APUWS & SMIP (AIIB) - Status of Interdepartmental Permissions

Phase-1 Phase-2
Permissi Permissi Permissi Permissi Permissi
Total Total Permissio
Dema ons ons ons Dema ons ons
Owning Permissi Permissi ns
nd Obtaine Obtaine Obtaine nd Obtaine Obtained
Departm ons ons Obtained
Receiv d upto d during d upto Receiv d upto upto
ents Require Require during
ed previous March March ed previous March 22
d d March 22
month 22 22 month
R&B 145 123 49 0 49 35 24 0 0 0
WRD 13 2 11 0 11 25 0 0 0 0
Railways 14 8 2 0 2 17 0 0 0 0
NHAI 7 6 0 0 0 18 0 0 0 0
PRED 5 2 0 0 0 2 0 0 0 0
Forest 4 0 0 0 0 0 0 0 0 0
RDC 3 0 0 0 0 0 0 0 0 0
Electricity 1 0 0 0 0 0 0 0 0 0
APSEB 1 1 0 0 0 0 0 0 0 0
Total 193 142 62 0 62 97 24 0 0 0
Electricit
R&B WRD Railways NHAI PRED Forest RDC APSEB
y
TP D TP D D
DR TPR TPR DR DR TPR TPR TPR DR TPR DR TPR DR
R R R R R
Srikakulam 0 0 0 0 0 0 0 0 0
Ananthapuramu 79 5 6 1 0 0 0 0 0
East Godavari 8 4 1 2 0 0 0 0 0
Prakasam 19 0 2 2 2 0 0 0 0
Visakhapatnam 0 0 0 0 0 0 0 0 0
Vizianagaram 0 0 0 0 0 0 0 0 0
Krishna 16 16 2 7 1 0 0 0 0
Guntur 8 5 11 3 1 0 0 0 0
Kadapa 13 7 2 0 0 0 0 0 0
Chittoor 11 0 2 1 0 0 0 1 0
Nellore 6 1 3 2 2 2 0 0 0
Kurnool 18 0 0 1 1 2 3 0 1
West Godavari 2 0 2 6 0 0 0 0 0
Total 180 38 31 25 7 4 3 1 1
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Demand received for an amount of 18.40
Pipeline along the NAM
lakhs but payment was done by the e
Road R&B chainage from
agency for Rs. 5,00,000/- to the Executive
1 199.4 to 212 KM Source
Engineer(RDC), R&B Division, Guntur.
( Addanki - Narketpalli
Permission is obtained for a length of 2.7
Road)
KM.
Road crossing at Letter addressed to R&B EE and Inspection
Meenakshi Hotel in NAM done with concessionaire regarding road
Road crossing on 17-06-2020. permission is
1 Addanki R&B pending
Nam Road Crossing at
ramnagar Jn
Distributi
3
Designs and Drawings approved on 21-3- on
Along the NAM road
2021, As per approved drawings permission
Nallavagu to to bhavani
requisition letters need to be addressed by
centre junction.(R&B
the PH department.
chainage Addanki -
Narketpalli NAM Road
201.25 to 205.050)
ongole to kurnool road
EE R&B raised demand for amount
( uppalapadu to podili) at
36,20000/- . EEPH department has to be
38/5 to 48/2 , 55/7 to
upload in the CFMS.
2 Kanigiri 2 R&B 56/0 and 68/4 to 68/7. Source
ongole to kurnool road EE R&B raised demand for amount
( Kambalapadu to 7,91000/- . EEPH department has to be
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Chinarikatla junction) at
upload in the CFMS.
56/0 to 59/4.
SH 53 (Ongole-Nandyal)
road (Ch 19/200 to A letter is forwarded from EE -R&B to EE-PH on
11.09.18 for a demand amount of 22,53,461 in the
1 R&B 23/200) and road form of Bank Guarantee and an amount 2,70,416 in Source
crossing at Old bus stand the form of GST. CFMS is not updated in system
junction
Road Crossing - Near NS
Pncolony(ongole-Nandyal )
Road
Chimakurt
3 Road Crossing - Near junior
hy college (Ongole-Nandyal)
Road Distribution Network hydraulic designs are Distributi
4 R&B Road Crossing - Near not approved on
SBI ATM (ongole-
Nandyal) Road
Road Crossing-Near
Boddu Rai (Chimakurthi-
Darsi) Road
4 Giddalur 4 R&B Anumulapalli Junction to Source
The Muncipal Commissioner, Giddalur &
Market yard (Giddalur).
PHMED addressed letter to R&B
Pipe line has to pass
department and awaiting for permission.
along the R&B road
Road Crossing - Giddalur
PHMED yet to be addressed letter to R&B
to Cumbum Road
Road crossing - Giddalur
PHMED yet to be addressed letter to R&B
to Komarole Road
Road Crossing - Giddalur PHMED yet to be addressed letter to R&B
to Porumamilla Road
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Road Crossing - Giddalur The
to Narva Road details
Road Crossing - Giddalur are
to Ongole Road tentative
Road Crossing - Giddalur and
to Cumbum Road Hydraulic Designs and drawings are not survey
4 R&B
prepared by the agency. work
complete
Road Crossing - Giddalur d
to Porumamilla Road partially.
Distributi
on
Along Old Madras-
Calcutta Road in
Sullurpet Town from
Km.78/300 to 79/685 on 1)An Amount of Rs. 17,87,375/- is paid to
right side and crossing at O/o EE, R&B, Gudur
Km.79/685. 2)An amount of Rs. 9,36,901 /- is paid to
5 Sullurpet 3 R&B the O/o EE, R&B, Gudur Source
3) An amount of 37,25,000/- is paid to R&B
Along Tada-Kalahasti department on 23-03-2021.
State Highway Road
4)Permission from R&B gudur is obtained.
from Km. 26/920 to 29/0
and Road Crossing at
Km.29/0.
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Along Sullurpet-
Santhavellore Road from
Km. 19/6 to 7/8 ( Except
Forest Area 11/84 to
13/44)

Along Sullurpet-
Santhavellore Road from
1/9 to 7/8. (Except Forest
Area Km.6/4 to 6/9)

Near Rajupalem village.

