24 June 2020

DAILY COALFLOW REPORT


PIT - COAL MINING
QUALITY SIZE DISTRIBUTION
DATE AREA PRODUCT TONNAGE
TM IM Ash VM FC TS CV_ar CV_adb cv_daf > 50.00 mm < 2.00 mm
AB-X 6,115.50 7.87 3.45 5.43 42.58 48.54 0.66 7,067 7,406 8,128
AB-P - - - - - - - - - -
Sector 1 AB-S - - - - - - - - - -
AB-L 243.54 5.82 3.53 15.05 44.18 37.24 0.88 6,484 6,641 8,157
AB-R - - - - - - - - - -
24 Siang
AB-X 631.90 13.17 6.67 3.50 40.03 49.81 0.68 6,716 7,219 8,036
AB-P 1,506.64 8.78 6.04 11.05 39.15 43.76 0.48 6,415 6,608 7,970
Sector 2 AB-S 226.56 10.67 7.36 12.29 36.79 43.56 0.34 6,136 6,363 7,920
AB-L - - - - - - - - - -
AB-R - - - - - - - - - -
AB-X 1,304.48 7.78 3.57 5.41 42.85 48.17 0.70 7,080 7,404 8,135
AB-P 354.90 5.08 2.14 6.58 43.76 47.51 2.05 7,195 7,417 8,126
Sector 1 AB-S - - - - - - - - - -
AB-L - - - - - - - - - -
AB-R - - - - - - - - - -
24 Malam
AB-X 1,534.26 9.62 5.68 7.40 40.79 46.13 0.30 6,725 7,018 8,074
AB-P - - - - - - - - - -
Sector 2 AB-S - - - - - - - - - -
AB-L - - - - - - - - - -
AB-R - - - - - - - - - -

CPP
01. COAL CRUSHING
QUALITY SIZE DISTRIBUTION
DATE DESC. PRODUCT TONNAGE
TM IM Ash VM FC TS CV_ar CV_adb cv_daf > 50.00 mm < 2.00 mm
PR-ABX - - - - - - - - - - - -
PR-ABM - - - - - - - - - - - -
24 Siang PR-ABL - - - - - - - - - - - -
PR-ABR - - - - - - - - - - - -
TOTAL - - - - - - - - - - - -
CR 028
PR-ABX - - - - - - - - - - - -
PR-ABM 5,026.92 - - - - - - - - - - -
24 Malam PR-ABL - - - - - - - - - - - -
PR-ABR - - - - - - - - - - - -###
TOTAL 5,026.92 - - - - - - - - - - -
IN HOPPER AB-X AB-P AB-S AB-L AB-R IN HOPPER AB-X AB-P AB-S AB-L AB-R
SECT. 1 - - - - - SECT. 1 - 295 - - -
INFORMATION

SECT. 2 - - - - - SECT. 2 - - - - -
ADDITIONAL

SECT. 4 - - - - - SECT. 4 - - - - -
24 Siang 24 Malam
ROM 1 - - - - - ROM 1 - - - - -
ROM 2 - - - - - ROM 2 - - - - 560
ROM 4 - - - - - ROM 4 - 1,820 2,352 - -
SHIFT 1 : No Crushing Radial Stacker Penuh
REMARK
SHIFT 2 : Crushing Product ABM
QUALITY SIZE DISTRIBUTION
DATE DESC. PRODUCT TONNAGE
TM IM Ash VM FC TS CV_ar CV_adb cv_daf > 50.00 mm < 2.00 mm
PR-ABX 5,762.66 - - - - - - - - - - -
PR-ABM - - - - - - - - - - - -
24 Siang PR-ABL - - - - - - - - - - - -
PR-ABR - - - - - - - - - - - -
TOTAL 5,762.66 - - - - - - - - - - -
CR 029
PR-ABX 1,753.62 - - - - - - - - - - -
PR-ABM - - - - - - - - - - - -
24 Malam PR-ABL - - - - - - - - - - - -
PR-ABR - - - - - - - - - - - -
TOTAL 1,753.62 - - - - - - - - - - -
IN HOPPER AB-X AB-P AB-S AB-L AB-R IN HOPPER AB-X AB-P AB-S AB-L AB-R
SECT. 1 3,397 - - - - SECT. 1 341 - - - -
INFORMATION
ADDITIONAL

