Fx
0.25
FGL
1.60
0.40
5.50
A B Direction of STAAD Force
1.00 3.5 1.00 Y
1.00 0.55 0.55 Y
SLS Load Combination: Summary of Reaction from Software output (Staad): Loads on Top of Pedestal
Data:
Unit weight of concrete gc = 25.00 kN/m3 Max punching shear force 151.287
Unit weight of soil gs = 18.00 kN/m3
Length of the footing L = 5.50 m
Breadth of the footing B = 2.00 m
Thickness of footing E = 0.40 m
Size of base plate Dp = 0.35
Lp = 0.25
Size of Pedestal Wx = Bp + 2*0.5 = 0.55 m
Wz = Lp + 2*0.5 = 0.45 m
Distance between pedestals = 2.00
Thickness of soil above slab S = 1.60 m
Length of the pedestal above GL Xp = 0.25 m
Net SBC of soil = 240 kN/m2
Max. allowable gross soil pressure with soil = 269 kN/m2
Increase due to wind/seismic SBC = 329 kN/m2
Allowable F.S for Over turning F.S. = 1.50
Allowable base friction m = 0.30
Allowable F.S for Sliding F.S. = 1.50
Fy
Fx
0.25
FGL
1.60
0.40
5.50
A B Direction of STAAD Force
1.00 3.5 1.00 Y
1.00 0.55 0.55 Y
SLS Load Combination: Summary of Reaction from Software output (Staad): Loads on Top of Pedestal
Data:
Unit weight of concrete gc = 25.00 kN/m3 Max punching shear force 151.287
Unit weight of soil gs = 18.00 kN/m3
Length of the footing L = 5.50 m
Breadth of the footing B = 2.00 m
Thickness of footing E = 0.40 m
Size of base plate Dp = 0.35
Lp = 0.25
Size of Pedestal Wx = Bp + 2*0.5 = 0.55 m
Wz = Lp + 2*0.5 = 0.45 m
Distance between pedestals = 2.00
Thickness of soil above slab S = 1.60 m
Length of the pedestal above GL Xp = 0.25 m
Net SBC of soil = 240 kN/m2
Max. allowable gross soil pressure with soil = 269 kN/m2
Increase due to wind/seismic SBC = 329 kN/m2
Allowable F.S for Over turning F.S. = 1.50
Allowable base friction m = 0.30
Allowable F.S for Sliding F.S. = 1.50
Fy
Fx
0.25
FGL
1.60
0.40
6.00
A B Direction of STAAD Force
1.25 3.5 1.25 Y
1.50 0.55 0.55 Y
SLS Load Combination: Summary of Reaction from Software output (Staad): Loads on Top of Pedestal
Data:
Unit weight of concrete gc = 25.00 kN/m3 Max punching shear force 216.976
Unit weight of soil gs = 18.00 kN/m3
Length of the footing L = 6.00 m
Breadth of the footing B = 3.00 m
Thickness of footing E = 0.40 m
Size of base plate Dp = 0.35
Lp = 0.25
Size of Pedestal Wx = Bp + 2*0.5 = 0.55 m
Wz = Lp + 2*0.5 = 0.45 m
Distance between pedestals = 2.00
Thickness of soil above slab S = 1.60 m
Length of the pedestal above GL Xp = 0.25 m
Net SBC of soil = 240 kN/m2
Max. allowable gross soil pressure with soil = 269 kN/m2
Increase due to wind/seismic SBC = 329 kN/m2
Allowable F.S for Over turning F.S. = 1.50
Allowable base friction m = 0.30
Allowable F.S for Sliding F.S. = 1.50
Fy
Fx
0.25
FGL
1.60
0.40
6.00
