You are on page 1of 4

TRAINING ACTIVITY MATRIX

FACILITIES/ VENUE DATE


TRAINING REMAR
TRAINEE TOOLS AND (WORKSTATION AND
ACTIVITY/IES KS
EQUIPMENT / AREA) TIME

Plan and prepare for Novalta,  Computer Practical work Febru Group
maintenance and Allan and area/ Computer ary Discussi
repair peripherals Lab 28, on
 Internet 2022
-Maintenance and/or Connection
Diagnosis of faults is Kim,  Manufacture
planned and prepared in Namjoon r’s Manuals Demo
line with job  Maintenance 8am- with
requirements. Bench 5pm Intervie
Min, Yoongi  Power supply w
-Tools, equipment and equipment
testing devices needed  LAN Tester
for the maintenance are  Crimping
obtained and checked Jung, Tools
for correct operation Hoseok  Wrenches
and safety  Soldering
Iron/ Gun
-Materials necessary to
Park, Jimin  Pliers
complete the work are
(Assorted)
obtained in accordance
 Screw
with established Drivers
procedures and checked (Assorted)
against job  Multi-meter
requirements.  Calibrators
-OHS policies and  Signal
procedures are followed
Generator
in line with job
 Connectors
requirements.
 Adaptors
 Wires and
-Computer systems and cables
networks for
maintenance are
checked against
job/service order or
instructions and
specifications.

Maintain computer Novalta,  Computer Practical work March Demons


systems and Allan and area/ Computer 1, tration
networks peripherals Lab
 Personal 2022
Protective
-Appropriate personal Kim, Equipment
protective equipment is Namjoon  Manufacture
used in line with 8am-
r’s Manual
standard procedures.  Calibrators 5pm

-Normal function of Min, Yoongi  Multi-meter


computer systems and
networks are checked in
accordance with Jung,
manufacturer’s
Hoseok
instructions.

-Scheduled/periodic
maintenance is Park, Jimin
performed in accordance
with manufacturer’s
requirements.

-Where necessary,
needed repairs/
replacements are made
in accordance with
established procedures.

-Unplanned events or
conditions are
responded to in
accordance with
established procedures

Diagnose faults of Novalta,  Computer Practical work March Written


computer systems Allan and area/ Computer 2, Exam
and networks peripherals Laboratory 2022
 Internet
-Appropriate personal Connection
protective equipment is Kim,  Manufacture Oral
used in line with Namjoon 8am – Intervie
r’s Manual
standard procedures.
 Personal 5pm w
-Faults or problems in protective
the computer systems Min, Yoongi equipment
and networks are
diagnosed according to
requirements and in line
with the standard Jung,
procedures Hoseok
.
- Contingency measures
are managed and
implemented in
accordance with Park, Jimin
established procedures

-Unplanned events or
conditions are
responded to in
accordance with
established procedures
Rectify/ correct Novalta,  Computer Practical work March Demons
defects in computer Allan and area/ Computer 3, tration
systems and peripherals Laboratory 2022 with
networks  Internet Oral
Connection
-Appropriate personal Kim, Intervie
 Manufacture
protective equipment is Namjoon r’s Manual 8am – w
used in line with 5pm
standard procedures.  Personal
Protective
-Defective components Min, Yoongi Equipment
or parts are replaced or  LAN Tester
corrected without  Crimping
damage to the Tools
surrounding Jung,  Wrenches
environment or services Hoseok  Soldering
-Adjustments, if
Iron/ Gun
necessary are made in  Pliers
accordance with (Assorted)
Park, Jimin
established procedures  Screw
Drivers
-Unplanned events or (Assorted)
conditions are  Wires and
responded to in cables
accordance with
established procedures.
Inspect and test Novalta,  Computer Practical work March Oral
computer systems Allan and area/ Computer 4, Questio
and networks peripherals Laboratory 2022 ning
 Internet
-Final inspections are Connection
undertaken to ensure Kim,  Manufacture
that the testing Namjoon 8am –
r’s Manual
conducted on the device
 LAN Tester 5pm
conforms with the Min, Yoongi
manufacturer’s  Personal
instruction/manual Protective
Equipment
-Computer systems and Jung,
networks are
Hoseok
checked/tested to
ensure safe operation.
-OHS standards and 5S
principles are followed Park, Jimin
according to enterprise
policies

-Work site is cleaned


and cleared of all debris
and left in safe
condition in accordance
with company
procedures

-Excess components
and materials are
disposed of based on
WEEE directives and
3Rs waste management
program.

-Report is prepared and


completed according to
company requirements

You might also like