Near sirasanambedu
6 Naidupeta 3 R&B village Permission yet to be applied Source

Near Kanuru village

7 Chittoor 5 R&B SH 502 (Chittoor- Letter submitted to NHAI department- Source


Cuddalore) road awaiting for approval.
( Letter No. 15N/DB/ATO/CTR/AIIB/2018,
(Ch 0/0 to 2/100) Date: 24-04-2019).
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
SH 69 (Chittoor-Puttur)
R&B road
(Ch 0/4 to 1/950)
Road Crossing at 2/100
of SH-502, Existing
1300 KL GLSR at Durga
Nagar
Road Crossing at 1/500
of SH-502, Existing 100
KL ELSR at Ambedkar
R&B
Nagar
Road Crossing at 0/200
of SH-502, Existing
1000 KL GLSR at
Kontamitta

Sri kalahasti - Pichatur


road from km 8/6- 34/0
Sri kalahasti -
Middikandriga Road
From 34/0 - 39/8 Demand Notice is received for an amount of
8 Puttur 6 R&B Pichatur - meet KM road Source
Rs. 1,71,42,590/-
From 0/0 - 2/6
Pichatur link road From
21/316 - 22/316
Ananthapur to Chennai
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
road for crossing the
road (From 319/0 to
320/6)
Chittoor to Puttur road for
crossing the road (From
62/860 to 64/710)
9 Allagadda Along Allagadda - Bills are uploaded in CFMS, for an amount Source
Ahobilam Road of Rs.2,00,29,959.00, vide token numbers
1 R&B
(Km.16/4 to Km.0/8 to 20201629246 and 20201632894.Bills to be
Km.0/2) resubmitted after getting clarification on
From Km.0/2 of payment of BG’s
Allagadda - Ahobilam
1 Road to Km.25/2 of
Koilakuntla - Allagadda
Road
From Km.25/2 to
Km.24/10 to Km.20/2 of
1
Koilakuntla - Allagadda
Road
5 R&B Road Crossing - Near
proposed WTP - At Km.0/8
of Allagadda to Ahobilam
Road
Road Crossing - At
Km.24/6 of Narasapuram
Metta to Chagalamarri
Road
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Road Crossing - Near
YSR Statue - Allagadda
to Koilakuntla Road
Road Crossing - From
Km.0/2 of Allagadda -
Ahobilam Road to
Km.25/2 of Koilakuntla -
Allagadda Road
At Old NH 18 road
crossings.

Along Nandyal -
Gadivemula Road(From Bills are uploaded in CFMS, for an amount
Km.48/6 to Km. 53/0) of Rs.21,39,481.00, vide token numbers
2 R&B
20201633378 and 20201632165. Bills are
Along Gadivemula - successfully adjusted to EE-R&B,Nandyal.
Nandikotk
10 Midthur Road Source
ur

Bills are uploaded in CFMS, for an amount


Along Nandyal -
of Rs.46,20,000.00, vide token numbers
1 R&B Nandikotkur Road(From
20201633414 and 20201630107. Bills are
Km.31/4 to Km.48/6)
successfully adjusted to EE-R&B,Kurnool.

Along Nandyal - Atmakur An am Bills are uploaded in CFMS, for an


11 Atmakur 2 R&B Source
Road amount of Rs.29,49,244.00, vide token
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
(From Km.35/4 to
Km.36/4)
Along Velugodu to
Vempenta Road
numbers 2020-1630042 and 2020-
(From Km.2/6 to
1633353.Bills are successfully adjusted to
Km.7/07, From Km.7/6 to
EE-R&B,Nandyal.
Km.8/0)
Road Crossing - At
1 R&B Km.36/4 of Nandyal -
Atmakur Road
Along Penchikalapadu -
Gudur - Yemmiganur
Bills are uploaded in CFMS, for an amount
Road(Km.9/6 to Km.12/0)
of Rs.95,13,000.00, vide token numbers
12 Gudur 2 R&B 20201633514 and 20201631926. Bills are Source
Road crossing at Km
to be resubmitted after clarification on
33/1 to 33/6 in front of
payment of BG’s.
municipal office.

Along Kodumuru -
Yemmiganur Road(From
1 R&B Km. 16/9 to Km.33/4) Bills are uploaded in CFMS, for an amount
of Rs.78,97,900.00, vide token numbers
2020-1632924,2020-1631316,2020-
Yemmigan
13 From Km.2/703 to 31/626 1633509 & 2020-1633538. Bills are Source
ur
of Yemmiganur Bye pass successfully adjusted to EE-R&B, Adhoni
Road and from and Kurnool.
1 R&B
Km.31/626 to Km.32/166
of Billikal to Yemmiganur
Road
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Along Kodur-
1 Dharmavaram road KM
34/600 TO 37/200

Mamillakunta-Puttaparthy
4
road Km 0/0 to 3/2
Bills are uploaded in CFMS, for an amount
of Rs.4185903,vide token number 2020-
R&B Puttaparthy Ring road Source
2 1630600.(IoCT). Bills ar successfully
Km 0/0 to 2/4 adjusted to EE-R&B,Dharmavaram.

Puttaparthy Diversion
2
road Km 0/0 to 4/9
14 Puttaparthi

Bukkapatnam Nallamada
Pulagampalli road km 3/2
2
to 4/2

Puttaparthi Diversion An HR Amount of 72,50,000 is raised and


14 road Km 1/8 to 2/8 and submitted to PAO from EE-PH, Distributi
R&B
4/2 to 4/8 Ananthapuramu division and same is on
pending at PAO office.(NCT)
Mamillakunta-Puttaparthy
8 road Km 1/8 to 2/7,5/2 to
6/6 and 7/8 to 8/3

