You are on page 1of 13

Progress Report on Source Development works of APUWS&SMIP with AIIB Assistance

Phase 1 - Package 1 (Ananthapuramu Circle)

Name of the agency: M/s Megha Engineering Infrastructure limited Physical progress: 4.4%
Agreement value: Rs. 611.78 Cr Total Value of work done: 28.33 Cr
Agreement date: 07.03.2019 Value of work done in this month:1.24 Cr
Agreement completion date: 06.03.2021 Financial progress: Nil
Original Project Duration: 2 Years Bills cleared: Nil
EOT sanctioned up to : 06.03.2023 Bills under clearance in CFMS: Rs.15.70 Cr

S.No Name of ULB Component Present Status as on date (03.01.2022) Total Value of
Work done in Cr.

10 th lift sidewall shuttering works were in progress. Approach bridge


longitudinal and lateral beams reinforcement and shuttering works
13.14 MLD Intake well- Bukkapatnam lake were in progress until 18-11-2021. Intakewell and footbridge was 3.65
submerged on 19-11-2021 due to the water in the Bukkapatnam
cheruvu reached above MWL 448.900 m and no work is in progress.

9 MLD WTP-Near Om shanthi temple


Raft concrete for Chlorine contact chamber is completed.Concrete for
Plinth Beam of compound wall is in progress. Shuttering for
clariflocculator outer sidewall below the GL is in progress. column 0.35
300 KL Clear water sump-Near Om shanthi temple footings for Aerator,Stilling chamber and measuring channel are
completed.Raft concrete of center shaft is completed.

Puttaparthi
1 (Agr.value: 46.19 300 KL GLSR-Chitravathi Gutta (Zone-5) Consent from Satya Sai Trust is awaited. Designs are yet to be
0
cr) submitted for review by department.

500 KL ELSR- Bedupalli(Zone-1) 3rd Brace beam Reinforcement and shuttering works are in progress. 0.45

Concrete for bottom dome slab is Completed and reinforcement for


500 KL ELSR-Prasanthi Gramam (Zone-2) 0.75
sidewall is in progress.

1200 KL GLSR- Yeddula Konda (Zone-3) Earthwork excavation for sidewall raft foundation is completed. 0

Concrete for Grade slab is completed and reinforcement for sidewall is


300 KL GLSR-Karnatakanage Palle (Zone-6) 0.15
in progress.
1500 KL ELSR-Yenumulapalle Gutta (Zone-7) GL Brace beam reinforcement and shuttering works are in progress. 0.51
500 KL ELSR-Bramhanapalle Thanda (Zone-8) Columns concrete upto the bottom dome ringbeam is completed. 0.55
Pipe line Procurement of DI 400 K7 Pipe line for a length of 1.67 km . 0.74
Coffer dam work is Partially Completed and work is stopped due to
20.75 MLD Intake well - Mid Pennar Dam high water level in dam. 0.60

450 KL Raw Water GLBR - Konepalli Approach road was completed.Earth work Excavation work is in
progress. 0
300 KL Sump - Gooty Ananthapuramu highway

300KL Sump-Concrete for 1st lift side wall above ground level is
completed.
Structural Drawings for 8 Components are approved.
Aerator-Concrete for plinth beam completed.
Stilling Chamber-Concrete for columns above GL Beam completed.
Flash Mixer-Concrete for Footings completed 0.70
By-pass Channel-Concrete for plinth beam completed.
11 MLD WTP- Gooty- Ananthapuramu highway Clarifloccultor- Concrete for 1st lift side wall completed.
Chlorine House - Concrete for columns up to plinth beam level
Gooty completed.
2 (Agr.value: 92.72 Chemical House - Concrete for footings completed.
cr) Boundary wall construction is in progress.

1050KL,GLBR-Kurnool Road 0

700 KL ELSR - Edga peta (ZONE-3) Bottom slab stagging work is in progress. 0.60

900 KL GLSR - SS palli Concrete for side wall 4th lift is completed. 0.42

Hydraulic design approved. Agency laying of 350mm dia DI-K7,clear


Pipe line 0.54
water gravity main for a length of 1490.5KM.
Total Value of
S.No Name of ULB Component Present Status as on date (03.01.2022) Work done in Cr.

Areator-Concrete for columns upto launder beam is completed and


Areator shaft wall completed upto launder beam level.
Flash Mixer-Flash Mixer side wall 1st lift concrete completed uoto
NGL.
CWR-CWR side wall 3rd lift concreting is completed (Height-2.6 mtrs)
and Final lift reinforcement binding completed & Final lift shuttering
7 MLD WTP - Peddamma temple work is in progress. 0.25
Clariflocculator-Clariflocculator Raft concreteing for section 1-1
portion is completed.
Boundary wall-Boundary wall footings+Plinth beam+ above plinth
beam columns concreting completed upto lintel beam (Length-
120mtrs).
Guard Room-Guard Room plinth beam concreting completed &
Columns reinforcement binding is in progress.

Pamidi NOC is received from Social Welfare department. Designs are


3 (Agr.value: 22.71 1000 KL ELSR - SC hostel and 500 KL ELSR -beside UPH submitted.Due to place and SBC constraint,capacity to be splited into
cr) 0
center two ELSRs (1000KL & 500KL),proposals are submitted to SE-office for
approval of Hydraulics.

500 KL ELSR - Gupta colony Formwork for Bottom Slab in progress 0.46

250 KL ELSR - Kondapur Formwork for 3rd level Brace beam is in progress 0.2

150 KL ELSR - Kothapalli Formwork for 1st Level Brace beam in progress. 0.12

Hydraulic designs of clear water pipe lines are submitted for approval
Pipe line as change of Site for 1500KL,ELSR and approval of LS is awaited from 0
the department.

Intake Well cum pump house - Akkampali Tank Intake well side wall brick work dismantling is under progress. 0.62

WTP CWR Side wall concreting completed and curing is under


Akkampalli - 5 MLD WTP progress.. 0.2

300 KL ELSR at Begarlapalli village columns above 1st brace beam first lift concrete completed.. 0.28

300 KL ELSR at Gollahatti Concreting for 1st brace beam completed 0.26
Madakasira
4 (Agr.value: 30.27 300 KL ELSR at Marurthi nagar Columns form work above first brace beam is under progress. 0.23
cr)
300 KL ELSR at Mallinayakanapalli 1st brace beam concrete completed 0.25

600 KL ELSR at Boyagiri Backfilling works are under progress. 0.38

500 KL ELSR at New sc colony Concreting for columns above 4th brace beam is under progress. 0.53

700 KL ELSR at government jr.college Concreting for columns above 1st brace beam 0.45
Longitudinal Section Drawings sent to SE office for approval.
Pipe line Procurement of DI K7 350MM Dia pipe has done with length of 176 0.06
metres at Gollahati site.
Total Value of
S.No Name of ULB Component Present Status as on date (03.01.2022) Work done in Cr.

