You are on page 1of 1

t

Jl. Marsekal Suryadharma Tangerang, 23 Maret 2022


Neglasari, Tangerang , Banten 15127
QUOTATION
MJT032-2232022

Customer : PT. Grand Indo Perkasa


Alamat : Medan
Contact Person : 0811630887 (Bpk Susanto)

NO Labor Description QTY Labor cost JUMLAH


1 Remove & Install 1 Rp 8.000.000 Rp 8.000.000
(cabin,wiring ,hyd line,transmission,pump,etc
2 Overhaul Transmission 1 Rp 29.800.000 Rp 29.800.000
3 Overhaul Hidraulic pump (work equipment pump) 1 Rp 10.000.000 Rp 9.700.000
4 Reseal Main Control Valve 1 Rp 7.000.000 Rp 6.900.000
5 Reseal Tandem pump 1 Rp 6.000.000 Rp 6.000.000
(power train,EPC, Brake,steering pump)
6 Reseal Lift Cylinder, Bucket Cylinder) 3 Rp 2.000.000 Rp 6.000.000
7 Remove & Install & Flushing oil cooler 1 Rp 1.500.000 Rp 1.500.000

SUBTOTAL Rp 67.900.000
* sudah termasuk biaya transport dll
* DP 30% TOTAL Rp 67.900.000
* Tidak termasuk Sparepart & pabrikasi

Pembayaran ke nomor rekening


Bank Mandiri 155-00-1048134-2 Hormat Kami,
AN : Irpan Hamdillah

Irpan Hamdillah
82211963300

You might also like