15 Kalyandur 1 R&B Restoration charges Bills are uploaded in CFMS, for an amount Source
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
gam along the road beyond
the toe of embankment of
KM 6/2 to 14/8 of
Ananthapuramu-Bellary of Rs.2564083,vide token number 2020-
road via Jallipalli, PABR 1630863. Bills are successfully adjusted to
dam EE-R&B,Ananthapuramu.
Restoration charges of B.T
Road cutting in Mustoor,
3 R&B Ramasagaram-Borampalli
road
Along the road, berm
portion from KM 23/0 to Demand drafts yet to be received. Letter
1 R&B 40/9 of Ramasagram- from SE R&B, ananthapuramu has given
Borampalli road permission and forwarded to EE R&B,
Restoration charges of Kalyandurgam. Approval letter of Demand
B.T Road cutting in draft from EE-R&B, kalyandurgam to EE-
1 R&B
Ramasagaram- PH, Ananthapuramu is awaiting.
Borampalli road
Along the road, berm
portion from KM 49/6 to
1 R&B 52/0 of Ananthapuramu-
Kalyandurgam section of CE-R&B,NH-Vijayawada returned with
NH-544DD. remarks(vide Memo no.544DD/EE(NH &
In between KM 49/6 to CRF)/DEE-4/AEE-1/2020-21,dated 17-12-
52/0 of Ananthapuramu- 2020) for resubmission of proposals.
1 R&B Kalyandurgam section of
NH-544DD.Crossing of
Pipe
1 R&B For laying of clear Water Demand drafts yet to br received. Letter from SE
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
R&B, ananthapuramu has given permission and
forwarded to EE R&B, Kalyandurgam. Approval
Mains and Distribution letter of Demand draft from EE-R&B,
lines within town kalyandurgam to EE-PH, Ananthapuramu is
awaiting.

16 Madakasir Madakasira to Bill is uploaded in CFMS, for an amount of Source &


a S.Rayapuram (via) Rs.16,92,802.00 ,vide Token number 2021- Distributi
Akkampalli Road. 234569. Bills are successfully adjusted to on
2 R&B Km.1/w2 to 2/4. EE-R&B,Kalyandurgam.
Madakasira to
S.Rayapuram road in km
2/0.
Akkampalli to
Begarlapalli Road.
Embankment 0/0 to 2/4.
2 R&B
Madakasira to
S.Rayapuram Road in
km 2/650.
Madakasira to
Baktharahalli (via)
Jilledukunta 0/0 to 2/5
2 R&B
Madakasira to
S.Rayapuram road in km
0/8 and 1/2.
2 R&B Madakasira to
Bheemarayanapalli (via)
State Border Road. 0/0 to
1/5.
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Madakasira to
S.Rayapuram in km 0/6
Madakasira to
Amarapuram Road from
km 0/0 to 1/2
Madakasira to
3 R&B
Amarapuram Road from
km 1/2 to 4/0
Madakasira to
Amarapuram.
Hindupur to Madakasira-
Tumkur Road from km
29/0 to 35/0 R&B Permission for 4 No’s of roads
Hindupur to Madakasira- demand note has given by R&B
Tumkur Road from km Department, for an amount of Rs 69,98,455
3 R&B 30/0 to 32/0 ruppees, for same amount Hand receipt
was submitted to EE(PH) ananthapuramu
Hindupur to Madakasira- for making payment Vide reference letter
Tumkur Road from in km
no. 43E/MDK AIIB/2018, Dated:01-05-2021.
29/6, 30/6, 32/4, 33/6,
34/2, 34/4.
Penukonda-Madakasira
Road in `km 38/8 to 40/4
2 R&B
Penukonda-Madakasira
Road in km 39/2 , 40/0
Kalyandurg-Madakasira
Road in km 73/100 to
2 R&B
74/664, 73/4 , 74/4,
74/600
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
17 Gooty Yeddulapalli to Pamidi Source
Beyond toe of road Bill is uploaded in CFMS, for an amount of
1
embankment from CH: Rs.2257925,vide Token number 2020-
R& B
Km 0/000 to 11/000 1631208. Bills are successfully adjusted to
Across the road,At CH: EE-R&B,Ananthapuramu.
1
11/000
R&B Along /crossings of
Bill is uploaded in CFMS, for an amount of
road ,Hyderabad-
Rs.591878,vide Token number 2020-
1 Bangalore road(Gooty
1629895. Bills are successfully adjusted to
village limits) from KM
EE-R&B,Ananthapuramu
308.615 to 305.800
Km.303/400 crossing of
1
pipeline
Km.305/8 ,304/200,
Bill is uploaded in CFMS, for an amount of
3 303/400 crossing of
Rs.9,34,944.00,vide Token number 2020-
pipeline
1626287. Bills are successfully adjusted to
Along the road(berm EE-R&B,Ananthapuramu
cutting at Km.303/300 on
1
L/S and 304/200 to
304/500 R/S
Hyd-Bgl road,Pamidi
Bill is uploaded in CFMS, for an amount of
Limits (Ambedkar circle
Rs.381654,vide Token number 2020-
1 to National highway) from
1631023. Bills are successfully adjusted to
KM 323.620 to
EE-R&B,Ananthapuramu
322.120,along the berm
3 Road crossings at Km Bill is uploaded in CFMS, for an amount of
0/5,2/2 & 3/0,Gooty- Rs.10,41,442,vide Token number 2020-
Pathikonda-Adoni road. 1628936. Bills are successfully adjusted to
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Along the berm, at Km 0/0
to 2/2 on L/S and 2/2 to 3/6
1 EE-R&B,Ananthapuramu
on R/S, Gooty-Pathikonda-
Adoni
Pamidi-Vajrakarur Road, Bill is uploaded in CFMS, for an amount of
Beyond toe of road Rs.1475729,vide Token number 2020-
1 R&B
embankment from CH: 1630980. Bills are successfully adjusted to
Km 0/000 to Km 5/800 EE-R&B,Ananthapuramu
Beyond toe of road
1 embankment from CH:
Km 322/220 to 323/628
R&B Across the road, At CH: Bill is uploaded in CFMS, for an amount of
1
18 Pamidi 322/220 Rs.401419, vide Token number 2020- Source
Across the road, At CH: 1631208. Bills are successfully adjusted to
1
323/628 EE-R&B,Ananthapuramu

