Sr No GMRCL Comments Sr No Contractor's Reply

The test shall be conducted at vendor`s factory during bearing


1 Factory assessment test shall be conducted 1
inspection

2 Control of Raw material and source shall be approved 2 Relevant details shall be shared prior to the testing of bearings

Relevant tests shall be conducted during the testing of


3 Testing of raw material & finished product 3
bearings at vendor`s factory
Vendor Quaity Assurance plan shall be submitted to ensure Vendor Quaity Assurance plan shall be submitted prior to the
4 4
the entire process in control during production. Factory assessment tests

Bearing shall comply with technical spec clause 9.1.3 -


5 Elastomeric bearing-including all clauses mentioned in 5 Agreed
acceptance specifications.
6 IRC 83 Part 2 (latest revision) shall be complied. 6 Agreed
It is to note that despite these compliances the approval will
be revoked if any negative feedback of the bearing is
7 7 Contractual provisions shall be complied
received during installation/construction stage and O&M
stage.

Shop drawings for relevant bearings are already submited to


All shop drawings shall be approved by P&D department, GMRC vide our office letter
8 8
GMRCL for GFC before commencement of production RBL/GMRC/PH-II/PKG.C2/2022/425 dated 06-01-
2022,necessary apporval is awaited to be received till date