Sub.: Formal Work Order for the work Construction of Guthuri Solar Powered MDTWS and
Mahammadpur Solar Powered MDTWS under RIDF-XXVI (NABARD).
Value of work:-Rs. 58,92,098.00
Timeof completion:- 12 Months.
Ref. (i) NIT No. SBG/T/30/21/13, Date: 29.06.2021.
(ii). Preliminary Work Order No. BCI/TECH/WO/25/02, Date 27.12.2021.
Dear Sir,
As you have signed the formal tender agreement and deposited the performance security, the
work of construction of Guthuri Solar Powered
MDTWS and Mahammadpur Solar Powered MDTWS
under RIDF-XXVI (NABARD) is allotted to
you at an accepted rate of Rs. 58,92,098.00 (Rupees Fifty
eight lakh ninety two thousand ninety eight) only under the following Division of Irrigation Department.
1) The Secretary to the Government of Assam, Irrigation Department, Dispur, Guwahati-06, for
favour of his kind information.
2) The Chief Engineer, Irrigation, Assam, Chandmari, Guwahati-03, for favour of his kind
information.
3) 6) The Executive Engineer, Sorbhog-Jania Division, Irrigation, Sorbhog (i)The Executive
Engineer, Barpeta-Baghbor Division, Irrigation, Barpeta for information and necessary action.
Please note that the executing authority for Mahammadpur Solar Powered MDTWS will be the
Executive Engineer, Sorbhog-Jania Division, Irrigation, Sorbhog and the executing authority for
Guthuri Solar Powered MDTWS will be the Executive Engineer, Barpeta-Baghbor Division,
Irrigation, Barpeta. Payment authority will be as per revised Administrative Approval issued by
the compelent authority subsequently.
4) The Assistant Executive Engineer, Barpeta Sub-Division. Irrigation, Barpeta and thelAssistant
Executive Engineey, Jania Sub-Division, Irrigation, Kaigachia for information and necessary
action.
Keup n o6 9
46
heoessay2 mere compleion of works,
breaking clods in returm filing, dressing, ramning, watering etc. and removal
as directed and specífed in following cassification kof soils,
of surplus eath with alead and
lit upto including bailing out of water where necessary upto depth below the
exstng ground level as menion in the approved drawing and as directed and specified.
In Ordinary soi
Supplying. fiting. fixing PVC pipes (IS 12818, 6 kg/cm2), joining pipes with relevent cement, ieveling, testing leakages etc. complete as directed. 860.00 Rm 1071.00 (Rupees One Thousand and Seventy One) Onily
(Cost of EW foundaton trenches will be paid seperately)
47
A 160mm dia_
B) 110 mm dia 700.00 Rm 524.00 (Rupees Five Hundred Twenty Four) Only
Supplying. Fiting, fixing PVC unequal tee joining with pipes with solvent cement, testing leakages elc. complete as directed. 12.00 No. 1066.00 (Rupees One Thousand and Sixty Six) Only
48
Supplyving. fiting, fixing PVC reducer joining with pipes with solvent cement, testing leakages etc. complete as directed 2.00 No. 503.00 (Rupees Five Hundred and Three) Only
49
50 Supplying, fiting, fixing. joining of PVC end cap fiting with solvent cement as per specification including local camiage, testing leakages etc. 14.00 No.
242.00 (Rupees Two Hundred Forty Two) Only
complete as directed
G Construction of Spout Chamber (7 nos.)
refiling (retum filing) the quantüly as 10.98 Cum 431.00 (Rupees Four Hundred Thirty One) Only
Earthwork in excavation trenches of walls retaining walls, footing of columns, steps and septic tank including
necessary aftaer completion of works, breaking ciods in returm filing, dressing, ramming, watering etc. and removal of surplus
earthwith alllead and
kof soils, including baiing out of water where necessary upto depth below the
51 ut upto 2 metre as directed and speciñed in following classification
and as directed and
existing ground level as menion in the approved drawing specified.
in Ordinar soil
4.12 6624.00 (Rupees SixThousand Six Hundred Twenty Four)
CC workinproportion1:36infoundation / abutment / piers / with walls elc. with with hard broken stone ag9. Of size 13mm to 38mm including
Curing with necessary tmber shuttering, scafiolding etc where necessary complete as directed (shutteing, scafolding cost will be paidseperately)
Cum
52 Only
53 1st brick war in ementmorterin abutmentandwingwall,parapet walletc. inciuing racking out joints and curing etc. complete (n proporion 1:4) 6.86 Cum 8708.00 (Rupees Eight Thousand Seven Hundred and
Eight)Only
12mm cement piastering inciuding dleaning surface and cuning complete as directed 54.24 Sqm 189.00 (Rupees One Hundred Eighty Nine) Only
54 an prop. 1:4
Suppiying, fting, fxing 110mm dia PVC rising pipe from the top of mmain line including local cariage, testing leakage etc. complete as directed. 14.00 No. 743.00 (Rupees Seven Hundred Forty Three) Only
55
56 Supplying, fiting,iing PVCbendpipeszejoiningwithpipeswithsolvent cement, testing leakages elc. complete as directed. 14.00 NO. 642.00 (Rupees Six Hundred Forty Two) Only
57
Supplying, fiting,fxing PVCpipes(IS 12818,4kg/cm2),joining pipes
(Cost of EW foundation trenches will be paid seperately)
with relevent cement, levelling, testing leakages elc. complele as directed 16.80 Rm 524.00 (Rupees Five Hundred Twenty Four) Only
110mm dia
Superiniending Engineer
Page 4 of 5 Barpe Circle Jmigatiorn
&aipaa Road