SLAB DESIGN

PODIUM LEVEL - 1

BOTTOM BARS(LX) TOP BARS


SLAB MARK SLAB THK SHORT SPAN(LX) LONG SPAN(LY) SHORT SPAN(LX) LONG SPAN(LY) REMARKS
B1 B2 T1 T3 T2 T4
S1P1 300 mm T16-200 T12-250 T16-100 T12-250 T12-250 T12-250 ONE WAY
S2P1 225 mm T16-200 T12-250 T16-100 T12-250 T12-250 T12-250 ONE WAY
S3P1 225 mm T16-250 T12-250 T16-200 T12-250 T12-250 T12-250 ONE WAY
S4P1 400 mm T16-250 T12-150 T16-100 T16-250 T16-250 T16-250 ONE WAY
S5P1 225 mm T12-250 T12-250 T12-200 T12-250 T12-250 T12-250 ONE WAY
S6P1 225 mm T16-250 T12-250 T16-100 T12-250 T12-250 T12-250 ONE WAY
S7P1 250 mm T16-250 T12-250 T16-200 T12-250 T16-250 T12-250 TWO WAY
S8P1 225 mm T12-250 T12-250 T16-100 T12-250 T12-250 T12-250 ONE WAY
S9P1 225 mm T16-150 T16-200 T12-250 T12-250 T12-250 T12-250 TWO WAY
S10P1 300 mm T16-250 T12-250 T16-100 T12-250 T12-250 T12-250 ONE WAY
S11P1 225 mm T16-250 T12-250 T16-200 T12-250 T12-250 T12-250 ONE WAY
S12P1 225 mm T12-250 T12-250 T16-200 T12-250 T16-250 T12-250 TWO WAY
SLAB DESIGN

PODIUM - 1

BOTTOM BARS(LX) TOP BARS


SLAB MARK SLAB THK SHORT SPAN(LX) LONG SPAN(LY) SHORT SPAN(LX) LONG SPAN(LY) REMARKS
B1 B2 T1 T3 T2 T4
S1P1 300 mm T16-200 T12-250 T16-100 T12-250 T12-250 T12-250 ONE WAY
S2P1 225 mm T16-200 T12-250 T16-100 T12-250 T12-250 T12-250 ONE WAY
S3P1 225 mm T16-250 T12-250 T16-200 T12-250 T12-250 T12-250 ONE WAY
S4P1 400 mm T16-250 T12-150 T16-100 T12-150 T12-150 T12-150 ONE WAY
S5P1 225 mm T12-250 T12-250 T12-250 T12-250 T12-250 T12-250 ONE WAY
S6P1 225 mm T16-250 T12-250 T16-150 T12-250 T12-250 T12-250 ONE WAY
S7P1 250 mm T16-250 T12-250 T16-250 T12-250 T16-250 T12-250 TWO WAY
S8P1 225 mm T12-250 T12-250 T16-150 T12-250 T12-250 T12-250 ONE WAY
S9P1 225 mm T16-150 T16-200 T12-250 T12-250 T12-250 T12-250 TWO WAY
S10P1 300 mm T16-250 T12-250 T16-150 T12-250 T12-250 T12-250 ONE WAY
S11P1 225 mm T16-250 T12-250 T16-200 T12-250 T12-250 T12-250 ONE WAY
S12P1 225 mm T12-250 T12-250 T16-250 T12-250 T16-250 T12-250 TWO WAY
Project PORSCHE M.E. HEADQUARTERS Project Number Sheet No.
566
Client Prepared by AHJ Checked by
AEDAS
MMS

Design Element
MAZZANINE FLOOR SLAB Date Date

SLAB ID: MS-5 GRID #: AB-7-8


SPAN ARRANGEMENT
Slab length in long direction (Ly)= 12.53 m
Slab length in short direction (Lx)= 5.10 m
b (Lx/Ly) 0.407185628743
Ly/Lx = 2.46
Span condition = Simply supported
Slab action = ONE WAY SLAB
MATERIAL PROPERTIES
Concrete strength = 40 MPa
Steel strength = 460 MPa
Unit wt of concrete = 25 KN/m^3
Unit wt of finishes = 23 KN/m^3
SECTION DEFINATION
Slab thickness required = 255 mm [t (req) =7.58 x Ly / (248+62 x Ly/Lx)]
Slab thickness provided = 275 mm
Clear cover bottom = 25 mm
Clear cover top = 25 mm
LOAD CALCULATION
Loading type Mechanical
Finishes + Ceiling = 100 mm
Superimposed dead load = 2.50 KN/m^2
Total dead load (SDL + SLAB S.W)= 11.68 KN/m^2
Live load = 7.50 KN/m^2
Factored load = (1.2 D + 1.6 L) 26.01 KN/m^2
Effective depth(bottom) = 244 mm
Effective depth(top)= 245 mm
FLEXURE DESIGN
Ultimate moment (+ve) = 94 KN-m
Ultimate moment (-ve) = KN-m
Temp & shrinkage R/F = 401 mm^2
Main reinforcement
As(bott)(B1) 955 mm^2 T 12 100 c/c
As(top)(T1) mm^2 T 10 c/c

