You are on page 1of 7
Fer abrde, yet oer fearaey Th, Foie PRATT FAR, WoT TERT 1, a5 aR, x83 Veet de, de A Ta TM, Hy, Tx goog 1 trTaferEta 020-2R90RORY/2IVORORS eral: cemippn@gmall.com AH) GH GV YA 20N9-RA/YANTAG/QOY” FE.SR/ 99/2024 qe we fase: Hoflwrean Wt 2029-22 AI See HEA Supply and installation of prefabricated ground water storage bolted tanks @T WATa7 pevararat Yeh 9) area afta acim, Fag als Faw ASIM/ APT A-A/Yoo F%.06/08/2029 ores srftrien( |) Ae, Aas als va w/e TT 3/9308 f8.03/99/2029 9) ota gt mettre fear Wr 2029-22 Ah aRaet £8.94/06/2029 UT GT PROMS AA MS. TER TGA O-PVC WOH WATT SLA SAH GT. WY ‘Wax equine O-PVvc ug waelt Reception, storage, installation and Test instruction Paeh IS 1GE¥U-20%L, ISO-9G 4822098 FUR WIT VTLS ATT. ASR WTA AT WATT ang agar’ oxen aaa aia Taw 9 orTY YS HT SSE SST. A ATT WA 2029-22 TA Ya Gla VSS ea MIATA MAI HVAT Aa sw. 3 Afar get wre Peart BA 2029-22 Th TRAE fF.94/06/2029 TT BE] PLAT art ome. Wax waged yeti w.9 aT Supply and installation of prefabricated ground water storage bolted tanks UT WATE PRAT ASH Me. TAX adta ex 2 vigadl Brae araeah yedioae a adios wer adler gehts veteaT GRedara Quo Hwa aad Hawa TAT YA HA SSSA SST. UT FAR BA 20N9-22 VAM eer O-Pve ogy wae AIA AT MATT HT Me m2 ahe aden wns wien wRBers Yao Ewa yea erchomAnt are. Tippank2 Section H( Miscellaneous) Sr] gyedtasra 9.3 £%.09/90/2029 FAR ‘omy arare no 1 Diseription Diseription Supply and installation of prefabricated ground water storage bolted tanks, a complete package in knockdown, ready to assemble construction consisting of outer wall surface mad out of special grade hot dip aluminum — Zink alloy, metallic factory coated stee! confirming to IS 15961-2012 minimum thickness of 0.6 mm ‘The inner surface should be provided with liners of minimum 0.6 mm thickness of reinforce polyethylene or polypropylene or metallocene material suitable for drinking water purpose. Top cover shall be of polyethene tape monophylament yarn or woven polypropylene or corrugated G.l. Sheets Rate include cost of inlet, outlet, overflow Pipes up to 5 m from periphery of tank including ball valves of standard quality , aluminum ladder, level indicater, water tightness test, transportation up to site of work and all taxes ete complete. ‘Supply and installation of prefabricated ground water storage bolted tanks, a complete package in knockdown, ready to assemble construction consisting of outer wall surface mad out of special grade hot dip aluminum — Zink alloy, metallic factory coated steel confirming to I 15961-2012 minimum thickness of 0.6 mm The inner surface should be provided with liners of minimum 0.6 mm thickness of reinforce polyethylene or polypropylene or metallocene material suitable for drinking water purpose. Top cover shall be of polyethene tape monophylament yarn or woven polypropylene or corrugated G.L. Sheets Rate include cost of inlet, outlet, overflow Pipes up to 5 m from periphery of tank including ball valves of standard quality > aluminum ladder, level indicater, water tightness test, transportation up to site of work excluding GST levied by GOI & GOM in all respect etc.complete, 2 | SA 2029-22 AI eyed O-PVC THEY eae! Reception, storage, installation and Test instruction Wak IS 1 G8O-2O, ISO-9GEV2OW TUR GAT ASCH TAT WATE BLOAT AT STS. lad: 2 FAR O-Pve Ws ach WIT Bamment anaa-rey (LTTE) eae aR aA wen Re aiftraar woh mere fer, yt Wa A. wees wera, Ah Hag air are wear afore wee wap atric, atta , were Peart oe aiBre/ skerate/ ararach/ APTER BEAT reich @far arate wa ohare afteicn avi Gear) / selene aftrien serail Prater a afriaer per, ayia args atte wa: Bo afta, srenaa Gas Gar, Hohe, Has Ula aelcrearSt a Hotere WOTRIGR upload BRvaraTst “Tippani2 item No 3 : ORIENTED PVC PIPE (0-PVC) RECEPTION, STORAGE, INSTALLATION AND TEST INSTRUCTIONS 15 15647-201, iS016902-2014 RECEPTION After the reception othe pipes, itis necessary to check their state. Before Its Installation, you should ‘emove the caps and meke a sampling to verify that all the pipes are correct, Checking the next points is particularly important: ‘The pipes should be free of dir. ‘* The chamferin the spigot end thoulé not be damaged, CLETELEPTELLLIA Technical Sheet - Installation Instructions, 395 REALIZATION OF THE TRENCH “The tench must be free of stones st the bottom and atthe sides, ‘Stones smaller then 20-20 mm are allowed, but they cannct be the main site of the ground particles Depth of trench) Minimum with 35% Proctor Normal. ‘4, The trench must be filed withthe selected material and