Professional Documents
Culture Documents
Avijit Ajit Sen: Professional Summary
Avijit Ajit Sen: Professional Summary
Address
Sai niwas-2, Tulinj Rd., Nalasopara
Palghar-401209 Carrier objective:
Career Timeline:
Origination Piano Presitel Ganesh Multi-Tech Engg. PRESSTECH(INDIA)
Month - Year May'17 Sept'18 Oct'18 Nov'20 Dec'20 Sept'21 Sept'21 Till Now
CORECOMPETENCIES-YEARWISEWORKING SKILLS-TECHNICAL
EXPERIENCE SPC 75%
New Project 1 FMEA 80%
Plant Quality &… 1 MSA 80%
Process Quality 2 APQP 85%
Control Plan 90%
Process Quality 3
7 - QC Tools 90%
Customer Quality 4 8D 90%
Part Feasibility… 4 MS Office 90%
PPAP 90%
0 1 2 3 4 5
0% 20% 40% 60% 80% 100%
MR, Process & Management Management
System Process & System
Department Production Production Quality Supplier , ,
Quality Quality
Quality MR MR
Plant Head Plant Head
Trainee Trainee Asst. Quality
Position Jr. Engineer Sr. Engineer Quality. Engineer
Engineer. Engineer Manager
PRESSTECH (INDIA) PVT. LTD. , Vasai.
Business Profile:- Manufacture and Dispatch Circlip's, Washer, Snap ring, Shim Washers, Spiral Rings, Dowel Pins &
Allied Sheet Metal Products.
Period:-09/2021–Till Date.
Certification:- ISO 9001:2015 (QMS), EMS 14001 : 2015 & IATF 16949.
Designation:- Plant Quality Head/NPD Head
Reporting to:- Managing Director & CEO.
ORGANIZATION STRUCTURE.
DIRECTOR
Key Assignments :-
PLANT HEAD
Daily Monitoring.
All Dept MIS. Production line Stoppage. APQP Status Technology upgradation status
RFQ Development Tool Status Facility New Resources Status. Deviation Status.
Weekly Monitoring.
Supplier Meeting Scrap Note Review TPM Status IHR Monitoring & Reductions Plan
Supplier Rejection Reduction Plan ECRN Review CAPA implementation Kaizen Review.
Monthly Monitoring.
All Dept. MRM Meeting. Customer Complaint Review. Cost of Short Supply. Cost of Poor Quality.
Monthly Sales Target Customer Score Card Review. Scheduled Vs Supply AIAG Documents Review
Process Audit Plan Layered Audit Plan OEE & Machine Capacitor
0
Quality Management System (9001:2015) Documentation handling and Implementation among the team
according to the specified clauses and evaluate the risk management on it.
ITAF (16949) Documentation handling and Implementation among the team according to the specified
clauses and evaluate the risk management on it.
Looking after new product development, customer quality, system quality, process quality & supplier
quality (globally).
RFQ Handling, Project Budget & Co-ordinate with Customers for new business.
Preparation of costing for proposed RFQ parts by customers with proper feasibility & adequate cost-saving production
methodology.
Promote and participate in work teams focused on the launch of new products using APQP (Advanced Product
Quality Planning) tools.
Timely Preparation of PPAP from Level 1 to Level 4 category as per customer requirement. Also to monitor the
Part Process Validation according to the control plan.
Daily Monitoring of Management Information System to make a timely decision on bottleneck & chronic
loss bearing problems.
Monthly Evaluation of MRM for all Departments to show the optimum Output from the department and Man-
power utilization with their effective data and generate the MOM with an action plan for everyone.
Work on Turnover Growth by increasing the ratio of schedule v/s supply, enquiry to order,
marketing strategy, addition of new customers & reduction in short supply.
Monitor the monthly sales and customers wise contribution to achieve the targeted norms as per
requirement.
Maintains and improves product quality by completing product, company, system, compliance, and surveillance audits,
investigating customer complaints, collaborating with other members of management to develop new product and
engineering designs, and manufacturing and training methods.
DWM Monitoring of the team as per hierarchy & present it to management for Timely completion of task and
their effectiveness.
To identify the scope of improvement in the system & process through the monthly internal QMS / Process audits.
Focus continuous improvement on Supplier Quality Rating with continuous supplier process audit &
controlling the supplier PPM in incoming stage & implementation on action plan.
