You are on page 1of 6

Stream number: 1

Job name: simulacion giratoria con resirculacion


Solid flowrate: 10.00 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 2.78 kg/s
Slurry volumetric flowrate: 0.1035E-02 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 100.00 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.622E-02 m
50% passing size: 0.224E-02 m
20% passing size: 0.316E-03 m
Size % passing
meters
0.107E-01 92.472
0.754E-02 85.158
0.535E-02 75.514
0.377E-02 64.577
0.267E-02 53.984
0.188E-02 46.310
0.134E-02 39.246
0.944E-03 33.220
0.667E-03 29.243
0.472E-03 24.070
0.334E-03 20.415
0.236E-03 17.910
0.167E-03 16.096
0.118E-03 14.682
0.834E-04 13.689
0.590E-04 12.898
0.417E-04 12.153
0.295E-04 11.452
0.209E-04 10.790
0.147E-04 10.167
0.104E-04 9.580
0.737E-05 9.027
0.521E-05 8.505
0.369E-05 8.014
0.00 0.000

Stream number: 2
Job name: simulacion giratoria con resirculacion
Solid flowrate: 4.05 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 1.12 kg/s
Slurry volumetric flowrate: 0.4186E-03 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 40.46 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.124E-02 m
50% passing size: 0.461E-03 m
20% passing size: 0.101E-04 m
Size % passing
meters
0.107E-01 100.000
0.754E-02 100.000
0.535E-02 100.000
0.377E-02 100.000
0.267E-02 100.000
0.188E-02 97.266
0.134E-02 82.430
0.944E-03 69.774
0.667E-03 61.420
0.472E-03 50.555
0.334E-03 42.878
0.236E-03 37.617
0.167E-03 33.808
0.118E-03 30.837
0.834E-04 28.753
0.590E-04 27.092
0.417E-04 25.527
0.295E-04 24.053
0.209E-04 22.664
0.147E-04 21.355
0.104E-04 20.122
0.737E-05 18.960
0.521E-05 17.865
0.369E-05 16.833
0.00 0.000

Stream number: 3
Job name: simulacion giratoria con resirculacion
Solid flowrate: 5.95 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 1.65 kg/s
Slurry volumetric flowrate: 0.6160E-03 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 59.54 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.858E-02 m
50% passing size: 0.455E-02 m
20% passing size: 0.250E-02 m
Size % passing
meters
0.107E-01 87.354
0.754E-02 75.069
0.535E-02 58.869
0.377E-02 40.497
0.267E-02 22.703
0.188E-02 11.669
0.134E-02 9.889
0.944E-03 8.371
0.667E-03 7.368
0.472E-03 6.065
0.334E-03 5.144
0.236E-03 4.513
0.167E-03 4.056
0.118E-03 3.699
0.834E-04 3.449
0.590E-04 3.250
0.417E-04 3.062
0.295E-04 2.886
0.209E-04 2.719
0.147E-04 2.562
0.104E-04 2.414
0.737E-05 2.275
0.521E-05 2.143
0.369E-05 2.019
0.00 0.000

Stream number: 4
Job name: simulacion giratoria con resirculacion
Solid flowrate: 7.81 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 2.17 kg/s
Slurry volumetric flowrate: 0.8082E-03 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 78.11 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.732E-02 m
50% passing size: 0.337E-02 m
20% passing size: 0.485E-03 m
Size % passing
meters
0.107E-01 90.361
0.754E-02 80.997
0.535E-02 68.650
0.377E-02 54.646
0.267E-02 41.083
0.188E-02 31.461
0.134E-02 28.928
0.944E-03 26.488
0.667E-03 23.867
0.472E-03 19.698
0.334E-03 15.565
0.236E-03 12.753
0.167E-03 10.799
0.118E-03 9.192
0.834E-04 7.939
0.590E-04 6.939
0.417E-04 6.111
0.295E-04 5.425
0.209E-04 4.856
0.147E-04 4.381
0.104E-04 3.980
0.737E-05 3.639
0.521E-05 3.344
0.369E-05 3.088
0.00 0.000