Land belong to Irrigtion Department (Requisition lD41:D55etter from


EE,PH addressed to SE, WRD. The same was forwarded to EnC (WRD),
10m dia Intake well - Penna Ahobilam reservoir(near dam) 0
Vijayawada for approval.(Designs & Drawings are need to be approved
by CE-Irrigation-Ananthapuramu)

Transformer Yard and Watchmen quarters near PABR dam Ideal Location near Intake well is yet to be identified 0
250 KL Intermediate sump-Ankampalli Land Alienation is under process, presently pending with RDO 0
Raw water pump house - Ankampalli kalyandurgam. 0
10 MLD WTP - Akkamma konda (Near temple) 0
250 KL Clear water sump - Akkamma konda (Near 0
temple), Kalyanadurgam Land belongs to Revenue department. NoC awaited. Revised GAD for
WTP components yet to be submitted by the agency
Clear water pump house- Akkamma konda(near temple) 0
250 KL GLBR- Akkamma konda hill rock 0
600 KL ELSR- NTR Colony(ZONE-1) Designs approved. But, work not grounded 0
Excavation is completed. Work is heldup since 8 months due to non
Kalyanadurgam 700 KL ELSR- Graveyard, Zone 2 availablity of labour
0
5 (Agr.value: 76.00
cr) Land belongs to Revenue department. NoC awaited. Design and
500 KL ELSR- Dhobi ghat, Near municipal elementary drawings are approved by both PMC and PHMED. Agency yet to 0
school (ZONE-3) ground the work.

900 KL ELSR- Marampally,Nearexisting GLBR - Zone 4 Excavation is completed. Work is heldup since 7months due to non 0
availablity of labour
Land belongs to Revenue department. NoC awaited. Designs approved
300 KL ELSR -Mudigallu,Nearhill down(Zone - 5) but work not grounded 0

Private Land (Land owners agreed to give the land as per market
300 KL ELSR- Ontimidde,Near existing raw water value. ULB commissioner addressed letter to CDMA for funds 0
pump(zone 6) requistion for an amoun t of Rs. 6.25 lakh on 03.10.2020). Drawings
are yet to be agency.

Pipe line LS of Raw Water Pumping Main is approved and LS for Clear Water 0
Gravity mains is yet to be approved.

Designs are approved and work is yet to be started and bund reparing
Intake well cum Pump House-Sanjeevaiah Sagar Project, work under progress at GDP reservoir where intake well to be 0
Gajuladine
constructed by WRD.
Revised GAD submitted and has to be approved
Clariflocculator-Container wall above GL form work under progress
Areator-Columns upto tie beam above GL are completed.
Stilling chamber -Slab completed and reinforcement for wall under
18 MLD Water Treatment Plant- Guddikal Road progress 0.5
Chemical house:Reinforcement is in progress for footings
Filter house-Excavation is in progress

300 KL Clear water Sump- Guddikal Road Roof salb completed for 300KL CWR 0.15
Yemmiganur 3 nos 8x12m Pumphouses -Guddikal Road,Gandhi Park
Designs are yet to be submitted by the agency 0
6 (Agr.value: 66.74 and Salar WaterWorks
cr) Pump house Suction Well - Guddikal Road Designs are yet to be submitted by the agency 0

1300 KL ELSR (Staging-22m)- Guddikal Road Form work for 2nd brace beam under progress 0.8

Watchman Quarters- Guddikal Road Designs&drawings are approved and work is not yet grounded 0
Bottom dome &slab completed and no work is in progress due to non
700 KL ELSR (Staging-18m)- Shilpa Estate avaialability of manpower in site 0.97

Columns upto ground level are completed and 13th flight completed
600 KL ELSR(Staging-17m)- Minority Colony 0.51
and no work is in progress due to non availabilty of manpower in site

1000 KL ELSR (Staging-18m)- YSR Colony Bottom dome &slab completed and no work is in progress due to non 1.32
avaialability of manpower in site
Pipe line Hydraulic designs approved. Agency is yet to procure pipes. 0
Total Value of
S.No Name of ULB Component Present Status as on date (03.01.2022) Work done in Cr.

Intake well in Alaganurunu reservoir Earthwork excavation is under progress. 0


Alaganuru 11 MLD WTP Approved General Award & Award Proceedings, for the private land 0
from District collector.

1300 KL ELSR - near BSNL Office Columns concrete completed for the up to 3rd brace beam. 0.74
1000 KL ELSR - Pagidala Road Columns concrete completed for the up to 3rd brace beam. 0.67
Nandikotkur
7 (Agr.value: 52.44 Tying of reinforcement and formwork is in progress for the second
cr) 900 KL ELSR- BRR Nagar brace beam ( No work is in progress due to non availability of labour at 0.55
site.
Work halted due to the honorable High Court Orders ( i.e any
1100 KL ELSR- Government school construction activity in the school premises has to be stopped which 0.5
were unrelated to the school )

Pipe line Agency is planning to procure the pipeline in the month of December 0
2021.
Structural Designs are approved. Permission for construction is to be
obtained from Water Resources Department. SE,PH Ananthapuramu
circle addressed letter to SE, Irrigation circle, Kurnool for permission,
10 m dia Intake well - Gandaleru Reservoir vide Lr.No: DB/D2/282/AMRUT/2016-20/TDP-Mty dated: 14-03-2021. 0

10 MLD WTP Padakandla B.Ed College premises Designs are under scrutiny at circle office 0

750 KL ELSR - Old RTC Complex Premises 1st lift columns above 1st brace beam completed 0.5
500 KL ELSR-Padakandla 2nd lift columns above 1st brace concreting works cmpleted 0.30
Allagadda
8 (Agr.value: 49.44 600 KL ELSR-BSNL Office Backside 1st lift columns above 1st brace beam completed 0.4
cr)
200 KL ELSR-Palasagaram Concreting for 4th Brace beam completed 0.30
600 KL ELSR-Court Complex Bottom dome work in progress 0.80