Monthly review on executed SPC & MSA Plan parts to ensure the stability in Product & Process. And also acquire
the timely Action plan with identified instability in process or product.
Monthly Review on Plant OEE, MTTR, MTBF & IDLE etc. Time with targeted values and to execute action plan on
non achieved targets.
Review on monthly execution of Departmental Training as per Plan for Manpower Upgradation & Efficient
Skill Matrix.
Technology Up gradation And Automation Implementation plan with target date & current status of identified
Technology Up gradation & Automation projects for Low cost Manufacturing & Inspection.
Identification of NVA & Reduction Plan for elimination of non value added activities in process with month wise
reduction trend to assure the optimum efficiency of plant.
To maintain and develop existing and new customers through appropriate proposition and methods to optimize
quality of service, business growth and customer satisfaction
To ensure compliance of health , Safety rules and regulations and utilization of personal protective equipments
by staff and workers on shop floor to avoid accidents.
Assist operation team to implement all business goals through appropriate lean manufacturing methodology.
Focus continuous improvement activities on current customer product while developing new systems for
future customers and programs.
SYSTEM DEVELOPMENT
Successfully implementation of ISO 14001:2015 (Environment Management System) with Necessary MPCB Norms
& collective Impact Data.
Successful implementation PPE Monitoring under my surveillance to Zero Tolerance accident on shop floor.
Assist all department management personnel in the development of systems to comply with IATF 16949, ISO 9001
& ISO 14001.
COPQ Reduced from 5.5% to 3.2%
Operated with 0.02% Rejection of Overall Plant with 200PPM.
Cost Saved Rs 4.8 lakhs 3mm Circlip's with Rolling & Coiling Operation within 3month.
Reduction of Cost of short supply from 17.5 % to 7.55% with increasing the production rate by utilization of
modern technology upgradation.
Introduction of Daily MIS for Production & Quality with quantitative & Qualitative parameters of efficiency.
Quarterly MRM is converted to Monthly MRM to improve result base working efficiency.
Successfully established a new Lab Set (Meta-Lab) with the help of META-TECH, Pune to check the parameters like
Thread Laps, De-carburization, Weld penetration & Microstructure, which enhance the detail quality of Raw-Material,
Rolling Fine Threads without dependency on Third-party.
Implementation of “I3" Rule (Involvement, Improvement & Implement) to reduce the internal rejection &
Timely Completion of the rework process on it. With Involvement of Quality Team & Improvement by Production
Team & Implement by Process by Owners.
Customer Rejection Handling process flow with Involvement of CFT with planned manner to execute the
optimum feedback from Customer.
Customer Complaint Closing Method by using 2-2-2-2 Mantra( 2 Min - 2 Hrs - 2 Days - 2 Weeks) with
acknowledgment within 2 min, Immediate Corrective Action planning within 2hrs, Corrective action implementation &
segregation within 2 days, Permanent Corrective action & Root cause within 2 days.
Future Implementation of 8 Camera automatic sorting machine to supply the defect-free part to the customer.
Business Profile:- Manufacture and Dispatch of Precision Machined and Cold forged Component for Automotive & Other
Appliance.
Period:-11/2020–10/2021
Certification:- ISO 9001:2015 & IATF 16949.
Designation:- Quality Manager
Reporting to:-Plant Head.
Key Assignments :-
Daily Monitoring.
Weekly Monitoring.
QMS Documentation. ITAF Documentation. Scarp Note Review. Kaizen Review.
Scarp Note Review Internal Rejection Review Supplier Rejection Review De-crab & Thread lab Plan Review
Monthly Monitoring.
MRM-01 MRM-02 DWM Review Shop floor Meeting Monthly Efficiency Review
CSR Cost of Poor quality Layout Report Plan Review
Quality Management System (9001:2015) Documentation handling and Implementation among the
team according to the specified clauses and evaluate the risk management on it for DCRN.
ITAF (16949) Documentation handling and Implementation among the team according to the specified
clauses .evaluate the risk management on it for DCRN.
To analyze & create a road map for customer rejection by monitoring the performance of supplied parts
during on-going production at customer end.
Apply robust system for reduction in Customer Complaints by control, resolve & Reduce the critical customer
complaint. Also to monitor the repetitive concern are not trail which can hamper the business.
Review and improve process control plans and PFMEAs (Process Failure and Mode Effect Analysis)
for assembly.
Review and improve mistake-proof devices, designs or processes.
