Foundation Design Sheet

OUTPUT SHEET

Job Name: cattel shed Subject: Ext. Column Footing F1


Job Number: ****** Originator: ammar Checker: samad

Input Data F1

Y= 3.80 kip
Dead Load
X= 3.64 kip
Y= 22.50 kip
Live Load
X= 4.13 kip
Y= 20.86 kip
Wind upword
X= 10.24 kip
M= 0.00 kip-ft
qa = 1.65 ksf
Df = 6 ft
fc' = 3 ksi
Fy = 60 ksi
Density of soil = 120 lb/cft
Density of concrete= 150 lb/cft

Footing Dimensions
L= 8 ft
B= 8 ft
hf = 12 in
Y= 16 in
Pedestal
X= 14 in
αs = 40
Bottom Clear Cover = 3 in
Side Clear Cover = 2 in

Analysis Results
M= 38.85 kip-ft 52.67 kg/cm2
P= 74.30 kip 330.50 KN
e= 0.52 ft 159.37 mm
L/6 = 1.33 ft 406.40 mm
Calculated L = 3.14 ft 0.96 m
If e ≤ L/6
Af (Required) = P/qallow(1+6e/L) = 62.69 sft
If e > L/6
Af (Required) = P/3qallow(4L/(L-2e)) N/A sft
62.6893939
qn = 0.90 ksf
Area Provided = 64.00
qult = 0.63 ksf Stress ratio = 0.70
Area Check Satisfied Stress ratio = 0.98
Two Shear Check
bo x = 1.91666667 ft
bo y = 2.08333333 ft
d= 9 in
Vu= 38.029401 kips
1-φVc = 141.969687 kips
Two Shear Check Satisfied Stress ratio = 0.2678699
One Shear Check
Ls = 2.66666667 ft
Vu= 13.52 kips
φVc = 70.9848435 kips
One Shear Check Satisfied Stress ratio = 0.1904632
Uplift Check
Downword Force = 153.6 kip
Upword reaction = -20.86 kip
Uplift Check Satisfied Stress ratio = 0.1358073
Reinforcement Required
Longitudnal Direction
Cantilever Length y = 3.41666667 ft
Mu = 29.5926042 kip-ft
Rn = 53.7265871 psi
ρ = 0.00090508
ρmin = 0.002
Ast = 0.78198948 in2
Ast min. = 2.304 in2
Ast Govn = 2.304 in2
Transverse Direction
Cantilever Length y = 3.33333333 ft
Mu = 28.1666667 kip-ft
Rn = 51.137739 psi
ρ = 0.00086102
ρmin = 0.002
Ast = 0.74391906 in2
Ast min. = 2.304 in2
Ast Govn = 2.304 in2
Top Reinforcement
Wu = 0.6 ksf
Cantilever Length y = 3.41666667 ft
Mu = 28.0166667 kip-ft
Rn = 50.8654079 psi
ρ= 0.00085638
ρmin = 0.002
Ast = 0.73991662 in2
Ast min. = 2.304 in2
Ast Govn = 2.304 in2
Development Length Ld
Ld in Compression = 10.9544512 in
Ld in Tension = 41.08 in
Dowel Calculations
Required Ast = 0
Min. Ast = 2.24 in2
Ties Calculation
Dia of Bar = 3#
Spacing = 8 in

Foundation Summary
Project Name cattel shed
Foundation Name Ext. Column F1

Foundation Pedestal
L B hf hs y x
ft ft in ft in in
8 8 12 5 16 14

Top Steel = Spacing (in)


Longitudnal Steel 2.304 12 # 4 8
Transverse Steel 2.304 12 # 4 8
Bottom Steel =
Longitudnal Steel 2.304 12 # 4 8
Transverse Steel 2.304 12 # 4 8
Dowel Steel = 2.24 3 # 8
Ties Steel = 8 # 3 8
0

M+(Dx+Lx+Wx)*(Df-hf)
Dy+Ly+Wdown+L*B*Df*Density of soil
M/P

6*e

qa-(((Df-(hf/12))*Density of soil)+(hf/12)*Density of concrete)/1000


(DLy+LLy)/qn
(1.2*D10+1.6*D12)/(D24*D25)
qult/qa
(Pedestal X+d)/12
(Pedestal Y+d)/12
hf-Bottom clear cover
qult*(L*B-(Pedestal Y+d)*(Pedestal X+d)/144)
0.75*4*SQRT(fc'*1000)*(2*(b0x+b0y)*12)*d/1000
Vu/1-φVc

