PATIMBAN PORT DEVELOPMENT PROJECT (I) - PACKAGE 3 : CONNECTING BRIDGE

Employer Engineer Contractor

MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF SEA
TRANSPORTATION
WIKA-PP JOINT OPERATION

SOIL SUPPORT TESTING WITH DCP TOOLS


Based on the Circular of the Minister of Public Works No.4 / SE / M / 2010
Date : 25 September 2020 Side : Right
Location : RAM ON/ OFF Sta : 0+600
Size Konus : 60°

No Collision Penetration Penetration DCP CBR


Collision Qty Cumulative
Cumulative
(cm) (mm) (mm) mm/Collision %
1 0 0 1,0 10 0
2 5 5 4,5 45 35
3 5 10 14,0 140 130
4 5 15 21,0 210 200
5 5 20 26,5 265 255
6 5 25 31,3 313 303
7 5 30 37,0 370 360
8 5 35 44,0 440 430
9 5 40 48,5 485 475
10 5 45 56,5 565 555
11 5 50 62,0 620 610
12 5 55 68,0 680 670
13 5 60 76,0 760 750
14 5 65 82,0 820 810 12,5 23,71

Collision Cumulative
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
0
Penetration Cumulative (mm)

100
200
300
400
500
600
700
800
900

Penetrometer Graph (DCP)

Approved By Prepared By
Engineer Contractor WIKA - PP

…................................. …...................................
PATIMBAN PORT DEVELOPMENT PROJECT (I) - PACKAGE 3 : CONNECTING BRIDGE
Employer Engineer Contractor

MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF SEA
TRANSPORTATION
WIKA-PP JOINT OPERATION

SOIL SUPPORT TESTING WITH DCP TOOLS


Based on the Circular of the Minister of Public Works No.4 / SE / M / 2010
Date : 25 September 2020 Side : Right
Location : RAM ON/ OFF Sta : 0+525
Size Konus : 60°

No Collision Penetration Penetration DCP CBR


Collision Qty Cumulative
Cumulative
(cm) (mm) (mm) mm/Collision %
1 0 0 1,0 10 0
2 5 5 5,0 50 40
3 5 10 10,0 100 90
4 5 15 15,5 155 145
5 5 20 21,0 210 200
6 5 25 26,0 260 250
7 5 30 31,0 310 300
8 5 35 36,5 365 355
9 5 40 42,3 423 413
10 5 45 49,3 493 483
11 5 50 54,5 545 535
12 5 55 62,0 620 610
13 5 60 69,8 698 688 11,5 26,45

Collision Cumulative
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
0
Penetration Cumulative (mm)

100
200
300
400
500
600
700
800

Penetrometer Graph (DCP)

Approved By Prepared By
Engineer Contractor WIKA - PP

…................................. …...................................
PATIMBAN PORT DEVELOPMENT PROJECT (I) - PACKAGE 3 : CONNECTING BRIDGE
Employer Engineer Contractor

MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF SEA
TRANSPORTATION
WIKA-PP JOINT OPERATION

SOIL SUPPORT TESTING WITH DCP TOOLS


Based on the Circular of the Minister of Public Works No.4 / SE / M / 2010
Date : 25 September 2020 Side : Right
Location : RAM ON/ OFF Sta : 0+425
Size Konus : 60°

No Collision Penetration Penetration DCP CBR


Collision Qty Cumulative
Cumulative
(cm) (mm) (mm) mm/Collision %
1 0 0 1,5 15 0
2 5 5 5,0 50 35
3 5 10 10,0 100 85
4 5 15 15,0 150 135
5 5 20 24,0 240 225
6 5 25 31,5 315 300
7 5 30 38,0 380 365
8 5 35 43,5 435 420
9 5 40 47,0 470 455
10 5 45 52,8 528 513
11 5 50 58,5 585 570
12 5 55 67,0 670 655
13 5 60 74,5 745 730 12,2 24,47

Collision Cumulative
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
0
Penetration Cumulative (mm)

100
200
300
400
500
600
700
800

Penetrometer Graph (DCP)