SECT. 2 518 - - - - SECT. 2 489 - - - -


SECT. 4 - - - - - SECT. 4 - - - - -
24 Siang 24 Malam
ROM 1 140 - - - 224 ROM 1 924 - - - -
ROM 2 1,316 - - - 168 ROM 2 - - - - -
ROM 4 - - - - - ROM 4 - - - - -
SHIFT 1 : Crushing Product ABX
REMARK
SHIFT 2 : Crushing Product ABX
02. COAL HAULING OUT CPP
QUALITY SIZE DISTRIBUTION
DATE PRODUCT TONNAGE
TM IM Ash VM FC TS CV_ar CV_adb cv_daf > 50.00 mm < 2.00 mm
CH-X 413.16 0.91 0.43 0.76 4.17 4.82 0.05 695 731 828 1.43 1.11
CH-M - - - - - - - - - - - -
24 Siang
CH-L 7,273.81 9.32 4.22 12.58 39.19 44.01 0.46 6,385 6,741 8,103 10.17 11.85
TOTAL 7,686.97 8.87 4.01 11.95 37.31 41.90 0.44 6,079 6,418 7,712 9.70 11.27
CH-X - - - - - - - - - - - -
CH-M 6,757.36 0.59 0.28 0.72 2.50 2.83 0.03 410 428 511 0.74 0.58
24 Malam
CH-L 228.61 9.44 4.29 12.56 39.15 43.99 0.47 6,370 6,731 8,095 10.20 11.90
TOTAL 6,985.97 0.88 0.41 1.11 3.69 4.17 0.04 605 634 759 1.05 0.95
TOTAL/SUMPRODUCT 14,672.94 5.07 2.30 6.79 21.31 23.94 0.25 3,473 3,664 4,402 5.58 6.36
03. STOCKPILE ROM CPP
QUALITY SIZE DISTRIBUTION
DATE ROM TONNAGE
TM IM Ash VM FC TS CV_ar CV_adb cv_daf > 50.00 mm < 2.00 mm
RO-X 60,925.37 7.87 3.57 5.71 42.07 47.51 0.63 6,964 7,295 8,051
ROM RO-M 22,907.00 7.56 3.38 12.53 40.35 43.74 0.39 6,547 6,844 8,139
SECT. 1 RO-L 5,535.59 6.61 3.57 14.61 40.99 40.83 0.51 6,464 6,675 8,158
RO-R 11,546.05 6.58 4.23 15.74 39.12 40.91 0.63 6,228 6,384 7,977
24 Siang
RO-X 63,064.78 10.78 6.46 8.61 41.29 43.64 0.37 6,493 6,807 8,014
ROM RO-M 45,989.50 9.19 5.67 12.15 39.59 42.59 0.54 6,305 6,549 7,969
SECT. 2 RO-L 4,349.36 10.41 6.00 15.43 38.92 39.65 0.32 5,975 6,269 7,978
RO-R 16,948.20 10.68 6.87 20.02 37.41 35.70 0.47 5,556 5,794 7,915
TOTAL 231,265.84 9.06 5.08 10.40 40.62 43.60 0.50 6,492.53 6,779.48 8,020.94
RO-X 60,964.89 7.87 3.57 5.70 42.08 47.52 0.63 6,965 7,297 8,052
ROM RO-M 21,146.98 7.56 3.38 12.53 40.35 43.74 0.39 6,547 6,844 8,139
SECT. 1 RO-L 5,535.59 6.61 3.57 14.61 40.99 40.83 0.51 6,464 6,675 8,158
RO-R 11,546.05 6.58 4.23 15.74 39.12 40.91 0.63 6,228 6,384 7,977
24 Malam
RO-X 64,110.38 10.76 6.45 8.59 41.28 43.68 0.37 6,497 6,810 8,015
ROM RO-M 43,637.50 9.19 5.67 12.15 39.59 42.59 0.54 6,305 6,549 7,969
SECT. 2 RO-L 4,349.36 10.41 6.00 15.43 38.92 39.65 0.32 5,975 6,269 7,978
RO-R 16,388.20 10.68 6.87 20.02 37.41 35.70 0.47 5,556 5,794 7,915
TOTAL 227,678.94 9.06 5.08 10.33 40.65 43.64 0.50 6,497.99 6,785.42 8,021.41
04. STOCKPILE PRODUCT CPP
QUALITY SIZE DISTRIBUTION
DATE STOCKPILE TONNAGE
TM IM Ash VM FC TS CV_ar CV_adb cv_daf > 50.00 mm < 2.00 mm
AB-X - - - - - - - - - - - -
AB-M 7,850.76 9.60 6.00 9.30 41.10 43.60 0.57 6,572 6,836 8,071 15.73 18.86
CR028 AB-L - - - - - - - - - - - -
AB-R - - - - - - - - - - - -
SUMPRODUCT 7,850.76 9.60 6.00 9.30 41.10 43.60 0.57 6,572 6,836 8,071 15.73 18.86
AB-X 9,067.91 - - - - - - - - - - -
AB-M - - - - - - - - - - - -
24 Siang CR029 AB-L - - - - - - - - - - - -
AB-R - 7.14 5.10 15.10 36.80 43.00 0.52 6,239.05 6,376.00 7,989.97 12.88 16.37
SUMPRODUCT 9,067.91 - - - - - - - - - - -
PR-SP1 102,209.97 8.97 4.22 7.47 40.97 47.34 0.49 6,833 7,183 8,136 14.07 10.95
PR-SP2 67,452.09 8.85 4.18 7.29 38.38 43.89 0.45 6,346 6,690 7,624 13.82 8.57
STOCKPIL
E PR-SP3 33,157.59 9.40 4.41 11.44 39.46 44.68 0.45 6,483 6,769 8,085 11.65 9.22
PR-SP4 37,126.53 8.91 3.96 12.65 39.33 44.06 0.44 6,434 6,773 8,128 10.06 11.69
PR-SP6 AB-L 117,179.97 9.44 4.29 12.56 39.15 43.99 0.47 6,370 6,731 8,095 10.20 11.90
PR-SP6-AB-X 61,030.80 9.73 4.75 7.06 41.10 47.10 0.40 6,789 7,146 8,112 15 9
SUMPRODUCT 418,156.95 9.22 4.30 9.58 39.80 45.31 0.46 6,555.36 6,902.02 8,033.83 12.55 10.46
QUALITY SIZE DISTRIBUTION
DATE STOCKPILE TONNAGE
TM IM Ash VM FC TS CV_ar CV_adb cv_daf > 50.00 mm < 2.00 mm
AB-X - - - - - - - - - - - -
AB-M 6,547.58 - - - - - - - - - - -
CR028
AB-L - - - - - - - - - - - -
SUMPRODUCT 6,547.58 - - - - - - - - - - -
AB-X 8,273.53 - - - - - - - - - - -
AB-M - - - - - - - - - - - -
CR029
AB-L - - - - - - - - - - - -
24 Malam SUMPRODUCT 8,273.53 - - - - - - - - - - -
PR-SP1 102,209.97 8.97 4.22 7.47 40.97 47.34 0.49 6,833 7,183 8,136 14.07 10.95
PR-SP2 70,000.09 8.53 4.02 7.03 36.98 42.29 0.43 6,115 6,447 7,347 13.32 8.26
STOCKPIL
E PR-SP3 32,730.33 9.40 4.41 11.44 39.46 44.68 0.45 6,483 6,769 8,085 11.65 9.22
PR-SP4 37,126.53 8.91 3.96 12.65 39.33 44.06 0.44 6,434 6,773 8,128 10.06 11.69
PR-SP6 AB-L 116,951.36 9.44 4.29 12.56 39.15 43.99 0.47 6,370 6,731 8,095 10.20 11.90
PR-SP6-AB-X 61,030.80 9.73 4.75 7.06 41.10 47.10 0.40 6,789 7,146 8,112 15.13 8.89
SUMPRODUCT 420,049.08 7.75 4.28 9.52 39.56 45.03 0.45 6,515.77 6,860.39 7,985.01 12.48 10.40

PORT PARING LAHUNG


01. COAL HAULING IN PLH
QUALITY SIZE DISTRIBUTION
DATE STOCKPILE TONNAGE
TM IM Ash VM FC TS CV_ar CV_adb cv_daf > 50.00 mm < 2.00 mm
PL-SP1 ABX - - - - - - - - - - - -
PL-SP1 ABM - - - - - - - - - - - -
PL-SP1 ABL 6,038.02 9.51 4.53 8.59 40.62 46.26 0.41 6,692 7,043 8,116 13.74 9.66
PL-SP1 ABR - - - - - - - - - - - -
PL-SP6 ABX 372.20 1.05 0.49 0.87 4.80 5.55 0.06 800 841 953 1.65 1.28
PL-SP6 ABL - - - - - - - - - - - -
PL-SP7 - - - - - - - - - - - -
24 Siang
PL-SP8 ABM - - - - - - - - - - - -
PL-SP8 ABL - - - - - - - - - - - -
PL-SP9 - - - - - - - - - - - -
PL-SP11 ABX - - - - - - - - - - - -
PL-SP10 ABX 1,691.02 8.40 3.80 6.10 41.60 48.50 0.56 6,925 7,276 8,075 12.80 8.63
PL-SP8 AW MAR - - - - - - - - - - - -
TOTAL 8,101.24 8.89 4.19 7.72 39.18 44.86 0.43 6,470 6,807 7,779 12.99 9.06
QUALITY SIZE DISTRIBUTION
DATE STOCKPILE TONNAGE
TM IM Ash VM FC TS CV_ar CV_adb cv_daf > 50.00 mm < 2.00 mm
PL-SP1 ABX - - - - - - - - - - - -
PL-SP1 ABM - - - - - - - - - - - -
PL-SP1 ABL 1,838.54 9.71 4.73 7.21 41.05 47.02 0.40 6,780 7,136 8,112 15.00 8.97
PL-SP1 ABR - - - - - - - - - - - -
PL-SP6 ABX 54.54 - - - - - - - - - - -
PL-SP6 ABL - - - - - - - - - - - -
PL-SP7 - - - - - - - - - - - -
24 Malam
PL-SP8 ABM 5,141.82 0.70 0.33 0.85 2.93 3.31 0.03 481 502 600 0.86 0.68
PL-SP8 ABL - - - - - - - - - - - -
PL-SP9 - - - - - - - - - - - -
PL-SP11 ABX - - - - - - - - - - - -
PL-SP10 ABX - - - - - - - - - - - -
PL-SP8 AW MAR - - - - - - - - - - - -
TOTAL 7,034.90 3.05 1.47 2.50 12.87 14.71 0.13 2,123 2,232 2,559 4.55 2.84
02. PRELIMINARY ANALYSIS BARGING
PRELIMINARY ANALYSIS
TRIP TB / BG DESTINATION BUYER MATERIAL CARGO
TM ASH CV_ar
37 Marino 178/Arrakis MV. NOSHIMA AEGIS SP1(AB-L) 10,200.14 9.10 12.13 6,453
38 Oasis/Santan 3003 MV. NOSHIMA AEGIS SP10(AB-X)+SP8(AB-M) 8,601.10 9.81 10.23 6,534
39 Prima 2029/Tama 3078 MV. NOSHIMA AEGIS SP1(AB-L)+SP6(AB-X) 8,652.41 8.93 10.99 6,556
0 - - - 0.00 - - -
0 - - - 0.00 - - -
0 - - - 0.00 - - -
0 - - - 0.00 - - -
0 - - - 0.00 - - -
0 - - - 0.00 - - -
0 - - - 0.00 - - -
TB / BG PL-SP1 ABX PL-SP1 ABM PL-SP1 ABL PL-SP6 ABX PL-SP6 ABM PL-SP8 ABM PL-SP8 ABL PL-SP10 ABX PL-SP10 ABMPL-SP8 AW MARPURE-HAUL
Marino 178/Arrakis - - 10,200.14 - - - - - - -
Oasis/Santan 3003 - - - - - 4,535.48 - 4,065.62 - -
Prima 2029/Tama 3078 - - 6,208.00 2,444.41 - - - - - -
INFORMATION

- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
CARGO

- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -

03. STOCKPILE PRODUCT PLH


QUALITY SIZE DISTRIBUTION
DATE STOCKPILE TONNAGE
TM IM Ash VM FC TS CV_ar CV_adb cv_daf > 50.00 mm < 2.00 mm
PL-SP1 ABX 15,460.1120 11.39 5.27 5.71 41.10 47.92 0.40 6,774 7,241 8,134 15.98 8.58
PL-SP1 ABM - - - - - - - - - - - -
PL-SP1 ABL 108,426.9684 9.10 4.08 12.13 39.41 44.38 0.43 6,453 6,799 8,121 10.94 11.38
PL-SP1 ABR - - - - - - - - - - - -
PL-SP6 ABX 48,088.6723 8.49 4.36 8.27 40.37 47.00 0.55 6,803 7,109 8,137 14.37 10.92
PL-SP6 ABL - - - - - - - - - - - -
PL-SP7 - - - - - - - - - - - -
24 Siang
PL-SP8 ABM 26,372.8637 10.38 4.82 12.40 39.14 43.65 0.45 6,310 6,691 8,089 10.45 12.67
PL-SP8 ABL - - - - - - - - - - - -
PL-SP9 - - - - - - - - - - - -
PL-SP11 ABX - - - - - - - - - - - -
PL-SP10 ABX 118,244.4723 9.18 4.42 7.81 40.92 46.85 0.48 6,784 7,141 8,130 13.51 11.47
PL-SP8 AW MAR - - - - - - - - - - - -
TOTAL 316,593.0887 9.25 4.37 9.64 40.18 45.81 0.47 6,634 6,986 8,125 12.63 11.31
QUALITY SIZE DISTRIBUTION
DATE STOCKPILE TONNAGE
TM IM Ash VM FC TS CV_ar CV_adb cv_daf > 50.00 mm < 2.00 mm
PL-SP1 ABX 15,460.1120 11.39 5.27 5.71 41.10 47.92 0.40 6,774 7,241 8,134 15.98 8.58
PL-SP1 ABM - - - - - - - - - - - -
PL-SP1 ABL 103,965.4934 9.11 4.09 12.05 39.43 44.43 0.43 6,459 6,805 8,121 11.00 11.34
PL-SP1 ABR - - - - - - - - - - - -
PL-SP6 ABX 45,644.2613 8.49 4.36 8.27 40.37 47.00 0.55 6,803 7,109 8,137 14.37 10.92
PL-SP6 ABL - - - - - - - - - - - -
PL-SP7 - - - - - - - - - - - -
24 Malam
PL-SP8 ABM 31,661.2437 8.76 4.07 10.47 33.09 36.91 0.38 5,337 5,658 6,838 8.85 10.67
PL-SP8 ABL - - - - - - - - - - - -
PL-SP9 - - - - - - - - - - - -
PL-SP11 ABX - - - - - - - - - - - -
PL-SP10 ABX 118,244.4723 9.18 4.42 7.81 40.92 46.85 0.48 6,784 7,141 8,130 13.51 11.47
PL-SP8 AW MAR - - - - - - - - - - - -
TOTAL 314,975.5827 9.12 4.31 9.44 39.57 45.13 0.46 6,533 6,881 7,998 12.46 11.12
Kapasitas
STOCKPILE TONNAGE TONNAGE CHECK
31038.41529 PL-SP1 ABX 20092.27 15,460.11 (4,632.16)
PL-SP1 ABM - -
PL-SP1 ABL 113933.13 103,965.49 (9,967.63)
PL-SP1 ABR - -
PL-SP6 ABX 7826.55 45,644.26 37,817.72
PL-SP6 ABL - -
PL-SP7 - -
PL-SP8 ABM 17686.03 31,661.24 13,975.21
PL-SP8 ABL - -
PL-SP9 - -
PL-SP11 ABX - -
PL-SP10 ABX 143439.12 118,244.47 (25,194.65)
PL-SP8 AW MAR - -
PL-SP8 AW MAR - -

