You are on page 1of 2

PT.

TRUBA JURONG ENGINEERING


DOCUMENT TITLE : PAGE

FIELD WELD DATA SHEETS (FWDS) FOR BOILER PRESSURE PARTS AND
BOILER EXTERNAL PIPING 1 OF 15
CILACAP 2x300 MW CFSPP PROJECT
DOCUMENT NUMBER : REVISION DATE OF ISSUED
0 31-Jan-05
P - T3104 - QAQC - 0 0 6
REVISION DATE EFFECTIVE DATE
31-Jan-05
NO. DESCRIPTION PAGE APPROVED

1 Cover 1

2 Field Weld Data Sheets


2.1 For Water Wall & Steam Cooled Wall 2

3 Weld Map
3.1 Water Wall Right Side (WM-BLR-001) 6
3.2 Water Wall Left Side (WM-BLR-002) 7 DODIT TRIASEMBODO
3.3 Water Wall Front (WM-BLR-003) 8 Site Manager
3.4 Water Wall Rear (WM-BLR-004) 9
3.5 Steam Cold Roof (WM-BLR-005) 10
CHECKED BY
3.6 Steam Cooled Wall Right Side (WM-BLR-006) 11
3.7 Steam Cooled Wall Left Side (WM-BLR-007) 12
3.8 Steam Cooled Wall Front (WM-BLR-008) 13
3.9 Steam Cooled Wall Rear (WM-BLR-009) 14
3.10 Steam Cooled Roof (WM-BLR-010) 15

CRIS B. GARCIA / BAJU P


QA/QC Coor. / SMR

ORIGINATOR

AGUS SUYANTO
QA/QC Engineer
REVISION STATUS
REV. No. DATE DESCRIPTION DISTRIBUTION
0 31-Jan-05 Issued For Review and Approval SDCC ( Original )
QA/QC ( Copy )
Site T3104 ( Copy )