Distribution reinforcemet
As(bott) 401 mm^2 T 10 150 c/c
As(top) mm^2 T 10 c/c
Project PORSCHE M.E. HEADQUARTERS Project Number Sheet No.
566
Client AEDAS Prepared by AHJ Checked by
MMS

Design Element Date Date


MAZZANINE FLOOR SLAB

SLAB ID MS-1 GRID #: DC-7-8


SPAN ARRANGEMENT

Slab length in long direction (Ly)= 7.2000 m

Slab length in short direction (Lx)= 5.1000 m


b (Lx/Ly) 0.7083
Ly/Lx = 1.41 7.2 m

Span condition = Four edges discontinous 5.1 m


Slab action = TWO WAY SLAB
MATERIAL PROPERTIES
Concrete strength = 40 MPa
Steel strength = 460 MPa
Unit wt of concrete = 25 KN/m^3

Unit wt of finishes = KN/m^3


SECTION DEFINATION

Slab thickness required = 163 mm [t (req) =7.58 x Ly / (248+62 x Ly/Lx)]

Slab thickness provided = 175 mm

Clear cover bottom = 25 mm

Clear cover top = 25 mm


LOAD CALCULATION

Loading type Mechanical


Finishes + Ceiling = 100 mm

Superimposed dead load = 2.50 KN/m^2


Total dead load (SDL + SLAB S.W)= 6.88 KN/m^2

Live load = 7.50 KN/m^2

Factored load = (1.2 D + 1.6 L) 20.25 KN/m^2

Effective depth(bottom) = 144 mm

Effective depth(top)= 145 mm


FLEXURE DESIGN

Ultimate moment along short direction Ultimate moment along long direction

M(+ve)dead 15 KN-m M(+ve)dead 7 KN-m


38 KN-m 18 KN-m
M(+ve)live 22 KN-m M(+ve)live 11 KN-m

M(-ve)D+L KN-m KN-m M(-ve)D+L KN-m KN-m


REINFORCEMENT Temp & shrinkage R/F = 236.6608696
Reinforcement along short direction Distribution reinforcement
As(bott)(B1)= 652 mm^2 T 12 150 c/c As(bottom) mm^2 T 10 c/c
As(top)(T1) mm^2 T c/c As(top) mm^2 T c/c
10 10

Reinforcement along long direction


As(bott)(B2)= 309 mm^2 T 10 250 c/c
As(top)(T2) mm^2 T 10 c/c
Project PORSCHE M.E. HEADQUARTERS Project Number Sheet No.
566
Client AEDAS Prepared by AHJ Checked by
MMS

Design Element Date Date


MAZZANINE FLOOR SLAB

SLAB ID MS-1 GRID #: DC-7-8

Check for Deflection


Time Dependent Multiplier 3.0
Ec = 29725 MPa
Ig = 4.47E+08 mm4

Short Direction
Mbd = 12 KN-m Δbd = 2.92 mm
Mbl = 13 KN-m Δbl = 4.77 mm

Long Direction
Mbd = 6 KN-m Δbd = 1.44 mm
Mbl = 6 KN-m Δbl = 2.35 mm

Average Deflection
Mbd = 9 KN-m Δbd = 2.18 mm
Mbl = 10 KN-m Δbl = 3.56 mm

Total Incremental Long Term Deflection


Δ= 10.088 mm
Lb/Δ = 714
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject MEZZANINE / MEP SLAB Checked by: MS Date:

SLAB ID MS-1 GRID #: DC-7-8


SPAN ARRANGEMENT
Slab length in long direction (Ly)= 6.7000 m
Slab length in short direction (Lx)= 5.5000 m
b (Lx/Ly) 0.8209 6.7 m
Ly/Lx = 1.22 5.5 m
Span condition = Four edges discontinous
Slab action = TWO WAY SLAB
MATERIAL PROPERTIES
Concrete strength = 40 MPa
Steel strength = 460 MPa
Unit wt of concrete = 25 KN/m^3
Unit wt of finishes = 7 KN/m^3
SECTION DEFINATION
Slab thickness required = 157 mm [t (req) =7.58 x Ly / (248+62 x Ly/Lx)]
Slab thickness provided = 175 mm
Clear cover bottom = 25 mm
Clear cover top = 25 mm
LOAD CALCULATION
Loading type Roof
Finishes + Ceiling = 100 mm
Superimposed dead load = 1.50 KN/m^2
Total dead load (SDL + SLAB S.W)= 6.60 KN/m^2
Live load = 1.50 KN/m^2
Factored load = (1.2 D + 1.6 L) 10.31 KN/m^2
Effective depth(bottom) = 145 mm
Effective depth(top)= 145 mm
FLEXURE DESIGN
Ultimate moment along short direction Ultimate moment along long direction