24 June 2020 Untuk format simulasi Pak Made


STOCKPILE TONNAGE Ash CV_adb CV_ar TS TM
PL-SP1 ABM 15,460.11 5.71 7,241 6,774 - 11.39
PL-SP1 ABL 103,965.49 12.05 6,805 6,459 0.43 9.11
PL-SP6 ABX 45,644.26 8.27 7,109 6,803 0.55 8.49
PL-SP8 ABM 31,661.24 10.47 5,658 5,337 0.38 8.76
PL-SP8 ABL - - - - - -
PL-SP10 ABM - - - - - -
PL-SP10 ABX 118,244.47 7.81 7,141 6,784 0.48 9.18
PL-SP8 AW MAR - - - - - -
TOTAL 314,975.58 9.44 6,881.00 6,533.20 0.46 9.12
24 June 2020 CHECK COALMINE-MINEFLEET
SHIFT 1 CHECK SHIFT 2 CHECK
AB-X (5,614.16) 501.34 AB-X (1,226.67) 77.81
AB-P - 0 AB-P 407.63 762.53
Sector 1 AB-S - 0 Sector 1 AB-S - 0
AB-L 120.99 364.53 AB-L - 0
AB-R 179.77 179.77 AB-R 548.79 548.79
AB-X 880.96 1512.86 AB-X (1,454.71) 79.55
AB-P (1,506.64) 0 AB-P - 0
Sector 2 AB-S (226.56) 0 Sector 2 AB-S - 0
AB-L - 0 AB-L - 0
AB-R - 0 AB-R - 0

-3 78.9
10155.09
10155.69
75.9

0.6

Stock status
ROM CPP Kapasitas Stock aktual Prosentase Sisa stock sisa hari status
RO-X 50,223 60,965 121% (10,742)
RO-M 39,707 22,907 58% 16,800
ROM SECT. 1
RO-L 76,183 5,536 7% 70,648
RO-R -
RO-X 63,942 64,110 100% (168)
RO-M 23,567 43,637 185% (20,070)
ROM SECT. 2
RO-L 36,803 4,349 12% 32,454
RO-R -
Total 290,426 201,505 69%
Stockpile CPP
PR-SP1 110,754 102,210 92% 8,544
PR-SP2 143,717 70,000 49% 73,717
Product

PR-SP3 30,526 32,730 107% (2,204)


PR-SP4 151,758 37,127 24% 114,631 Over Capacity
PR-SP6 ABX 51,534 - 0% 51,534
PR-SP6 ABL 130,499 117,180 90% 13,319
Total 618,788 359,247 58%
Paring Lahung -
PL-SP1 ABX 182,125 15,460 8% 166,665 13.89
PL-SP3 ABM 50,000 - 0% 50,000 4.17
Product

