You are on page 1of 30

Universidad Nacional de Cajamarca hidroenergia

ESTACIONES PLUVIOMETRICAS 24 HORAS

ESTACION "A"

ESTACION : chontali

PRESIPT. MAX 24 H EN mm

AÑO ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC. PROM. ANUAL
MAX. ANUAL TOTAL
1997 28.80 8.80 22.60 12.80 16.20 10.20 16.00 10.10 8.00 8.80 46.80 44.20 19.44 46.80 233.30
1998 38.40 27.00 38.80 28.60 26.20 5.30 6.20 10.00 22.40 40.80 32.00 9.60 23.78 40.80 285.30
1999 47.00 20.20 12.30 50.40 15.80 9.40 10.40 6.60 20.00 22.80 29.80 35.00 23.31 50.40 279.70
2000 24.50 32.80 25.60 51.30 35.10 22.40 5.80 4.00 11.00 36.20 34.70 19.80 25.27 51.30 303.20
2001 23.80 43.00 24.40 25.50 21.00 29.00 9.30 8.30 16.20 51.60 27.20 42.30 26.80 51.60 321.60
2002 11.60 34.30 92.50 30.60 31.20 24.60 12.80 6.00 27.00 8.50 6.70 24.20 25.83 92.50 310.00
2003 70.50 13.30 21.70 31.90 13.30 4.70 11.00 6.60 30.00 13.40 43.30 20.50 23.35 70.50 280.20
2004 27.20 18.20 17.40 24.70 21.50 6.00 20.30 1.70 15.30 28.80 29.00 19.39 19.12 29.00 229.49
2005 30.90 24.60 22.60 32.00 23.90 30.50 10.80 3.10 9.20 48.00 28.70 22.20 23.88 48.00 286.50
2006 46.60 7.80 33.10 52.20 17.80 12.30 7.80 5.60 15.50 50.30 20.30 24.80 24.51 52.20 294.10
2007 34.40 47.80 41.90 66.30 25.80 15.00 4.30 5.80 29.10 23.80 32.60 33.30 30.01 66.30 360.10
MAX 70.50 47.80 92.50 66.30 35.10 30.50 20.30 10.10 30.00 51.60 46.80 44.20
MIN 11.60 7.80 12.30 12.80 13.30 4.70 4.30 1.70 8.00 8.50 6.70 9.60
PROMEDIO 34.88 25.25 32.08 36.94 22.53 15.40 10.43 6.16 18.52 30.27 30.10 26.84

_______________________________________________________________________________________________________________________________________
Ingeniería Civil
Universidad Nacional de Cajamarca hidroenergia

ESTACION "B"

ESTACION : El progreso

PRESIPT. MAX 24 H EN mm

AÑO ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC. PROM. ANUAL
MAX. ANUAL TOTAL
1997 0.40 12.40 21.00 27.10 1.00 0.00 4.70 2.10 1.50 8.80 10.10 15.00 8.68 27.10 104.10
1998 2.00 37.40 21.30 40.30 8.60 0.00 0.00 0.40 10.40 45.40 2.80 1.40 14.17 45.40 170.00
1999 4.60 21.60 10.10 5.10 0.70 0.00 5.10 0.30 1.50 21.50 9.50 16.40 8.03 21.60 96.40
2000 31.60 34.50 55.10 33.20 12.00 10.00 0.00 0.80 6.60 22.80 10.40 6.10 18.59 55.10 223.10
2001 29.50 58.50 14.70 14.30 8.80 5.70 2.60 0.00 7.30 7.90 5.40 22.50 14.77 58.50 177.20
2002 7.30 30.30 27.10 44.40 52.60 8.30 3.70 3.00 10.30 0.60 4.30 6.80 16.56 52.60 198.70
2003 31.40 15.10 31.80 19.90 7.60 1.40 3.30 3.10 17.30 8.40 30.60 8.00 14.83 31.80 177.90
2004 4.00 12.50 55.40 16.40 15.50 1.60 5.10 0.00 0.40 20.50 11.10 18.00 13.38 55.40 160.50
2005 2.70 24.10 12.10 9.80 3.70 17.00 8.70 0.00 2.50 6.90 12.90 7.40 8.98 24.10 107.80
2006 12.00 5.90 2.70 9.60 18.40 5.50 2.00 0.00 6.20 9.90 5.60 15.20 7.75 18.40 93.00
2007 1.80 13.10 43.00 13.60 3.30 0.60 0.00 0.40 2.00 29.60 2.80 13.00 10.27 43.00 123.20
MAX 31.60 58.50 55.40 44.40 52.60 17.00 8.70 3.10 17.30 45.40 30.60 22.50
MIN 0.40 5.90 2.70 5.10 0.70 0.00 0.00 0.00 0.40 0.60 2.80 1.40
PROMEDIO 11.57 24.13 26.75 21.25 12.02 4.55 3.20 0.92 6.00 16.57 9.59 11.80

