You are on page 1of 20
ABERDEEN DAILLING SCHOOL ‘COILED TUBING EXERCISE 2 COILED TUBING EXERCISE 2 QL. Given the rig up shown above. Which scenario is more suitable for high pressure work? 1 2.8 3. Both of these 4, None of these (1 point) Q2. Given the rig up shown above. The coil is in the hole when choke line starts to leak inboard of the manual valve. Which scenario allows two barriers to be closed while repairing the leak? LA 2B 3, Both of these 4. None of these (1 point) Q3. Given the rig up shown above. The coil is in the hole when it breaks between the gooseneck and the reel. Which scenario allows securing the well and killing it by circulating down the coil and taking returns through the choke? LA 2.B 3. Both of these 4. None of these (1 point) Rev .06_030 Aberdeen Drilling Schools 2003 tet ABERDEEN DRILLING SCHOOL, COILED TUBING EXERCISE 2 Q4. Given the rig up shown above. Which scenario allows changing the packing in the stripper with the coil in the hole whilst maintaining two closed barriers? LA 2.8 3. Both of these 4. None of these (1 point) Q5. How is the maximum rated working pressure of the stripper assembly determined? a. Pressure testing b, Manufacturers data for test pressure c. Type of stripper (conventional, side-door, radial) d. Manufacturers data for working pressure (1 poins) Rev 5 .06_036 Aberdeen Drilling Schools 2003 ABERDEEN DRILLING SCHOOL. COILED TUBING EXERCISE 2 Q6.__ In the Figure below , some of the components in the conventional Stripper have been numbered. Match the correct numbers to the following descriptions: a. Lower Bushing b. Non Extrusion Ring ©. Packing Insert d Upper Bushing/Split Cap e. Lock Pins f Energiser (1 point for cach correct component description) QZ. In the Figure below, identify the type of correct assembly beside the description below:~ Rev § 08 030 Aberdeen Drilling Schools 2003, 1-3 ABERDEEN DRILLING SCHOOL, COILED TUBING EXERCISE 2 a. Shear Seal BOP As b. Side Door Stripper (1 point) 14 Rev 5 .08_030 Aberdeen Drilling Schools 2003 ABERDEEN DRILLING SCHOOL ‘COILED TUBING EXERCISE 2 QB. In the Figure below, what happens when the stripper is energised? a. Hydraulic pressure is applied to the Lower Bushing and compresses the packing upward b. Hydraulic pressure is applied to the Upper Bushing and compresses the packing, downward Wellhead pressure will pack the stripper without the assistance of hydraulic pressure The hydraulic pressure is applied to the wellhead pressure port and compresses the packing upward 2 points) Q9 In the Figure above the stripper is packed. If wellhead pressure increases, does it assist the assembly to retract the stripper? a.YES b.NO (1 Point) Rev 5.06030 Aberdeen Drilling Schools 2003 ABERDEEN DRILLING SCHOOL COILED TUBING EXERCISE 2 Q.10 The Figure below, shows a standard CT Quad BOP configuration. Some components have been numbered. Match the correct numbers to the following component descriptions a. Shear Ram b. Pipe Ram ©. Slip Ram d. Blind Ram ©. Kill Port (1 points for each correct answer) 3 5 (7) —_ ~<«—8 2 1° Ey -— die th <— QUA. The Figure above, shows a standard CT Quad BOP configuration, Some components have been numbered. Match the correct numbers to the following component descriptions: a. Pipe Ram Equalising Valve b. Blind Ram Equalising Valve ¢. Manual Closing Handle d. Hydraulic Actuator ¢€. Pressure Sensor Port (1 points for each correct answer) Q.12. What are the main advantages of the Combi BOP over the Quad BOP? (Two answers) a. Less height b.When CT pipe is cut and the blind is closed, itis easier to pump the kill fluid down c. Minimise steps for BOP emergency operation d.When the lower set of rams on a Combi are closed, itis possible to pump down the CT annulus e. A Combi BOP has more flexibility in carrying out operations (3 points) 1-6 Rev 5 .06_030 Aberdeen Drilling Schools 2003, ABERDEEN DRILLING SCHOOL COILED TUBING EXERCISE 2 Qu13. When is an Annular BOP installed a. When the stripper assembly is not available b.When there is a need to seal around tools which have a different outside diameter than the CT ¢. When extra security is desired for high-pressure work d.When it is required to strip the coiled tubing into the well under pressure (2 points) Q.14. What essential precautions should be taken when stripping through an Annular BOP. (Two Answers) a. Lubricate the tubing b. Have a spare annular insert available ¢. Closely monitor annular operating pressure and weight indicator reading . Consult fishing diagram (if stripping tool string) €. Set strippers to retract (3 points) QS. Which is the proper order from top to bottom of the coiled tubing BHA, a. CT connector, Check valve 1, Release Joint, Check valve 2, Circulating Port, DH Motor/Bit b,CT connector, Release Joint, Check valve 1, Check valve 2, Circulating Port, DH Motor/Bit CT connector, Check valve 1, Check valve 2, Release Joint, Circulating Port, DH Motor/Bit 4. CT connector, Release Joint, Circulating Port, Check valve 1, Check valve 2, DH Motor/Bit (2 points) Q.16. What is the purpose of having a check valve in the CT Bottom Hole Assembly? a. So the coiled tubing does not have to be pressure tested before running in hole b. So the bottom hole assembly will not be exposed to pressure ¢. Pressure control can be maintained if the coiled tubing fails at surface 4. The coiled tubing will not collapse if exposed to annular differential pressure (2 points) Q.17. Why are Flapper type check valves preferred over “ball and seat” types for coiled tubing operations? a. They can withstand more pressure b. Balls, plugs, or darts can be pumped through them to other tools in the BHA, c.They will close faster d.They require less maintenance (2 points) Rev 5 .06_030 Aberdeen Drilling Schools 2003 1-7 ABERDEEN DRILLING SCHOOL ‘COILED TUBING EXERCISE 2 a.To operate safely and to contain the well pressure b.To provide better protection than a stuffing box c-To clean the pipe when pulling out of the hole 4d.To enable the repair of any connection above the BOPs that might start to leak (2 points) Q.19. What pressure does the manufacturer use to test a new 10000-psi working pressure BOP (body only) a. 15000 psi b. 10000 psi 20000 psi d. 17500 psi points) Q.20. Single ram type preventers are designed to: a. Hold pressure only from above b. Hold pressure only from below c. Hold pressure from both above and below 4d. Hold pressure when energised by well bore pressure @ points) Q.21. What is the purpose of Blind/Shear rams? a. To shear tubulars like pipe while simultaneously sealing the hole b.To shear tubulars like pipe without sealing the hole To effect a seal on the tubulars in the hole (3 points) Q.22. What is a 7-1/16 inch, 10,000-psi flange? a. This flange is designed for an RX ring gasket type b. This flange has a 10,000-psi. test pressure and 5,000-psi working pressure ¢.This flange has a 10,000-psi.working pressure and 7-1/16 inch ID This flange has a 7-1/16 inch OD and a working pressure of 10,000-psi (3 points) 1-8 Rev 5 .06_030 Aberdeen Drilling Schools 2003, ABERDEEN DRILLING SCHOOL, COILED TUBING EXERCISE 2 Q.23, What would be the effect of fitting a 7- 1/16 inch X 5,000-psi flange to a working 10,000-psi rated BOP stack? a.The rating would remain at 10,000psi b.The rating would become 5,000-psi. c-The rating would become 7,500-psi. (2 points) Q.24. In the Figure below, what happens when the stripper is energised? a. Hydraulic pressure is applied to the Lower Bushing and compresses the packing upward b, Hydraulic pressure is applied to the Upper Bushing and compresses the packing down ward c. Wellhead pressure will pack the stripper without the assistance of hydraulic pressure d.The hydraulic pressure is applied to the wellhead pressure port a packing upward J compresses the (2 points) Packing Arrangements ES] ~«- Retract Port

You might also like