PL-SP6 ABX 202,713 45,644 23% 157,069 13.09


PL-SP8 ABM 347,064 31,661 9% 315,403 26.28
PL-SP10 ABX 1,445,088 118,244 8% 1,326,843 110.57
PL-SP11 ABX 100,000 - 0% 100,000 8.33

Total 2,326,991 211,010 9%


Ash CV_adb CV_ar TS TM

24 Malam Untuk format simulasi Pak Made


STOCKPILE Tonnage Ash CV_adb CV_ar TS TM
RO-X 60,964.89 5.70 7,297.15 6,965.42 0.63 7.87
RO-M 21,146.98 12.53 6,547.12 6,547.12 0.39 7.56
ROM SECT. 1
RO-L 5,535.59 14.61 6,674.87 6,464.17 0.51 6.61
RO-R 11,546.05 15.74 6,383.82 6,227.82 0.63 6.58
RO-X 64,110.38 8.59 6,810.47 6,496.64 0.37 10.76
RO-M 43,637.50 12.15 6,549.32 6,304.90 0.54 9.19
ROM SECT. 2
RO-L 4,349.36 15.43 6,268.64 5,975.16 0.32 10.41
RO-R 16,388.20 20.02 5,794.36 5,555.67 0.47 10.68
TOTAL 227,678.94 10.33 6,785.42 6,497.99 0.50 9.06

24 Malam Untuk format simulasi Pak Made

STOCKPILE TONNAGE Ash CV_adb CV_ar ts TM

AB-X - - - - - -
AB-M 6,547.58 - - - - -
CR028
AB-L - - - - - -
SUMPRODUCT 6,547.58 - - - - -
AB-X 8,273.53 - - - - -
AB-M - - - - - -
CR029
AB-L - - - - - -
SUMPRODUCT 8,273.53 - - - - -
PR-SP1 102,209.97 7.47 7,183 6,833 0.49 8.97
PR-SP2 70,000.09 7.03 6,447 6,115 0.43 8.53
STOCKPILE PR-SP3 32,730.33 11.44 6,769 6,483 0.45 9.40
PR-SP4 37,126.53 12.65 6,773 6,434 0.44 8.91
PR-SP6 116,951.36 12.56 6,731 6,370 0.47 9.44
PR-SP7 61,030.80 7.06 7,146 6,789 0.40 9.73
SUMPRODUCT 420,049.08 9.52 6,860 6,516 0.45 7.75
stok 19 out

3809696 15345

6709485 16060.0

3794351
6693425
QUALITY
TONNAGE
TM Ash
ROM SECT. 1 RO-X 1 200.00 7.87 5.71
RO-M 1 22,907.00 7.56 12.53
RO-L 1 5,535.59 6.61 14.61
RO-R 1 11,546.05 6.58 15.74
ROM SECT. 2 RO-X 2 63,064.78 10.78 8.61
RO-M 2 45,989.50 9.19 12.15
RO-L 2 4,349.36 10.41 15.43
RO-R 2 16,948.20 10.68 20.02
SUMPRODUCT 170,540.47 9.48 12.07

RO-X 1 2% 199.00 7.87 5.71


RO-M 1 27% 2,128.00 7.56 12.53
RO-L 1 20% 1,631.00 6.61 14.61
RO-R 1 0% - 6.58 15.74
RO-X 2 44% 3,482.00 10.78 8.61
RO-M 2 7% 560.00 9.19 12.15
RO-L 2 0% - 10.41 15.43
RO-R 2 0% - 10.68 20.02
TARGET 100% 5000 12 11.5
HASIL 100% 8000 8.89 11.05
CV_ar
6,964
6,547
6,464
6,228
6,493
6,305
5,975
5,556
6,324.80

6,963.60
6,547.12
6,464.17
6,227.82
6,492.86
6,304.90
5,975.16
5,555.67
6500
6,500.00