, Maligaon, Guwahati
(ii) Principal Direct)!' of Audit; Noi'ilieast Frontier Railway, Maligaon, GuwaJmtl.
(iii) Dy. Comptroller & Auditor General oflndia (Railways), 224, Rail BItawan, New Delhi.

for Kinajicial Commissioner (Railways)

No. 200I/W-1/NL/N1V2 New Delhi, dated; .08.2015

Copy forwarded to:


(i) The CAO/Con., N.F. Railway, Guwalmti.
(ii) WDO,F(X)llI and Budget Branches, Rf^lway Board +- •v'

(AaisiirRehinun)
Dircctur Works-ll
Kuilway Boai'd
(MrS/Sanctivn LcUcd
i . N. F.
ABSTRACT COST OF WORK.
(Outer Sheet)
Department; Engineering/Con.
Esiimate No: CE/CON/1- ofgQis. 9n-?« Office of the GM/CON/i\/ii ^
Framed by ; Shri Anil Kumar v N.F.railv/ay, Maligaon
D .
Region: Nagaland Designatton : CE/CON/6

Station or kilometerage = 90,535 Km

Sub Heads Work tSTtlVlATED COST Reference .... Pink book Item No 10 of 2015-16
Material Stores in Original total in
of Work Stores Total
Stock to be case of revised allocation
purchased Estimate D-R.P, O.L.W.R. Ordy.
revenue

roi-a Amount already


Department Amount
sanctioned as Amount to be
ffteU
Part-I - sanctioned now
CIVIL engineering.
16,56.25.259.96 5.33,65,121.00
11,22,60,138.96 ^
electrical engineering 0.00
0.00
c.oo
s s T engineering.
0.00
0.00
Gross 0.00
16.56,25.259.96 5,33,65.121.00
Funds: Available 11,22,60,138.96
■To be provided from Rs 300 Crs. alloted vide' Pink B^ok l em Nc.10 of 2015-16.
Report and justification
Specification ....

Drawing and anneyura •


Signature
No oc c, Ie T ^ (ANIL KUMAR)
Dated a0 , 5- Designation : CE/Con/fi
inoidence and allocation verified (Subject to the Check note attached). Sanction registered as
This requires the sanction of CAO/CON/1 No, ...
Dated

3>

Dy ^.A a c.A.o/coiy-11
%