DAILY MAINTENANCE CHECKLIST OF ELECTRO MECHANICAL EQUIPMENTS AND AUTOMATION SYSTEM OF MASSANJORE DAM
B ELECTRICAL SYSTEM
Page 1 of 6
ANNEXURE - I
DAILY MAINTENANCE CHECKLIST OF ELECTRO MECHANICAL EQUIPMENTS AND AUTOMATION SYSTEM OF MASSANJORE DAM
3 All network path (OFC & Cat- cable and wire ) is healthy.
Page 2 of 6
ANNEXURE - II
MONTHLY MAINTENANCE CHECKLIST OF ELECTRO MECHANICAL EQUIPMENTS AND AUTOMATION SYSTEM OF MASSANJORE DAM
MONTHLY CHECKING Jan Feb Mar April May June July Aug Sep Oct Nov Dec Remarks
B ELECTRICAL SYSTEM
Page 3 of 6
ANNEXURE - II
MONTHLY MAINTENANCE CHECKLIST OF ELECTRO MECHANICAL EQUIPMENTS AND AUTOMATION SYSTEM OF MASSANJORE DAM
MONTHLY CHECKING Jan Feb Mar April May June July Aug Sep Oct Nov Dec Remarks
3 All network path (OFC & Cat- cable and wire ) is healthy.
Page 4 of 6
ANNEXURE - III
HALF YEARLY/YEARLY MAINTENANCE OF ELECTRO MECHANICAL EQUIPMENTS AND AUTOMATION SYSTEM OF MASSANJORE DAM
3 Check gear boxes for oil leakage, if any rectify and topup.
4 Check the condition of gear oil and it should be changed every 5000
hours of working.
5 All the nuts and bolts of trunnion assembly and its anchorages shall
be checked for tightness
6 All the geared couplings shall be greased
7 Check all the welds for soundness and rectify defects; if any
8 Clean all drain holes including those in end arms, horizontal girders
trunnion and pulley blocks
9 Check all nuts and bolts for tightness and tighten them; if loose
B ELECTRICAL SYSTEM
Page 5 of 6
ANNEXURE - III
HALF YEARLY/YEARLY MAINTENANCE OF ELECTRO MECHANICAL EQUIPMENTS AND AUTOMATION SYSTEM OF MASSANJORE DAM
d Starter to motor
3 All network path (OFC & Cat- cable and wire ) is healthy.
5 Ensure all field instruments & sensores are functioning (i.e. all Level
sensors, encoders, Local PLC, ADCP and others)
7 Ensure all UPS for system at cetral & remote in proper functionning
11 Ensure all network with all redundency sytem for automation keep
in functionning.