DESIGN OF BASE PLATE & ANCHOR BOLT:

BASEPLATE TYPE: #REF!


Grid : #REF! Node No.: #REF!

DESIGN DATA :-
STEEL COLUMN SIZE D = 1050 mm
Tf = 25 mm
BASE PLATE SIZE Z
B
Length L = 1500 mm
Breadth B = 1500 mm
Thickness T = 45 mm
CONCRETE PEDESTAL SIZE
Length Lp = 1700 mm
Breadth Bp = 1700 mm X X

L
Assume Size of Bolt 56 mm
l1
Assume Total Nos. of Bolt n = 8 Nos.
Edge Dist. for Bolt ed = 100 mm l2
Edge To Centre of Column Flange 237.5 mm
Z
BASE PLATE SIZE BETWEEN STIFFENERS
Distance of bolt center from column flange ef = 125 mm
Distance between stiffeners ds = 362.5 mm
Distance between centre of stiffener to edge of base plate = 25 mm
No. of stiffeners = 5 nos

Centre To Centre of Bolt s = 1300 mm


Projection of base plate from Column l' = 225 mm

Concrete grade M25

Characteristic comp. strength fck = 25 N/mm IS:456-2000 Table 2


Permissible stress in bending comp. cbc = 8.5 N/mm IS:456-2000 Table 21

Permissible bearing stress b = (min of sqrt(A1/A2), 2) * 0.25fck


IS:456-2000 cl. 34.4
Area of pedestal, A1 = Lp * Bp = 2890000 mm 2

Area of base plate, A2 = L * B = 2250000 mm2


sqrt (A1/A2) = 1.13

Permissible bearing stress b = 1.13 x 0.25 x 25


= 7.08 N/mm

Permissible bond stress in tension bd 0.9 N/mm IS:456-2000 Table 21

m -Modulur Ratio 280/3cbc = 10.98 IS:456-2000, Cl B-2.1.2


BOLTS:
Permissible Tensile stress tf = 120 N/mm IS:800-1984 Table 8.1

BASE PLATE:
Yield stress fy = 230 N/mm (As per Table-3, IS2062:1999)
BHEL - 345 MW NAGOTHANE CCPP
PE-DC-297-612-C020
Design Calculation for STG Building - Baseplate and Bolts

SUMMARY OF UNIAXIAL MOMENT FOR ALL LOAD COMBINATIONS


#REF!
Ref: E-238, E-239, E-240 & F-160
AXIAL MOMENT-x MOMENT-z Jointno Load Case
81 -355.559 -118.571
Moment-x Moment-Z Moment Mu
Joint No. Load Axial (kN) sl.no
(kNm) (kNm) (kNm)
#VALUE!

#REF! #REF! #REF! -88.481 -7.161 1


56.232 -11.944 2 Err:512
-209.798 -10.007 3 Err:512
-183.675 -9.074 4 Err:512
57.892 -8.838 5 Err:512
615.53 -72.167 6 Err:512
-503.066 48.278 7 Err:512
349.5 -70.23 8 Err:512
-769.097 50.215 9 Err:512
375.623 -69.297 10 Err:512
-742.973 51.148 11 Err:512
617.19 -69.061 12 Err:512
-501.407 51.384 13 Err:512
549.573 -58.568 14 Err:512
-569.024 61.877 15 Err:512
552.879 -45.502 16 Err:512
-565.718 74.943 17 Err:512
521.667 -79.915 18 Err:512
-596.93 40.531 19 Err:512
524.971 -66.848 20 Err:512
-593.626 53.597 21 Err:512
567.635 -55.688 22 Err:512
-550.961 64.758 23 Err:512
570.942 -42.622 24 Err:512
-547.655 77.823 25 Err:512
531.388 -78.756 26 Err:512
-587.209 41.689 27 Err:512
534.691 -65.689 28 Err:512
-583.905 54.756 29 Err:512
89.865 -98.632 30 Err:512
-1028.732 21.813 31 Err:512
142.981 -85.324 32 Err:512
-975.615 35.121 33 Err:512
723.505 -98.305 34 Err:512
-395.092 22.14 35 Err:512
685.291 -85.065 36 Err:512
-433.305 35.38 37 Err:512
-150.042 -95.762 38 Err:512
-1268.639 24.683 39 Err:512
-96.925 -82.454 40 Err:512

file:///var/www/apps/conversion/tmp/scratch_5/347555095.xlsx KHM 03/08/2017


BHEL - 345 MW NAGOTHANE CCPP
PE-DC-297-612-C020
Design Calculation for STG Building - Baseplate and Bolts

Moment-x Moment-Z Moment Mu


Joint No. Load Axial (kN) sl.no
(kNm) (kNm) (kNm)