Stretch Maximum Number of days without defect to reflects the capability to supply defect free parts over a period of
time by applying various firewall & bottle necking at detection level.
To sustain & maintain robust disciplinary rules for days from last defect to maintain the consistency of supplier to
supply defect free parts over a period of time. This parameter is calculated over a period, which shows the interval after
recent defectin a year.
Maintain Quick Response to Quality Concerns by acknowledging the concern to Team till ground level that
indicates response of Quality Manager to Quality concerns. Score for this parameter will be attributed by the Plant
Head based on response from Quality Manager to close the concerns.
Executing Supplier Audit and generating supplier Performance Score Card is to improve the Quality Rating of
suppliers & Action Plan on Non-Conformance. Business enhancement depends upon the Rating of suppliers.
Supplier Defect Communication Follow-ups for Corrective Actions with timely completion of
Segregation process & Preventive Action to avoid the repetitive concerns and achieve the Zero Defect.
Kaizen/ Poke yoke Or Other defect prevention Improvement Ideas & Implementation to improve the
productivity with optimum quality and enhance the technology mindset of team.
Monthly presentation of MRM-01 & MRM-02 to Management to show the optimum Output from the
department and Man-power utilization with their efficiency data.
SYSTEM DEVELOPMENT
Ganesh Multi-tech Engineering Pvt. Ltd., Vasai.
Business Profile:- Specialized in the manufacture of sheet metal Press parts and components for Automobile
Industry in particular and parts and Accessories for engineering concerns in general.
Period:- 10/2018–11/2020
Certification:- ISO 9001:2015 (QMS) & ISO 14001:2015 (EMS)
Designation:- Quality Assurance Engineer (Asst. Quality Head).
Reporting to:- General Manager.& Quality Head.
Key Assignments :-
Weekly Reports
1.QIR meeting 2.QDR meeting 3.Rejection analysis Report 4.KAIZEN Report
Preparation & Execution for System Audit, Internal Audit & Surveillance Audit.
Preparing PPAP documents for in process development part.
Daily Monitoring of Eye Chart & Internal Rejection Record with concrete preventive action on it.
To attain Customer Meeting ( Thyssen Krupp & Mahindra & Mahindra) monthly for
Quality Improvement.
Providing SCAR, CAPA & 8D Report as an action plan for customer rejection.
To conform checked Plating, Powder Coating, Raw material reports by Quality Team.
Checking & Preparing Detailed Inspection Report or Layout Report.
Weekly Evaluation for Kaizen & Poka-Yoke in order to increase Production & Quality Efficiency.
SYSTEM DEVELOPMENT
Successfully Passing the “Sustainability Audit” conducted by INTERTEK for THYSSEN KRUPP LTD From
28% (2017) to 61% (2019).
Establishment & Successfully passing the Surveillance audit for EMS (Environment Management System)
1400:2015 clearing all impact records.
Weekly 1 hrs maintaining Plant Housekeeping & “5S” throughout the factory.
Piano Presitel Pvt. Ltd., Bhayander.
Business Profile:- Specialized in the manufacture of sheet metal press parts like clutch, brake, washer, rings
and special fastener for Automobile & Industrial Engineering with specified quality.
Key Assignments:
Inspection of finished automotive parts like clutch, brake and automotive assembly. Formation and Submitting of
various Quality documents like PPAP, NCR,8D REPORTS,APQP ISO and IATF documents.
Examine critical dimensions in profile projector, vernier caliper, micro meter ,different gauges and load
testing machine.
Daily Production Planning and Control of manufacturing parts.
Controlling PRESS SHOP, HEAT TREATMENT, SURFACE FINISH and TOOL ROOM.
Quality inspection of material according to its dimensions with various instrument like vernier caliper,
micrometer, height gauges, plug gauges, profile projector.
Taking Pre and Post production control & inspection of machine.
SYSTEM DEVELOPMENT
Academic Qualification
Certifications
I am Certified trained designer from Cadd Center for SOLIDWORKS & AUTOCADD
from year 2019.
Trained & Certified FIRST-AIDER from First Aid Industrial Training & Health(FAITH) Government
of Maharashtra Reg No: RFATI 38FI/2012 .
Software proficiency
Main Project
Cricket
Gardening
Football
Playing Volleyball
Personal Profile
I hereby declare that all the details furnished here are true to the best of my
PLACE: SIGNATURE: