ABSTRACT OF COST
A . CIVIL PART
1 . Final survey = Rs. #N/A
2 . Land acquisition = Rs. 45,000.00
3 . Construction underground PVC pipe distribution system = Rs. #N/A
4 . Construction of spout chamber = Rs. #N/A
5 . Construction of goat proof boundary fencing = Rs. #N/A
6 . Construction of Approach Road = Rs. #N/A
7 Construction of Control Room = Rs. #N/A
8 Construction of Sign Board = Rs. 11,900.00
Total = Rs. #N/A
Add 1% for contingency ( Except item at Sl. No. 2) = Rs. #N/A
Add 1% for labour cess ( Except items at Sl. No. 2) = Rs. #N/A
TOTAL COST OF CIVIL WORKS = Rs. #N/A
Say = Rs. #N/A
B . MECHANICAL PART
9 . Boring , installation of DTW, supply & installation surge
tank, delivery pipes, accessories etc. = Rs. 1,493,700.00
Executive Engineer
Dhubri Division (Irrigation)
Gauripur
CONSTRUCTION OF KURIRPAR DTWS
Detailed estimate for final survey
Item No. 1 : Carrying out levelling survey, taking long section including cross section at 30 M interval of proposed
canal system, aflux bund, guide bund, approach road and along the stream including chaining, pegging, holding staff
carrying out instrument, clearing jungle etc., complete as directed
(Total Station machine will be supplied by the department).
Quantity = 25.00 Ha
Total = 25.00 Ha
@ Rs. 1082.61 /Ha ( As per CE's SOR 2017-18) = Rs. 27,065.00
Item No. 2 : Supplying sal wooden peg of different sizes including pointing one end etc. complete as directed.
Size = 5.0 cm x 5.0 cm x 60
cm
Quantity = 83.00 No.
@ Rs. 99.14 / No. ( As per CE's SOR 2017-18) = Rs. 8,229.00
Item No. 3 : Supplying sal wooden hammer of of size 15 cm x 10 cm with 45 cm long & 5 cm wooden handle etc.
complete as directed.
Quantity = 5.00 No
@ Rs. 495.73 / No. ( As per CE's SOR 2017-18) = Rs. 2,479.00
Item No. 4 : Construction of RCC BM Pillar of size 0.15 M X 0.10 M in proportion 1:2:4 with required reinforcement
including E/W in excavation, brick soling, centering, shuttering and propping, etc. complete as directed.
Quantity = 1.00 No
@ Rs. 3145.74 / No. ( As per CE's SOR 2017-18) = Rs. 3,146.00
Total = Rs. 40,919.00
Cost excluding VAT = Rs. 38,602.83
Add 12% for GST = Rs. 4,632.34
Grand Total = Rs. 43,235.17
Say = Rs. #N/A
Rupees Forty Three Thousand Four Hundred Only
Executive Engineer
Dhubri Division (Irrigation)
Gauripur
CONSTRUCTION OF KURIRPAR DTWS
Estimate for Land Acquisition
Executive Engineer
Dhubri Division (Irrigation)
Gauripur
CONSTRUCTION OF KURIRPAR DTWS
Detailed estimate for construction of P.V.C. distribution system
Item No. 1: Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing
dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place
and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube
with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
a. All type of soil except soil mixed with gravel and boulders
For normal lead of 30m and lift of 1.50m
900.00 x 0.75 x 0.75 = 506.25 m3
750.00 x 0.75 x 0.75 = 421.88 m3
Total = 928.13 m3
@Rs. 184.16 /m3 ( As per CE's SOR 2017-18) = Rs.170,924.00
Item No. 2 Supplying fitting fixing of P.V.C. pipe (IS 12818, 4kg/cm2 ) , joining pipes with relevant cement ,levelling
, testing leakages etc. complete as directed .(Cost of earth work foundation trenches will be paid separately)
Executive Engineer
Dhubri Division (Irrigation)
Gauripur
CONSTRUCTION OF KURIRPAR DTWS
Estimate for Construction of Spout Chamber
Item No. 1: Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing
dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place
and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube
with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
a. All type of soil except soil mixed with gravel and boulders
For normal lead of 30m and lift of 1.50m
Column 1 x 0.40 x 0.40 x 1.30 = 0.21 m3
Cross Wall 2 x 0.60 x 0.25 x 0.30 = 0.09 m3
Long Wall 2 x 1.35 x 0.25 x 0.30 = 0.20 m3
2 x 1.10 x 0.25 x 0.30 = 0.17 m3
1 x 0.85 x 0.25 x 0.30 = 0.06 m3
Floor 1 x 0.60 x 0.60 x 0.10 = 0.04 m3
2 x 1.00 x 0.60 x 0.10 = 0.12 m3
Curtain Wall 1 x 0.60 x 0.60 x 0.10 = 0.04 m3
Total = 0.93 m3
@Rs. 184.16 /m3 ( As per CE's SOR 2017-18) = Rs. 171.00
Item No. 2: 1st class brick work in cement mortar in abutment and wing wall, parapet wall tc.including racking out
joints and curing etc. complete in prop. 1:4 .
