fase: Hoflwrean Wt 2029-22 AI See HEA Supply and installation of
prefabricated ground water storage bolted tanks @T WATa7
pevararat
Yeh 9) area afta acim, Fag als Faw ASIM/ APT A-A/Yoo
F%.06/08/2029
ores srftrien( |) Ae, Aas als va w/e TT
3/9308 f8.03/99/2029
9) ota gt mettre fear Wr 2029-22 Ah aRaet £8.94/06/2029 UT GT
PROMS AA MS. TER TGA O-PVC WOH WATT SLA SAH GT. WY
‘Wax equine O-PVvc ug waelt Reception, storage, installation and Test instruction
Paeh IS 1GE¥U-20%L, ISO-9G 4822098 FUR WIT VTLS ATT. ASR WTA AT WATT
ang agar’ oxen aaa aia Taw 9 orTY YS HT SSE SST. A ATT
WA 2029-22 TA Ya Gla VSS ea MIATA MAI HVAT Aa sw.
3 Afar get wre Peart BA 2029-22 Th TRAE fF.94/06/2029 TT BE] PLAT
art ome. Wax waged yeti w.9 aT Supply and installation of
prefabricated ground water storage bolted tanks UT WATE PRAT ASH Me. TAX
adta ex 2 vigadl Brae araeah yedioae a adios wer adler gehts veteaT
GRedara Quo Hwa aad Hawa TAT YA HA SSSA SST.
UT FAR BA 20N9-22 VAM eer O-Pve ogy wae AIA AT MATT HT
Me m2 ahe aden wns wien wRBers Yao Ewa yea
erchomAnt are.
Tippank2Section H( Miscellaneous)
Sr] gyedtasra 9.3 £%.09/90/2029 FAR ‘omy arare
no
1 Diseription Diseription
Supply and installation of prefabricated ground
water storage bolted tanks, a complete package
in knockdown, ready to assemble construction
consisting of outer wall surface mad out of
special grade hot dip aluminum — Zink alloy,
metallic factory coated stee! confirming to IS
15961-2012 minimum thickness of 0.6 mm
‘The inner surface should be provided with liners
of minimum 0.6 mm thickness of reinforce
polyethylene or polypropylene or metallocene
material suitable for drinking water purpose.
Top cover shall be of polyethene tape
monophylament yarn or woven polypropylene
or corrugated G.l. Sheets Rate include cost of
inlet, outlet, overflow Pipes up to 5 m from
periphery of tank including ball valves of
standard quality , aluminum ladder, level
indicater, water tightness test, transportation up
to site of work and all taxes ete complete.
‘Supply and installation of prefabricated ground
water storage bolted tanks, a complete package in
knockdown, ready to assemble construction
consisting of outer wall surface mad out of
special grade hot dip aluminum — Zink alloy,
metallic factory coated steel confirming to I
15961-2012 minimum thickness of 0.6 mm
The inner surface should be provided with liners
of minimum 0.6 mm thickness of reinforce
polyethylene or polypropylene or metallocene
material suitable for drinking water purpose. Top
cover shall be of polyethene tape
monophylament yarn or woven polypropylene or
corrugated G.L. Sheets Rate include cost of inlet,
outlet, overflow Pipes up to 5 m from periphery
of tank including ball valves of standard quality
> aluminum ladder, level indicater, water
tightness test, transportation up to site of work
excluding GST levied by GOI & GOM in all
respect etc.complete,
2 | SA 2029-22 AI eyed O-PVC THEY eae! Reception, storage, installation and
Test instruction Wak IS 1 G8O-2O, ISO-9GEV2OW TUR GAT ASCH TAT
WATE BLOAT AT STS.
lad: 2 FAR O-Pve Ws ach WIT
Bamment anaa-rey
(LTTE)
eae aR aA
wen Re aiftraar
woh mere fer, yt
Wa A. wees wera, Ah Hag air are wear afore wee
wap atric, atta , were Peart oe aiBre/ skerate/ ararach/ APTER BEAT
reich @far arate
wa ohare afteicn avi Gear) / selene aftrien serail Prater a afriaer per,
ayia args atte
wa: Bo afta, srenaa Gas Gar, Hohe, Has Ula aelcrearSt a Hotere
WOTRIGR upload BRvaraTst
“Tippani2item No 3 : ORIENTED PVC PIPE (0-PVC)
RECEPTION, STORAGE, INSTALLATION AND TEST INSTRUCTIONS
15 15647-201, iS016902-2014
RECEPTION
After the reception othe pipes, itis necessary to check their state. Before Its Installation, you should
‘emove the caps and meke a sampling to verify that all the pipes are correct,
Checking the next points is particularly important:
‘The pipes should be free of dir.
‘* The chamferin the spigot end thoulé not be damaged,
CLETELEPTELLLIA
Technical Sheet - Installation Instructions,
395REALIZATION OF THE TRENCH
“The tench must be free of stones st the bottom and atthe sides,
‘Stones smaller then 20-20 mm are allowed, but they cannct be the main site of the ground particles
Depth of trench) Minimum with
35% Proctor Normal.