500 KL ELSR-MPDO Office (M.V.Nagar) Concreting for 2nd Brace beam completed 0.45

500 KL ELSR-Chintakunta Concreting for 2nd Brace beam completed 0.45

Pipe line Not yet procured 0

8 dia intake well- Sunkesula Reservoir Designs approved. But, work not grounded 0
5.5 MLD Water Treatment Plant- West BC colony Designs approved. Aerator,clariflocculator,stilling chamber and clear
water sump are in progress
a) Stilling chamber Sidewall completed
b) Aerator Aerator cascade reinforcement is in progress
c) Clariflocculator partition wall is completed and outer Side wall 3rd lift completed.
0.87
d) Pre-Chlorine house Slab completed and brick work is in progress
Gudur e) 200 KL Clear water Sump- STBC colony Slab completed
9 (Agr.value: 24.86
cr) g)Chemical house Lintel beam completed
h)Wash Water Tank upto bottom slab completed
i)Filter bed and utility building 1st lift compted and backfilling is in progress
700 KL ELSR (Staging-17m)- Thimmagurudu Bottom slab form work is in progress 0.48
600 KL ELSR (Staging-17m)-Old policestation Bottom slab form work is in progress 0.39
600 KL ELSR(Staging-17m)- Sc Colony Colmns completed upto 2nd level brace beam. 0.28
Pipe line work started and laying of 2491 m is completed out of
Pipe Line - Scope - 18590 m 18590m and Hydro testing done for 0.97 km 2.1
Total Value of
S.No Name of ULB Component Present Status as on date (03.01.2022) Work done in Cr.

Intakewell - Velugodu Reservoir - 0

1) Clear water sump: Sidewall 4th Lift completed


2) Clariflocculater:Sidewall 4th Lift completed
11 MLD WTP-Karivena Village 0.35
3)Chlorine house & Flashmixer:PCC completed
4)Aerator: Raft completed

Atmakur
10 (Agr.value: 54.35
cr)

1200 ELSR - Swaraj nagar PCC completed 0

900 KL ELSR-Near Govt.boys hostel Dudyala road 3rd brace beam concreting completed 0.55

1000 KL ELSR-Kurnool-Guntur Road Columns reinforcement completed above 3rd brace beam. 0.63

1000 KL ELSR-Srisailam road 4th brace beam reinforcement and formwork work is in progress 0.63

Pipe line LS drawings submitted by the agency for approval 0

Intake well cum Pump house - 10 m dia - Gandikota Land Issue (EE, PH Kadapa addressed requisition letter to WRD,
reservoir Kadapa and joint inspection was conducted by WRD authorities and 0
awaiting permissions.)
Land Issue (EE, PH Kadapa addressed requisition letter to WRD,
8 MLD WTP - Gandikota Reservoir premises Kadapa and joint inspection was conducted by WRD authorities and 0
awaiting permissions.)
Land Issue (EE, PH Kadapa addressed requisition letter to WRD,
220 KL Clear sump and Pump house - Gandikota Reservoir
premises Kadapa and joint inspection was conducted by WRD authorities and 0
awaiting permissions.)
Yerraguntla
11 (Agr.value: 57.77 Land Issue (EE, PH Kadapa addressed requisition letter to WRD,
cr) 660 KL Clear water sump - Gandikota Reservoir premises Kadapa and joint inspection was conducted by WRD authorities and 0
awaiting permissions.)
The Special officer,Yerraguntla Nagara Panchayat has approved the
600 KL ELSR - Vinayak Nagar Council Resolution for handing over of site vide in CR No.1067, Dt:- 01- 0
12-2020.

1000 KL ELSR - ZPH School PMC recommended for approval of designs, awaiting for PHMED 0
approval

750 KL ELSR - Vinayak Nagar Designs are yet to be submitted by the contractor for review by PMC 0
Pipe line Designs approved. But, work not grounded 0
8 m dia intake well cum pump house - Subsidiary
Reservoir- 2 Premises Possession proceedings recieved from EE-NTR TGP
11 MLD WTP - Subsidiary reservoir-2 premises Division,Porumamilla-Proceedings No.EE/NTR TGP/PML/158S dated: 0
300 KL Clear water sump - Subsidiary Reservoir - 2 21.06.2021 division ,Porumamilla
premises
800 KLELSR - at Telugugangacolony (Zone III) 0
Mydukur 800 KL ELSR - at Municipal Office(Zone IV) 0
12 (Agr.value: 38.26 Designs are under preparation as per revised hydraulic & revised ELSR
cr) 1000 KLELSR- Chinnaihgaripalli (Zone 1B) locations 0
500 KL ELSR - at Lingaladinnae (Zone II A) 0
600 KL ELSR - Kesilingapalli Village(Zone-1 A) 0
The Joint Collector, Kadapa inspected the site on 16-01-2021 for the
1000 KL ELSR-Venkatapuramu(Zone- 2B) proposed land and the alienation is in process.Survey No.1811.NOC to 0
be received.
Pipe line Designs approved. But, work not grounded 0
Progress Report on Source Development works of APUWS&SMIP with AIIB Assistance as on 3rd January 2022
Phase 1 - Package 2 (Nellore Circle)

Name of the agency: M/s NCC limited Physical progress: 21.08 %


Agreement value: Rs. 559.62 Cr Value of work done :118 Cr
Agreement date: 18.02.2019 Value of work done in this month:Nil
Agreement completion date: 17.02.2021 Financial progress: 10.38%
Original Project Duration: 2 Years Bills cleared: Rs. 58.11 Cr
EOT Sanctioned upto: 17.02.2023 Bills under clearance in CFMS: Rs. 56.22 Cr

Total Value
S.No Name of ULB Component Work Status as on Last meeting (06.12.2021) Present Status as on date (03.01.2022) Work done during this month of Work
done in Cr.

Intake well - Near Thammavaram NoC Received from Water Resources Department. NoC Received from Water Resources Department. - 0
Structural Designs are approved by Department. Structural Designs are approved by Department.

Designs are yet to be approved due to Change in WTP Designs are yet to be approved due to Change in WTP
location location
Land Issue: EE (PH) proposed alternate site near Land Issue: EE (PH) proposed alternate site near
thammavaram hillock for construction of WTP and he thammavaram hillock for construction of WTP and he
addressed requisition letters to Commissioner Addanki and addressed requisition letters to Commissioner Addanki and
WTP- 12 MLD - Singarakonda superintending Engineer of Construction circle Ongole (on superintending Engineer of Construction circle Ongole (on - 0
12-11-2021 ) to take necessary action to alienate the land. 12-11-2021 ) to take necessary action to alienate the land.
*Commissioner Addanki Adressed letter to Revenue *Commissioner Addanki Adressed letter to Revenue
division officer,Ongole (on 22-11-2021) to take necessary division officer,Ongole (on 22-11-2021) to take necessary
initiative steps to alienate the required land. initiative steps to alienate the required land.
*Physical inspection was done by MRO Korisepadu and *Physical inspection was done by MRO Korisepadu and
revenue department on 26-11-2021. revenue department on 26-11-2021.
Addanki
1
(Agr.value: 52.29 cr)

ELSR- 900 KL - Market Yard Top dome slab completed.jointing of vertical pipes need to Top dome slab completed.jointing of vertical pipes need to 1.71
be done. be done. -
side wall completed and top dome slab reinforcement is in side wall completed and top dome slab reinforcement is in
ELSR-1200 KL - NSP Office - 1.74
progress. progress.
ELSR - 1400 KL - GOVT. Junior College 1st brace beam was completed 1st brace beam was completed - 0.6
Land Issue:Land proposed for the construction of GLBR is a Land Issue:Land proposed for the construction of GLBR is a
private land. EE, PH, Ongole addressed the letter to the private land. EE, PH, Ongole addressed the letter to the
GLBR- 600 KL- Thammavaram Hillock Area Commissioner, Addanki N.P on 20.03.2021 to process the Commissioner, Addanki N.P on 20.03.2021 to process the - 0
land acquistion. land acquistion.

Obtained permission from commissioner Addanki Obtained permission from commissioner Addanki
GLBR - 1000 KL - Singarakonda Hillock N.P ,Drawings and designs are not yet approved by N.P ,Drawings and designs are not yet approved by - 0
depatment depatment

Pipe line ( Source package - IOCT) Pipe laying completed upto 9.54 km and work is in Pipe laying completed upto 9.54 km and work is in - 11.04
progress. progress.
Agency submitted designs to EE PH. Design approval has to Agency submitted designs to EE PH. Design approval has to
500 KL OHBR at Peddarikatla be given by Department (Due to change of Locations EE be given by Department (Due to change of Locations EE - 0
proposed to cross check the levels with DPR) . proposed to cross check the levels with DPR) .
GAD was recommended for approval by PMC. Approval GAD was recommended for approval by PMC. Approval
WTP 9MLD at kanigiri sheep market yard. pending from the Department (Drawings are at SE Office pending from the Department (Drawings are at SE Office - 0
for approval). for approval).

Design approval is pending with the Department (Due to Design approval is pending with the Department (Due to
750 KL ELSR at Devang nagar change of Locations EE said to cross check levels with DPR) change of Locations EE said to cross check levels with DPR) - 0
2 Kanigiri
(Agr.value: 92.77 cr)
Structural Designs are yet to be approved by Irrigation Structural Designs are yet to be approved by Irrigation
10m dia Intake Well at Ramatheertham reservoir Department, NoC to be received from Water Resources Department, NoC to be received from Water Resources - 0
Department. Department.

1400 KL ELSR in Indira colony Ground clearance work started by the agency but local Ground clearance work started by the agency but local - 0
people stopped work due to land issue. people stopped work due to land issue.
Location finalized, NOC to be received from educational Location finalized, NOC to be received from educational
900 KL ELSR at Govt junior college - 0
Department. Department.
Pipe line Pipe laying completed upto 7.25 km, Work is in progress. Pipe laying completed upto 7.25 km, Work is in progress. - 7.2
Intakewell cum pump house - Gundla Structural Designs & Drawings yet to be received from Structural Designs & Drawings yet to be received from
Bramheswaram Reservoir Department. NoC from Water Resources Department is yet Department. NoC from Water Resources Department is yet - 0
to be obtained. Change of source is under discussion to be obtained. Change of source is under discussion
NOC Obtained from Revenue Department, GAD and NOC Obtained from Revenue Department, GAD and
9 MLD WTP- Kothapalle Hydraulics are submitted by the agency to SE office and Hydraulics are submitted by the agency to SE office and - 0
same was approved. Work yet to be grounded same was approved. Work yet to be grounded

NOC obtained from Revenue Department, Structural NOC obtained from Revenue Department, Structural
250 KL GLBR-Hill Area near St.Pauls College Designs & Drawings yet to be approved by the Department, Designs & Drawings yet to be approved by the Department, - 0
Agency yet to mobilise men and machinery. Agency yet to mobilise men and machinery.
NOC obtained from Revenue Department, Structural NOC obtained from Revenue Department, Structural
500 KL GLSR-Hill Area near Krishna Theatre backside Designs & Drawings approval is pending with the Designs & Drawings approval is pending with the - 0
Department. Department.
NOC obtained from Revenue Department, Structural NOC obtained from Revenue Department, Structural
500 KL GLSR- Hill Area near WTP Location, Designs & Drawings approval is pending with the Designs & Drawings approval is pending with the - 0
Nallabanda Bazar
Department. Department.
Giddalur NOC is pending from PR department. Revised Structural
3 (Agr.value: 47.73 cr) 500 KL ELSR Vivekananda Nagar Drawings are submitted to PMC &&SE-PH.Earth work Excavation works completed Excavation works completed 0
excavation completed.

600 KL GLSR- Hill Area near Lakshmi Narasimha NOC obtained from Revenue Department, Structural NOC obtained from Revenue Department, Structural
swamy temple Designs & Drawings approval is pending with the Designs & Drawings approval is pending with the - 0
Department. Department.
NOC obtained from Revenue Department, Structural NOC obtained from Revenue Department, Structural
700 KL GLSR- Hill Area near Lakshmi Narasimha Designs & Drawings approval is pending with the Designs & Drawings approval is pending with the - 0
Swamy temple Department. Department.
NOC obtained from Revenue Department, Structural NOC obtained from Revenue Department, Structural
700 KL GLSR- Hill Area near SC colony Designs & Drawings approval is pending with the Designs & Drawings approval is pending with the - 0
Department. Department.