Approved By Prepared By
Engineer Contractor WIKA - PP

…................................. …...................................
PATIMBAN PORT DEVELOPMENT PROJECT (I) - PACKAGE 3 : CONNECTING BRIDGE
Employer Engineer Contractor

MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF SEA
TRANSPORTATION
WIKA-PP JOINT OPERATION

SOIL SUPPORT TESTING WITH DCP TOOLS


Based on the Circular of the Minister of Public Works No.4 / SE / M / 2010
Date : 26 September 2020 Side : Right
Location : RAM ON/ OFF Sta : 0+325
Size Konus : 60°

No Collision Penetration Penetration DCP CBR


Collision Qty Cumulative
Cumulative
(cm) (mm) (mm) mm/Collision %
1 0 0 1,5 15 0
2 5 5 6,0 60 45
3 5 10 12,0 120 105
4 5 15 16,0 160 145
5 5 20 23,0 230 215
6 5 25 32,0 320 305
7 5 30 39,0 390 375
8 5 35 45,0 450 435
9 5 40 48,0 480 465
10 5 45 54,0 540 525
11 5 50 60,0 600 585
12 5 55 69,0 690 675
13 5 60 76,0 760 745 12,4 23,83

Collision Cumulative
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
0
Penetration Cumulative (mm)

100
200
300
400
500
600
700
800

Penetrometer Graph (DCP)

Approved By Prepared By
Engineer Contractor WIKA - PP

…................................. …...................................
PATIMBAN PORT DEVELOPMENT PROJECT (I) - PACKAGE 3 : CONNECTING BRIDGE
Employer Engineer Contractor

MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF SEA
TRANSPORTATION
WIKA-PP JOINT OPERATION

SOIL SUPPORT TESTING WITH DCP TOOLS


Based on the Circular of the Minister of Public Works No.4 / SE / M / 2010
Date : 26 September 2020 Side : Right
Location : RAM ON/ OFF Sta : 0+200
Size Konus : 60°

No Collision Penetration Penetration DCP CBR


Collision Qty Cumulative
Cumulative
(cm) (mm) (mm) mm/Collision %
1 0 0 1,0 10 0
2 5 5 5,0 50 40
3 5 10 11,0 110 100
4 5 15 17,0 170 160
5 5 20 25,0 250 240
6 5 25 31,0 310 300
7 5 30 38,0 380 370
8 5 35 46,0 460 450
9 5 40 50,0 500 490
10 5 45 53,0 530 520
11 5 50 59,0 590 580
12 5 55 68,0 680 670 12,2 24,43

Collision Cumulative
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
0
Penetration Cumulative (mm)

100
200
300
400
500
600
700
800

Penetrometer Graph (DCP)

Approved By Prepared By
Engineer Contractor WIKA - PP

…................................. …...................................
PATIMBAN PORT DEVELOPMENT PROJECT (I) - PACKAGE 3 : CONNECTING BRIDGE
Employer Engineer Contractor

MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF SEA
TRANSPORTATION
WIKA-PP JOINT OPERATION

SOIL SUPPORT TESTING WITH DCP TOOLS


Based on the Circular of the Minister of Public Works No.4 / SE / M / 2010
Date : 30 September 2020 Side : Left
Location : RAM ON/ OFF Sta : 0+200
Size Konus : 60°

No Collision Penetration Penetration DCP CBR


Collision Qty Cumulative
Cumulative
(cm) (mm) (mm) mm/Collision %
1 0 0 1,0 10 0
2 5 5 6,0 60 50
3 5 10 9,0 90 80
4 5 15 14,0 140 130
5 5 20 21,0 210 200
6 5 25 29,0 290 280
7 5 30 38,0 380 370
8 5 35 45,0 450 440
9 5 40 52,0 520 510
10 5 45 58,0 580 570
11 5 50 58,0 580 570
12 5 55 64,0 640 630
13 5 60 72,0 720 710
14 5 65 84,0 840 830 12,8 22,97

Collision Cumulative
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
0
Penetration Cumulative (mm)

100
200
300
400
500
600
700
800
900

Penetrometer Graph (DCP)