‘4, The trench must be filed withthe selected material and compacted laterally untl the upper part of
the pipe Is buried atleast 30 cm,
5! Steps 3 and 4 can bé done with the same natural material obtained from the excavation, eying to
‘avold rocks and large stones, and checking that this natural material ean support the forces
produced by che pressure inside of the pipe,
‘Technleal Sheet Installation instructions
397
: fe®
|
|
|
|ASSEMBLY
Remove'the protaction caps
Verify thatthe pipe is clean and In good condition. Paying ettention to the sockets and spigot
fends, Check that the chamfer s correct and free cf racks.
‘Verify that the sea isin ts place, clean and free of foreign materials (stones, sand, et).
Lubricate the chamferof the spigot and the seal with cint lubricant.
Line up the pipe as much as possible horizontal and vertically.
Insert only the chamfer edge ofthe socket, just 10 support the pipe but leaving the socket lp free.
‘= Inthe case of pipes with nominal diameter £250 mm, 2 frm and dry push should be given to seize the
‘momentum produced by the free movement inthe lip of the socket and introduce ft until the mark is
«hidden into the socket.
‘When installing diameters>250mm, one should use mechanical means to introduce the pipe using
materials such as Wood, hoists, tackles or slings.
Inthenext table, you can find an approximated number of assembiles per diameter with kg of lubricant
we) | 20] 20] 0] 00] azo fas [aso | 035] 5 [00 [so] sxleoo [eo
assemblies | 87| 76] 54 | 46| 24|32| 30] 25] 22 | a7 | 6] 4] az | 9.
PIPE CUTTING
~ Pipes can be cut transversally Using 2 circular saw or a hacksaw. The resulting male cut ends should be
‘chamfered in order to be entered manually in another socket pipe or fitting. The chamfer can be made with
‘8 circular saw and be reviewed later with 2 file. The chamfer should be approximately of 35°.
‘A mask myst be worn to prevent dust inhalation and protections and safety measures must to be taken for
cutting machines.
Pipes chamfered on-site are less accurate than those made at the factory. Because of that, they could
reauire higher introduction efforts or even require simple mechenical means to place the srigot inside the
socket
‘Technical Sheet Installation instructions
399)ANGULAR DEVIATION ALLOWED IN THE SOCKET
* ipadaiton o the euretre ofthe pipe, en angulr deviation i towed atthe Junetion between pipes:
‘Therefore Inthe fal layout ofthe pines, one can ada both affects,
{tis important not to exceed the established values of angular deviation nthe socket-end when bending the
on | _ssimamanginraevason | Obploamentinthe sect)
Es sede) Safe)
Sosco F 20
‘The plpe connections ean be subject to greater angular devistons Wf subjected to high stresses, fs
Fecommended.not to exceed those limits In order to avoid endangering the safety coeficients of the
‘sembly under pressure
FORCES PRODUCED BY THE BENDING OF THE PIPE
‘The bent pptine behaves ea narrow angle curve; ths means that there i ome backpressure onthe
{Pend a the ale be shows These cose presen, under noma canon om be pated by
Seticeriy compacted 3 stern, ¥rectory, tay soul be sippred wh sede a caste
conature
Forces ins curved pipe (a) 2) 2)
tae eae
oa ao fas a
a
so_[ eso [om [ao | ass | aoe | as
a0_[ oma] as [aay [30a
suo_| eae _| 078 | ase_| a7 [a7 [38
a86_| oso | at [an [gat at
- [avo [eee ne as [sr ae
3 | os | as [a [are sm] 0
EO EE
EE
EC A
a
a I a
EB
[a
soo [oss [426 [ast | tans [aa
(tector eat mewn
‘Technical Sheet nsiltation Instructions
401PIPE OVERLAPE
pipes are of sade length of 00 m lana, but dorng Iaying the folowing oustars ave be
Pee fac ner veducton i sandal pipx anath, Tw standard oveiags ae defined inte rex able
land maybe considered for estimating axl pipe lengths 2s below
Ditamy | is [ 160] too [aso [sis [eo [aso | soo
veriap [292 [sas [375 | 450 | saz [625 | 64 | 68
as | 775
EFFECT OF TEMPERATURE
= When the temperature ls high plestc pipes undérgos loss of mechanical properties and we must take
his nto sccount. Because ofthat, we must ayold the following conditions during pressure tests:
+ Pipe partially fully exposed to weathering line uncovered).
High outside temperature,
+ + Standing water inside the pipe. ‘
Prolonged sun exposure prior tothe test.
sbove its operating temperature, 0
Allthese eizcumstances may increase the temperature ofthe Pipe
is recommended to:
the overpressure test can damage the pipeine. i order to avots thal
cover the pipe once the tightness of the network levered.
epee tne pp as an apne
‘Technical Sheet- Installation instructions