M(+ve)dead 14 KN-m M(+ve)dead 9 KN-m


18 KN-m 12 KN-m
M(+ve)live 4 KN-m M(+ve)live 3 KN-m
M(-ve)D+L KN-m KN-m M(-ve)D+L KN-m KN-m
REINFORCEMENT Temp & shrinkage R/F = 238.3043478
Reinforcement along short direction Distribution reinforcement
As(bott)(B1)= 300 mm^2 T 10 250 c/c As(bottom) 238 mm^2 T 10 250 c/c
As(top)(T1) mm^2 T c/c As(top) mm^2 T 10 c/c
10

Reinforcement along long direction


As(bott)(B2)= mm^2 T 10 c/c
As(top)(T2) mm^2 T 10 c/c
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject MEZZANINE / MEP SLAB Checked by: MS Date:

SLAB ID MS-1 GRID #: DC-7-8

Check for Deflection


Time Dependent Multiplier 3.0
Ec = 29725 MPa
Ig = 4.47E+08 mm4

Short Direction
Mbd = 11 KN-m Δbd = 2.26 mm
Mbl = 2 KN-m Δbl = 0.77 mm

Long Direction
Mbd = 7 KN-m Δbd = 1.52 mm
Mbl = 2 KN-m Δbl = 0.52 mm

Average Deflection
Mbd = 9 KN-m Δbd = 1.89 mm
Mbl = 2 KN-m Δbl = 0.64 mm

Total Incremental Long Term Deflection


Δ= 6.303 mm
Lb/Δ = 1063
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject MEZZANINE / MEP SLAB Checked by: MS Date:

SLAB ID MS-2 GRID #: DC-8-10


SPAN ARRANGEMENT
Slab length in long direction (Ly)= 12.5000 m
Slab length in short direction (Lx)= 6.5500 m
b (Lx/Ly) 0.5240
Ly/Lx = 1.91 12.5 m
Span condition = Four edges discontinous 6.55 m
Slab action = TWO WAY SLAB
MATERIAL PROPERTIES
Concrete strength = 40 MPa
Steel strength = 460 MPa
Unit wt of concrete = 25 KN/m^3
Unit wt of finishes = KN/m^3
SECTION DEFINATION
Slab thickness required = 259 mm [t (req) =7.58 x Ly / (248+62 x Ly/Lx)]
Slab thickness provided = 275 mm
Clear cover bottom = 25 mm
Clear cover top = 25 mm
LOAD CALCULATION
Loading type Mechanical
Finishes + Ceiling = 100 mm
Superimposed dead load = 2.50 KN/m^2
Total dead load (SDL + SLAB S.W)= 9.38 KN/m^2
Live load = 7.50 KN/m^2
Factored load = (1.2 D + 1.6 L) 23.25 KN/m^2
Effective depth(bottom) = 244 mm
Effective depth(top)= 245 mm
FLEXURE DESIGN
Ultimate moment along short direction Ultimate moment along long direction

M(+ve)dead 48 KN-m M(+ve)dead 13 KN-m


99 KN-m 26 KN-m
M(+ve)live 51 KN-m M(+ve)live 14 KN-m
M(-ve)D+L KN-m KN-m M(-ve)D+L KN-m KN-m
REINFORCEMENT Temp & shrinkage R/F = 401.0086957
Reinforcement along short direction Distribution reinforcement
As(bott)(B1)= 1011 mm^2 T 12 100 c/c As(bottom) 401 mm^2 T 10 150 c/c
As(top)(T1) mm^2 T c/c As(top) mm^2 T 10 c/c
10

Reinforcement along long direction


As(bott)(B2)= mm^2 T 12 c/c
As(top)(T2) mm^2 T 10 c/c
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject MEZZANINE / MEP SLAB Checked by: MS Date:

SLAB ID MS-2 GRID #: DC-8-10

Check for Deflection


Time Dependent Multiplier 3.0
Ec = 29725 MPa
Ig = 1.73E+09 mm4

Short Direction
Mbd = 37 KN-m Δbd = 6.99 mm
Mbl = 29 KN-m Δbl = 8.38 mm

Long Direction
Mbd = 10 KN-m Δbd = 1.93 mm
Mbl = 8 KN-m Δbl = 2.32 mm

Average Deflection
Mbd = 24 KN-m Δbd = 4.46 mm
Mbl = 19 KN-m Δbl = 5.35 mm

Total Incremental Long Term Deflection


Δ= 18.731 mm
Lb/Δ = 667
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject MEZZANINE / MEP SLAB Checked by: MS Date:

SLAB ID MS-3 GRID #: AC-9-10


SPAN ARRANGEMENT
Slab length in long direction (Ly)= 7.2500 m
Slab length in short direction (Lx)= 7.1750 m
b (Lx/Ly) 0.9897 7.25 m
Ly/Lx = 1.01 7.175 m
Span condition = Four edges discontinous
Slab action = TWO WAY SLAB
MATERIAL PROPERTIES
Concrete strength = 40 MPa
Steel strength = 460 MPa
Unit wt of concrete = 25 KN/m^3
Unit wt of finishes = KN/m^3
SECTION DEFINATION
Slab thickness required = 177 mm [t (req) =7.58 x Ly / (248+62 x Ly/Lx)]
Slab thickness provided = 200 mm
Clear cover bottom = 25 mm
Clear cover top = 25 mm
LOAD CALCULATION
Loading type Mechanical
Finishes + Ceiling = 100 mm
Superimposed dead load = 2.50 KN/m^2
Total dead load (SDL + SLAB S.W)= 7.50 KN/m^2
Live load = 7.50 KN/m^2
Factored load = (1.2 D + 1.6 L) 21.00 KN/m^2
Effective depth(bottom) = 169 mm
Effective depth(top)= 170 mm
FLEXURE DESIGN
Ultimate moment along short direction Ultimate moment along long direction

M(+ve)dead 18 KN-m M(+ve)dead 18 KN-m


42 KN-m 41 KN-m
M(+ve)live 24 KN-m M(+ve)live 24 KN-m
M(-ve)D+L KN-m KN-m M(-ve)D+L KN-m KN-m
REINFORCEMENT Temp & shrinkage R/F = 277.7478261
Reinforcement along short direction Distribution reinforcement
As(bott)(B1)= 616 mm^2 T 12 150 c/c As(bottom) mm^2 T 10 c/c
As(top)(T1) mm^2 T c/c As(top) mm^2 T 10 c/c
10

Reinforcement along long direction


As(bott)(B2)= 604 mm^2 T 12 150 c/c
As(top)(T2) mm^2 T 10 c/c
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject MEZZANINE / MEP SLAB Checked by: MS Date:

SLAB ID MS-3 GRID #: AC-9-10

Check for Deflection


Time Dependent Multiplier 3.0
Ec = 29725 MPa
Ig = 6.67E+08 mm4

Short Direction
Mbd = 14 KN-m Δbd = 2.36 mm
Mbl = 14 KN-m Δbl = 3.54 mm

Long Direction
Mbd = 14 KN-m Δbd = 2.31 mm
Mbl = 14 KN-m Δbl = 3.47 mm

Average Deflection
Mbd = 14 KN-m Δbd = 2.33 mm
Mbl = 14 KN-m Δbl = 3.50 mm

Total Incremental Long Term Deflection


Δ= 10.506 mm
Lb/Δ = 690
Job No: Sheet of
Consulting Engineers & Architects

Computed AHJ Date:


Project PORSCHE M.E HEADQUARTER
by:
Subject MEZZANINE / MEP SLAB Checked by: MS Date:

SLAB ID: MS-5 GRID #: AB-7-9


SPAN ARRANGEMENT
Slab length in long direction (Ly)= 12.53 m
Slab length in short direction (Lx)= 5.10 m
b (Lx/Ly) 0.4071856287425
Ly/Lx = 2.46
Span condition = Simply supported
Slab action = ONE WAY SLAB
MATERIAL PROPERTIES
Concrete strength = 40 MPa
Steel strength = 460 MPa
Unit wt of concrete = 25 KN/m^3
Unit wt of finishes = 23 KN/m^3
SECTION DEFINATION
Slab thickness required = 255 mm [t (req) =7.58 x Ly / (248+62 x Ly/Lx)]
Slab thickness provided = 275 mm
Clear cover bottom = 25 mm
Clear cover top = 25 mm
LOAD CALCULATION
Loading type Mechanical
Finishes + Ceiling = 100 mm
Superimposed dead load = 2.50 KN/m^2
Total dead load (SDL + SLAB S.W)= 11.68 KN/m^2
Live load = 7.50 KN/m^2
Factored load = (1.2 D + 1.6 L) 26.01 KN/m^2
Effective depth(bottom) = 244 mm
Effective depth(top)= 245 mm
FLEXURE DESIGN
Ultimate moment (+ve) = 94 KN-m
Ultimate moment (-ve) = KN-m
Temp & shrinkage R/F = 401 mm^2
Main reinforcement
As(bott)(B1) 955 mm^2 T 12 100 c/c
As(top)(T1) mm^2 T 10 c/c

Distribution reinforcemet
As(bott) 401 mm^2 T 10 150 c/c
As(top) mm^2 T 10 c/c

Check for Deflection


Time Dependent Multiplier 3.0
Ec = 29725 MPa
Ig = 1.73E+09 mm4

Short Direction
Mbd = 42 KN-m Δbd = 1.33 mm
Mbl = 27 KN-m Δbl = 1.28 mm

Total Incremental Long Term Deflection


Δ= 5.273 mm
Lb/Δ = 2375
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject MEZZANINE / MEP SLAB Checked by: MS Date:

SLAB ID MS-6 GRID #: BC-8-9


SPAN ARRANGEMENT
Slab length in long direction (Ly)= 3.3250 m /////////////////////////////////////////////////////////////
Slab length in short direction (Lx)= 2.1500 m
b (Lx/Ly) 0.6466
Ly/Lx = 1.55 3.325 m
Span condition = Two short edges discontinous 2.15 m
Slab action = TWO WAY SLAB
MATERIAL PROPERTIES
Concrete strength = 40 MPa
Steel strength = 460 MPa ///////////////////////////////////////////////////////////////
Unit wt of concrete = 25 KN/m^3
Unit wt of finishes = KN/m^3
SECTION DEFINATION
Slab thickness required = 73 mm [t (req) =7.58 x Ly / (248+62 x Ly/Lx)]
Slab thickness provided = 150 mm
Clear cover bottom = 25 mm
Clear cover top = 25 mm
LOAD CALCULATION
Loading type Mechanical
Finishes + Ceiling = 100 mm
Superimposed dead load = 2.50 KN/m^2
Total dead load (SDL + SLAB S.W)= 6.25 KN/m^2
Live load = 7.50 KN/m^2
Factored load = (1.2 D + 1.6 L) 19.50 KN/m^2
Effective depth(bottom) = 120 mm
Effective depth(top)= 120 mm
FLEXURE DESIGN
Ultimate moment along short direction Ultimate moment along long direction

M(+ve)dead 1 KN-m M(+ve)dead KN-m


5 KN-m 2 KN-m
M(+ve)live 4 KN-m M(+ve)live 1 KN-m
M(-ve)D+L 9 KN-m 9 KN-m M(-ve)D+L KN-m KN-m
REINFORCEMENT Temp & shrinkage R/F = 197.2173913
Reinforcement along short direction Distribution reinforcement
As(bott)(B1)= mm^2 T 10 c/c As(bottom) 197 mm^2 T 10 250 c/c
As(top)(T1) 183 mm^2 T 250 c/c As(top) 197 mm^2 T 10 250 c/c
10

Reinforcement along long direction


As(bott)(B2)= mm^2 T 10 c/c
As(top)(T2) mm^2 T 10 c/c
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject MEZZANINE / MEP SLAB Checked by: MS Date:

SLAB ID MS-6 GRID #: BC-8-9

Check for Deflection


Time Dependent Multiplier 3.0
Ec = 29725 MPa
Ig = 2.81E+08 mm4

Short Direction
Mbd = 1 KN-m Δbd = 0.09 mm
Mbl = 2 KN-m Δbl = 0.24 mm

Long Direction
Mbd = 0.3 KN-m Δbd = 0.02 mm
Mbl = 1 KN-m Δbl = 0.09 mm

Average Deflection
Mbd = 1 KN-m Δbd = 0.05 mm
Mbl = 1 KN-m Δbl = 0.16 mm

Total Incremental Long Term Deflection


Δ= 0.327 mm
Lb/Δ = 10162
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject OFFICE SLAB Checked by: MS Date:

SLAB ID: OS-1 GRID #: AB-1-9


SPAN ARRANGEMENT
Slab length in long direction (Ly)= 57.60 m
Slab length in short direction (Lx)= 5.10 m
b (Lx/Ly) 0.0885416666667
Ly/Lx = 11.29
Span condition = Continous (exterior span)
Slab action = ONE WAY SLAB
MATERIAL PROPERTIES
Concrete strength = 40 MPa
Steel strength = 460 MPa
Unit wt of concrete = 25 KN/m^3
Unit wt of finishes = 23 KN/m^3
SECTION DEFINATION
Slab thickness required = 213 mm [t (req) =7.58 x Ly / (248+62 x Ly/Lx)]
Slab thickness provided = 225 mm
Clear cover bottom = 25 mm
Clear cover top = 25 mm
LOAD CALCULATION
Loading type Office
Finishes + Ceiling = 100 mm
Superimposed dead load = 3.00 KN/m^2
Total dead load (SDL + SLAB S.W)= 10.93 KN/m^2
Live load = 2.50 KN/m^2
Factored load = (1.2 D + 1.6 L) 17.11 KN/m^2
Effective depth(bottom) = 195 mm
Effective depth(top)= 195 mm
FLEXURE DESIGN
Ultimate moment (+ve) = 35 KN-m
Ultimate moment (-ve) = 49 KN-m
Temp & shrinkage R/F = 320 mm^2
Main reinforcement
As(bott)(B1) 436 mm^2 T 10 150 c/c
As(top)(T1) 614 mm^2 T 10 100 c/c

Distribution reinforcemet
As(bott) 320 mm^2 T 10 200 c/c
As(top) 320 mm^2 T 10 200 c/c

Check for Deflection


Time Dependent Multiplier 3.0
Ec = 29725 MPa
Ig = 9.49E+08 mm4

Short Direction
Mbd = 22 KN-m Δbd = 1.27 mm
Mbl = 5 KN-m Δbl = 0.44 mm

Total Incremental Long Term Deflection


Δ= 4.262 mm
Lb/Δ = 1197
Consulting Engineers & Architects Job No: Sheet of

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject OFFICE SLAB Checked by: MS Date:


SLAB ID: OS-2 GRID #: BC 3-7
SPAN ARRANGEMENT
Slab length in long direction (Ly)= 31.80 m
Slab length in short direction (Lx)= 3.60 m
b (Lx/Ly) 0.11320754716981
Ly/Lx = 8.83
Span condition =
Simply supported
Slab action = ONE WAY SLAB
MATERIAL PROPERTIES
Concrete strength = 40 MPa
Steel strength = 460 MPa
Unit wt of concrete = 25 KN/m^3
Unit wt of finishes = 23 KN/m^3
SECTION DEFINATION
Slab thickness required = 180 mm [t (req) =7.58 x Ly / (248+62 x Ly/Lx)]
Slab thickness provided = 200 mm
Clear cover bottom = 25 mm
Clear cover top = 25 mm
LOAD CALCULATION
Loading type
Office
Finishes + Ceiling = 100 mm
Superimposed dead load = 3.00 KN/m^2
Total dead load (SDL + SLAB S.W)= 10.30 KN/m^2
Live load = 2.50 KN/m^2
Factored load = (1.2 D + 1.6 L) 16.36 KN/m^2
Effective depth(bottom) = 170 mm
Effective depth(top)= 170 mm
FLEXURE DESIGN
Ultimate moment (+ve) = 30 KN-m
Ultimate moment (-ve) = KN-m
Temp & shrinkage R/F = 279 mm^2
Main reinforcement
As(bott)(B1) 427 mm^2 T 150 c/c
As(top)(T1) mm^2 T
10 c/c
10
Distribution reinforcemet
As(bott) 279 mm^2 T 250 c/c
As(top) mm^2 T
10 c/c
10

Check for Deflection


Time Dependent Multiplier 3.0
Ec = 29725 MPa
Ig = 6.67E+08 mm4

Short Direction
Mbd = 19 KN-m Δbd = 0.76 mm
Mbl = 5 KN-m Δbl = 0.28 mm

Total Incremental Long Term Deflection


Δ= 3 mm
Lb/Δ = 1408
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject OFFICE SLAB Checked by: MS Date:

SLAB ID OS-4 GRID #: BC-1-2


SPAN ARRANGEMENT
Slab length in long direction (Ly)= 7.2000 m
Slab length in short direction (Lx)= 3.6000 m
b (Lx/Ly) 0.5000 7.2 m
Ly/Lx = 2.00 3.6 m
Span condition = Four edges discontinous
Slab action = TWO WAY SLAB
MATERIAL PROPERTIES
Concrete strength = 40 MPa
Steel strength = 460 MPa
Unit wt of concrete = 25 KN/m^3
Unit wt of finishes = KN/m^3
SECTION DEFINATION
Slab thickness required = 147 mm [t (req) =7.58 x Ly / (248+62 x Ly/Lx)]
Slab thickness provided = 175 mm
Clear cover bottom = 25 mm
Clear cover top = 25 mm
LOAD CALCULATION
Loading type Office
Finishes + Ceiling = 100 mm
Superimposed dead load = 3.00 KN/m^2
Total dead load (SDL + SLAB S.W)= 7.38 KN/m^2
Live load = 2.50 KN/m^2
Factored load = (1.2 D + 1.6 L) 12.85 KN/m^2
Effective depth(bottom) = 144 mm
Effective depth(top)= 145 mm
FLEXURE DESIGN
Ultimate moment along short direction Ultimate moment along long direction

M(+ve)dead 12 KN-m M(+ve)dead KN-m


17 KN-m KN-m
M(+ve)live 5 KN-m M(+ve)live KN-m
M(-ve)D+L KN-m KN-m M(-ve)D+L KN-m KN-m
REINFORCEMENT Temp & shrinkage R/F = 236.6608696
Reinforcement along short direction Distribution reinforcement
As(bott)(B1)= 296 mm^2 T 12 250 c/c As(bottom) 237 mm^2 T 10 250 c/c
As(top)(T1) mm^2 T c/c As(top) mm^2 T 10 c/c
10

Reinforcement along long direction


As(bott)(B2)= mm^2 T 10 c/c
As(top)(T2) mm^2 T 10 c/c
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject OFFICE SLAB Checked by: MS Date:

SLAB ID OS-4 GRID #: BC-1-2

Check for Deflection


Time Dependent Multiplier 3.0
Ec = 29725 MPa
Ig = 4.47E+08 mm4

Short Direction
Mbd = 9 KN-m Δbd = 2.22 mm
Mbl = 3 KN-m Δbl = 1.13 mm

Long Direction
Mbd = KN-m Δbd = 0.00 mm
Mbl = KN-m Δbl = 0.00 mm

Average Deflection
Mbd = 5 KN-m Δbd = 1.11 mm
Mbl = 2 KN-m Δbl = 0.56 mm

Total Incremental Long Term Deflection


Δ= 3.887 mm
Lb/Δ = 1852
Job No: Sheet of
Consulting Engineers & Architects

Project Computed by: AHJ Date:


PORSCHE M.E HEADQUARTER

Subject ROOF SLAB Checked by: MS Date:


SLAB ID RS-1 GRID #: ADa-3-5
SPAN ARRANGEMENT
/////////////////////////////////////////////

//////////////////////////////////
Slab length in long direction (Ly)= 16.2000 m
Slab length in short direction (Lx)= 14.4000 m
b (Lx/Ly) 0.8889
Ly/Lx = 1.13 16.2 m
Span condition = One short edge discontinous 14.4 m

Slab action = TWO WAY SLAB


MATERIAL PROPERTIES
Concrete strength = 40 MPa
Steel strength = 460 MPa /////////////////////////////////////////////
Unit wt of concrete = 25 KN/m^3
Unit wt of finishes = KN/m^3
SECTION DEFINATION
Slab thickness required = 386 mm [t (req) =7.58 x Ly / (248+62 x Ly/Lx)]
Slab thickness provided = 400 mm
Clear cover bottom = 25 mm
Clear cover top = 25 mm
LOAD CALCULATION
Loading type
Roof
Finishes + Ceiling = 100 mm
Superimposed dead load = 3.30 KN/m^2
Total dead load (SDL + SLAB S.W)= 13.30 KN/m^2
Live load = 1.50 KN/m^2
Factored load = (1.2 D + 1.6 L) 18.36 KN/m^2
Effective depth(bottom) = 369 mm
Effective depth(top)= 365 mm
FLEXURE DESIGN
Ultimate moment along short direction Ultimate moment along long direction

M(+ve)dead 92 KN-m M(+ve)dead 64 KN-m


112 KN-m 78 KN-m
M(+ve)live 19 KN-m M(+ve)live 14 KN-m
M(-ve)D+L 277 KN-m 277 KN-m M(-ve)D+L 122 KN-m 122 KN-m
REINFORCEMENT Temp & shrinkage R/F = 606.44347826
Reinforcement along short direction Distribution reinforcement
As(bott)(B1)= 741 mm^2 T 150 c/c As(bottom) 606 mm^2 T 150 c/c
12 12
As(top)(T1) 1900 mm^2 T 150 c/c As(top) 606 mm^2 T 150 c/c
20 12

Reinforcement along long direction


As(bott)(B2)= mm^2 T 10 c/c
As(top)(T2) 820 mm^2 T c/c
10
Job No: Sheet of
Consulting Engineers & Architects

Project Computed by: AHJ Date:


PORSCHE M.E HEADQUARTER

Subject ROOF SLAB Checked by: MS Date:


SLAB ID RS-1 GRID #: ADa-3-5

Check for Deflection


Time Dependent Multiplier 3.0
Ec = 29725 MPa
Ig = 5.33E+09 mm4

Short Direction
Mbd = 73 KN-m Δbd = 7.55 mm
Mbl = 11 KN-m Δbl = 1.77 mm

Long Direction
Mbd = 51 KN-m Δbd = 5.26 mm
Mbl = 8 KN-m Δbl = 1.32 mm

Average Deflection
Mbd = 62 KN-m Δbd = 6.40 mm
Mbl = 10 KN-m Δbl = 1.54 mm

Total Incremental Long Term Deflection


Δ= 20.747 mm
Lb/Δ = 781
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject ROOF SLAB Checked by: MS Date:


SLAB ID RS-2 GRID #: AB-1-2
SPAN ARRANGEMENT
Slab length in long direction (Ly)= 7.2000 m //////////////////////////////////////////

///////////////////////////////
Slab length in short direction (Lx)= 6.3000 m
b (Lx/Ly) 0.8750
Ly/Lx = 1.14 7.2 m
Span condition = One short edge discontinous 6.3 m
Slab action = TWO WAY SLAB
MATERIAL PROPERTIES
Concrete strength = 40 MPa
Steel strength = 460 MPa //////////////////////////////////////////
Unit wt of concrete = 25 KN/m^3
Unit wt of finishes = KN/m^3
SECTION DEFINATION
Slab thickness required = 171 mm [t (req) =7.58 x Ly / (248+62 x Ly/Lx)]
Slab thickness provided = 175 mm
Clear cover bottom = 25 mm
Clear cover top = 25 mm
LOAD CALCULATION
Loading type
Roof
Finishes + Ceiling = 100 mm
Superimposed dead load = 3.30 KN/m^2
Total dead load (SDL + SLAB S.W)= 7.68 KN/m^2
Live load = 1.50 KN/m^2
Factored load = (1.2 D + 1.6 L) 11.61 KN/m^2
Effective depth(bottom) = 145 mm
Effective depth(top)= 145 mm
FLEXURE DESIGN
Ultimate moment along short direction Ultimate moment along long direction

