Professional Documents
Culture Documents
RABIGH 2 SOLAR PV
INDEPENDENT POWER PLANT
REQUEST FOR PROPOSALS
PART IV: FORM SHEETS
DESIGN CONDITIONS
Data by
Item Unit
Bidder
Design lifetime
mm -----
Precipitation (of highest month)
month -----
mm ------
Precipitation (of lowest month)
month -------
1
in case the minimum design temperature for PV module string length is different than the minimum design
temperature, the bidder has to provide the detailed calculation and written approvals from PV module
manufacturer, Inverter manufacturer and combiner box manufacturer (if applicable).
1
Sensitivity: LNT Construction Internal Use