Cross Wall 2 x 0.60 x 0.25 x 0.90 = 0.27 m3
Long Wall 2 x 0.35 x 0.25 x 0.90 = 0.16 m3
1 x 1.10 x 0.25 x 0.90 = 0.25 m3
Side Wall 4 x 1.20 x 0.25 x 0.30 = 0.36 m3
4 x 1.00 x 0.125 x 0.55 = 0.28 m3
Curtain Wall 2 x 1.10 x 0.25 x 0.60 = 0.33 m3
Total = 1.65 m3
@Rs. 7760.19 /m 3
( As per CE's SOR 2017-18) = Rs. 12,804.00
Item No. 3: C.C work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone
agg. of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc.where necessary
complete as directed. (Shuttering, scaffolding cost will be paid separately).
Executive Engineer
Dhubri Division (Irrigation)
Gauripur
CONSTRUCTION OF KURIRPAR DTWS
Estimate for goat proof boundary fencing
Item No. 1: Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing
dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place
and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube
with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
2 x 30.00 = 60.00 m
2 x 20.00 = 40.00 m
Deduction for Gate 1 x 2.00 = -2.00 m
Total = 98.00 m
@Rs. 530.42 /m (As per APWD S.R. 2013-14) = Rs. 51,981.00
Item No. 8 : Supplying, fitting and fixing double leaf heavy duty iron gate, frame made from 40mm x 40mm x 6mm
M.S. angle and with M.S. flat of 40mm x 6mm size as per approved design.Necessary locking arrangement for
temporary closing the gate and 2nos.( minimum) strong iron hinges of M.S bars and flat of same sizes on each leaf to
be embedded in C.C brick pillers as necessary including a red oxide painting to all iron works as directed and
specified.(Separate payment will be made for posts).
1 x
2.00 x 1.80 x 1.00 = 3.60 qtl
@Rs. 6,808.23 (As
/qtl. per APWD S.R. 2013-14) = Rs. 24,510.00
Total = Rs. 235,022.00
Cost excluding VAT = Rs. 221,718.87
Add 12% for GST = Rs. 26,606.26
Grand Total = Rs. 248,325.13
Say = Rs. #N/A
(Rupees Two Lakh Forty Eight Thousand Three Hundred Only)
Executive Engineer
Dhubri Division (Irrigation)
Gauripur
CONSTRUCTION OF KURIRPAR DTWS
Detailed estimate for Approach Road
Item No. 1: Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design
section and grade by obtaining earth from outside borrow pits and filling in uniform layer not exceeding 15cm thick
including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat at
embankment and borrow pit area, breaking clods not more than 10mm cube, ramming, watering, dressing and
roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if
any, lead upto 30 M and lift upto 1.5 M complete as directed.
A) Ordinary soil
7.50 + 4.50
50.00 mx mx 1.00 m = 300.00 m3
2
Total = 300.00 m3
@Rs. 211.85 /m3 ( As per CE's SOR 2017-18) = Rs. 63,555.00
EXTRA LEAD AND LIFT
Extra lead (for earth work) for every 30 M or part thereof beyond the initial lead of 30M
Lead = 4 No
Qnty = 4 x 300.00 = 1200 m3
@Rs. 11.64 /m3 ( As per CE's SOR 2017-18) = Rs. 13,968.00
Item No. 2 : Collection and supply of sand and gravel (40% sand and 60% gravel) of size 13mm to 38mm from
approved quarry including loading, unloading and stacking in measurable stacks at work site up to a height of 1.00m
including payment of forest royality etc.