NOC pending from Municipal department. Structural


Designs are submitted by agency and accepted by PMC and
500 KL ELSR- Sarridy Palli same was submitted to EE-PH. Earth work completed and Tying of Reinforcement for Annular raft is in Progress Tying of Reinforcement for Annular raft is in Progress 0.2
ready for PMC.
Pipe line ( Source package - IOCT) 450K9 Pipe line laid for a length of 0.91km 450K9 Pipe line laid for a length of 1.31km 450K9 Pipe line laid for a length of 0.4 km 6.1
Designs and Drawings are yet to be approved by Designs and Drawings are yet to be approved by
Intake well- Ramatheertham Reservoir Department Department - 0

8.5 MLD Water Treatment Plant-Garikametta Site clearance is pending at Muncipal commissioner. Site is Site clearance is pending at Muncipal commissioner. Site is - 0
not handed over to EE-PH not handed over to EE-PH

4 Chimakurthy 1500 KL ELSR - Near MRO Office Site clearance is pending at MRO office. Site is not handed Site clearance is pending at MRO office. Site is not handed - 0
(Agr.value: 27.31 cr) over to commissioner of Chimakurthy ULB. over to commissioner of Chimakurthy ULB.
Clearances are available. Work is not started due to Local Clearances are available. Work is not started due to Local
1000 KL ELSR - at Junior College issue. issue. - 0

Pipe line ( Source package - IOCT) Clearance for Pumping main along Ongole Branch canal is Clearance for Pumping main along Ongole Branch canal is - 0
pending at WRD. pending at WRD.
5 m dia. Collecting well (KP Canal) Permission received from Offtake chamber. Permission received from Offtake chamber. - 0
Design and Drawings are yet to be approved by Design and Drawings are yet to be approved by
2000 ML SS Tank (Mangalampadu) - 0
Department. Department.

300 KL Sump (Mangalampadu) Hydraulic Designs approved. Structural Designs are yet to Hydraulic Designs approved. Structural Designs are yet to - 0
be submitted by the agency. be submitted by the agency.
Hydraulic Designs approved. Structural Designs are yet to Hydraulic Designs approved. Structural Designs are yet to
Sullurpeta 11 MLD WTP (Mangalampadu) be submitted by the agency. 600KL ELBR Annular Raft be submitted by the agency. 600KL ELBR Annular Raft - 0.25
5 (Agr.value: 106.18 concrete works completed concrete works completed
cr) 300 KL ELSR - Sullur Harizanawada Ground level Brace beam completed Ground level Brace beam completed - 0.15

1100 KL ELSR - Ragavaiahpeta pond Alternate Land is identified.Requistion letter have been Alternate Land is identified.Requistion letter have been - 0
sent to concern departments sent to concern departments
1200 KL ELSR - Kalakshetram Design and Drawings are under review by PMC. Design and Drawings are under review by PMC. - 0
900 KL ELSR - Mannarpollur Concreting for 1st Bracebeam completed Concreting for 1st Bracebeam completed - 0.6

Pipe line ( Source package - IOCT) Pipe Laying completed upto length of 16.26 km, work is in Pipe Laying completed upto length of 16.26 km, work is in - 25
progress progress
8 m dia Collecting well - Off take (KP Canal) Land acquisition is pending , Designs and drawings are yet Land acquisition is pending , Designs and drawings are yet - 0
to be approved. to be approved.
Land acquisition is pending ,Designs and drawings are yet Land acquisition is pending ,Designs and drawings are yet
6 m Dia Collecting well at Thimmaji Kandrika to be approved. to be approved. - 0

SS Tank- 1417 ML- Juvvapalem NOC is pending at Irrigation Department NOC is pending at Irrigation Department - 0
WTP - 10 MLD - Thimmaji Kandrika NOC is pending at Irrigation Department NOC is pending at Irrigation Department - 0
Naidupeta
6 (Agr.value: 106.10 850 KL ELSR near Electrical substation Concreting for columns columns completed upto 2nd level Concreting for columns columns completed upto 2nd level
Brace beam Brace beam - 0.50
cr)
1000 KL ELSR near RDO Concreting for columns columns completed upto GL Brace Concreting for columns columns completed upto GL Brace - 0.45
beam beam
Concrete works for Columns 1st lift above 3rd level Brace Concrete works for Columns 1st lift above 3rd level Brace
900 KL ELSR near Swarnamukhi River Concrete works for 3rd level Brace beam completed 0.64
beam completed beam completed
Pipe Laying completed upto length of 2.1 km, work is in Pipe Laying completed upto length of 2.1 km, work is in
Pipe line ( Source package - IOCT) - 13.86
progress progress

Land Issue:An extent of 1.86 acres in P.V.Kandriga village of Land Issue:An extent of 1.86 acres in P.V.Kandriga village of
D.K.T. lands under cultivation are required for acquisition. D.K.T. lands under cultivation are required for acquisition.
As per RFCTLARR Act 2013, Land acquisition proposal sent As per RFCTLARR Act 2013, Land acquisition proposal sent
to District Collector by Tahsildar, KVB Puram recommended to District Collector by Tahsildar, KVB Puram recommended
for compensation to all 5 land owners. On 14.11.2018, the for compensation to all 5 land owners. On 14.11.2018, the
500 KL Sumpcum Pumphouse, Lakshmipuram
village District collector, Chittoor sent letter to SE (PH), Nellore District collector, Chittoor sent letter to SE (PH), Nellore - 0
requesting for deposit of funds to pay compensation to requesting for deposit of funds to pay compensation to
land owners. On 13.01.2020 EE (PH), Tirupati, addressed a land owners. On 13.01.2020 EE (PH), Tirupati, addressed a
letter to MD, APUFIDC requesting for release of funds letter to MD, APUFIDC requesting for release of funds
towards land acquisition for Rs.16,74,000/-.On30.3.2020 towards land acquisition for Rs.16,74,000/-.On30.3.2020
Commissioner addressed letter to DMA for funds request. Commissioner addressed letter to DMA for funds request.

Puttur
7 (Agr.value: 118.64
cr)

Land Issue: An extent of 0.75 acres of KVB Puram village of Land Issue: An extent of 0.75 acres of KVB Puram village of
D.K.T. lands under cultivation are required for acquisition. D.K.T. lands under cultivation are required for acquisition.
As per RFCTLARR Act 2013, Land acquisition proposal sent As per RFCTLARR Act 2013, Land acquisition proposal sent
to District Collector by Tahsildar, KVB Puram recommended to District Collector by Tahsildar, KVB Puram recommended
for compensation to Land owner. On 14.11.2018, the for compensation to Land owner. On 14.11.2018, the
1000 KL Sump cum Pumphouse KVB Puram (v) District collector, Chittoor sent letter to SE (PH), Nellore District collector, Chittoor sent letter to SE (PH), Nellore - 0
requesting for deposit of funds to pay compensation to requesting for deposit of funds to pay compensation to
land owners. On 13.01.2020 EE (PH), Tirupati, addressed a land owners. On 13.01.2020 EE (PH), Tirupati, addressed a
letter to MD, APUFIDC requesting for release of funds letter to MD, APUFIDC requesting for release of funds
towards land acquisition for Rs.12,37,500/-.On30.3.2020 towards land acquisition for Rs.12,37,500/-.On30.3.2020
Commissioner addressed letter to DMA for funds request. Commissioner addressed letter to DMA for funds request.

