Compliance - SOR dated
Observation
Nagawara Station Cut & Cover-02
Compliance
after completion of PU
work has not been carried out
It was observed backfilling work
Zone-03 Ch 21220-21250. Backfilling
Waterproofing on RC Wall(East &West side) of
blind strut.
has been delayed due to removal of temporary
dismantle main struts
blind struts were erected in order to
Tocast main wall2nd lift, temporary
was
space. Due to this reason, soil compaction
in particular location which created confined
delayed.
blind struts were removed immediately &
After casting 2nd lift of main wall with roof slab,
started backfilling work.
Attachments:
1. Compliance photos
En(gegr) ec P b H I
B R o s e
D r d e a
Confined area backfilled with crushed stone sand in between
Walls and soldier pile.
A B H
bRo s E )
Sibanaran
BMRCL
teef
Compaction done for each layer by means of Baby Roller.
Sibanarayan
Backfilling done.