PROFILE
in West Wales. This is a circa £50 million scheme which was tendered on a
Design & Build model.
Highways Design Lead
I led the team of design engineers and CAD Technicians to analyze the
preliminary design prepared by ARUP, provided guidance to undertake the
value engineering tasks – lowering of profile, cut/fill earthwork iterations
etcetera. My team work was appreciated by the UK counterparts for delivering
the work of high quality and within tight dead scales by putting in extra effort.
— Neath Port Talbot CBC, Neath Transport Interchange, UK (£310k) 2020-2021
The scheme will provide an integrated transport hub at Neath Station, creating
a new 9 bay bus terminal accompanied with improved links for pedestrians and
cyclists to the retail centre.
Highways Design Lead
As Highway Design Lead, my core duties and responsibilities included leading a
team of junior engineers through the detailed design development of all
highway design features, supporting the preparation of technical reports,
highlighting the major design constraints and risks associated with it, work
specifications, coordination of design activities with other disciplines such as
lighting, signals, drainage and pavement team.
— Monmouthshire County Council, Wyebridge Car Park, UK (£100k) 2020-2021
To develop the detail design of proposed car park facility with 39 parking space
including 1 for disabled users off the Wyebridge Street within the town of
Monmouth.
Highway Design Lead
Following a successful planning application undertaken by others, I was
responsible for leading a team of graduate engineers to complete the detailed
design and specification of the new car park. To ensure construction costs met
funding, I undertook a value engineering review to design out the need to divert
a buried gas main, saving £70k.
— Velindre University NHS Trust, Velindre Cancer Centre Enabling Works, UK
(£180 Million) 2020
To develop a new permanent Access through the current ASDA car park and a
permanent Emergency Access off the Holybush Estate leading to the proposed
Velindre Cancer Hospital. The scheme also included a temporary construction
access using the existing Hospital access off the park road.
Highways Design Lead
I led the team of graduate engineer and engineer in India office for successful
delivery of various MCHW series drawings and C3D model of the access roads,
compliance/non- compliance associated with the design. I assisted UK
counterparts in addressing the anomalies in the provided prelim design,
identifying constraints and proposing mitigation measures, liaising with
drainage disciplines for successful delivery of overall package.
Northamptonshire Highways, Farthinghoe Bypass Scheme, UK (£33.75
Million). 2019-2021
Page 2 of 6
ANU MALIK, Senior Engineer
To develop five bypass options i.e. four northern routes and a southern route to
remove through traffic through the Farthinghoe village and enhance local
environment as well as road safety of the village traffic. These options were
consulted on in order to identify a preferred route to be taken forward for
further development.
Highways Designer
As a Design Engineer, I was responsible for design of feasible design options,
their compliance-non- compliance schedule and side road designs. I analyzed all
the options in terms of land-take and their impact on special landscape area or
businesses to help the client in identifying the best route.
— North MidWales Trunk Road Agent, A55 Resilience WeITAG Stage 2, UK (£1.1
million) (2018-2020)
Investigate numerous options to improve journey times, reliability and the
resilience of A55/A494 corridor from Holyhead to Welsh/English border.
Highways Design Lead
As a Design Lead, I led a team of Engineer and CAD technician to model Two
lane/ Three lane Expressway options at congested hotspot locations, convert At
-grade junction into Grade Separated junction, improvement of existing
junctions using GD300 Expressway standard. I supported UK counterparts in
preparation of technical reports and compliance schedules. I liaised with UK
barrier’s supplier to understand the latest trend barriers to be used in the
scheme.
— Torfaen County Borough Council, Pontypool and New Inn Phase 2 Car Park
Design, UK (£5.5 million) 2017-2020
Provision of Convenient access and additional park and ride capacity from the
trunk road network with improved station facilities to Pontypool and New Inn
station.
Highways Designer/Highways Design Lead
I was involved in concept as well as preliminary stage of the project. As a
designer, I developed 3D model of feasible car park option by altering the
indicative layout to suit DMRB standards and carried out swept path analysis. I
proposed the vertical profile with optimized cut/fill that led to minimum height
of retaining wall while tie-in with existing railway tracks. As a Project manager, I
checked and reviewed the work done by team in signs and Markings design,
RRRAP assessment and drawing production. I worked in collaboration with
UK colleague during my secondment to resolve the drainage issue and model
detention basin. I was also responsible for technical report writing and
Departure for Schedule forms.
— Ceredegion County Council, Bow Street Alternative Car Park Design, UK, (£8
million) 2017-2019, Welsh Government
Provision of car park, bus interchange and cycle storage along the new Bow
Street Station that will increase accessibility to the rail network, support
transport integration and provide an alternative to car park use.
Highways Designer/Highways Design Lead
As a Designer, I was involved in quick 3D analysis of various 2D options
prepared by UK counterparts to find the suitable option with which the effect of
Page 3 of 6
ANU MALIK, Senior Engineer
maximum flood base depth and impact on third parties are reduced. The
selected option was designed in accordance with DMRB standards and 3D
design was carried out. As a design lead, I reviewed the highways detail design
package comprising of 3D design, signs and markings, post and foundation
design. I also supported UK counterparts in resolving site queries.
— Balfour Beatty, Bethel Road Active Travel Scheme, UK 2020
To undertake an appraisal for introducing new routes that will enhance the
provision for walkers and cyclists linking A4086 Llanberis Road to the Lon
Eifion cycleway into Caernarfon town centre including residential dwellings and
industrial units within the region.
Highways Design Lead
I was responsible for guiding an Assistant Engineer to deliver 2D/3D design of
NMU track along Bethel road, update Active Travel route design and drawings
along Goat and Plas Menai Roundabout in accordance with Wales Active
Travel Guidance 2013. I was responsible for suggesting alternative options to
mitigate the design issues raised due to space constraint.
— Department for Infrastructure, A29 Cookstown Bypass Scheme, UK (£30
million) 2019
This scheme envisages a Wide 2+1 Single-Carriageway bypass running round
the eastern side of the town carrying all traffic that does not wish to stop in the
town
Highways Designer
As a Design Engineer, I prepared a WS2+1 arrangement bypass option to
improve overtaking opportunities on proposed bypass of A29 road. I also
prepared various alternative options for side road junctions of proposed bypass
options and carried out visibility checks. I also supported UK counterparts in
technical note preparation.
— Kent County Council, A249 Bearsted Road Improvement Scheme, UK, (£4
million 2017
The proposed scheme aims to accommodate increased traffic volume by
signalising the A249 Bearsted Road roundabout and enlarging the New
Cut Road roundabout, whilst widening between the two
Highways Designer
Developed 3D model of New Cut Road Roundabout using Stockdale method. I
was also involved in exploring various cut/fill and retaining wall options to
minimize land take requirements.
— Detailed Design of A41 Stanton Road Ghost Island Junction, Tong, UK 2017-
2018.
Develop the 3D design of ghost island junction by generating additional lanes to
east of existing T junction. As a Senior Engineer, guided highway team engineer
to carry out detailed design of junction in accordance with DMRB (TD-42/95)
standards and preparing compliance/non-compliance sheet. Prepared design
methodology, Design Risk Assessment and standard drawings for construction
with quality standards.