Pipe line ( Source package - IOCT) Procurement completed upto 24.39 km.Pipe Laying Procurement completed upto 24.39 km.Pipe Laying Pipe Laying completed upto length of 2.21 km 40.00
completed upto length of 14.26 km completed upto length of 16.47 km
NOC obtained from Municipal Department, Structural
1600 KL ELSR at Burial Ground Designs & Drawings are approved by the Department, Tying of Reinforcement for Annular raft is in Progress Tying of Reinforcement for Annular raft is in Progress 0.5
Agency yet to mobilise men and machinery.

8 Chittoor As per proposed design, connection has been taken from As per proposed design, connection has been taken from
(Agr.value: 8.56 cr) AMRUT scheme. Municipal E.E proposed new Pipe line AMRUT scheme. Municipal E.E proposed new Pipe line
Pipe line ( Source package - IOCT) alignment. During the joint inspection of Municipal staff, alignment. During the joint inspection of Municipal staff, - 0
Public health department and IOCT agency for which Public health department and IOCT agency for which
survey has been completed and yet to get approved. survey has been completed and yet to get approved.
Progress Report on Distribution network Packages of APUWS&SMIP with AIIB Assistance as on 3rd January 2022
Phase 1 - Package 3 (Ananthapuramu District)
S.N Component Work Status as on Last meeting (06.12.2021) Present Status as on date ( 03.01.2022) Work done during this month
o

Name of the agency: M/s Haricons and GPR Infra(JV) Physical progress: Nil
Agreement value: Rs. 157.03 Cr Total Value of work done: Nil
Agreement date: 08-03-2019 Value of work done in this month:Nil
Agreement completion date: 07-03-2021 Financial progress: Nil
Original Project Duration: 2 Years Bills cleared: Nil
EOT Sanctioned upto: 07-09-2021 Bills under clearance in CFMS:.Nil

a) QAPs of HDPE Pipes, DI valves, DI Pipes, DI specials and


House Service Connections, are recommended for approval a) QAPs of HDPE Pipes, DI valves, DI Pipes, DI specials and House
1 Pipe line - 321.29 Km by PMC Service Connections, are recommended for approval by PMC a) Hydraulic Designs for Gooty are
b) Hydraulic Designs for Madakasira ,Puttaparthy & Pamidi b) Hydraulic Designs for Gooty are recommended for approval recommended for approval by PMC
ULB is approved, for remaining ULBs EPANET distribution by PMC
models are to be furnished to PMC, for review.

Phase 1 - Package 4 (Kadapa District)

Name of the agency: M/s Haricons and GPR Infra(JV) Physical progress: Nil
Agreement value: Rs. 58.12 Cr Value of work done: Nil
Agreement date: 08-03-2019 Value of work done in this month:1.85 cr
Agreement completion date: 07-03-2021 Financial progress: Nil
Original Project Duration: 2 Years Bills cleared: Nil
EOT Sanctioned upto: 07-09-2021 Bills under clearance in CFMS:Nil
a) QAPs of HDPE Pipes, DI valves, DI Pipes, DI specials and a) QAPs of HDPE Pipes, DI valves, DI Pipes, DI specials and House
House Service Connections, are recommended approval by Service Connections, are recommended approval by PMC.
1 Pipe line - 149.24 Km PMC. -
b) EPANET distribution models are to be furnished to PMC, b) EPANET distribution models are to be furnished to PMC, for
for review. review.
Phase 1 - Package 5 (Kurnool District)

Name of the agency: M/s IHP Physical progress: 0.99%


Agreement value: Rs. 187.28 Cr Value of work done: 1.85 Cr
Agreement date: 26-02-2019 Value of work done in this month:
Agreement completion date: 25-02-2021 Financial progress: Nil
Original Project Duration: 2 Years Bills cleared: Nil
EOT Sanctioned upto: 25-08-2021 Bills under clearance in CFMS:.Nil

a) QAPs of HDPE Pipes, Specials and House Service Connections,


a) QAPs of HDPE Pipes, Specials and House Service are recommended for approval by PMC. For the remaining
Connections, are recommended for approval by PMC. For materials, QAPs are yet to be furnished.
the remaining materials, QAPs are yet to be furnished.
1 Pipe line - 413.58 Km b) Hydraulic Designs for Allagadda,Gudur & Nandikotkur b) Hydraulic Designs for Allagadda,Gudur & Nandikotkur ULBs a)Procurement of HDPE Pipes-44.8
ULBs are approved, for remaining ULBs EPANET are approved, for remaining ULBs EPANET distribution models km has done
distribution models are to be furnished to PMC, for are to be furnished to PMC, for review.Recommended approval
for Atmakur ULB
review.Recommended approval for Atmakur ULB c)Procurement of HDPE Pipes-44.8 km has done

Phase 1 - Package 6 (Chittoor District)

Name of the agency: M/s Kommi Chandra Sekhar Physical progress: 5.1%
Agreement value: Rs. 26.33 Cr Value of work done: 1.4 cr
Agreement date: 25-02-2019 Value of work done in this month:Nil
Agreement completion date: 24-02-2021 Financial progress: Nil
Original Project Duration: 2 Years Bills cleared: Nil
EOT Sanctioned upto: 24-08-2021 Bills under clearance in CFMS:.Nil

a) QAPs of DI Valves, DI Pipes, MDPE Pipes and House Service


a) QAPs of DI Valves, DI Pipes, MDPE Pipes and House Connections are approved by Department, Procurement for a)Total - 3 Zones
Service Connections are approved by Department, HSCs is initiated.For Chittoor ULB Recommended for approval by PMC
1 Pipe line - 68.78 Km Procurement for HSCs is initiated. b)Total - 3 Zones - 2 Zones
b) EPANET distribution models are to be furnished to PMC, Recommended for approval by PMC - 2 Zones EPANET distribution models to be
for review. EPANET distribution models to be furnished to PMC, for review - furnished to PMC, for review - 1
C) Supply of MDPE Pipes and HSC Fittings 1 Zone Zone for Chittoor ULB