compacted laterally untl the upper part of the pipe Is buried atleast 30 cm, 5! Steps 3 and 4 can bé done with the same natural material obtained from the excavation, eying to ‘avold rocks and large stones, and checking that this natural material ean support the forces produced by che pressure inside of the pipe, ‘Technleal Sheet Installation instructions 397 : fe® | | | | ASSEMBLY Remove'the protaction caps Verify thatthe pipe is clean and In good condition. Paying ettention to the sockets and spigot fends, Check that the chamfer s correct and free cf racks. ‘Verify that the sea isin ts place, clean and free of foreign materials (stones, sand, et). Lubricate the chamferof the spigot and the seal with cint lubricant. Line up the pipe as much as possible horizontal and vertically. Insert only the chamfer edge ofthe socket, just 10 support the pipe but leaving the socket lp free. ‘= Inthe case of pipes with nominal diameter £250 mm, 2 frm and dry push should be given to seize the ‘momentum produced by the free movement inthe lip of the socket and introduce ft until the mark is «hidden into the socket. ‘When installing diameters>250mm, one should use mechanical means to introduce the pipe using materials such as Wood, hoists, tackles or slings. Inthenext table, you can find an approximated number of assembiles per diameter with kg of lubricant we) | 20] 20] 0] 00] azo fas [aso | 035] 5 [00 [so] sxleoo [eo assemblies | 87| 76] 54 | 46| 24|32| 30] 25] 22 | a7 | 6] 4] az | 9. PIPE CUTTING ~ Pipes can be cut transversally Using 2 circular saw or a hacksaw. The resulting male cut ends should be ‘chamfered in order to be entered manually in another socket pipe or fitting. The chamfer can be made with ‘8 circular saw and be reviewed later with 2 file. The chamfer should be approximately of 35°. ‘A mask myst be worn to prevent dust inhalation and protections and safety measures must to be taken for cutting machines. Pipes chamfered on-site are less accurate than those made at the factory. Because of that, they could reauire higher introduction efforts or even require simple mechenical means to place the srigot inside the socket ‘Technical Sheet Installation instructions 399) ANGULAR DEVIATION ALLOWED IN THE SOCKET * ipadaiton o the euretre ofthe pipe, en angulr deviation i towed atthe Junetion between pipes: ‘Therefore Inthe fal layout ofthe pines, one can ada both affects, {tis important not to exceed the established values of angular deviation nthe socket-end when bending the on | _ssimamanginraevason | Obploamentinthe sect) Es sede) Safe) Sosco F 20 ‘The plpe connections ean be subject to greater angular devistons Wf subjected to high stresses, fs Fecommended.not to exceed those limits In order to avoid endangering the safety coeficients of the ‘sembly under pressure FORCES PRODUCED BY THE BENDING OF THE PIPE ‘The bent pptine behaves ea narrow angle curve; ths means that there i ome backpressure onthe {Pend a the ale be shows These cose presen, under noma canon om be pated by Seticeriy compacted 3 stern, ¥rectory, tay soul be sippred wh sede a caste conature Forces ins curved pipe (a) 2) 2) tae eae oa ao fas a a so_[ eso [om [ao | ass | aoe | as a0_[ oma] as [aay [30a suo_| eae _| 078 | ase_| a7 [a7 [38 a86_| oso | at [an [gat at - [avo [eee ne as [sr ae 3 | os | as [a [are sm] 0 EO EE EE EC A a a I a EB [a soo [oss [426 [ast | tans [aa (tector eat mewn ‘Technical Sheet nsiltation Instructions 401 PIPE OVERLAPE pipes are of sade length of 00 m lana, but dorng Iaying the folowing oustars ave be Pee fac ner veducton i sandal pipx anath, Tw standard oveiags ae defined inte rex able land maybe considered for estimating axl pipe lengths 2s below Ditamy | is [ 160] too [aso [sis [eo [aso | soo veriap [292 [sas [375 | 450 | saz [625 | 64 | 68 as | 775 EFFECT OF TEMPERATURE = When the temperature ls high plestc pipes undérgos loss of mechanical properties and we must take his nto sccount. Because ofthat, we must ayold the following conditions during pressure tests: + Pipe partially fully exposed to weathering line uncovered). High outside temperature, + + Standing water inside the pipe. ‘ Prolonged sun exposure prior tothe test. sbove its operating temperature, 0 Allthese eizcumstances may increase the temperature ofthe Pipe is recommended to: the overpressure test can damage the pipeine. i order to avots thal cover the pipe once the tightness of the network levered. epee tne pp as an apne ‘Technical Sheet- Installation instructions

You might also like