Executive Engineer
Dhubri Division (Irrigation)
Gauripur
CONSTRUCTION OF KURIRPAR DTWS
Estimate for Construction of Control Room
Item No. 1 : Earth work in excavation fof foundation trenches including filling up sides of trenches and removal
of spoils after completion of foundation , dressing, ramming, shoring etc. complete including bailing out water
where necessary in ordinary soil.
Long wall 3 x 2.50 x 0.40 x 0.40 = 1.20 m3
Short wall 2 x 1.00 x 0.40 x 0.40 = 0.32 m3
2 x 0.60 x 0.40 x 0.40 = 0.19 m3
Total = 1.71 m3
@ Rs. 201.30 / m3 ( As per SOR, CE(I) 2017-1 = Rs 344.22
Item No. 2 : CC Work in proportion 1:3:6 in foundation /abutment/ pier/wing walls etc. with hard broken stone
aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary,
complete as directed. (shuttering where necessary shall be measured and paid separately).
The rate is inclusive of cost of cube test before is inclusive of cost of cube test before starting the work i.e. 3 nos
per each lot of cement as directed and specified.
In the ties and plinth beam in foundation shaped testing of column pile cap base slab retaining walls of septic
tank inspection pit intercepting trap . yard gully including formation of trap slap of septic tank etc. upto plinth
level in prop 1:2:4.
Executive Engineer
Dhubri Division (Irrigation)
Gauripur
PWD
0.95
CONSTRUCTION OF KURIRPAR DTWS
Detail estimate for construction of Sign Board
Item No. 1 : Supply of sign board made of 1.60mm thick MS iron sheet fitted with steel frame of size 1.05 m x 0.75m
fixed with 2 Nos. 50mm dia GI (medium) pipes 2.10m above and 0.60m below ground fitted with C.C. work in
proportion 1:3:6 and size 0.45m x 0.45m x 0.60m below ground including painting with approved paint including writing
letters complete as directed.
Executive Engineer
Dhubri Division (Irrigation)
Gauripur
CONSTRUCTION OF KURIRPAR DTWS
Estimate for base pillar for Solar Module Mounting Structure
( For one number pillar)
Item No. 1 : Earth work in excavation fof foudation trenches including filling up sides of trenches and removal of
spoils after completion of foundation , dressing, ramming, shoring etc. complete including bailing out water where
necessary in ordinary soil.
1 x 1.50 x 1.50 x 1.50 = 3.38 m3
@ Rs. 201.30 / m3 ( As per SOR, CE(I) 2017-18 ) = Rs. 680.39
Item No. 2 : Soling in foundation in floor at all level septic tank etc. including filling interstices ramming etc.
complete as directed and as specified thickness
(i) 9 cm brick on flat including sand packing.
1 x 1.50 x 1.50 = 2.25 m2
@ Rs. 502.08 / m2 ( As per SOR, CE(I) 2017-18 ) = Rs. 1129.68
Item No. 3 : CC Work in proportion 1:3:6 in foundation /abutment/ pier/wing walls etc. with hard broken stone
aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary,
complete as directed. (shuttering where necessary shall be measured and paid separately).
The rate is inclusive of cost of cube test before is inclusive of cost of cube test before starting the work i.e. 3 nos per
each lot of cement as directed and specified.
In the ties and plinth beam in foundation shaped testing of column pile cap base slab retaining walls of septic tank
inspection pit intercepting trap . yard gully including formation of trap slap of septic tank etc. upto plinth level in
prop 1:2:4.
(a) M 15 grade
Base 1 x 1.50 x 1.50 x 0.15 = 0.34 m3
1 x 1.00 x 1.00 x 0.30 = 0.30 m3
1 x 0.50 x 0.50 x 1.07 = 0.27 m3
Total = 0.91 m3
@ Rs. 8323.06 / m3 ( As per SOR, CE(I) 2017-18 ) = Rs. 7573.98
Item No. 7 : Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers,
Quantity = 1/3rd of item No. 1 = 1.13 m3
@ Rs. 286.57 / m3 ( As per SOR, CE(I) 2017-18 ) = Rs. 323.82
Item No. 8 : 20mm dia bolt ( 6 Nos.) ( As per market rate) = Rs. 1000.00
Total = Rs. 17,455.19
Say = Rs. #N/A
Cost for 4 no.s of Pillar = Rs #N/A