Phase 1 - Package 7 (Nellore District)

Name of the agency: M/s Haricons and GPR Infra(JV) Physical progress: 23.64 %
Agreement value: Rs. 139.57 Cr Value of work done: Rs.33 Cr
Agreement date: 14-02-2019 Value of work done in this month:Nil
Agreement completion date: 13-02-2021 Financial progress: Nil
Project Duration: 2 Years Bills cleared: Nil
EOT Sanctioned upto: 13-08-2021 Bills under clearance in CFMS: Rs. 16.51 Cr.

a) EPANET distribution models for


a) Laying of 180 km length of HDPE pipe line, is completed. Nellore is approved. For all ULBs
b) Field Hydro testing is completed for a length of 175 km.
c) EPANET distribution models for Nellore is approved. For all EPANET distribution models are to
a) Laying of 180 km length of HDPE pipe line, is completed. ULBs EPANET distribution models are to be furnished to PMC, be furnished to PMC, for review.
b) Field Hydro testing is completed for a length of 175 km. b)For Sullurpeta & Naidupeta
c) EPANET distribution models for Nellore is approved. For for review. Total - 3 Zones
1 Pipe line - 512.24 Km all ULBs EPANET distribution models are to be furnished to d)For Sullurpeta & Naidupeta Recommended for approval by PMC
PMC, for review. Total - 3 Zones - 2 Zones
Recommended for approval by PMC - 2 Zones
d) In Nellore ULB 10000 No's House service connections EPANET distribution models to be furnished to PMC, for review - EPANET distribution models to be
are given 1 Zone. furnished to PMC, for review - 1
Zone.
e) In Nellore ULB 11000 No's House service connections are c) In Nellore ULB 11000 No's House
given service connections are given
Phase 1 - Package 8 (Prakasam District)

Name of the agency: M/s Velko Infratech Physical progress: Nil


Agreement value: Rs. 92.10 Cr Value of work done: Nil
Agreement date: 29-05-2019 Value of work done in this month:Nil
Agreement completion date: 28-05-2021 Financial progress: Nil
Original Project Duration: 2 Years Bills cleared: Nil
EOT: Yet to be sanctioned Bills under clearance in CFMS:.Nil

a) QAP of House Service Connections, is recommended for


approval by PMC. For the remaining materials, QAPs are yet
to be furnished.
1 Pipe line - 325.48 Km b) Hydraulic Designs for Addanki ULB is approved, for -
remaining ULBs EPANET distribution models are to be
furnished to PMC, for review.

Phase 2 - Package 14 (Guntur District)


Name of the agency: M/s Haricons and Kommi
Chandrasekhar(JV) Physical progress: 4.1 %
Value of work done: Rs. 6.33 Cr
Agreement value: Rs. 153.46 Cr Value of work done in this month:
Agreement date: 23-02-2019 Financial progress: Nil
Agreement completion date: 22-02-2021 Bills cleared: Nil
Original Project Duration: 2 Years
EOT Sanctioned upto: 22-08-2021 Bills under clearance in CFMS: Rs. 5.83 Cr.

a) QAPs of HDPE Specials, DI Valves, DI Pipes, MDPE, UPVC


pipes and House Service Connections are recommended for a) QAPs of HDPE Specials, DI Valves, DI Pipes, MDPE, UPVC pipes
approval by PMC. and House Service Connections are recommended for approval
b) Hydraulic Designs for Mangalagiri,Tadepalli,Vinukonda & a)Hydraulic Designs for Mangalagiri
Piduguralla ULBs are approved, for remaining EPANET by PMC. are recommended for Approval by
1 Pipe line - 443.66 Km
distribution models are to be furnished to PMC, for review. b)Hydraulic Designs for Mangalagiri are recommended for PMC for revised designs
c) Pipes procured for Pipe line of length - 41.9 km for Approval by PMC for revised designs b)HSC at Piduguralla-3037 Nos done.
c) Pipes procured for Pipe line of length - 41.9 km for Guntur
Guntur ULB ULB
d) In piduguralla 3009 No's House service connections are
given on existing HDPE pipe in piduguralla till now.

Phase 2 - Package 15 ( Krishna District)


Name of the agency: M/s Sian Infra and Realcon LLP JV
with M/s Haricons Physical progress: Nil
Agreement value: Rs. 115.73 Cr Value of work done: Nil
Value of work done in this month:Nil
Agreement date: 23-02-2019 Financial progress: Nil
Agreement completion date: 22-02-2021 Bills cleared: Nil
Original Project Duration: 2 Years
EOT: Yet to be sanctioned Bills under clearance in CFMS:.Nil

a) QAPs of HDPE Pipes are approved. a) QAPs of HDPE Pipes are approved.
1 Pipe line - 388.59 Km b) Hydraulic Designs for Nandigama,Jaggaiahpet, Pedana & b) Hydraulic Designs for Nandigama,Jaggaiahpet, Pedana &
Tiruvuru ULBs are approved, for remaining ULBs EPANET Tiruvuru ULBs are approved, for remaining ULBs EPANET
distribution models are to be furnished to PMC, for review. distribution models are to be furnished to PMC, for review.
Phase 2 - Package 16 ( West Godavari District)

Name of the agency: M/s Gaja Engineering JV with M/s


Kommi Chandrasekhar Physical progress: 2.44
Agreement value: Rs. 116.86 Cr Value of work done: Rs. 2.89Cr
Agreement date: 20-02-2019 Value of work done in this month:Nil
Financial progress: Nil
Agreement completion date: 19-02-2021 Bills cleared: Nil
Original Project Duration: 2 Years Bills under clearance in CFMS: Rs. 2.86 Cr.
EOT Sanctioned upto: 19-02-2023
a) QAPs of HDPE Pipes and Specials, are approved. For the a) QAPs of HDPE Pipes and Specials, are approved. For the
remaining materials, QAPs are still to be furnished. remaining materials, QAPs are still to be furnished.
b) Laying of 2.66 km length of HDPE pipe line, is completed b) Laying of 2.66 km length of HDPE pipe line, is completed in
in Jangareddygudem ULB. Jangareddygudem ULB.
c) Laying of 2.44 km length of HDPE pipe line, is completed c) Laying of 2.44 km length of HDPE pipe line, is completed in
in Palacole ULB. Palacole ULB.
d)Laying of 3.90 km length of HDPE pipe line, is completed d)Laying of 3.90 km length of HDPE pipe line, is completed in
in Tanuku ULB. Tanuku ULB.
e)Laying of 1.84 km length of HDPE pipe line, is completed e)Laying of 1.84 km length of HDPE pipe line, is completed in
in Nidadavole ULB. Nidadavole ULB.
f)Laying of 1.45 km length of HDPE pipe line, is completed f)Laying of 1.45 km length of HDPE pipe line, is completed in
1 Pipe line - 296.94 Km in Kovvur ULB. Kovvur ULB. -
g) Procurement of HDPE Pipes is completed for a length of g) Procurement of HDPE Pipes is completed for a length of
20080 m. 20080 m.
h) Hydraulic Designs are recommended for approval by h) Hydraulic Designs are recommended for approval by PMC.
PMC. i) Procurement of HDPE Specials-515 nos completed.
i) Procurement of HDPE Specials-515 nos completed.