A B Direction of STAAD Force
1.25 3.5 1.25 Y
1.50 0.55 0.55 Y
SLS Load Combination: Summary of Reaction from Software output (Staad): Loads on Top of Pedestal
Data:
Unit weight of concrete gc = 25.00 kN/m3 Max punching shear force 216.976
Unit weight of soil gs = 18.00 kN/m3
Length of the footing L = 6.00 m
Breadth of the footing B = 3.00 m
Thickness of footing E = 0.40 m
Size of base plate Dp = 0.35
Lp = 0.25
Size of Pedestal Wx = Bp + 2*0.5 = 0.55 m
Wz = Lp + 2*0.5 = 0.45 m
Distance between pedestals = 2.00
Thickness of soil above slab S = 1.60 m
Length of the pedestal above GL Xp = 0.25 m
Net SBC of soil = 240 kN/m2
Max. allowable gross soil pressure with soil = 269 kN/m2
Increase due to wind/seismic SBC = 329 kN/m2
Allowable F.S for Over turning F.S. = 1.50
Allowable base friction m = 0.30
Allowable F.S for Sliding F.S. = 1.50
Fy
Fx
0.10
FGL
0.90
0.30
1.70
A B
0.60 0.50 0.60
0.70 0.38 0.38
C D
Mz `
Z
SLS Load Combination: Summary of Reaction from Software output (Staad): Loads on Bot of Footing
Data:
Unit weight of concrete gc = 25 kN/m3
Unit weight of soil gs = 18 kN/m3
Length of the footing L = 1.70 m
Breadth of the footing B = 1.40 m
Thickness of footing E = 0.3 m
Size of Pedestal Wx = 0.38 m
Wz = 0.38 m
Distance between FGL To Bot of Footing = 1.2
Thickness of soil above slab S = 0.9 m
Length of the pedestal above GL Xp = 0.1 m
Net SBC of soil = 150 kN/m2
Max. allowable gross soil pressure with soil = 166.2 kN/m2
Increase due to wind/seismic SBC = 204 kN/m2
Allowable F.S for Over turning F.S. = 1.4
Allowable base friction m = 0.5
Allowable F.S for Sliding F.S. = 1.4
Load Case P MBD MCD MBD/P MCD/P ex ez Mxx Mzz ex/Lf ez/B
101 1.0DL+1.0LL 89.19 93.81 62.43 1.05 0.70 0.00 -0.20 0.00 -18.00 0.000 0.119
102 1.0DL+0.8LL+0.8W1 56.16 34.86 39.31 0.62 0.70 0.00 0.23 0.00 12.88 0.000 0.135
103 1.0DL+0.8LL+0.8W2 68.62 48.58 48.03 0.71 0.70 0.00 0.14 0.00 9.7 0.000 0.084
104 1.0DL+0.8LL+0.8W3 62.87 62.59 44.01 1.00 0.70 0.00 -0.15 0.00 -9.2 0.000 0.086
105 1.0DL+0.8LL+0.8W4 75.32 76.31 52.72 1.01 0.70 0.00 -0.16 0.00 -12.28 0.000 0.096
106 1.0DL+1.0W1 32.24 -3.10 22.57 -0.10 0.70 0.00 -0.10 0.00 -3.10 0.000 0.057
107 1.0DL+1.0W2 47.81 14.04 33.47 0.29 0.70 0.00 0.56 0.00 26.6 0.000 0.327
108 1.0DL+1.0W3 40.62 31.56 28.44 0.78 0.70 0.00 0.07 0.00 3.0 0.000 0.043
109 1.0DL+1.0W4 56.19 48.70 39.33 0.87 0.70 0.00 -0.02 0.00 -0.94 0.000 0.010
Max 58.1
TOP REINFORCEMENT
Base pressure(kN/m2) = 58.13 kN/m2
Design max.upward pressure fmax = 33.37 kN/m2
Factor of safety gf = 1.5
Distance B/w two column = 0.5 m
Lever arm distance Lcc = 0.48 m
Bending moment per meter width = -2.77 kNm/m
Shear Force, per metre width = -7.61 kN/m