Stream number: 5
Job name: simulacion giratoria con resirculacion
Solid flowrate: 7.81 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 2.17 kg/s
Slurry volumetric flowrate: 0.8082E-03 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 78.11 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.529E-03 m
50% passing size: 0.290E-03 m
20% passing size: 0.808E-04 m
Size % passing
meters
0.107E-01 100.000
0.754E-02 100.000
0.535E-02 100.000
0.377E-02 100.000
0.267E-02 100.000
0.188E-02 100.000
0.134E-02 99.843
0.944E-03 97.851
0.667E-03 89.799
0.472E-03 74.268
0.334E-03 55.382
0.236E-03 42.578
0.167E-03 33.847
0.118E-03 26.493
0.834E-04 20.489
0.590E-04 15.698
0.417E-04 11.944
0.295E-04 9.040
0.209E-04 6.814
0.147E-04 5.120
0.104E-04 3.839
0.737E-05 2.874
0.521E-05 2.148
0.369E-05 1.605
0.00 0.000

Stream number: 6
Job name: simulacion giratoria con resirculacion
Solid flowrate: 11.86 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 3.29 kg/s
Slurry volumetric flowrate: 0.1227E-02 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 118.57 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.665E-03 m
50% passing size: 0.322E-03 m
20% passing size: 0.615E-04 m
Size % passing
meters
0.107E-01 100.000
0.754E-02 100.000
0.535E-02 100.000
0.377E-02 100.000
0.267E-02 100.000
0.188E-02 99.067
0.134E-02 93.900
0.944E-03 88.268
0.667E-03 80.114
0.472E-03 66.175
0.334E-03 51.115
0.236E-03 40.885
0.167E-03 33.834
0.118E-03 27.975
0.834E-04 23.309
0.590E-04 19.587
0.417E-04 16.580
0.295E-04 14.164
0.209E-04 12.224
0.147E-04 10.661
0.104E-04 9.396
0.737E-05 8.364
0.521E-05 7.513
0.369E-05 6.802
0.00 0.000

Stream number: 7
Job name: simulacion giratoria con resirculacion
Solid flowrate: 1.86 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 0.52 kg/s
Slurry volumetric flowrate: 0.1921E-03 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 18.57 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.766E-03 m
50% passing size: 0.343E-03 m
20% passing size: 0.669E-04 m
Size % passing
meters
0.107E-01 100.000
0.754E-02 100.000
0.535E-02 100.000
0.377E-02 100.000
0.267E-02 100.000
0.188E-02 94.900
0.134E-02 89.950
0.944E-03 84.556
0.667E-03 76.744
0.472E-03 63.391
0.334E-03 48.965
0.236E-03 39.165
0.167E-03 32.410
0.118E-03 26.799
0.834E-04 22.329
0.590E-04 18.763
0.417E-04 15.882
0.295E-04 13.568
0.209E-04 11.709
0.147E-04 10.212
0.104E-04 9.001
0.737E-05 8.012
0.521E-05 7.196
0.369E-05 6.516
0.00 0.000

Stream number: 8
Job name: simulacion giratoria con resirculacion
Solid flowrate: 10.00 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 2.78 kg/s
Slurry volumetric flowrate: 0.1035E-02 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 100.00 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.654E-03 m
50% passing size: 0.318E-03 m
20% passing size: 0.605E-04 m
Size % passing
meters
0.107E-01 100.000
0.754E-02 100.000
0.535E-02 100.000
0.377E-02 100.000
0.267E-02 100.000
0.188E-02 99.841
0.134E-02 94.633
0.944E-03 88.957
0.667E-03 80.739
0.472E-03 66.692
0.334E-03 51.514
0.236E-03 41.204
0.167E-03 34.098
0.118E-03 28.194
0.834E-04 23.491
0.590E-04 19.740
0.417E-04 16.709
0.295E-04 14.274
0.209E-04 12.319
0.147E-04 10.744
0.104E-04 9.470
0.737E-05 8.429
0.521E-05 7.571
0.369E-05 6.855
0.00 0.000

You might also like