Beyond toe of road


1
embankment from CH:
R& B
Km 0/000 to 11/000
Across the road, At CH:
1
11/000
along NH-67 from LC - The Executive Engineer, R&B, NH division
149 at Settivaripalle to issued demand for restoration charges for
1
Muddanur Junction ( km laying of Gravity main for a length of
Yerraguntl 511/200. to Km 525.000) 31.35km along and across R&B NH Roads
19 R & B (NH) Source
a Muddanur Junction to for Rs.26,52,000/- towards license fee and
1 Yerraguntla (km 186/646 Rs.78,38,000/- towards performance bank
to 168/846) along NH-76 guarantee. The Executive Engineer(PH),
5 Road crossing at Kadapa submitted HR to the MD,
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
km.511/200
Road crossing at
km.512/500
Road crossing at
km.524/600
APUFIDC for release of funds. Bills are
Road crossing at
returned.
km.169/250
Road crossing at
km.169/146
The Executive Engineer,R&B, NH division
Clearwater Gravity main issued demand for restoration charges for laying
to Mydukur municipality of Gravity main for a length of 7.58 km along
and across R&B NH Roads for Rs.1,67,000/-
along NH-167 B from
1 towards license fee and Rs.18,95,000/- towards
Onipenta Junction to performance bank gurantee.. The Executive
Yerracheruvu Junction Engineer(PH), Kadapa submitted HR to the
( km 1/03 to 8/5) MD, APUFIDC for release of funds. Bills are
returned.
Road Crossing @ NH-67
20 Mydukur R & B (NH) Km 588.615 Source
Road Crossing @ NH-
167B Km 1.030
Road Crossing @ NH-
5 167B Km 4.710
Road Crossing @ NH-
167B Km 5.0
Road Crossing @ NH-
167B Km 8.5
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Along Vinukonda –
Gutlapalli - Ravulapuram
R&B Road.
(From CH:11/400 to DEE, PH, Narasaraopet addressed to The
14/250 ) Executive Engineer, R&B Division,
21 Vinukonda 1 R&B Narasaraopet vide Lr. No: NRT/Sub Source
Along Vinukonda –
Div/VNK/AIIB/Package-1/2020,
Gutlapalli - Ravulapuram
Dt:9.07.2020.
R&B Road.
(From CH:0/400 to
0/600 )
Road Crossing - At
Vundvali Junction, Letter submitted to The Superintending
Chainage at 431/4 Km. Engineer, R&B Circle, Mangalagiri by The
Road Crossing - At Superintending Engineer,PH Quality Control
22 Tadepalli 3 R&B Mugguroad Junction, Circle, Guntur vide Source
Chainage at 429/2 Km. Lr.no:1728/IoCT/AIIB/Package-1/ATO/2020;
Road Crossing - At Dt: 10.07.2020. Joint Inspection is yet to be
Bharatamatha Statue, done.
Chainage at 8/6 Km.
Letter Submitted to Executive Enigneer,R &
B Division, Mylavaram by Executive
Distribution Clear water
Enigneer,PH Division, Vijayawada vide Distributi
23 Tiruvuru 2 R&B main from ELRS TO
Lr.NO.39/TVR/AIIB/JTO-1/2020, on
House holds.
Dt:16.07.2020. Joint inspection yet to be
done.
Along(CH: from 6.50 Km DEE, PH, Narasaraopet,Lr. No:1498/MCL /
24 Macherla 1 R&B to 12.900 Km) from NS CWSIS/AIIB/JTO1/2018, Dt:1.03.2018 Source
Canal crossing point to addressed to the SE R&B, Guntur & the
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Mpl Office process of permission is in progress
Along Adigoppula Village
to Piduguralla Town R&B
Road.
Macherla-karampudi-
DEE, PH, Narasaraopet,Roc.No.321/ 2020-
vinukonda road-
Pidugurall 21/E1, Dt:13.05.2020 addressed to the EE
25 1 R&B CH15/000 to 26/800, Source
a R&B, Narasaraopet & the process of
nakarekallu -gurajala
permission is in progress.
road - Ch 16/100 to
30/200
Julakallu -piduguralla -
0/000 to 10/864
Clear water main along
Permission applied in online and received a
the Thotlavalleru to
demand Draft of Rs.700000/- Vide
Vuyyuru R&B Road
Application No: APRCRP003066 and
(From Chainage KM
waiting for site inspection.
+0.00 to KM+7.00)
Road Crossing form Permission applied in online and received a
Vuyyuru Katuru Road
demand Draft of Rs.3000/- Vide Application
Junction to Mantada (From
Chainage KM+26 to No: APRCRP003068 and waiting for site
26 Vuyyuru 5 R&B inspection. Source
KM+27)
Clear Water pumping
main along the road from Permission applied in online and received a
Vuyyuru Katuru road demand Draft of Rs.90000/- Vide
Junction to Mantada Application No: APRCRP003067 and
(From Chainage KM+25 waiting for site inspetion.
to KM+27)
Road rossing near Flora Permission to be applied.
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
School Junction
Road Crossing near
Permission to be applied.
Vuyyuru center
From Intake well @River
Krishna(Gudimetla) To
Regarding permission obtaining, requisition
Proposed 10 MLD
letter by EE-PHMED sended to SE-R&B.
WTP@Anasagaram
Vide Lr.No 145/NND/AIIB/JTO1/2020-3
(Nandigama) is proposed
Dt.25.06.2020. Demand Recieved for
to lay in the berm portion
Rs.1600000 vide application No.
of Gudimetla-Nandigama
APRCRP003065, awaiting for payment
Road No 211 same was
approvals.
continue along old
Nandigam
27 2 R&B bypass road. Source
a
From Proposed (10 MLD)
WTP To Proposed Regarding permission obtaining, requisition
800KL ELSR @ BC letter by EE-PHMED sended to SE-R&B.
colony, Nandigama is Vide Lr.No 145/NND/AIIB/JTO1/2020-3
proposed to lay in berm Dt.25.06.2020. Demand Recieved for
portion of old bypass Rs.720000 vide application No.
road From RTO office APRCRP003064, awaiting for payment
road junction to BC approvals.
colony.
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required

Letter submitted to The Superintending


Clear water pumping Engineer, R&B Circle, Vijayawada by The
Jaggaihpet main from head water Superintending Engineer,PH Circle, Krishna
28 9 R&B Source
a works to proposed vide Lr. No. 42/ JPT/WSIS/AIIB/TS-
ELSRs . JTO1//2020 -2Dt:16.07.2020. Joint
Inspection is yet to be done.