_______________________________________________________________________________________________________________________________________
Ingeniería Civil
Universidad Nacional de Cajamarca hidroenergia

ESTACION "C"

ESTACION : LA CASCARILLA

PRESIPT. MAX 24 H EN mm

AÑO ENERO FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC. PROM. ANUAL
MAX. ANUAL TOTAL
1997 21.20 19.95 37.98 40.09 10.05 5.56 14.47 8.07 6.19 15.55 37.86 42.43 21.62 42.43 259.41
1998 24.00 45.31 37.63 48.57 20.51 2.68 3.13 5.39 20.12 59.05 18.52 6.03 24.24 59.05 290.92
1999 19.60 34.84 17.49 27.41 7.50 3.95 10.59 3.14 10.24 35.81 24.12 34.72 19.12 35.81 229.43
2000 14.10 22.23 28.04 26.90 14.34 10.04 1.62 1.42 5.57 18.75 13.63 7.84 13.71 28.04 164.48
2001 16.50 45.92 15.72 15.84 11.38 12.11 4.32 2.56 9.07 20.30 11.39 25.59 15.89 45.92 190.69
2002 21.20 30.50 67.00 17.50 18.50 20.00 4.80 0.00 5.50 2.20 23.30 17.90 19.03 67.00 228.40
2003 24.00 35.60 24.20 21.00 10.00 18.60 6.00 11.20 4.40 24.80 43.10 27.60 20.88 43.10 250.50
2004 19.60 26.00 29.40 41.40 15.80 4.20 3.80 0.00 4.60 22.00 19.70 29.80 18.03 41.40 216.30
2005 14.10 18.30 32.00 20.00 16.80 26.00 3.50 0.00 4.00 23.50 70.00 51.50 23.31 70.00 279.70
2006 16.50 8.50 9.00 40.50 16.70 3.70 2.40 0.70 3.70 28.50 20.00 29.50 14.98 40.50 179.70
2007 1.00 30.00 40.20 25.40 12.50 21.00 6.30 5.00 3.20 43.50 10.00 19.50 18.13 43.50 217.60
MAX 45.80 56.50 67.00 48.57 58.00 26.00 14.47 13.40 20.12 59.05 70.00 51.50
MIN 1.00 8.50 9.00 6.98 1.20 0.00 0.00 0.00 0.00 2.20 10.00 6.03
PROMEDIO 17.47 30.10 29.34 27.03 15.57 11.53 5.31 4.23 5.82 26.48 27.51 24.52
S/D = Sin Dato

_______________________________________________________________________________________________________________________________________
Ingeniería Civil
Universidad Nacional de Cajamarca hidroenergia

CÁLCULO DE LA PRECIPITACIONES MEDIAS MÁXIMAS

CÁLCULO DE LA PRECIPITACIONES MEDIAS MÁXIMAS

APLICANDO METODO DE THIESSEN


1

Datos:
·         Área (1) = 1.998 Km2

·         Área (2) = 4.373 Km2

·         Área (3) = 27.288 Km2

AREA TOTAL 33.66 Km2

2
3

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

APLICANDO EL METODO DE THIESSEN HALLAMOS LAS PRECIPITACIONES MEDIAS 24 HORAS

AREA T. P. MEDIA
AÑOS chontali el progreso la cascarilla A1 (km) A2 (km) A3 (km)
(km) (mm)
1997 46.80 27.10 42.43 1.998 4.373 27.29 33.661 40.70
1998 40.80 45.40 59.05 1.998 4.373 27.29 33.661 56.19
1999 50.40 21.60 35.81 1.998 4.373 27.29 33.661 34.83
2000 51.30 55.10 28.04 1.998 4.373 27.29 33.661 32.93
2001 51.60 58.50 45.92 1.998 4.373 27.29 33.661 47.89
2002 92.50 52.60 67.00 1.998 4.373 27.29 33.661 66.64
2003 70.50 31.80 43.10 1.998 4.373 27.29 33.661 43.26
2004 29.00 55.40 41.40 1.998 4.373 27.29 33.661 42.48
2005 48.00 24.10 70.00 1.998 4.373 27.29 33.661 62.73
2006 52.20 18.40 40.50 1.998 4.373 27.29 33.661 38.32
2007 66.30 43.00 43.50 1.998 4.373 27.29 33.661 44.79

PRECIPITACIONES MEDIAS MENSUALES

AÑOS Pmed. (mm) ANALISIS ESTADISTICA


1997 40.70 Media 46.4
1998 56.19 Mediana 43.3
1999 34.83 D. estándar 11.0
2000 32.93 Mínimo 32.9
2001 47.89 Máximo 66.6
2002 66.64 Suma 510.8
2003 43.26 Cuenta 11
2004 42.48
2005 62.73
2006 38.32
2007 44.79

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

Histograma de Precipitaciones Max 24 h. anuales


70.00
60.00
50.00
40.00
P (mm)

30.00 ANALISIS CON DISTRIBUCION LOG - NORMAL


20.00
10.00
0.00
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007

Años

Distribucion log normal


0.040
AÑO p (mm) F(x) f(x) 0.035
1 69.46 0.973 0.005 0.030
2 64.42 0.931 0.012 0.025
3 55.87 0.769 0.027 0.020
4 47.40 0.497 0.035
f (x)
0.015
5 46.43 0.463 0.035
0.010
6 45.99 0.447 0.035
0.005
7 42.09 0.317 0.031
0.000
8 40.71 0.275 0.029
9 40.62 0.273 0.029
10 36.87 0.175 0.023
11 32.67 0.096 0.015
INTENSIDAD

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

MEDIA 47.50
DESV.EST. 11.39

ANALISIS CON DISTRIBUCION LOG - NORMAL DE 2 PARAMETROS

AÑO I (mm/h) y = ln (x) F(x) f(x) 2.000


1 69.458 4.241 0.961 0.367 1.800
2 64.417 4.165 0.924 0.621
1.600
3 55.868 4.023 0.792 1.249
4 47.405 3.859 0.539 1.732 1.400
5 46.432 3.838 0.503 1.740 1.200
6 45.989 3.828 0.486 1.739 1.000

f (x)
7 42.086 3.740 0.337 1.592 0.800
8 40.708 3.706 0.286 1.482
0.600
9 40.620 3.704 0.282 1.474
0.400
10 36.866 3.607 0.159 1.057
11 32.670 3.486 0.064 0.544 0.200
0.000
3.400 3.500 3.600 3.700 3.800 3.900 4.000 4.100 4.200 4.300
y = ln (x)

MEDIA 3.8362
DESV.EST. 0.2293

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

ANALISIS CON DISTRIBUCION LOG - NORMAL DE 3 PARAMETROS

AÑO I (mm/h) y = ln (x-a) F(x) f(x) 1.000


1 69.458 3.839 0.944 0.243 0.900
2 64.417 3.724 0.910 0.350 0.800
3 55.868 3.493 0.800 0.605 0.700
4 47.405 3.195 0.579 0.845 0.600
5 46.432 3.154 0.544 0.857 0.500

f (x)
6 45.989 3.135 0.528 0.860
0.400
7 42.086 2.949 0.370 0.816
0.300
8 40.708 2.874 0.311 0.763
0.200
9 40.620 2.869 0.307 0.759
0.100
10 36.866 2.629 0.153 0.511
0.000
11 32.670 2.269 0.036 0.170
2.000 2.500 3.000 3.500 4.000
y = ln (x-a)

MEDIA 3.1026
DESV.EST. 0.4627
a 23.0000
C.ASIMETRIA (0.01891)

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

ANALISIS CON DISTRIBUCION GUMBEL

80.000
Var. Reducida
AÑO 70.000
I (mm/h) y = (x - u)/a Tr
1 69.458 2.365 11.148 60.000
2 64.417 1.936 7.446 50.000
3 55.868 1.210 3.879 40.000

INTENSIDAD
4 47.405 0.491 2.185 30.000

(mm/h)
5 46.432 0.409 2.060
20.000
6 45.989 0.371 2.006
7 42.086 0.040 1.619 10.000
8 40.708 -0.077 1.514 0.000
9 40.620 -0.085 1.508 0.000 2.000 4.000 6.000 8.000 10.000 12.000
10 36.866 -0.404 1.288 TIEMPO DE RETORNO AÑOS
11 32.670 -0.760 1.134

Media reducida Yn

0 1 2 3 4 5 6 7 8
x medio 47.5018 10 0.4952 0.4996 0.5035 0.5070 0.5100 0.5128 0.5157 0.5181 0.5202
desv. Est x (Sx) 11.3913 20 0.5230 0.5252 0.5268 0.5283 0.5296 0.5309 0.5320 0.5332 0.5343
30 0.5362 0.5371 0.5380 0.5388 0.5396 0.5402 0.5410 0.5418 0.5424
n = número de datos 11 40 0.5436 0.5442 0.5448 0.5453 0.5458 0.5463 0.5468 0.5473 0.5477
yn medio = 0.4996 50 0.5485 0.5489 0.5493 0.5497 0.5501 0.5504 0.5508 0.5511 0.5515
Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

Sn = 0.9676 60 0.5521 0.5524 0.5527 0.5530 0.5533 0.5535 0.5538 0.5540 0.5543
70 0.5548 0.5550 0.5552 0.5555 0.5557 0.5559 0.5561 0.5563 0.5565
parámetros, según n 80 0.5569 0.5570 0.5572 0.5574 0.5576 0.5578 0.5580 0.5581 0.5583
a = Sx / Sn 11.77 90 0.5586 0.5587 0.5589 0.5591 0.5592 0.5593 0.5595 0.5596 0.5598
u = x-yn*a 41.62 100 0.5600

Desviación tipica reducida Sn

0 1 2 3 4 5 6 7 8 9
10 0.9496 0.9676 0.9833 0.9971 1.0095 1.0206 1.0316 1.0411 1.0493 1.0565
20 1.0628 1.0696 1.0754 1.0811 1.0864 1.0915 1.0961 1.1004 1.1047 1.1086
30 1.1124 1.1159 1.1193 1.2260 1.1255 1.1285 1.1313 1.1339 1.1363 1.3880
40 1.1413 1.1430 1.1458 1.1480 1.1499 1.1519 1.1538 1.1557 1.1574 1.1590
50 1.1607 1.1623 1.1638 1.1658 1.1667 1.1681 1.1696 1.1708 1.1721 1.1734
60 1.1747 1.1759 1.1770 1.1782 1.1793 1.1803 1.1814 1.1824 1.1834 1.1844
70 1.1854 1.1863 1.1873 1.1881 1.1890 1.1898 1.1906 1.1915 1.1923 1.1930
80 1.1938 1.1945 1.1953 1.1959 1.1967 1.1973 1.1980 1.1987 1.1994 1.2001
90 1.2007 1.2013 1.2020 1.2026 1.2032 1.2038 1.2044 1.2049 1.2055 1.2060

BALANCE HIDROLÓGICO-AJUSTE DE LAS ESCALAS MEDIAS MENSUALES A UN MODELO PROBABILÍSTICO

Pexc = 1−𝐹(𝑥)

DATOS Probabilidad de excedencia F(x) Diferencia Delta D


Empírica
nº Intensidad Normal LN2 LN3 Gumbel Normal LN2 LN3 Gumbel
1 69.458 0.083 0.027 0.039 0.056 0.090 0.056 0.044 0.027 0.006
2 64.417 0.167 0.069 0.076 0.090 0.134 0.098 0.091 0.077 0.032
3 55.868 0.250 0.231 0.208 0.200 0.258 0.019 0.042 0.050 0.008
4 47.405 0.333 0.503 0.461 0.421 0.458 0.170 0.128 0.088 0.124
5 46.432 0.417 0.537 0.497 0.456 0.485 0.121 0.080 0.039 0.069
6 45.989 0.500 0.553 0.514 0.472 0.498 0.053 0.014 0.028 0.002
7 42.086 0.583 0.683 0.663 0.630 0.618 0.099 0.080 0.047 0.034

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

8 40.708 0.667 0.725 0.714 0.689 0.661 0.058 0.048 0.023 0.006
9 40.620 0.750 0.727 0.718 0.693 0.663 0.023 0.032 0.057 0.087
10 36.866 0.833 0.825 0.841 0.847 0.776 0.009 0.008 0.013 0.057
11 32.670 0.917 0.904 0.936 0.964 0.882 0.013 0.020 0.048 0.034

Máximo 1.20 1.21 0.09 0.12


1.36/√𝑛
𝐷=𝐸𝑚𝑝𝑖𝑟𝑖𝑐𝑎−𝑃𝑒𝑥𝑐 rechazada rechazada Aceptada Aceptada
0.410

ANALISIS CON DISTRIBUCION LOG - NORMAL DE 3 PARAMETROS

AÑO I (mm/h) y = ln (x-a) F(x) f(x)


1.000
1 69.458 3.839 0.944 0.243
0.900
2 64.417 3.724 0.910 0.350
3 55.868 3.493 0.800 0.605 0.800
4 47.405 3.195 0.579 0.845 0.700
5 46.432 3.154 0.544 0.857
0.600
6 45.989 3.135 0.528 0.860
7 42.086 2.949 0.370 0.816 0.500

f (x)
8 40.708 2.874 0.311 0.763 0.400
9 40.620 2.869 0.307 0.759
0.300
10 36.866 2.629 0.153 0.511
0.200
11 32.670 2.269 0.036 0.170
0.100
0.000
2.000 2.500 3.000 3.500 4.000
y = ln (x-a)
MEDIA 3.103
DESV.EST. 0.463
a 23.000
Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

C.ASIMETRIA -0.019

trabajaremos con estos parametros

MEDIA = 3.10264709
DESVES = 0.46268607
a= 23
C. Asimetria -0.01890678

Si quiero conocer la precipitacion para Tr = 5 Si quiero conocer la precipitacion para Tr 10

sabiendo que Tr = 1 / P exc sabiendo que Tr = 1 / P exc

--> Pexc = 1 / 5 = 0.2 --> Pexc = 1 / 10 = 0.1


--> Pno exc = 1-P exc = 0.80 --> Pno exc = 1-P exc = 0.90

z = f ( Pexc) =DISTR.NORM.ESTAND.INV(0,99) z = f ( Pexc) =DISTR.NORM.ESTAND.INV(0,99)

z = 0.8416212 z = 1.28155157

y=m+z s y=m+z s

y= 3.4921 y= 3.6956

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

y = ln (x - a) y= ln (x - a)

x-a= e (y) x-a= e (y)

x - a = 32.853343 x - a = 40.2698539

x = 32.853343 - 23.000 x = 40.2698539 - 23.000

x= 55.9 x= 63.3

DATOS:
MEDIA = 3.1026
DESVES = 0.4627
a= 23.0000
C. Asimetria (0.0189)

Si quiero conocer la precipitacion para Tr = 25 Si quiero conocer el caudal para Tr = 50

sabiendo que Tr = 1 / P exc sabiendo que Tr = 1 / P exc

--> Pexc = 1 / 25 = 0.04 --> Pexc = 1 /50 = 0.02


--> Pno exc = 1-P exc = 0.96 --> Pno exc = 1-P exc = 0.98

z = f ( Pexc) =DISTR.NORM.ESTAND.INV(0,99) z = f ( Pexc) =DISTR.NORM.ESTAND.INV(0,99)

z = 1.7506861 z = 2.05374891

y=m+z s y=m+z s

y= 3.9127 y= 4.0529

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

y = ln (x - a) y= ln (x - a)

x-a= e (y) x-a= e (y)

x - a = 50.032117 x - a = 57.5634663

x = 50.032117 - 23.000 x = 57.5634663 - 23.000

x= 73.0 x= 80.6

DATOS:
MEDIA = 3.1026
DESVES = 0.4627
a= 23.0000
C. Asimetria (0.0189)

Si quiero conocer la precipitacion para Tr = 100 Si quiero conocer la precipitacion para Tr = 200.000

sabiendo que Tr = 1 / P exc sabiendo que Tr = 1 / P exc

--> Pexc = 1 / 100 = 0.01 --> Pexc = 1 / 200 = 0.005


--> Pno exc = 1-P exc = 0.99 --> Pno exc = 1-P exc = 1.00

z = f ( Pexc) =DISTR.NORM.ESTAND.INV(0,99) z = f ( Pexc) =DISTR.NORM.ESTAND.INV(0,99)

z = 2.3263479 z= 2.5758293

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

y=m+z s y=m+z s

y= 4.1790 y= 4.2944

y = ln (x - a) y= ln (x - a)

x-a= e (y) x-a= e (y)

x - a = 65.301555 x - a = 73.2917042

x = 65.301555 - 23.000 x = 73.2917042 - 23.000

x= 88.3 x= 96.3

Cuadro : Lluvias máximas (mm)

Resultados del modelo elegido log 3 parametros


Cuadro : Precipitación máxima corregida por intervalo fijo de observación

Sin corregir Pmax. con corrección (*)


Período de Retorno
LGN 3 Parametros LGN 3 Parametros
200 96.29 105.921
100 88.30 97.132
50 80.56 88.620
25 73.03 80.335
10 63.27 69.597
5 55.85 61.439
PTt   0.21LnT  0.52  0.54t 0.25  0.50 P1060

T P.Max Duración en minutos


años 24 horas 5 10 15 20 30 60
200 105.92 9.5 14.2 17.4 19.8 23.6 31.0
100 97.13 8.7 13.0 15.8 18.1 21.5 28.2
50 88.62 7.8 11.7 14.3 16.3 19.4 25.5
Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

25 80.34 7.0 10.4 12.7 14.5 17.3 22.7


10 69.60 5.8 8.7 10.7 12.2 14.5 18.9
5 61.44 5.0 7.5 9.1 10.4 12.4 31.0
Fuente: Elaboración del autor aplicando el Modelo de Bell

Cuadro: Intensidades máximas (mm/hora)


T P.Max
Duración en minutos
años 24 horas 5 10 15 20 30 60
200 105.9 114.0 85.3 69.5 59.5 47.2 31.0
100 97.1 103.8 77.7 63.3 54.2 43.0 28.2
50 88.6 93.7 70.1 57.1 48.9 38.8 25.5
25 80.3 83.5 62.5 50.9 43.6 34.6 22.7
10 69.6 70.1 52.5 42.8 36.6 29.0 18.9
5 61.4 59.9 44.8 36.5 31.3 24.8 31.0
Fuente: Elaboración del autor

Y X1 X2
log I LogT Logt
2.0569049 2.30103 0.69897
1.930949 2.30103 1
1.8419848 2.30103 1.1760913
1.774517 2.30103 1.30103
1.673942 2.30103 1.4771213 Resumen
1.4913617 2.30103 1.7781513
2.0161974 2 0.69897 Estadísticas de la regresión
1.890421 2 1 Coeficiente d 0.97752848
1.8014037 2 1.1760913 Coeficiente d 0.95556193
1.7339993 2 1.30103 R^2 ajustado 0.95286871
1.6334685 2 1.4771213 Error típico 0.04243999
1.4502491 2 1.7781513 Observacione 36
1.9717396 1.69897 0.69897
1.845718 1.69897 1 ANÁLISIS DE VARIANZA
1.7566361 1.69897 1.1760913 Grados de libertad
Suma de Promedio
cuadradosde los cuadradosF Valor crítico de F
1.6893089 1.69897 1.30103 Regresión 2 1.27810953 0.63905476 354.803223 4.875E-23
1.5888317 1.69897 1.4771213 Residuos 33 0.05943804 0.00180115
1.4065402 1.69897 1.7781513 Total 35 1.33754757

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

1.9216865 1.39794001 0.69897


1.79588 1.39794001 1 Coeficientes Error típico Estadístico t Probabilidad Inferior 95%Superior 95%Inferior 95%Superior 95%
1.7067178 1.39794001 1.1760913 Intercepción 2.04304268 0.03287754 62.1409877 8.99825E-36 1.9761528 2.1099325 1.9761528 2.109933
1.6394865 1.39794001 1.30103 Variable X 1 0.15300593 0.01280171 11.9519931 1.55713E-13 0.1269607 0.1790512 0.1269607 0.179051
1.5390761 1.39794001 1.4771213 Variable X 2 -0.49161937 0.02065051 -23.806644 2.34346E-22 -0.533633 -0.449606 -0.533633 -0.449606
1.3560259 1.39794001 1.7781513
1.845718 1 0.69897
1.7201593 1 1 Cuadro N°10: Resultado del Análisis de Regresión:
1.6314438 1 1.1760913 Constante 2.04304268 Log K= 2.0430 K= 110.42
1.5634811 1 1.30103 Err. estándar de est.Y 0.04243999 m= 0.153
1.462398 1 1.4771213 R cuadrada 0.95286871 n= 0.492
1.2764618 1 1.7781513 Núm. de observaciones 36 I= 110.42 T0.153
1.7774268 0.69897 0.69897 Grado de libertad 33 Donde: t0.491
1.651278 0.69897 1 Coeficiente(s) X 0.15300593 -0.4916194 T= años
1.5622929 0.69897 1.1760913 Error estándar de coef. 0.01280171 0 t= minutos
1.4955443 0.69897 1.30103
1.3944517 0.69897 1.4771213
1.4913617 0.69897 1.7781513

Intensidades máximas (mm/h)

I= K Tm
tn
K= 110.42
m= 0.153
n= 0.492
CURVAS IDF

Período(t)de Retorno (T) en años


Duración
(minutos) 25 50 100 200 CURVAS IDF
5 81.91 91.07 101.26 112.59 120
Ingenieria110Civil
Universidad Nacional de Cajamarca CURVAS IDF hidroenergia

120
10 58.25 64.77 72.02 80.08 110
20 41.43 46.07 51.22 56.95 100
90
30 33.94 37.74 41.96 46.66
80
40 29.47 32.76 36.43 40.51 70
50 26.41 29.36 32.64 36.30 60
60 24.14 26.84 29.85 33.19 50
40
70 22.38 24.88 27.67 30.76
30
80 20.96 23.30 25.91 28.81 20
90 19.78 21.99 24.45 27.19 10
100 18.78 20.88 23.22 25.82 0
0 10 20 30 40 50 60 70 80 90 100 110 120
110 17.92 19.93 22.15 24.63
120 17.17 19.09 21.23 23.60 25 50 100 200

Número de Curva: (CN) METODO SCS PARA ABSTRACCIONES


CARACTERISTICAS DEL SUELO DE LA CUENCA

1. AREA DE LA CUENCA: 33.66 km2

2. GRUPO HIDROLOGICO DEL SUELO

- 0.1 GRUPO B
- 0.5 GRUPO C
- 0.4 GRUPO D

3. USO DEL SUELO


- 20%
caminos, calles y carreteras pavimentados con cunetas y alcantarillas de agua de lluvia

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

- 40% Bosques con troncos delgados, cubierta pobre, sin hierva.


- 10% Areas cubiertas con:
50% cubierta aceptable de pastos.
50% buena cubierta de pastos
- 30% Tierra cultivada general con herramientas de conservacion.

METODO SCS PARA ABSTRACCIONES

GRUPO HIDROLOGICO DEL SUELO


USO DEL SUELO B C D
% CN PROD. % CN PROD. % CN PROD.
CARRETERAS 2 95 1.9 10 95 9.5 8 95 7.6
BOSQUES (troncos delgados,
cubierta pobre, sin hierba) 4 66 2.64 20 77 15.4 16 83 13.28
TERRENO CUBIERTO 1 61 0.61 5 74 3.7 4 80 3.2
1 69 0.69 5 79 3.95 4 84 3.36
TIERRA CULTIVADA 3 71 2.13 15 78 11.7 12 81 9.72
TOTAL 11 7.97 55 44.25 44 37.16

* CN ponderado= CN(B)+CN(C)+CN(D)

CN ponderado= 89.38

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

Tp  0.5 D  0.6tc

tb  2.67  tp
Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

2.08* A
Qp 
tp

2.08* A
Qp 
tp

t r  1.67Tp
t p  0.6tc 

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

ANÁLISIS DE CONSISTENCIA

Anual Acumulado
Año A B C PP A B C PPA
1997 233.30 104.10 259.41 198.94 3183.49 1631.90 2507.13 2440.84
1998 285.30 170.00 290.92 248.74 2950.19 1527.80 2247.72 2241.90
1999 279.70 96.40 229.43 201.84 2664.89 1357.80 1956.80 1993.16
2000 303.20 223.10 164.48 230.26 2385.19 1261.40 1727.37 1791.32
2001 321.60 177.20 190.69 229.83 2081.99 1038.30 1562.89 1561.06
2002 310.00 198.70 228.40 245.70 1760.39 861.10 1372.20 1331.23
2003 280.20 177.90 250.50 236.20 1450.39 662.40 1143.80 1085.53
2004 229.49 160.50 216.30 202.10 1170.19 484.50 893.30 849.33
2005 286.50 107.80 279.70 224.67 940.70 324.00 677.00 647.23
2006 294.10 93.00 179.70 188.93 654.20 216.20 397.30 422.57
2007 360.10 123.20 217.60 233.63 360.10 123.20 217.60 233.63

1) ANÁLISIS DE DOBLE MASA

3500.00
DATOS PROMEDIO ACUMULADO DE CADA ESTACIÓN

3000.00 R² = 0.999451752180433

2500.00
R² = 0.996852916812878 R2 = Regresión Lineal
ESTACION A
2000.00 Linear (ESTACION A)
ESTACION B SI SE OBTIENE R2 > 0.99 LA MUESTRA ES CONSISTENTE
1500.00 R² = 0.995820669960757 Linear (ESTACION B)
ESTACION C
SI SE OBTIENE R2 < 0.99 LA MUESTRA ES INCONSISTENTE
Linear (ESTACION C)
1000.00

500.00 POR LO TANTO LA MUESTRA ES CONSISTENTE

0.00
0 500 1000 1500 2000 2500 3000

PROMEDIO ACUMULADO ANUAL DE CADA ESTACIÓN

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

PROMEDIO ACUMULADO ANUAL DE CADA ESTACIÓN

2) ANÁLISIS DE SALTOS

2.1 Identificacion de saltos:

Se llama salto a la forma determinística transitoria que permite a una serie temporal pasar de un estado a otro,
como respuesta a ciertos cambios propiciados por el hombre.
PROMEDIO DE
AÑO PRECIPITACION
EN ESTUDIO
1997 198.94 Submuestra 1 periodo desde 1995 hasta 2002
1998 248.74
1999 201.84
2000 230.26
2001 229.83
2002 245.70
2003 236.20
2004 202.10 Submuestra 2 periodo desde 2003 hasta 2007
2005 224.67
2006 188.93
2007 233.63

