2023
Sl Name of the
Name of the work Work done Location Labour Machinery
No Agency
Concrete Mixer
CC M-20 for PF coping wall at PF-1 KUU 20 & Vibrator
Rising of platforms from low level to high level at Nirakarpur, M/s P. C Construction
1 Kuhuri, Humma, Jhadupudi & Mandasa Road stations of Berhampur- Ganjam
Khurda Road Division. CC 1:3:6 for foundation of KUR end side Boundary wall Concrete Mixer
NKP 8 & Vibrator
on PF No-4
CC 1:2:4 for bed concrete on curtain wall, drop wall and Concrete Mixer
Miscellaneous repairs to Major and minor bridges such as Br.-719 30
Bridge bed of Br-719. & Vibrator
ballast retaining walls, bridge floor, water way cleaning,
construction of toe wall , drop wall, bridge apporach pitching M/s Badal Kumar Plastering with epoxy plaster on Bottom and side portion
6 Br.-696 6
and pier protection work etc. For bridges between Khurda Paschimkabat of Bridge span of Br No-696.
Road - Ganjam section under ADEN/Balugaon of Khurda
Road Division. PCC 1:4:8 for ballast retaining wall of Br -705 A UP &
Br.-705 A 12
DN
Closure of LC no. 210 by construction of diversion road from M/s THE SEALCOAT
8 LC no. 210 to LC no.209 between Kaipadar Road - Tapang STRUCTURAL WORKS No work done
stations of Khurda Road division. PRIVATE LIMITED
New works, additions and alterations to the existing M/s Badal Kumar
structures, all ordinary repair and maintenance works of Paschimkabat
12 miscellaneous nature and supplies each costing Rs. No work done
500000/- or less in the section KUR(Ex) to BALU(In) for the (ZONAL)
period upto 30.06.2023. (2022-23)
Provision Of 1st FOB at Argul (ARGL) PH, Dhaulimuhan M/S SRI JAGANNATH
13 (DLMH) PH, Golabai (GLBA) PH, Mukteswar (MKTP) PH TRANSPORT No work done
and Solari (SLZ) PH stations of Khurda Road Division. CORPORATION
Wall & Floor Tile fixing, Plastering with CM 1:6 for toilet room. LC-216 3
Proposed miscellaneous repairs to LC approach road
surface, Circulating area, Colony roads, service buildings, M/s Badal Kumar Plastering with CM 1:6 for base of tube well LC-211 2
14
PF surface, PF shelter and other misc. Works under Paschimkabat Brick work, Plastering with CM 1:6 for LC Boom Operating rod
ADEN/BALU’s jurisdiction of Khurda Road Division and earth filling around compound wall of LC goomty.
LC-212 3
Provision of Goomties in connection with interlocking of 09 M/S Sibani Casting of CC M-25 Design Mix for Lintel, Sunshed of
16 KUU 8
nos. Of Level Crossing gates of KUR Division. Constructions Battery room at LC-238
Closure of LC no. 210 by construction of diversion road from M/s THE SEALCOAT
8 LC no. 210 to LC no.209 between Kaipadar Road - Tapang STRUCTURAL WORKS Nil
stations of Khurda Road division. PRIVATE LIMITED
Proposed Conversion and Rebuilding of 03 Nos Stone Slab M/s Chitta Ranjan Swain,
9 Bridges ( Br. No-639 UP,757 UP and 789 UP )into RCC Box Jajpur. Nil
Bridges on Kur to BALU Section of Khurda Road Division.
Construction Of Diversion Road From LC No-232 to LC No- M/S BICHITRA NANDA Quarry Dust Spreading, Leveling on approach road from LC No-232
15 233 Between BSDP-KUU Stations(i.e KAPG North & South LC SAMANTARAY to Station. 4
Gates) Of KUR Division.