Ubalanka to
Mummidivaram
1.From Km.11/000 to
13/500 of Kothapeta
bridge to
Mukteshwaram(SH)
2.From Km 13/500 to
16/200 Kothapeta bridge
Mummidiv Demand Letter received from EE(R&B) for
29 2 R&B to Mukteshwaram(SH) Source
aram an amount of 269.42lakhs.
3.From Km 0/000 to
3/400 & NH 216 to
Krapuchinthalapudi-
thanelanka-
Pallivaripalem(RR)
4.From Km32/000 to
39/800 of Amalapuram-
Bobbaralanka(SH)
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
5.From 32/000 to 28/900
of Amalapuram-
Bobbaralanka(SH)
6.0/000 to 11/000 of
Kothapeta Bridge to
Mukteswaram(SH)

1) Kondalammachinta
2) Mukteswaram road
3) Thanelanka road
Demand Letter received from EE(R&B) for Distributi
4) Krapachintalapudi
an amount of 39.50lakhs. on
5) Bandarupalem
6) Somidevarapalem
7) Peyyalavaripeta
8) Cheyyeru road

30 Jangaredd R&B Permissions applied for Distribution &


ygudem Along Eluru - Source Packages from PHMED to R&B Distributi
1
Jangareddygudem Road department - Joint Inspection done in third on
week of December 2021 for Distibution
Crossing at Package. Distributi
1
Ganganamma Temple on

Crossing at Teleford
1 Source
School
1 Crossing at Masjid center Distributi
on &
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Source
Distributi
Along Aswaraopeta -
2 on &
Jangareddygudem Road
Source
Along Kovvur - Chagallu Permissions applied from PHMED to R&B Distributi
1
Road department - Awaiting for Joint Inspection. on
Along Kovvur - Chagallu Permissions applied from PHMED to R&B Source
1
Road department - Awaiting for Joint Inspection.
Along Kovvur - Permissions applied from PHMED to R&B Source
1
Vijjeswaram Road department - Awaiting for Joint Inspection.
Along Kovvur - Permissions applied from PHMED to R&B Distributi
1
Vijjeswaram Road department - Awaiting for Joint Inspection. on
31 Kovvur R&B
Along Kovvur - Vadapalli Permissions applied from PHMED to R&B Distributi
1
Chagallu Road department - Awaiting for Joint Inspection. on
Road Crossing - Near
Permissions applied from PHMED to R&B Source
1 IOC Bunk, Kovvur -
department - Awaiting for Joint Inspection.
Devarapalli Road
Along Kovvur - Permissions applied from PHMED to R&B Source
1 department - Awaiting for Joint Inspection.
Devarapalli Road
Permissions applied from PHMED to
Road Crossing at R&B(SH) department - Awaiting for Joint Source
1
Proposed Intakewell Inspection.
NH-565 at 246.60 to Agreement to be re submitted duly revising
1 Kanigiri 1 NHAI 250.20, 250.60 to the remarks mention by the Chief Source
263.30, 245.00 to 246.00 Engineer(R&B) ,National Highways &CRF
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
on 31.03.2021.
The Muncipal Commissioner, Giddalur
Road Crossing - Kurnool
2 Giddalur 1 NHAI addressed letter to R&B department and
to Ongole Road
awaiting for permission.
Along the Chennai-
3 Sullurpeta 1 NHAI Kolkata National Letter Yet to be Applied.
Highway (NH16)

4 Naidupeta 1 NHAI Near Bustand Letter Yet to be Applied.

Puttur to Satyavedu road Demand Notice is received for an amount of


5 Puttur 1 NHAI along NH-716 From 0/0 - Rs.24,32,000/- ( Bank Guarantee an
18/0 amount of Rs. 1,01,00,000/-)
Road Crossing - NH 40 - Letter addressed to the Project
6 Allagadda 1 NHAI At Km.246/460 of Manager,NHAI. Joint inspection completed.
Kurnool to Kadapa Road Pending at REPL.
Along the road,Pamidi to
Agreement copies submitted, Awaiting for
7 Gooty 1 NHAI Gooty from CH: 308.00
approval from NHAI authorities.
to 321.250
Letter submitted to The Superintending
Engineer, NHAI , Mangalagiri by The
 Road Crossing - NH 16 -
Superintending Engineer,PH Quality Control
At Vehicle underpass
8 Tadepalli 1 NHAI Circle, Guntur vide Source
Km.434+640 of Tadepalli
Lr.no:1728/IoCT/AIIB/Package-1/ATO/2020;
to Mangalagiri Highway.
Dt: 10.07.2020. Joint Inspection is yet to be
done.
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
DEE (PH) Machilipatnam Sub - division
Along Tarakaturu to
addressed to the NHAI vide Lr. No:
Guduru (NH-65) Road
9 Pedana 1 NHAI 1694/Pedana/AIIB/TO-JTO2/2020 , Dt :
(From CH:55/400 to
20.10.2020 & the process of permission is
60/000 )
in progress
Letter submitted to The Project Director,
Road Crossing through
NHAI , Mangalagiri by Executive
existing RCC encasing
Mangalagi Engineer,PH Quality Control Circle, Guntur
10 1 NHAI pipes at Guduru (NH –
ri vide Lr.No :EE/PH/GNT/AIIB/2020,324M
65) Road
Dt: 08.07.2020. Joint Inspection is yet to be
(From CH:58/900 )
done.
Letter submitted to The Project Director,
Road Crossing at NHAI , Mangalagiri by Executive
Mangalagiri flyover Engineer,PH Quality Control Circle, Guntur
11 Guntur 1 NHAI
chainage 427+150 Km of vide Lr.No :EE/PH/GNT/AIIB/2020,322M
Source
Mangalagiri Highway. Dt: 08.07.2020. Joint Inspection is yet to be
done.
Road Crossing at
Ankireddypalem to Letter submitted to The Project Director,
Pothur Road, vehicle NHAI , Vijayawada by Executive
under passing at Engineer,PH Quality Control Circle, Krishna
12 Tiruvuru 2 NHAI
chainage 396+340 Km . vide Lr.No :39/TVR/AIIB/JTO-1/2020,
Raw water main line Dt:15.07.2020. Joint Inspection is yet to be
along ibrahimpatnam to done.
tiruvuru in berm portion.
Road Crossing at Letter submitted to Project Director, PIU,
13 Vuyyuru 1 NHAI ibrahimpatnam junction NHAI, Vijayawada by Executive Source
NH-65. Engineer,PH Division,Vijayawada vide
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Lr.No: 36/AIIB/Vuyyuru/JTO2/2020-2,Dt.
30.07.2020. Joint inspection completed and
demand yet to be received.
From Intake well @River
Krishna (Gudimetla) To
Proposed (10 MLD) WTP Regarding permission obtaining, requisition
@ Anasagaram, letter by EE-PHMED sent to PD(PIU)-NHAI.
Nandigama is crossing NH-
Vide
65 at Nandigama and same Source
was continued to be laid in Lr. No 145/NND/AIIB/JTO1/2020-4
the berm portion of old NH- Dt.25.06.2020.
65 from RTO office road Awaiting permission from NHAI.
junction to Anasagaram,
Nandigama.
From Proposed (10 MLD)
Nandigam WTP @ Anasagaram TO
14 3 NHAI Regarding permission obtaining, requisition
a Proposed ELSRs in
letter by EE-PHMED sent to PD(PIU)-NHAI.
Nandigama. It is to be
Lr. No 145/NND/AIIB/JTO1/2020-4 Source
laid in the berm portion of
Dt.25.06.2020.
old NH-65 From
Awaiting permission from NHAI.
Anasagaram To RTO
office road junction.
From Lakshmi prasanna
Regarding permission obtaining, requisition
theater to Proposed
letter by EE-PHMED sent to PD(PIU)-NHAI.
700KL ElSR at
Lr. No 145/NND/AIIB/JTO1/2020-4 Source
Mukkapati Nagar
Dt.25.06.2020.
proposed to be laid in the
Awaiting permission from NHAI.
berm portion of NH-65.
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required