Design strength of reinforcement fy = 500 N/mm2
Design strength of concrete fc = 30 N/mm2
Cover to the reinforcement d' = 50 mm
1m Width of slab is considered for the design,
b = 1000 mm
Diameter of the reinforcement f = 12 mm
Effective depth [E - (d' + f/2)] d = 244 mm
Max BM at face of the column Mu = 1.5 * (-2.77)
= -4.16 kNm
[Mu/(b*d2)] = -0.070
Required percentage(Ref.Tables of SP 16) = 0.085 < 0.12 %
Ast required As = 0.12 * 1000 * 244 /100
= 292.80 mm2/m
Spacing of the reinforcement required 1000 * (0.785*12^2) /292.8
= 386 mm
Provide 12 dia @ 150 mm
Unsupported length
lz = 1 m
lx = 1 m
Effective length ratio
lrz = 2
Zd(B)
lrx = 2
Load Data
ezz = 14.667 mm
0.05 x D = 19 mm
exx = 14.667 mm
0.05 x D = 19 mm
\ exx = 0.00 mm
ezz = 0.00 mm
Hence eccentric in both directions
Mx = 21.00 kNm
lex/D = 5.26
< 12, Hence the column is short column
No of bars = 1.92
say = 2.00
Spacing of bars = 600.00 mm
say 150.00
d'/D(for Mx) = 0.121
`
d'/D(for Mz) = 0.12105263
Axial load carrying capacity of column
Puz = 2030.63 kN
Calculation for additional moment in X direction due to slenderness (Ref: Cl: 38.7.1 IS:456-2000)
d'/D = 0.121
From Table 60 of SP16,
k1 = 0.20
k2 = 0.29
Pbz = 881.06 kN
k = 1.61
Calculation for additional moment in Z direction due to slenderness (Ref: Cl: 38.7.1 IS:456-2000)
Maz =(Pu.D/2000).(lez/D)2 = 0.94 kNm
d'/D = 0.12
From Table 60 of SP16,
k1 = 0.20
k2 = 0.29
Pbx = 881.06 kN
k = 1.61
p/fck = 0.01
Pu/fck.b.D = 0.041
Mu/fck.b.D2 = 0.04
Mu/fck.b.D2 = 0.04
Pu/Puz = 0.09
Hence Referring Page 71 of IS 456 2000
an = 1.00
Hence safe
Provided steel 12 dia @ 100c/c on all faces Total no of bars is 2
Spacing of hoop/tie
The spacing of tie shall not exceed 1/4th of minimum member dimension
and not less than 75mm and not greater than 100mm
Spacing of tie, s = 95 mm
Provided spacing, s = 100 mm
h = Larger dimension of rectangular confining hoop measured to its outer face
hb = 150.00 mm
hD = 150.00 mm
h = 150.0 mm
Ak = 90000.0 mm2
Ag = 144400.0 mm2
No of legs provided = 3.0
Acoording to special confinement reinforcement
Area of tie reinf Ash = 0.18 * S * h * (fck / fy) * ((Ag/Ak)-1)
= 0.18 * 100 * 150 * (30 / 500) * ((144400 / 90000)-1)
2 LEGGED STIRU Ash = 32.64 mm2
Dia of tie required fs = Sqrt(32.64 * 4 / PI() )
fs = 6.45 mm
Dia of tie provided fs = 8 mm
Provide Stirupps Y 8 @ 100 C/C
X
Mux 150
FGL -0.0m
Zd(B) 700
Muz Z
k2 d'/D
0.05 0.1 0.15
rectangular 0.424 0.328 0.046
eq reinf on 4 sides
k1 d'/D
0.05 0.1 0.15
rectangular 0.219 0.207 0.196
k2
d'/D
0.05 0.1 0.15
rectangular 0.424 0.328 0.046
eq reinf on 4 sides
0.005
Column Dimension,Bc
Equivalent Moment
Eff.dep /
