ANNEXURE - I

DAILY MAINTENANCE CHECKLIST OF ELECTRO MECHANICAL EQUIPMENTS AND AUTOMATION SYSTEM OF MASSANJORE DAM

DAILY CHECKING FOR THE MONTH OF :-


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

A. GATE AND HOIST


1 Entrance to all hoist platforms shall be kept locked. All
keys shall remain with the authorized operating supervisor

2 The gate operation should be trouble free and there


should not be unusual sound
3 Alarm siren is working in order

4 Daily inspection of hoist and gate to ensure that there are


no unusual happenings.

B ELECTRICAL SYSTEM

1 Ensured that power supply is at 440/400 volts.

2 Ensure that phase sequence of the starter and motor is


proper.
3 Ensure that limit switches are positioned at desired levels.

4 Check all power indicating lamps are functionning.

5 Check that there is no sign of heating up, burning smell,


decolouration or sparking at any of the boards (SDBs as
well as main boards),

6 The spaces in front of DB’s and sockets are free (without


any storage of fi les/ papers etc.)

Page 1 of 6
ANNEXURE - I

DAILY MAINTENANCE CHECKLIST OF ELECTRO MECHANICAL EQUIPMENTS AND AUTOMATION SYSTEM OF MASSANJORE DAM

DAILY CHECKING FOR THE MONTH OF :-


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

C AUTOMATION SYSYTEM INCLUDING NETWORKING TELEMETRY


& INSTRUMENTATION

1 All VDU (Visual Display Unit) of system working propery.

2 Ensure all control voltage of system for unit is correct.

3 All network path (OFC & Cat- cable and wire ) is healthy.

4 Telemetry system working properly.

5 Ensure all field instruments & sensores are functioning (i.e.


all Level sensors, encoders, Local PLC, ADCP and others)

6 Ensure all servers of sysytem are in working mode

7 Ensure all UPS for system at cetral & remote in proper


functionning
8 Ensure SMS Tiggering is working

9 Ensure all siren is healthy

10 Ensure CCTV/ SCADA Surveillance Network is healty in all


respect.
11 Ensure all network with all redundency sytem for
automation keep in functionning.

Page 2 of 6
ANNEXURE - II

MONTHLY MAINTENANCE CHECKLIST OF ELECTRO MECHANICAL EQUIPMENTS AND AUTOMATION SYSTEM OF MASSANJORE DAM

MONTHLY CHECKING Jan Feb Mar April May June July Aug Sep Oct Nov Dec Remarks

A GATE AND HOIST


1 Clean the dust of all hoisting machinery and hoist platform.

2 Check oil level in gear boxes and replenish wherever


required with oil of proper grade
3 Lubricate all bearings, bushings, pins, linkages, etc. with
grease of suitable grade by grease gun
4 Check all bolts and nuts on gear boxes, hoist drum and
shaft couplings and other points for tightness

5 Check wheel rotation by hand for free rotation greased


properly if needed.
6 Remove all dirt, girt, etc. from trunnion assembly and
lubricate trunnion bearings with suitable water resisting
grease
7 Check Seals and seal seating for leakages. Locations of
excessive leakages shall be recorded for taking remedial
measures.
8 Check welds at critical points like between yoke girder web
and tie flats, between trunnion and tie between turnnion,
lifting bracket and gate

B ELECTRICAL SYSTEM

1 Clean the dust of all panels, enclosures and hoisting


machinery and hoist platform
2 Check all the fuses/ MCCB/MCB on power lines and ensure
closing of panel board covers not to entry of dust and
moist
3 Check the supply voltage

4 All Starters (DOL, VFD & soft Starter) should be cleaned


free of moisture and dust and working properly.

5 Each individual contactor /relay should be examined to


make sure that it operated freely.

