You are on page 1of 2

Project East West Rail Phase 2 Job ref.

5155888
Calc sheet no. Rev.
Part of Structure Group C: Y5
24 0
Drawing Ref. Calc. By Date Check By Date
DP 24-07-2017 SS 27-07-2017
Reference Calculations Output

Case 2. Permanent load+Prestress + Varying load


At opening for traffic

Stress at slab top


Mpa -0.6 1.0 2.5 2.7 2.9 3.1 3.2 3.3 3.3 3.3

Stress at girder top


Mpa -0.87 6.25 12.56 14.19 12.93 14.15 15.12 13.67 14.19 14.59

Stress at girder bottom


Mpa 16.11 11.65 7.61 6.53 13.64 12.90 12.26 18.29 17.96 17.72

Girder Compressive stress limit OK OK OK OK OK OK OK OK OK OK

Girder Tensile stress limit OK OK OK OK OK OK OK OK OK OK

At long term

Stress at slab top


Mpa -0.6 1.0 2.5 2.7 2.9 3.1 3.2 3.3 3.3 3.3

Stress at girder top


Mpa -0.78 6.28 12.59 14.22 13.27 14.49 15.46 14.27 14.79 15.19

Stress at girder bottom


Mpa 9.51 9.66 5.62 4.54 10.70 9.95 9.32 14.58 14.25 14.01

Girder Compressive stress limit OK OK OK OK OK OK OK OK OK OK

Girder Tensile stress limit OK OK OK OK OK OK OK OK OK OK

Slab Compressive stress limit OK OK OK OK OK OK OK OK OK OK

Case 3. Permanent load+Prestress + Varying load


At opening for traffic

Stress at slab top


Mpa 0.5 5.6 10.4 10.8 11.4 12.1 12.4 12.5 12.6 12.3

Stress at girder top


Mpa 0.07 9.90 18.70 20.50 19.53 21.13 22.27 20.86 21.38 21.56

Stress at girder bottom


Mpa 16.17 9.83 4.15 2.95 9.87 8.85 8.10 14.09 13.75 13.62

Girder Compressive stress limit OK OK OK OK OK OK OK OK OK OK

Girder Tensile stress limit OK OK OK OK OK OK OK OK OK OK

At long term

Stress at slab top


Mpa 0.5 5.6 10.4 10.8 11.4 12.1 12.4 12.5 12.6 12.3

Stress at girder top


Mpa 0.16 9.93 18.73 20.53 19.87 21.47 22.61 21.45 21.97 22.16

Stress at girder bottom


Mpa 9.58 7.84 2.16 0.95 6.92 5.91 5.15 10.38 10.03 9.91

Girder Compressive stress limit OK OK OK OK OK OK OK OK OK OK

Girder Tensile stress limit OK OK OK OK OK OK OK OK OK OK

Slab Compressive stress limit OK OK OK OK OK OK OK OK OK OK


Project East West Rail Phase 2 Job ref. 5155888
Calc sheet no. Rev.
Part of Structure Group C: Y5
25 0
Drawing Ref. Calc. By Date Check By Date
DP 24-07-2017 SS 27-07-2017
Reference Calculations Output

Case 4. Permanent load+Prestress + Varying load


At opening for traffic

Stress at slab top


Mpa 0.3 1.6 2.9 3.1 3.3 3.4 3.5 3.6 3.6 3.5

Stress at girder top


Mpa -0.01 6.81 12.99 14.60 13.32 14.50 15.45 13.98 14.49 14.87

Stress at girder bottom


Mpa 16.97 12.21 8.04 6.94 14.03 13.25 12.59 18.61 18.26 18.00

Girder Compressive stress limit OK OK OK OK OK OK OK OK OK OK

Girder Tensile stress limit OK OK OK OK OK OK OK OK OK OK

At long term

Stress at slab top


Mpa 0.3 1.6 2.9 3.1 3.3 3.4 3.5 3.6 3.6 3.5

Stress at girder top


Mpa 0.09 6.84 13.02 14.62 13.66 14.84 15.79 14.58 15.08 15.47

Stress at girder bottom


Mpa 10.38 10.22 6.05 4.94 11.09 10.30 9.65 14.89 14.54 14.28

Girder Compressive stress limit OK OK OK OK OK OK OK OK OK OK

Girder Tensile stress limit OK OK OK OK OK OK OK OK OK OK

Slab Compressive stress limit OK OK OK OK OK OK OK OK OK OK