(L-X/12)/2-d/12
qult*Ls*B
0.75*2*SQRT(fc'*1000)*L*12*d/1000
Vu/φVc

(Density of soil*L*B*(Df-(hf/12))+Density of concrete*hf*L*B)/1000


(wind up ward Y)
1*(Up ward reaction/Downward force)

(L-Pedestal X/12)/2
qult*Cantelever length Y*Cantelever length Y*L/2
(Mu*12000)/(0.85*L*12*d^2)
0.85*fc' *(1-SQRT(1-2*Rn/(0.85*fc' *1000)))/Fy

ρ*L*12*d
0.002*B*12*hf
MAX(Ast:Ast min)

(B-Pedestal Y/12)/2
qult *Cantelever length Y*Cantelever Length Y/2*B
Mu*12000/(0.85*B*12*d^2)
0.85*fc' *(1-SQRT(1-2*Rn/(0.85*fc' *1000)))/Fy

ρ *B*12*d
0.002*D24*12*D26
MAX(Ast:Ast min.)

(Df-hf/12)*Density of soil/1000
MAX(Cantelever Length Y,Cantelever Length Y)
Wu*Cantelever Length Y*Cantelever Length Y/2*L
Mu*12000/(0.85*L*12*d^2)
0.85*fc' *(1-SQRT(1-2*Rn/(0.85*fc' *1000)))/Fy

ρ *L*12*d
0.002*L*12*hf
MAX(Ast:Ast min)

MAX(0.02*Fy*1000*MAX(Longetuidnal Steel:Transvers steel)/(8*SQRT(fc' *1000)),0.0003*Fy*1000*MAX(Long


3*Fy*1000*MAX(Longetuidnal Steel:Transvers steel)/(40*8*SQRT(fc' *1000))
0.01*Pedestal Y*Pedestal X

Ties steel
MIN(48*Dia of bar/12,16*Dowel Steel/8,8)
0003*Fy*1000*MAX(Longetudinal steel:Transverse steel)/1000,8)
Foundation Design Sheet
OUTPUT SHEET

Job Name: cattel shed Subject: Ext. Column Footing F1


Job Number: ***** Originator: ammar Checker: samad

Input Data F1

Y= 3.76 kip
Dead Load
X= 0.00 kip
Y= 7.80 kip
Live Load
X= 0.00 kip
Y= 12.94 kip
Wind upword
X= 0.00 kip
M= 0.00 kip-ft
qa = 1.65 ksf
Df = 6 ft
fc' = 3 ksi
Fy = 40 ksi
Density of soil = 120 lb/cft
Density of concrete= 150 lb/cft

Footing Dimensions
L= 5 ft
B= 5 ft
hf = 12 in
Y= 14 in
Pedestal
X= 14 in
αs = 40
Bottom Clear Cover = 3 in
Side Clear Cover = 2 in

Analysis Results
M= 0.00 kip-ft 0.00 kg/cm2
P= 30.31 kip 134.84 KN
e= 0.00 ft 0.00 mm
L/6 = 0.83 ft 254.00 mm
Calculated L = 0.00 ft 0.00 m
If e ≤ L/6
Af (Required) = P/qallow(1+6e/L) = 18.37 sft
If e > L/6
Af (Required) = P/3qallow(4L/(L-2e)) N/A sft
18.3721212
qn = 0.90 ksf
Area Provided = 25.00
qult = 0.68 ksf Stress ratio = 0.76
Area Check Satisfied Stress ratio = 0.73
Two Shear Check
bo x = 1.91666667 ft
bo y = 1.91666667 ft
d= 9 in
Vu= 14.4992147 kips
1-φVc = 136.054283 kips
Two Shear Check Satisfied Stress ratio = 0.1065693
One Shear Check
Ls = 1.16666667 ft
Vu= 3.96592 kips
φVc = 44.3655272 kips
One Shear Check Satisfied Stress ratio = 0.0893919
Uplift Check
Downword Force = 60 kip
Upword reaction = -12.94 kip
Uplift Check Satisfied Stress ratio = 0.2156667
Reinforcement Required
Longitudnal Direction
Cantilever Length y = 1.91666667 ft
Mu = 6.24396333 kip-ft
Rn = 18.1378746 psi
ρ = 0.00045507
ρmin = 0.002
Ast = 0.24573839 in2
Ast min. = 1.44 in2
Ast Govn = 1.44 in2
Transverse Direction
Cantilever Length y = 1.91666667 ft
Mu = 6.24396333 kip-ft
Rn = 18.1378746 psi
ρ = 0.00045507
ρmin = 0.002
Ast = 0.24573839 in2
Ast min. = 1.44 in2
Ast Govn = 1.44 in2
Top Reinforcement
Wu = 0.6 ksf
Cantilever Length y = 1.91666667 ft
Mu = 5.51041667 kip-ft
Rn = 16.0070201 psi
ρ= 0.00040144
ρmin = 0.002
Ast = 0.2167773 in2
Ast min. = 1.44 in2
Ast Govn = 1.44 in2
Development Length Ld
Ld in Compression = 8 in
Ld in Tension = 27.39 in
Dowel Calculations
Required Ast = 0
Min. Ast = 1.96 in2
Ties Calculation
Dia of Bar = 3#
Spacing = 8 in

