ZPMC 公司简介

Brief Introduction of ZPMC


Shanghai Zhenhua Port Machinery Co.,Ltd.(ZPMC)
is a world-famous manufacturer of cranes and large
steel structures,ZPMC has captured more than 70%
of the world market share in the industry, ZPMC’s
products are in use at 60 countries and regions, and
over 120 terminals around the world.
ZPMC endeavors to develop offshore heavy-duty
industry. Large floating cranes、heavy-duty
engineering vessels and heavy lifting vessel are our
advantage.
上海振华港机(集团)公司(ZPMC)是世界知名起重机和大型
钢结构制造商,产品占据本行业世界市场70%以上份额,
遍布世界60个国家和地区的120余个码头 。
ZPMC目前正大力发展海上重工产业。大型浮吊、重型起
重工程船及重吊船是其强项。
ZPMC为世界500强企业并在沪市成功上市 。
Please visit:
ZPMC is one of the .500 strongest companies and has
ZPMC公司详细情况请登陆: been successfully listed on the Shanghai Stock Exchanges.
http://www.zpmc.com
ZPMC has more than 1,000 professional
engineers working at hull、engine and electric.
There are about 260 technical institutes and
tens of Universities in Shanghai which are all
the resource that ZPMC can use, such as SJTU、
704 and 708 academic institution .

¾ ZPMC有专业船舶部,拥有1000余名专
业工程师从事船体、轮机、电气方面的工

¾ 上海有260余科技研究所,数十所大学都
是我们的后备力量,如上海交通大学、
704、708研究所等。
ZPMC has more than 7000 welders. They all hold CCS,
among them, more than 2000 are holding international
welding certification. (ABS,GL,DNV......)
ZPMC拥有7000名焊工,均持有CCS证书,其中有2000名还拥有国际焊接证书。
(如ABS、GL、DNV…)
Last year, the steel quantity consumed by ZPMC is
more than 600,000tons, this year, it will be more
than 800,000tons.
去年,ZPMC使用钢材600,000吨,预计今年
使用钢材量将超过800,000吨。

ZPMC掌握高强度钢材的焊接技术并有专门的试验机构
---------
The key points for the welding of high strength steel plates are:
焊接高强度钢板的关键在于:

z Proper preheating before welding and temperature preservation after


welding. 焊接前充分预热及焊接后保温
z To carry out welding strictly according to the welding procedure
specification 严格按照焊接流程说明进行焊接
z To have high level welders and heat rectifiers.
高标准的焊机及热传感器
‹ welding in high quality ISO 9000
高质量的焊接保障

To guarantee the high quality of the vessel,


ZPMC regards the following as the key points

为了确保产品的高品质,ZPMC将以下几点视为关键:

9 Raw material shall be purchased and checked strictly


9 Steel plates Shall be classified for the project according to time, location, strength group and toughness grade
9 Steel plate shall be pretreated by automated plate pretreatment process line
9 Welding parameters shall be as per approved WPS
9 Cut steel plate by using advanced equipment strictly according to the drawings
9 Welds requires high quality shall be performed by expert welders
9 To guarantee the quality of painting, all of the structures re-blast cleaned by advanced equipment in workshop
9 Quality Control system complying with international accepted standards
9 严把原材料采购、验收关
9 根据项目的时间、地点及种类对钢板进行分类
9 先进预处理设备对钢板进行预处理
9 焊接参数必须按照认可的焊接工艺规则
9 采用先进设备严格按照图纸切割钢板
9 优秀的焊工完成高质量的焊接工作
9 涂装车间内完成分段的二次处理和涂装,确保涂装质量
9 符合国际标准的严格的质量控制系统
Large-size fabrication workshop
ZPMC拥有大型的结构生产车间和场地

小分段堆场
中分段车间
甲板起重机车间
材料堆场 油漆车间 Storage area
停泊码头 Workshop
Workshop Painting for small size
Material for cranes Berth for medium
workshop size section block
storage on board dock
area 小分段车间

Workshop
for small
size block

Painting
workshop

油漆车间
A bout 160,000 m 2 w orkshop for construction
A bout 24,000 m 2 outside area for assam bly and storage
A bout 1350 m quayside place for assam bly
约160,000平方米的生产车间
约24,000平方米用于组装和材料堆放的露天场地
约1350米用于组装的海岸线

(
)

F or reference only

C onstruction planning
ZPMC拥有新的车间供船舶建造

E F
A
喷 喷

漆 漆

房 房



ZPMC is in possession of more than 10 steel structure shops with a total area
over 200,000 square meters, three of which is 30m wide and 400m long.
ZPMC拥有10多个钢结构加工车间,总面积超过200,000平方米,
其中有3个车间长400米宽30米

¾ Recently, another two heavyduty work


shops are built which will have lifting
capacity of 4x400t with 25m hook high.