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

A) Evaluacion , cuantificación y correccion de datos de la submuestra 1 y 2

Submuestra 1 : Para el calculo de la media y desviacion estándar de la submuestra 1 se cuenta con los siguientes datos

n1 = 6

AÑO P (mm) Cálculo de la media


1997 198.94
1998 248.74 promedio = 225.89
1999 201.84
2000 230.26 Cálculo de la desviación estándar
2001 229.83
2002 245.70
   (x  X ) 2

 21.23
n 1

Submuestra 2 : Para el calculo de la media y desviacion estándar de la submuestra 2 se cuenta con los siguientes datos

AÑO P (mm) n2 = 5
2003 236.20
2004 202.10 Cálculo de la media
2005 224.67
2006 188.93 promedio = 217.11
2007 233.63

Cálculo de la desviación estándar

   (x  X ) 2

 20.699
n 1

Ingenieria Civil
Universidad Nacional de Cajamarca    (x  X ) 2

 hidroenergia
n 1

B) Evaluación de la consistencia en la media

B.1) Cálculo de la desviación estándar ponderada (Sp)

1
S12  x  ( x1  X 1 ) 2 21.232242953
n1  1
1
S 22  x  ( x1  X 2 )2 20.699495753
n2  1

1/ 2
  n  1 * S12   n2  1 * S22 
SP     4.5821
 n1  n2  2 

B.2) Cálculo de la desviación estándar de las diferencias de las medias

1/ 2
1 1
Sd  S P      2.77459
 n1 n2 

B.3) Determinación del T calculado (Tc)

X1  X 2
Tc   3.16
Sd
Ingenieria Civil
X1  X 2
Tc 
Universidad Nacional de Cajamarca  hidroenergia
Sd

B.4) Determinacion del T tabular (Tt)

Para determinar este parámetro primero se determina el grado de libertad GL total con la fórmula:

𝐺𝑙=𝑛1+𝑛2−
2
Gl = 8 + 7 - 2 = 9

Con el nivel de confianza de 95 % (α = 5%) y el numero de grados de libertad total GL, se obtiene el valor de Tt de las tablas.

Tt para 95% = 2.093 (de tablas)

Por lo que estadísticamente:

Tc  T1 (  5%) ACEPTAR HP

Tc T1 (  5%) RECHAZAR HA

3.16 < 2.093 No se realizan correcciones

C) Evaluación de consistencia en la varianza

C.1) Formulación de hipótesis:

Similarmente a como se procedió en la prueba de “T” las hipótesis de esta prueba se plantean estadísticamente de la siguiente manera.

HP : S12  S22 (  0.05)


HA : S12  S22 (  0.05)

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

Se lee, “las variancias de los periodos dudoso y confiable de la estación en estudio son estadísticamente iguales o son estadísticamente diferentes”.
2
Donde, S12 y S 2 son las variancias muéstrales correspondientes a los periodos dudoso y confiable de la estación en estudio.

C.2) Determinación del F calculado (Fc)

El estadístico Fc se determina mediante la expresión:

1 2
Fc  , si : S12  S22 O en cambio: Fc  , si : S 22  S12
2 1

En el caso de nuestro ejercicio:

2
Fc  , si : S22  S12
1

27.001
Fc   0.95
20.37
C.3) Determinación del F tabular (Ft)

Los grados de libertad y nivel de significación se expresa de la manera siguiente:

G.L.N.= n1-1 G.L.D.= n2-1 α= 0.05(Nc=95%)

Donde:

G.L.N.= Grado de libertad del numerador


G.L.D.= Grado de libertad del denominador.

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

Nc= Nivel de confianza.

Con los grados de libertad del numerador y del denominador y el nivel de significación α=0.05, se obtiene de las tablas el valor teórico correspondiente o
directamente de software con los mismos datos de entrada.

Ft para 95% = 3.57 (de tablas)

En el caso de nuestro ejercicio:

G.L.N. = 6-1= 5
G.L.D. = 5- 1 = 4

C.4) Criterios de aceptacion o rechazo de la HP

Si:
Fc  Ft (95%) Aceptar HP (muestra consistente)
Fc Ft (95%) Aceptar HA (muestra inconsistente).

En el primer caso se dice que la prueba de F es no significativa y la información es inconsistente y en el segundo, la prueba es significativa, según que
las discrepancias entre tales estadísticos sea leve o exista una gran diferencia respectivamente. En este último caso, debe eliminarse el salto corregido
de datos del periodo dudoso partiendo del periodo confiable.

0.95 < 3.57 No se realizan correcciones

Ingenieria Civil
Universidad Nacional de Cajamarca hidroenergia

POR LO TANTO LA MUESTRA ES CONSISTENTE

Ingenieria Civil