Source &
Jangaredd Along Aswaraopeta - Permissions yet to be applied from PHMED
15 3 State-NH Distributi
ygudem Jangareddygudem road to R&B department
on

Letter addressed letter to Project director


At Ravulapalem NH 216
PIU,Rajamahendravaram vide Roc no.
@ch 940/550 passing Source
/2020/E1,Date:06-07-2020. Permission is
through subway
awaited

1)Pallipalem Centre - Ch
82+300
2) Kasivarithoomu -
Mummidiv Ch.83+100
16 2 NHAI 3) Dhommetivaripalem
aram
road- Ch.84+055
4) Sub Registrar Office Letter addressed letter to the Project
Road - Ch84+660 director PIU, Rajamahendravaram vide Roc Distributi
5) Kondalammachinta - no. 148/2020/E1,Date:16-07- on
ch 85+400 2020.Permission is awaited
6) Bondaikodu - Ch.
87+000
7) Mohipalacheruvu-
Ch.88+800
8) From Pallipalem
centre to Kothalanka
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
culvert-
Ch 82+300 to 80+800
9) From Lamp College to
Mahipala cheruvu centre
- Ch. 86+500 to 88+800
Road Crossing (NH-
1 365BB) - At Proposed Source
Intakewell
Road Crossing - Near
IOC Bunk Kovvur -
1 Permissions yet to be applied to NHAI Source
17 Kovvur NHAI Devarapalli Road(NH-
department
365BB)
Along Kovvur -
Distributi
1 Devarapalli Road(NH-
on
365BB)

Requisition letter addressed by the


Railway Crossing -
1 Railway Muncipal Commissioner to DRM/Engg, Source
Giddalur at YSR circle
Guntur Division and awaiting for permission.
1 Giddalur
Railway Crossing -
Distributi
1 Railway Giddalur, Nallabanda
on
Bazar
Crossing Near Requisition Letter addressed to Southern
2 Sullurpet 1 Railway Source
Kalakshetram Tank railway.
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required

Nellore
Kovuru fly over near PHMED address letter to Railway
3 merged 1 Railway
Penna river. Department.
villages

4 Chittoor 1 Railway Near PCR Govt. College Source

Puttur entrance Railway


5 Puttur 1 Railway Source
line crossing

Across the railway line Bill is uploaded in CFMS, for an amount of


KM 243/14-16 between Rs.589980,vide Token number 2020-
2 Railways Kalluru-Pamidi station 1629362 and Rs.657730,vide Token
KM 242/09-10 Kalluru- number 2020-1630099. Bills are waiting for
Khaderpet. Fund Clearance.
6 Gooty Source

Across the railway line Feasibility Report is submitted. Joint


2 Railways Gooty-Turakapalli Inspection completed and awaiting for
Gooty-P K Cheruvu. Demand Drafts from Railway Authorities
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required

Across the railway line Bill is uploaded in CFMS, for an amount of


KM 243/12-14 between Rs.516939,vide Token number 2020-
7 Pamidi 2 Railways Kalluru-Pamidi station 1629239 and Rs.604562,vide Token Source
KM 242/06-07 Kalluru- number 2020-1625445. Bills are waiting for
Khaderpet. Fund Clearance.

At 327/23-25 between The Senior Divisional Engineer, South


1 Mangapatnam- Central Railway, Guntakal issued demand
Muddanur stations for the above two crossings. The Executive
Engineer (PH), Kadapa submitted Hand
Yerraguntl receipt of Rs.5,47,021 and Rs.6,11,678/-
8 Railways Source
a (547021+611678 = Rs.11,58,699-
At 298/34-36 between 00)submitted against Railway demand to
1 Yerraguntla- the MD APUFIDC for release of funds on
Yerragudipadu stations 20-06-2020. Bills are waiting for Fund
Clearance.