-1215.522 37.991 41 Err:512

file:///var/www/apps/conversion/tmp/scratch_5/347555095.xlsx KHM 03/08/2017


BHEL - 345 MW NAGOTHANE CCPP
PE-DC-297-612-C020
Design Calculation for STG Building - Baseplate and Bolts

Moment-x Moment-Z Moment Mu


Joint No. Load Axial (kN) sl.no
(kNm) (kNm) (kNm)

991.195 -97.136 42 Err:512


-127.402 23.31 43 Err:512
952.981 -83.896 44 Err:512
-165.616 36.549 45 Err:512
554.466 -50.155 46 Err:512
-564.131 70.29 47 Err:512
557.772 -37.089 48 Err:512
-560.825 83.356 49 Err:512
501.934 -75.517 50 Err:512
-616.662 44.928 51 Err:512
505.238 -62.451 52 Err:512
-613.359 57.995 53 Err:512
-50.57 -91.258 54 Err:512
-1169.167 29.187 55 Err:512
2.546 -77.95 56 Err:512
-1116.05 42.495 57 Err:512
849.1 -92.868 58 Err:512
-269.496 27.577 59 Err:512
810.886 -79.628 60 Err:512
-307.71 40.817 61 Err:512
1308.528 -14.195 62 Err:512
189.931 106.25 63 Err:512
1311.455 -13.769 64 Err:512
192.859 106.676 65 Err:512
-359.222 -120.697 66 Err:512
-1477.819 -0.252 67 Err:512
-356.295 -120.272 68 Err:512
-1474.891 0.174 69 Err:512
1681.74 -55.904 70 Err:512
563.143 64.541 71 Err:512
-732.434 -78.988 72 Err:512
-1851.031 41.457 73 Err:512
1648.041 -55.344 74 Err:512
529.444 65.101 75 Err:512
-692.88 -78.697 76 Err:512
-1811.477 41.748 77 Err:512
1305.749 -11.016 78 Err:512
187.152 109.429 79 Err:512
746.451 49.207 80 Err:512
-355.559 -118.571 81 Err:512
-1474.155 1.874 82 Err:512
-914.857 -58.348 83 Err:512
1640.651 -54.721 84 Err:512
522.054 65.724 85 Err:512
1081.353 5.501 86 Err:512
-690.461 -74.865 87 Err:512

file:///var/www/apps/conversion/tmp/scratch_5/347555095.xlsx KHM 03/08/2017


BHEL - 345 MW NAGOTHANE CCPP
PE-DC-297-612-C020
Design Calculation for STG Building - Baseplate and Bolts

Moment-x Moment-Z Moment Mu


Joint No. Load Axial (kN) sl.no
(kNm) (kNm) (kNm)

-1809.057 45.58 88 Err:512


-1249.759 -14.642 89 Err:512
Maximum values Err:512
Minimum values Err:512

file:///var/www/apps/conversion/tmp/scratch_5/347555095.xlsx KHM 03/08/2017


BHEL - 345 MW NAGOTHANE CCPP
PE-DC-297-612-C020
Design Calculation for STG Building - Baseplate and Bolts

CONVERSION OF BIAXIAL MOMENT TO UNIAXIAL MOMENT

Load case : Grid : #REF!


Node No. #REF!
b
LOAD DATA :-
b'
Un Factored loads from Support Reactions
Z
Vertical Load Pc = kN
Moment Mx = 355.56 kNm
Mz = 118.57 kNm
h' = 100 + 125 + 1050 + 125 Mx

h'

'
1400 mm

h
X X
b' = 175 + 1150
1325 mm

Mx/h' = 355.559 / (1400/1000)


Mx/h' = 253.97 kN

Mz/b' = 118.571 / (1325/1000)


Mz/b' = 89.49 kN Mz
z
Z

Condition 1 : Mx/h' >= Mz/b', Mx' = Mx+xh'/b' x Mz Equation 40, cl.3.8.4.5, BS 8110 : part 1 : 1997
Condition 2 : Mx/h' < Mz/b', Mz' = Mz+xb'/h' x Mx Equation 41, cl.3.8.4.5, BS 8110 : part 1 : 1997

Where,
h' and b' are shown in figure
" " is the coefficient obtained from table 3.22, BS 8110 : part 1 : 1997
( " " corresponds to the value of " N/bhf cu ")
Where, N =P
N/bhfcu = P/bhfcu = *1000/(1500*1500*25)
= #VALUE!
Hence = #VALUE!

Here, Mx/h' > Mz/b'


As per condition 1, Mu = #VALUE!
#VALUE! kNm

file:///var/www/apps/conversion/tmp/scratch_5/347555095.xlsx KHM 03/08/2017