Foundation Summary
Project Name cattel shed
Foundation Name Int. Column F1

Foundation Pedestal
L B hf hs y x
ft ft in ft in in
5 5 12 5 14 14

Top Steel = Spacing (in)


Longitudnal Steel 1.44 7 # 4 9
Transverse Steel 1.44 7 # 4 9
Bottom Steel =
Longitudnal Steel 1.44 7 # 4 9
Transverse Steel 1.44 7 # 4 9
Dowel Steel = 1.96 2 # 8
Ties Steel = 8 # 3 8
0

M+(Dx+Lx+Wx)*(Df-hf)
Dy+Ly+Wdown+L*B*Df*Density of soil
M/P

6*e

qa-(((Df-(hf/12))*Density of soil)+(hf/12)*Density of concrete)/1000


(DLy+LLy)/qn
(1.2*D10+1.6*D12)/(D24*D25)
qult/qa
(Pedestal X+d)/12
(Pedestal Y+d)/12
hf-Bottom clear cover
qult*(L*B-(Pedestal Y+d)*(Pedestal X+d)/144)
0.75*4*SQRT(fc'*1000)*(2*(b0x+b0y)*12)*d/1000
Vu/1-φVc

(L-X/12)/2-d/12
qult*Ls*B
0.75*2*SQRT(fc'*1000)*L*12*d/1000
Vu/φVc

(Density of soil*L*B*(Df-(hf/12))+Density of concrete*hf*L*B)/1000


(wind up ward Y)
1*(Up ward reaction/Downward force)

(L-Pedestal X/12)/2
qult*Cantelever length Y*Cantelever length Y*L/2
(Mu*12000)/(0.85*L*12*d^2)
0.85*fc' *(1-SQRT(1-2*Rn/(0.85*fc' *1000)))/Fy

ρ*L*12*d
0.002*B*12*hf
MAX(Ast:Ast min)

(B-Pedestal Y/12)/2
qult *Cantelever length Y*Cantelever Length Y/2*B
Mu*12000/(0.85*B*12*d^2)
0.85*fc' *(1-SQRT(1-2*Rn/(0.85*fc' *1000)))/Fy

ρ *B*12*d
0.002*D24*12*D26
MAX(Ast:Ast min.)

(Df-hf/12)*Density of soil/1000
MAX(Cantelever Length Y,Cantelever Length Y)
Wu*Cantelever Length Y*Cantelever Length Y/2*L
Mu*12000/(0.85*L*12*d^2)
0.85*fc' *(1-SQRT(1-2*Rn/(0.85*fc' *1000)))/Fy

ρ *L*12*d
0.002*L*12*hf
MAX(Ast:Ast min)

MAX(0.02*Fy*1000*MAX(Longetuidnal Steel:Transvers steel)/(8*SQRT(fc' *1000)),0.0003*Fy*1000*MAX(Long


3*Fy*1000*MAX(Longetuidnal Steel:Transvers steel)/(40*8*SQRT(fc' *1000))
0.01*Pedestal Y*Pedestal X

Ties steel
MIN(48*Dia of bar/12,16*Dowel Steel/8,8)
0003*Fy*1000*MAX(Longetudinal steel:Transverse steel)/1000,8)