You are on page 1of 3

Condition of

Activity (Routine/
No. Activity Hazard Consequence
Non Routine/
Emergency)

Using computer to print packing list or other


1 Routine Computer Screen
Docs

Lorry load fixing measure criteria

2 Fabric Unloading to trolley

3 Accessories Unloading to trolley Routine Working Posture

4 Inspection process Routine Working posture

5 Making a accessory kit Routine Hoist

Storing the carton and unlading the carton


6 Routine Work at height
from rack

7 Using computer to print pick list or other Docs

8 Sending it using the conveyor belt

Wheels of the loaded


9 Loading to cut kit bin Routine
trolley

10 Store back again Routine Work posture

Loading to AGV and taking goods to Sewing


11 Routine Reparing
floor

11 Rack collapsed NOnRoutine Racks

12 Building Collpsed NOnRoutine Building

Faulty Machine switch


13 Using Conveyor Belt Routine
and panel board

16 Use of stairs Routine


Staircase

17 Use of stairs Routine


Sharpedges

18 Work at unloading bay Routine Unloading bay plat form

Using computor to print packing list or other Computer Screen


19 Routine
Docs

20 Routine Working Posture

21 Fabric Unloading to trolley Routine Fabric rolls

22 Cut a sample to inspect color shading Routine Working posture

23 Routine Scissors

24 Issue 10% sample to inspect Routine

25 Pushing pulling the trolley to RM stores Routine Loaded trolley

26 Using Hoist Routine

Pushing or pulling the trolley on mezzanine


27 Routine
floor

Storing the fabric rolls and unlading the rolls


28 Routine
from rack

using the gravity conveyor to move down the


29 Routine
fabric rolls

30 Routine

Pushing pulling the trolley to Cutting or


31 Routine
inspection

Faulty Machine switch


32 Routine and panel board
Using Inspection machine
33
Storing fabric lapping

34 Routine Storage
Storage
Condition of
Activity (Routine/
No. Activity Hazard Consequence
Non Routine/
Emergency)

You might also like