Sl. No Name of work Name of Dept. Claim Date of Railway Date of Name, Designation Data Remarks
Agency amount in request for counter appointm and mobile number update on
thousand arbitration claim if ent of of Arbitrators Date
(Rs.) on any, in present
thousand arbitrators
(Rs.)
01 Hajipur Community Navin Engg. - - - 10.10.09 1 Sri Subodh Kumar, 26.06.11 All document
hall Kishore Dy. CE/C/GB/PNBE including/Case file and
singh 2 Sri Neeraj Verma, final bill with M.B.
Presiding Arbitrator Under custody of
& Dy. FA/WP, Arbitrator. Intimation
Chamber Bhawan sent to DGM/G/ECR
3 Sri A.K. Yadav, vide letter no.
Dy.CE/C/PNBE W/409/Misc./W-1,
dt. 16.09.2020 to
apprise the current
status.
02 At DGA: Shivam Engg. 2921.00 04.05.2013 1104.00 23.09.13 1. Shri P.S. Rai, 15.09.15 Award awaited.
Reconstruction of Electrical CSTE/C/S & Intimation sent to
station building , Presiding Arbitrator DGM/G/ECR vide letter
widening & raising of 2. Shri K. Kotaiah, no.
PF and movement to FA&CAO/Con-II W/362/SB/DGA/Court
circulating area. 3. Shri Anil Kr. Singh Case/W-1, dt.
Shaiwal, CE/C/NE 16.09.2020 to apprise
the current status.
03 Making PQRS siding, Rajeev Engg. -- -- -- -- -- -- Contractor not turn up
cess repair & Ranjan from beginning. File not
incidental temporary traced in division.
work in BCA-
HJP(singal line)
section & Sonpur-
Chhapra Kacheri (UP)
section connection
with CTR(P) work in
BCA-HJP(Singal line)
and CTR(P) & TRR (P)
Work
04 MSK repairs of Badly Lal Engg. 1108.00 08.10.2014 321.0 22.11.17 Shri R.K. Sinha, 08.08.18 Item wise reply
damaged station Mohamm CE/TSP & Sole submitted to sole
approach road ex ad Arbitrator arbitrator on
circulating area 13.09.2018
(DRM/TC/1227)
05 At DES: Renovation of Syed Engg. 458.0 23.07.2019 550.0 09.01.18 Shri V.K. Mishra, 09.03.19 Reply submitted to
proposed station Khalid Dy.CE/TMC/HJP previous arbitrator sri
building. Ahmad (Now Retd) & Sole N.K. Jha,
Arbitrator CE/Con./Plg/MHX.
Intimtion sent to
DGM/G/ECR vide letter
no. W/362/Renovation/
DES/W-1, dt.
16.09.2020 to apprise
the current status.
06 For the work of Syed Engg. 177 + 10 12.07.2002 27.02.19 Shri Pamod Kumar, 06.01.22 1st hearing will be held
carting of released Khalid % intrest PCE(SAG)/(S&T)/HQ/ on 06.01.2022
rails and P.way fitting Ahmad HJP & Sole Arbitrator
laying in block section
between SEE-ATNR
07 At DES: Provision of Syed Engg. 1049.0 20.11.2017 527.0 10.05.19 Shri Abhijit Kr. Sinha, -- Award issuing on
sports stadium. Khalid FA&CAO/TA & Sole 16.03.2021
Ahmad Arbitrator

08 Sonpur Division of Syed Engg. 1272 23.07.2018 105.0 04.07.19 Shri H.C. Yadav, 21.01.21 1st hearing held on
Diseal store room at Khalid Dy.CE/PD/MGS & 21.01.2021
SAI, BNR, SLT, DOL, Ahmad Sole Arbitrator
CSR, TIL, LAK & UMNR
09 Repairs to level Sayed Engg. 28(+18% 25.06.2019 - 02.07.20 Shri D.P. Shah, -- Hearing not started
crossing between Khalid INTREST) Dy.CEE/TRD/HQ/HJP
NYO-BAGL Ahmad cum Sole Arbitrator

10 Welding of 90 rail Uday Engg. 2698 09.12.2010 - 03.10.19 1. Shri A.K. Sinha, -- Hearing not started
joint on cess and in Mannu & (166378 Contractor's
sity with all labour Company Intrest.) nominee Cum
and material tools and from 1998 Presiding CTE
plant etc related to to June 2. Shri Abhijit Kr.
C.A. No. DRM/TC/16, 2002 Sinha, FA&CAO/G &
dt. 09.04.1996 T
3. Shri Anil Kr. Singh
CE/TMC

11 Construction of 5 Subhash Engg. 3377798 15.10.2017 74000 21.08.19 Shri Arvind Kumar, 20.01.20 Award demand
units Qtr Type-02 Kumar 3377. Sr. Professor, challenging process for
(DSS) 02 units type-III Yaday IRICEN/PUNE as Sole Sr. DFM/SEE
at KUE & 01 unit type- Arbitrator
II & Type-III Qtr. at
Bhakhari