最近,有两个起吊能力达4x400t,起吊高度
25m的重型车间在建,
在建的管系车间
Large warehouse and steel storage areas
ZPMC拥有大型仓库及钢材堆场

z ZPMC has warehouses and steel storage area of over 60,000 square
meters to store all kinds of mechanical & electrical components and
large quantities of steels.
ZPMC拥有60,000多平方米的仓库及堆场,用于存放各种机械、
电气设备及大量的钢材。
Large storage areas for completed steel structure
ZPMC拥有大型的完工钢结构堆场

ZPMC has over 500,000 square meters areas used


for the assembly and storage of steel structures.
ZPMC拥有500,000平米的场地用于分段建造和储
备。
¾ Some heavy duty machining equipments
ZPMC拥有重型机械设备

‹ large-sized steel plate pretreatment working line,


Leveler machine, rolling machine
大型钢板预热作业线,平整器,滚压机
‹ large-sized plasma cutting machine,
milling machine, gear grinding machine, folding machine
大型等离子切割机,齿轮磨床,折边机
‹ heavy duty hydraulic trailer: 500T、400T、250T、100T
重型液压拖车:500T、400T、250T、100T
Having quay with enough depth quayside area for berthing of large
vessel, fabrication areas is close to the sea for an easy sailing of the
huge vessel
ZPMC拥有水深足以停泊大船的码头和建造场地,建造场地靠海,便于大船驶入 。
ZPMC will assign a special quayside
area for hull construction of
OFFSHORE ENGINEERING.

ZPMC将专门为海上重工项目划出一块
建造区域。
ZPMC world first-class fabrication base
(Changxing Island) is located at the
mouth of Yangtse River and the water
depth of the navigational channel to the
sea is over 14 m,
which will ensure the safe sailing of
large engineering vessel.
ZPMC一流的生产基地(长兴岛)位
于长江口,入海航道水深14米,确保
大型工程船舶可以航行。
¾ Eight large floating cranes and 22 heavy equipment carriers
ZPMC有8艘大型浮吊和22 艘大型运输船
ZPMC has built or is building: 7500T fully revolving
floating crane、 Derrick PIPELAY vessel DLV4400T、
KOREA 2X4000T floating crane、4000T full revolving
floating crane 、Self-use 4000T floating crane、
1700T American floating crane、 1600T floating
crane 、 1200T floating crane、1200T PIPELAY
VESSEL 2X2000 semi-submersible vessel 、offshore
platform 、 pontoon and etc, has complete the
alteration of the 22 heavy equipment carriers.
DNV、ABS、LR、GL、CCS and etc. are the partners of
ZPMC.
ZPMC已建或在建:
海上重工船舶:7500T全回转起重打捞工程船“蓝鲸号”、
DLV4400T伊朗浅水铺管船、 4000T全回转浮吊“华天龙”号、韩国
三星2X4000T浮吊、自用4000T浮吊、1700T美国浮吊、 1600T浮
吊、 1200T浮吊、 中海油1200T浅水铺管船、2X2000T半潜式起重
船、海洋平台及浮筒等,已经设计改造完成22艘大型运输船。
ZPMC与DNV、ABS、LR、GL、CCS等保持良好的合作关系。
Fabrication methods

船体建造方法
To fabricate the blocks and lift the completed blocks on the hydraulic trailer using
workshop crane and in the large sandblasting workshop for sandblasting treatment

在重型车间中制作分段并使用车间行车将已制造好的
分段吊至液压平板车上运至大型冲砂车间内冲砂。
To transport the completed blocks to a special
areas by large hydraulic trailer
用大型液压平板车将制造好的分段运至专用场地放置
To lift the hull by large floating crane onto the floating dock.

浮吊配合专用浮船坞开工船体的建造
¾ ZPMC is in possession of large floating dock for the construction of heavy
lifting vessel. The floating dock’ breadth is 60 meters.
ZPMC有用于建造工程船的大型浮船坞,浮船坞宽60米。

Floating dock: 225*60*8M


主 要 尺 度 浮船坞: 225*60*8M
总 长 221.6m

首端浮墙长 10.00m

尾端浮墙长 10.00m

首、尾端浮墙宽 60.00m

内净宽 60.00m

浮箱甲板高度(边/中) 8.50m

顶甲板高度(距基线) 21.50m

安全甲板高度(距基线) 18.50m

龙骨墩高度(距主甲板中心线)1.20m
设计最大沉深(距基线) 15.70m 第七压载水舱 第六压载水舱 第五压载水舱 第四压载水舱 第三压载水舱 第二压载水舱 第一压载水舱

尾泵舱 安全通道 首泵舱

设计最大沉深龙骨墩以上水深 6.00m 13440 28800 28800 19200 28800 28800

8000 201600 8000

升举能力 18000t
压载水舱数量 28只 第七压载边舱
第一压载边舱
(左)
(左)

集粪柜 集粪柜

第七压载中舱 第一压载中舱

(左) (左)

第一压载中舱
第七压载中舱
(右)

第一压载边舱
第七压载边舱
(右)
(右)
Transport the hull to the dock and launch it, commissioning and testing the
vessel after the assembly of superstructure and the crane in shore.
用浮船坞将建造好的船体运至深水处,使浮船坞注水下沉、船体下水后靠岸安装好上
层建筑及起重机等,整船进行调试试车
Thank You !