M(+ve)dead 10 KN-m M(+ve)dead 7 KN-m


14 KN-m 10 KN-m
M(+ve)live 4 KN-m M(+ve)live 3 KN-m
M(-ve)D+L 34 KN-m 34 KN-m M(-ve)D+L 15 KN-m 15 KN-m
REINFORCEMENT Temp & shrinkage R/F = 238.3043478
Reinforcement along short direction Distribution reinforcement
As(bott)(B1)= 239 mm^2 T 250 c/c As(bottom) 238 mm^2 T 250 c/c
10 10
As(top)(T1) 583 mm^2 T 100 c/c As(top) 238 mm^2 T 250 c/c
10 10

Reinforcement along long direction


As(bott)(B2)= mm^2 T 10 c/c
As(top)(T2) 245 mm^2 T 250 c/c
10
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject ROOF SLAB Checked by: MS Date:


SLAB ID RS-2 GRID #: AB-1-2

Check for Deflection


Time Dependent Multiplier 3.0
Ec = 29725 MPa
Ig = 4.47E+08 mm4

Short Direction
Mbd = 8 KN-m Δbd = 2.01 mm
Mbl = 2 KN-m Δbl = 0.82 mm

Long Direction
Mbd = 6 KN-m Δbd = 1.36 mm
Mbl = 2 KN-m Δbl = 0.60 mm

Average Deflection
Mbd = 7 KN-m Δbd = 1.68 mm
Mbl = 2 KN-m Δbl = 0.71 mm

Total Incremental Long Term Deflection


Δ= 5.758 mm
Lb/Δ = 1251
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject ROOF SLAB Checked by: MS Date:

SLAB ID RB-3 GRID #: BC-2-3


SPAN ARRANGEMENT
Slab length in long direction (Ly)= 7.2000 m
Slab length in short direction (Lx)= 3.6000 m
b (Lx/Ly) 0.5000
Ly/Lx = 2.00 7.2 m
Span condition = Four edges discontinous 3.6 m
Slab action = TWO WAY SLAB
MATERIAL PROPERTIES
Concrete strength = 40 MPa
Steel strength = 460 MPa
Unit wt of concrete = 25 KN/m^3
Unit wt of finishes = KN/m^3
SECTION DEFINATION
Slab thickness required = 147 mm [t (req) =7.58 x Ly / (248+62 x Ly/Lx)]
Slab thickness provided = 175 mm
Clear cover bottom = 25 mm
Clear cover top = 25 mm
LOAD CALCULATION
Loading type Roof
Finishes + Ceiling = 100 mm
Superimposed dead load = 1.50 KN/m^2
Total dead load (SDL + SLAB S.W)= 5.88 KN/m^2
Live load = 1.50 KN/m^2
Factored load = (1.2 D + 1.6 L) 9.45 KN/m^2
Effective depth(bottom) = 145 mm
Effective depth(top)= 145 mm
FLEXURE DESIGN
Ultimate moment along short direction Ultimate moment along long direction

M(+ve)dead 10 KN-m M(+ve)dead KN-m


13 KN-m KN-m
M(+ve)live 3 KN-m M(+ve)live KN-m
M(-ve)D+L KN-m KN-m M(-ve)D+L KN-m KN-m
REINFORCEMENT Temp & shrinkage R/F = 238.3043478
Reinforcement along short direction Distribution reinforcement
As(bott)(B1)= mm^2 T 10 c/c As(bottom) 238 mm^2 T 10 250 c/c
As(top)(T1) mm^2 T c/c As(top) mm^2 T 10 c/c
10

Reinforcement along long direction


As(bott)(B2)= mm^2 T 10 c/c
As(top)(T2) mm^2 T 10 c/c
Job No: Sheet of
Consulting Engineers & Architects

Computed by: AHJ Date:


Project PORSCHE M.E HEADQUARTER

Subject ROOF SLAB Checked by: MS Date:

SLAB ID RB-3 GRID #: BC-2-3

Check for Deflection


Time Dependent Multiplier 3.0
Ec = 29725 MPa
Ig = 4.47E+08 mm4

Short Direction
Mbd = 7 KN-m Δbd = 1.77 mm
Mbl = 2 KN-m Δbl = 0.68 mm

Long Direction
Mbd = KN-m Δbd = 0.00 mm
Mbl = KN-m Δbl = 0.00 mm

Average Deflection
Mbd = 4 KN-m Δbd = 0.88 mm
Mbl = 1 KN-m Δbl = 0.34 mm

Total Incremental Long Term Deflection


Δ= 2.986 mm
Lb/Δ = 2411