9 Tadepalli 7 Railways Crossing at Letter submitted to The Divisional Railway Distributi


Seetanagaram to Manager, South Central Railway, on
Mahanadu Road @ Vijayawada by Executive Engineer, PH
chainage 426/2A to Division, Guntur vide Lr.no:
426/2 (vehicle under EE/PH/GNT/AIIB/2020, Dt: 14.08.2020.
pass). Joint Inspection is yet to be done.
Crossing at
Seetanagaram to NH 5
@ chainage 424/35 to
425/1 (vehicle under
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
pass).
Crossing at Undavalli
Center to Buckingham
cancal backside @
chainage 425/0 to 424/14
(vehicle underpass).
Crossing at Undavalli
Junction to
Kunchanapalli Junction
@ chainage 424/14
(Doble Track).
Crossing at existing WTP
@ chainage 24/28 to 24/30.
LC 17.
Crossing at cement Letter submitted to The Divisional Railway
factory road @ chainage Manager, South Central Railway, Guntur by
24/27 to 24/25. LC 17B. Executive Engineer,PH Division, Guntur
vide Lr.no: EE/PH/GNT/AIIB/2020,345M
Crossing at trunk road to
Dt: 14.08.2020. Joint Inspection Completed
KCWEES School @
on 19.08.2020.Demand yet to receive.
chainage 23/23 to 23/24.
LC 17.(near Ward
Sachivalayam-8).
Letter submitted to The Divisional Railway
Crossing at Mangalagiri- Manager, South Central Railway, Guntur by
Mangalagi Nidamarru Road @ Executive Engineer, PH Division, Guntur
10 1 Railways Source
ri chainage 19/729 at LC vide Lr.no: EE/PH/GNT/AIIB/2020,323M
14. Dt: 08.07.2020. Joint Inspection is yet to be
done.
11 Tiruvuru 1 Railways Crossing at Kondapalli Letter submitted to The Senior Divisional Source
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Engineer, South Central Railway by
Executive Engineer, PH Division, Krishna
vide Lr.no: Lr.NO.39/TVR/AIIB/JTO-1/2020,
Dt:14.07.2020. Joint Inspection is yet to be
done.
across Macherla-Guntur
DEE, PH, Narasaraopet, Lr. No:1498/MCL /
road crossing with
CWSIS/AIIB/JTO1/2018 , Dt:1.03.2018
12 Macherla 1 Railways trenchless technology Source
addressed to the DRM, SCR, Guntur & the
pipe jacking method (at
process of permission is in progress
CH: 12.350 Km)
DEE, PH, Narasaraopet,Roc.No.753-6 /
Along Macherla Bus Stop 2017-18/E1, Dt:28.03.2018 addressed to
Railways Source
to Indian Oil Petrol Bunk. the EE R&B, Guntur & the process of
Pidugurall permission is in progress.
13 2
a Letter submitted to railways department,
Along Guntur -
Roc.No.320/ 2020-21/E1, Dt:13.05.2020
Railways Hyderabad road crossing Source
addressed to the DRM, SCR, Guntur & the
@ Janapadu
process of permission is in progress.
Crossing near
Jaggayapeta on Letter submitted to Senior Divisional
Mottumarri - Engineer, Secunderabad South central
Jaggaihpet Jaggayapeta track Railways by Executive Engineer, PH Circle,
14 1 Railways
a between stations Krishna vide Lr.NO.42/JPT/AIIB/JTO-
Makkapeta and 1/2020-1, Dt:16.07.2020. Joint Inspection is
Jaggayapeta between yet to be done.
pole 25/8 and 25/9.
Applied for permission to Railway
15 Gollaprolu 1 Railway Crossing at Surempeta Source
Department & Joint inspection is to be done
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Joint inspection completed awaiting for
16 Naidupeta 1 Railway Near 1000KL ELSR Source
demand notice
Rail track crossing near
Rail electrical pole no
1 Source
KVR-1032(Track going to
Andhra Sugars Factory)
Main Railway track
crossing at Rail gate
Distributi
1 between Kovvur railway
on
station and godavari Applied for Permissions to Sr.Divisional
17 Kovvur Railway bridge. Engineer, Vijayawada,SCR department
Under Passage crossing Distributi
1
for Arch Bridge in Kovvur on
Under Passage crossing
in Kovvur between
Distributi
1 Kovvur railway station
on
and Godavari Road cum
Rail bridge.
1 Sullurpet 1 WRD Permissions requested to Letter submitted to the The Executive Source
cross the Pipeline across Engineer, TGP Divisioin, Srikalahasthi vide
the Major and Branch Lr.No. 48M/AIIB/Sullurpet/2020, dated
Canals 25.07.2020.
(I)12L Major- Km.
12.750.
(II)7L Major - Km. 0.400.
(III)4L Major - Km. 4.475.
(IV)8A Branch Canal-
Km. 9.775.
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
(V)8A Branch Canal- Km.
6.775.
(VI)8A Branch Canal-
Km. 15.760.
Permission awaited from the WRD,
Intake well and Water
1 WRD SKDGNSS Project, Kadapa.
Treatment Plant
Yerraguntl
2 Source
a pumping main from
1 WRD intake well to WTP Water
Treatment Plant
In between Permission accorded for 1-No(HNSS main
Kalyanadu INTAWELL(PABR Dam) canal crossing near kowkuntla village) and
3 5 WRD Source
rgam to Borampalli by- for remaining 4-No permissions are awaited
pass(Canal crossings) from EE-HNSS,division-5,Gunthakal.

