Given,
Slab Details:
Long Side,b= 65 ft fy= 4 ksi
Short Side,a= 50 ft fc´= 60 ksi
Rib Spacing,a1,b1= 6 ft
Live Load= 40 psf
Assume,
Partition Wall,PW= 50 psf Unit Weight of concrete= 150 pcf
False Seiling,FS= 20 psf Poisson's ratio,μ= 0.15
Floor Finish,FF= 30 psf
Column Size, 30X24 l1= 30 inch
l2= 24 inch
Thickness:
Beam thickness,Df= 50*12/20= 30 inch
Rib thickness,D= 50*12/20= 30 inch ≈ 42 inch
Df/D= 0.071428571
bf/b= 6
I= b*D³/12= 74088 inch⁴
k=2.3/I= 2.3*b*D³/12= 170402.4 inch⁴
G= E/2(1+μ)= 1567389.8
Load Calulation:
Punching Shear Check:
b₀= 270 inch
ØVc=Ø*4*√fc´*b₀*d= 2074.77 kip
Vu= 1384.72 kip
Considering Punching Shear Section is OK.
At Midpoint, x 25 ft
y 32.5 ft
At Midpoint, x 25 ft
y 32.5 ft
Short Direction Long Direction
Unit Positive Unit Positive
Moment, Moment,
k‐ft 1234.26 k‐ft 730.33
Mu= Mu=
Mu/Rib= k‐ft 154.28 Mu/Rib= k‐ft 73.03
Ru= Ru=
(Mu/Øbd² ‐ 0.105 (Mu/Øbd² ‐ 0.049
)= )=
531ρ²‐ 531ρ²‐
60ρ+Ru=0 ‐ 0.00178 60ρ+Ru=0 ‐ 0.000823
, ρ= , ρ=
in² 0.86508 in² 0.399978
As=ρ*b*d As=ρ*b*d
As(min.)= As(min.)=
in² 0.9072 in² 0.9072
0.0018*b 0.0018*b
*t= *t=
As(Prov.) ‐ 3‐#6 As(Prov.) ‐ 3‐#6