Beam Size/Span Ast Required Min.Ast Ast Provided Bottom Reinforcement Top Reinforcement
th
Dia M
No of Legs
Max.BM Max.SF Torsion
(Me)
Spacer Bar
STAAD (Mu) (Vu) (Tu)
Moment m
Total Layer
Total Layer
ID Thro# Thro# Thro# Thro# Thro# Thro# bar
Location b D L d Astr Ascr Ast.Min Astp Ascp (Ist (IInd (IIIrd (Ist (IInd (IIIrd eStrain
Layer) Layer) Layer) Layer) Layer) Layer) n
t
kNm kN kNm kNm kN mm mm mm m mm mm kNm N/mm2 mm2 mm2 mm2 mm2 mm2 No Dia No Dia No Dia Dia No Dia No Dia No Dia N/mm2 % N/mm2 N/mm2 kN mm mm mm2 mm2 e
L
S 19 14 1 18.06 20.46 400 230 300 256 116.76 60.02 1.20 170 0 155 226 0 0.29 0.38 0.09 12 1 2 12 1 0.347 0.38 0.444 3.5 26.1711 8 -1959 192 150 o
2 - Legged###
c
TB1 M 1674 14 9 1 11.10 16.36 400 230 300 3.50 256 116.76 60.02 0.74 103 0 155 226 0 0.17 0.38 0.21 2 12 12 1 1 0.278 0.38 0.444 3.5 26.1711 8 -1141 192 150 a
2 - Legged###
t
S 19 14 1 18.16 20.46 400 230 300 256 116.76 60.02 1.20 171 0 155 226 0 0.29 0.38 0.09 12 1 2 12 1 0.347 0.38 0.444 3.5 26.1711 8 -1959 192 150 i
2 - Legged###
o
S 34 118 1 24.77 124.30 300 300 600 554 252.67 366.66 0.27 104 0 437 603 0 0.06 0.36 0.30 16 1 3 16 1 0.748 0.36 0.434 3.5 72.0986 8 464 300 150 n
2 - Legged###
6, 20 &
TB2 M 110 25 0 104.68 25.44 300 300 600 3.68 554 252.67 366.66 1.14 455 0 437 603 0 0.27 0.36 0.09 3 16 16 1 1 0.153 0.36 0.434 3.5 72.0986 8 -519 300 150 2 - Legged###
15
S 34 118 1 24.74 124.19 300 300 600 554 252.67 366.66 0.27 104 0 437 603 0 0.06 0.36 0.30 16 1 3 16 1 0.747 0.36 0.434 3.5 72.0986 8 465 300 150 2 - Legged###
S 9 31 1 7.89 37.59 300 300 400 354 161.46 149.71 0.21 52 0 279 402 0 0.05 0.38 0.33 16 1 2 16 1 0.354 0.38 0.442 3.5 46.9136 8 -1660 265.5 150 2 - Legged###
16, 27 &
TB3 M 17 18 0 12.36 18.12 300 300 400 3.68 354 161.46 149.71 0.33 81 0 279 402 0 0.08 0.38 0.30 2 16 16 1 1 0.171 0.38 0.442 3.5 46.9136 8 -538 265.5 150 2 - Legged###
34
S 24 37 1 21.92 43.69 300 300 400 354 161.46 149.71 0.58 146 0 279 402 0 0.14 0.38 0.24 16 1 2 16 1 0.411 0.38 0.442 3.5 46.9136 8 -4805 265.5 150 2 - Legged###
S 9 38 1 6.77 44.79 300 300 400 354 161.46 149.71 0.18 44 0 279 402 0 0.04 0.38 0.34 16 1 2 16 1 0.422 0.38 0.442 3.5 46.9136 8 -7285 265.5 150 2 - Legged###
33, 37 &
TB4 M 31 14 0 26.87 14.24 300 300 400 3.68 354 161.46 149.71 0.71 180 0 279 402 0 0.17 0.38 0.21 2 16 16 1 1 0.134 0.38 0.442 3.5 46.9136 8 -474 265.5 150 2 - Legged###
36
S 9 38 1 6.74 44.68 300 300 400 354 161.46 149.71 0.18 44 0 279 402 0 0.04 0.38 0.34 16 1 2 16 1 0.421 0.38 0.442 3.5 46.9136 8 -6937 265.5 150 2 - Legged###
Dia Spacing Nos of bar per meter span
8 90 11.1111111111111 558.2222
10 125 8 628
800
Mz kN-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0