Possession proceedings recieved from EE-


1 WRD Intake well NTR TGP Division,Porumamilla-
Proceedings No.EE/NTR TGP/PML/158S
4 Mydukur Source
dated: 21.06.2021 division ,Porumamilla
pumping main from
1 WRD intake well to WTP Water
Treatment Plant
5 Vinukonda 1 WRD Along source starting Letter submitted to Irrigation department, Source
point in villatur village to Commissioner Lr.No.1860/2016/E1
BT Road starting point Dt:01.03.2018 addressed to SE Irrigation
near jawaher NSP right Dept., Narasaropet & the process of
main canal permission is in progress.
( ravulapuram R&B
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
road,Ch:14/250 )
Canal Crossing at
upstream side of
Prakasam Barrage,
chainage @0.1 Km of Letter submitted to The Superintending
Buckingham Canal. Engineer, Irrigation Circle, Gunutr by The
Canal Crossing at Superintending Engineer, PH Quality
6 Tadepalli 3 WRD Undavalli Junction, Control Circle, Guntur vide Source
chainage @0.60 Km of Lr.no:1728/IoCT/AIIB/Package-1/ATO/2020;
Buckingham Canal. Dt: 10.07.2020. Joint Inspection is yet to be
Canal Crossing towards done.
Ambedkar Nagar at
IOCL, chainage @2.2
Km of Guntur Channel.
Canal Crossing at
Krishnarao palem, Letter submitted to The NS Canal Division,
chainage @15 Km. Nuzvid by Executive Engineer, PH Circle,
Source
7 Tiruvuru 2 WRD Canal Crossing at Krishna vide Lr.NO.39/TVR/AIIB/JTO-
Jamalapuram major 1/2020, Dt:15.07.2020. Joint Inspection is
canal at ch.13.990 KM yet to be done.
near A kondur
Letter submitted to Irrigation department, Lr.
Along source starting
No:1339/2019 /E1, Dt:29.02.2020
Pidugurall point in Buggavagu
8 1 WRD addressed to SE, Irrigation Dept, Source
a regulator to Adigoppula
Narasaropet & the process of permission is
Village (CH:66/719)
in progress.
Canal Bridge crossing at
9 Vuyyuru 3 WRD Permission to be applied. Source
KEB Canal
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Canal Bridge crossing at
Permission to be applied.
Murugu Drain
Canal Bridge crossing at
Permission to be applied.
Rivas Canal
From Intake well @River Regarding permission obtaining, requisition
Krishna(Gudimetla) To letter by EE-PHMED sent to EE-NS Canal
Proposed 10 MLD WTP@ (I&CAD).
Nandigam NS CANAL Anasagaram (Nandigama).
10 10 Lr.No 145/NND/AIIB/JTO1/2020. Source
a (I&CAD) This water line is proposed
to cross the NS canals in Dt.25.07.2020.
between Gudimetla to Awaiting permission from I&CAD(NS
Nandigama. canala).
Letter submitted to Executive Engineer, NS
canals, O&M division, Jaggayyapet by
Clear water Pumping
Jaggaihpet Executive Engineer, PH Circle, Krishna vide
11 1 WRD main , irrigation bridge Source
a Lr.NO.42/JPT/AIIB/JTO-1/2020-3,
crossing at burial ground.
Dt:16.07.2020. Joint Inspection is yet to be
done.
12 Mummidiv 4 WRED Letter addressed to the SE WRED vide Source
aram Collection well to OHBR Letter no.178M/52/MMDV-WS/AIIB/TS-JTO
Ubalanka .1/2020, dt06.05.2020. Noc is
awaited.
Along the road Along Letter addressed to the SE WRED
canal bund road from throughLetter
Chintanalanka lock no.246M/52/MMDV-WS/AIIB/TS-JTO-/2020
chainage 43/300 to ,Dt-02-07-22020. Noc is awaited.
Pallavari palem chainage
54/000
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Canal crossing at
Ubalanka sai baba
temple
chainage@19.600
Crossing for flood bank
at Ubalanka
Road Crossing - Giddalur The
to Kongalaveedu Road details
are
tentative
and
Hydraulic Designs and drawings are not survey
1 Giddalur 2 P.R
Road Crossing - Giddalur prepared by the agency. work
to Pamulapalli Road complete
d
partially(
Distributi
on)
Along the road from Letter submitted to EE,PRD(PRI), Kurnool
2 Gudur 1 P.R Sunkesula barrage to Vide Lr.No. JTO/permission for water Source
Gudur WTP mains/2018 dated 20/04/2018, for approval.
In between Permission accorded for 1-No(HNSS main
Kalyandur INTAWELL(PABR Dam) canal crossing near kowkuntla village) and
3 5 WRD Source
gam to Borampalli by- for remaining 4-No permissions are awaited
pass(Canal crossings) from EE-HNSS,division-5,Gunthakal.
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
Permission awaited from the WRD,
Intake well and Water
1 WRD SKDGNSS Project, Kadapa.
Treatment Plant
Yerraguntl
4 Source
a
pumping main from
1 WRD intake well to WTP Water
Treatment Plant

Permission awaited from the WRD,


1 WRD Intake well SKDGNSS Project, Kadapa.
5 Mydukur Source
pumping main from
1 WRD intake well to WTP Water
Treatment Plant
Letter submitted to PR
Raw water main line
department,Lr.No.1860/2016/E1
vinukonda via
6 Vinukonda 1 PRED Dt:01.03.2018 addressed to EE PR, Source
donapadu,along vellatur
Narasaropet & the process of permission is
village to peruripadu
in progress.
Raw water main Pipeline
Letter submitted to PRED vide
Guduru to Pedana via
Lr.No.1694/Pedana/AIIB/JTO2/2020 -2 ,Dt:
7 Pedana 1 PRED saradai pet , Source
22.07.2020 & the process of permission is
Akulamannadu and
in progress.
Kappaladoddi villages .
Along Sullurpet - Letter submitted to the District Forest
Santhavellore Road Officer, Chittoor vide Lr.No.
1 Sullurpet 1 Forest Source
Forest Area ( Km. 11/84 NLR/AIIB/DB/ATO/2019/464M, dated
to 13/44 & 6/4 to 6/9) 15.12.2020
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required

near Rosanuru reserve Letter submitted to district forest officer for


2 Naidupet 1 Forest Source
forest area joint inspection.

Proposals submitted in online to the


PCCF,Guntur for according necessary
Along Allagadda - permission. RoFR certificate has to be
3 Allagadda 1 Forest Source
Ahobilam road submitted to the Divisional Forest
Officer,Nandyal WL division.The District
Collector has to issue the RoFR certificate.
From Velugodu
Reservoir(1R canal) to
Vempenta - Along the Permission obtained for DGPS Survey on
4 Atmakur 1 Forest Road and 13-07-2021 from PCCF, wild Life. Survey Source
From Banakacherla to yet to be conducted.
Bhanumukkala - Along
the Road.
Permissions required
Electricity Demand Notice is received for an amount of
1 Puttur 1 from APSPDCL for two Source
(APSPDCL) Rs 29,52,348/- and 47,38,142/-..
pump houses
1 Yemmigan 1 APSEB Shifting of Transformer Proposals submitted to DE,APSPDCL, Source
ur from proposed WTP Adoni, by AE,PH, Yemmiganur, vide
Application number
81323C000402020NOV03.
Bills are uploaded in CFMS, for an amount
of Rs.230273,vide token number 2021-
Interdepartmental Permissions

No of
Name of Departmen
S.No Permissions Location Present Status Remarks
ULB t
Required
644537(IoCT).Payment done of 230273.00
on dated 22.12.21 but again DD will be
raised from DE,APSPDCL, Adoni, due to
revised estmate (change SSR rates) after
03.12.2021.
Nandikotk Road Crossing - At Joint inspection completed on 02.02.2019.
1 1 RDC
ur Shikaripet Demand notice is yet to be received.
From Consent Issued for laying pipe line along
Bhanumukkala(Km.63/60 the road from Banumukkala Turning to WTP
0 to Km.71/480) to at Karivena (2 Kms) and from WTP to the
Nandyal junction in ELSR at Srisilam road (5kms) by EE-
Atmakur ULB APRDC,Kurnool Vide Letter Source
Dated:27/04/2018.
2 Atmakur 2 RDC
Road Crossings at Draft undertaking agreement submitted
Km.70/100, Km.70/900
by EE(PH),Kurnool to EE-APRDC,
and Km.71/200 of
Kurnool on 17/03/2020.
Kurnool - Guntur Road
Proposal Resubmitted to EE APRDC IN
June 2021 duly attending the remarks.