Phase 2 - Package 17 ( East Godavari District)

Name of the agency: M/s Gaja Engineering JV with M/s Physical progress: 5.31%
Kommi Chandrasekhar Value of work done: Rs. 2.82 Cr
Agreement value: Rs. 53.06 Cr Value of work done in this month:
Agreement date: 20-02-2019
Agreement completion date: 19-02-2021 Financial progress: Nil
Original Project Duration: 2 Years Bills cleared: Nil
Bills under clearance in CFMS: Rs. 1.7 Cr.
EOT Sanctioned upto: 19-08-2021

a) QAPs of HDPE Pipes and HSC Fittings, Specials, are a) QAPs of HDPE Pipes and HSC Fittings, Specials, are approved.
approved. For the remaining materials, QAPs are still to be For the remaining materials, QAPs are still to be furnished.
furnished. b) Procurement of HDPE Pipes is completed for a length of
b) Procurement of HDPE Pipes is completed for a length of 19718 m.
19718 m. c) Laying of 6.31 km length of HDPE pipe line, is completed in
c) Laying of 6.31 km length of HDPE pipe line, is completed Mummidivaram ULB.
in Mummidivaram ULB. d) Laying of 7.86 km length of HDPE pipe line, is completed in
d) Laying of 7.86 km length of HDPE pipe line, is completed Yeleswaram ULB.
in Yeleswaram ULB. e) Laying of 3.54 km length of HDPE pipe line, is completed in
1 Pipe line - 137.49 Km e) Laying of 3.54 km length of HDPE pipe line, is completed Gollaprollu ULB. -
in Gollaprollu ULB. f) Hydraulic Designs are recommended for approval by PMC.
f) Hydraulic Designs are recommended for approval by g) Procurement of HDPE Specials-425 nos are done.
PMC.
g) Procurement of HDPE Specials-425 nos are done.

Phase 2 - Package 18 ( Visakhapatnam District)


Name of the agency: M/s Standarad Infratech JV with
M/s Velko Infratech Physical progress: Nil
Agreement value: Rs. 74.58 Cr Value of work done: Nil
Agreement date: 19-02-2019 Value of work done in this month:Nil
Financial progress: Nil
Agreement completion date: 18-02-2021 Bills cleared: Nil
Original Project Duration: 2 Years Bills under clearance in CFMS:.Nil
EOT Sanctioned upto: 17-08-2021

a) QAP of HDPE Pipes is approved. For the remaining a) QAP of HDPE Pipes is approved. For the remaining materials, a) For Narsipatnam ULB.Hydraulic
materials, QAPs are still to be furnished to PMC. QAPs are still to be furnished to PMC. designs are recommended for
1 Pipe line - 185.40 Km b) Hydraulic Designs are recommended for approval by b) For Narsipatnam ULB.Hydraulic designs are recommended for Approval by PMC for revised
Department. Approval by PMC for revised designs designs

Phase 2 - Package 19 ( Vizianagaram District)


Name of the agency: M/s Standarad Infratech JV with Physical progress: Nil
M/s Velko Infratech Value of work done: Nil
Agreement value: Rs. 86.5 Cr Value of work done in this month:Nil
Agreement date: 19-02-2019
Agreement completion date: 18-02-2021 Financial progress: Nil
Original Project Duration: 2 Years Bills cleared: Nil
Bills under clearance in CFMS:.Nil
EOT Sanctioned upto: 17-08-2021
a) QAP of HDPE Pipes is approved. For the remaining materials,
QAPs are still to be furnished to PMC.
B)For Nellimarla ULB,revised Hydraulic models are yet to be
furnished to PMC, for review a)For Nellimarla ULB,revised
c)For Bobbili ULB, revised design Total - 6 Zones Hydraulic models are yet to be
Recommended for approval by PMC - 4 Zones furnished to PMC, for review
EPANET distribution models to be furnished to PMC, for review b)For Bobbili ULB, revised design
a) QAP of HDPE Pipes is approved. For the remaining – 2 Zones Total - 6 Zones
materials, QAPs are still to be furnished to PMC. d)For Parvathipuram ULB,revised Hydraulic models are yet to be Recommended for approval by PMC
1 Pipe line - 178.04 Km b) Hydraulic Designs are recommended for approval by furnished to PMC, for review - 4 Zones
EPANET distribution models to be
Department. furnished to PMC, for review – 2
Zones
c)For Parvathipuram ULB,revised
Hydraulic models are yet to be
furnished to PMC, for review

Phase 2 - Package 20 ( Srikakulam District)

Name of the agency: M/s Velko Infratech Physical progress: Nil


Agreement value: Rs. 99.24 Cr Value of work done: Nil
Agreement date: 20-02-2019 Value of work done in this month:Nil
Agreement completion date: 19-02-2021 Financial progress: Nil
Original Project Duration: 2 Years Bills cleared: Nil
EOT Sanctioned upto: 18-08-2021 Bills under clearance in CFMS:.Nil
a) QAP of HDPE Pipes is approved. For the remaining a) QAP of HDPE Pipes is approved. For the remaining materials,
materials, QAPs are still to be furnished to PMC. QAPs are still to be furnished to PMC.
1 Pipe line - 256.47 Km b) Status of Hydraulic Designs for Palasa & Ichapuram ULB b) Status of Hydraulic Designs for Palasa & Ichapuram ULB are -
are approved by department, for remaining ULBs EPANET approved by department, for remaining ULBs EPANET
distribution models are to be furnished to PMC, for review. distribution models are to be furnished to PMC, for review.

You might also like