Approved By Prepared By
Engineer Contractor WIKA - PP

…................................. …...................................
PATIMBAN PORT DEVELOPMENT PROJECT (I) - PACKAGE 3 : CONNECTING BRIDGE
Employer Engineer Contractor

MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF SEA
TRANSPORTATION
WIKA-PP JOINT OPERATION

SOIL SUPPORT TESTING WITH DCP TOOLS


Based on the Circular of the Minister of Public Works No.4 / SE / M / 2010
Date : 30 September 2020 Side : Left
Location : RAM ON/ OFF Sta : 0+350
Size Konus : 60°

No Collision Penetration Penetration DCP CBR


Collision Qty Cumulative
Cumulative
(cm) (mm) (mm) mm/Collision %
1 0 0 1,0 10 0
2 5 5 4,0 40 30
3 5 10 8,0 80 70
4 5 15 13,0 130 120
5 5 20 24,0 240 230
6 5 25 32,0 320 310
7 5 30 42,0 420 410
8 5 35 49,0 490 480
9 5 40 54,0 540 530
10 5 45 62,0 620 610
11 5 50 67,0 670 660
12 5 55 74,0 740 730
13 5 60 82,0 820 810
14 5 65 89,0 890 880 13,5 21,27

Collision Cumulative
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
0
Penetration Cumulative (mm)

100
200
300
400
500
600
700
800
900
1000

Penetrometer Graph (DCP)

Approved By Prepared By
Engineer Contractor WIKA - PP

…................................. …...................................
PATIMBAN PORT DEVELOPMENT PROJECT (I) - PACKAGE 3 : CONNECTING BRIDGE
Employer Engineer Contractor

MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF SEA
TRANSPORTATION
WIKA-PP JOINT OPERATION

SOIL SUPPORT TESTING WITH DCP TOOLS


Based on the Circular of the Minister of Public Works No.4 / SE / M / 2010
Date : 01 October 2020 Side : Left
Location : RAM ON/ OFF Sta : 0+425
Size Konus : 60°

No Collision Penetration Penetration DCP CBR


Collision Qty Cumulative
Cumulative
(cm) (mm) (mm) mm/Collision %
1 0 0 1,0 10 0
2 5 5 6,0 60 50
3 5 10 12,0 120 110
4 5 15 15,0 150 140
5 5 20 22,0 220 210
6 5 25 28,0 280 270
7 5 30 36,0 360 350
8 5 35 45,0 450 440
9 5 40 54,0 540 530
10 5 45 63,0 630 620
11 5 50 68,0 680 670
12 5 55 74,0 740 730
13 5 60 82,0 820 810
14 5 65 91,0 910 900 13,8 20,65

Collision Cumulative
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
0
Penetration Cumulative (mm)

100
200
300
400
500
600
700
800
900
1000

Penetrometer Graph (DCP)

Approved By Prepared By
Engineer Contractor WIKA - PP

…................................. …...................................
PATIMBAN PORT DEVELOPMENT PROJECT (I) - PACKAGE 3 : CONNECTING BRIDGE
Employer Engineer Contractor

MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF SEA
TRANSPORTATION
WIKA-PP JOINT OPERATION

SOIL SUPPORT TESTING WITH DCP TOOLS


Based on the Circular of the Minister of Public Works No.4 / SE / M / 2010
Date : 01 October 2020 Side : Left
Location : RAM ON/ OFF Sta : 0+525
Size Konus : 60°

No Collision Penetration Penetration DCP CBR


Collision Qty Cumulative
Cumulative
(cm) (mm) (mm) mm/Collision %
1 0 0 1,0 10 0
2 5 5 5,0 50 40
3 5 10 13,0 130 120
4 5 15 19,0 190 180
5 5 20 29,0 290 280
6 5 25 36,0 360 350
7 5 30 41,0 410 400
8 5 35 49,0 490 480
9 5 40 52,0 520 510
10 5 45 66,0 660 650
11 5 50 78,0 780 770
12 5 55 86,0 860 850 15,5 17,88

Collision Cumulative
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
0
Penetration Cumulative (mm)

100
200
300
400
500
600
700
800
900

Penetrometer Graph (DCP)

Approved By Prepared By
Engineer Contractor WIKA - PP

…................................. …...................................