Page 3 of 6
ANNEXURE - II

MONTHLY MAINTENANCE CHECKLIST OF ELECTRO MECHANICAL EQUIPMENTS AND AUTOMATION SYSTEM OF MASSANJORE DAM

MONTHLY CHECKING Jan Feb Mar April May June July Aug Sep Oct Nov Dec Remarks

6 Check all connections / terminals so that no wires are


broken and no connections are loose
7 Check all relays and meters physically.

8 Checking tightness of all the control and power cable


connection.
9 Check all protections for motors.

10 Check all the contactors for proper operation.

C AUTOMATION SYSYTEM INCLUDING NETWORKING TELEMETRY


& INSTRUMENTATION

1 All VDU (Visual Display Unit) of system working propery.

2 Ensure all control voltage of system for unit is correct.

3 All network path (OFC & Cat- cable and wire ) is healthy.

4 Telemetry system working properly.

5 Ensure all field instruments & sensores are functioning (i.e.


all Level sensors, encoders, Local PLC, ADCP and others)

6 Ensure all servers of sysytem are in working mode

7 Ensure all UPS for system at cetral & remote in proper


functionning
8 Ensure SMS Tiggering is working

9 Ensure all siren is healthy

10 Ensure CCTV/ SCADA Surveillance Network is healty in all


respect.
11 Ensure all network with all redundency sytem for
automation keep in functionning.

Page 4 of 6
ANNEXURE - III

HALF YEARLY/YEARLY MAINTENANCE OF ELECTRO MECHANICAL EQUIPMENTS AND AUTOMATION SYSTEM OF MASSANJORE DAM

HALF YEARLY/YEARLY CHECKING 1 2 Remarks

A GATE AND HOIST

1 Clean the dust of all hoisting machinery and hoist platform.

2 Lubricate the wire rope.

3 Check gear boxes for oil leakage, if any rectify and topup.

4 Check the condition of gear oil and it should be changed every 5000
hours of working.

5 All the nuts and bolts of trunnion assembly and its anchorages shall
be checked for tightness
6 All the geared couplings shall be greased

7 Check all the welds for soundness and rectify defects; if any

8 Clean all drain holes including those in end arms, horizontal girders
trunnion and pulley blocks

9 Check all nuts and bolts for tightness and tighten them; if loose

10 The wheel bearings and guide rollers shall be lubricated

11 Check tightness of all coupling bolts of motor to worm reducer, gear


boxes and line shaft.

B ELECTRICAL SYSTEM

1 Overhaul the controllers

2 Inspect and clean circuit breakers

3 Change oil in stand by generator

4 Check earth connections and motor leads

5 Check motor windings for overheating

6 Check Solenoids Operated Brakes

Page 5 of 6
ANNEXURE - III

HALF YEARLY/YEARLY MAINTENANCE OF ELECTRO MECHANICAL EQUIPMENTS AND AUTOMATION SYSTEM OF MASSANJORE DAM

HALF YEARLY/YEARLY CHECKING 1 2 Remarks

7 Check gate limit switches and adjust.

7 Check exposed electrical wiring of

a Operating equipment of gates / valves / hoists

b From supply point to main switch

c Main switch to starter

d Starter to motor

e From starter to all lighting points, availability of bulbs and its


glowing

C AUTOMATION SYSYTEM INCLUDING NETWORKING TELEMETRY &


INSTRUMENTATION

1 All VDU (Visual Display Unit) of system working propery.

2 Ensure all control voltage of system for unit is correct.

3 All network path (OFC & Cat- cable and wire ) is healthy.

4 Telemetry system working properly.

5 Ensure all field instruments & sensores are functioning (i.e. all Level
sensors, encoders, Local PLC, ADCP and others)

6 Ensure all servers of sysytem are in working mode

7 Ensure all UPS for system at cetral & remote in proper functionning

8 Ensure SMS Tiggering is working

9 Ensure all siren is healthy

10 Ensure CCTV/ SCADA Surveillance Network is healty in all respect.

11 Ensure all network with all redundency sytem for automation keep
in functionning.

Page 6 of 6