DIFD INDUSTRIES PVT LTD

PREVENTIVE MAINTENANCE PLAN CUM CHECK LIST


Machine Name : Step-Up Transformer Period : 2019-20 Doc No: DIFD/MAINT/D/00
Rev : 0
Machine No: Date :

Sl Check Details
Description Frequency
No Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

1 P
Check transformer load Amp,
Monthly A
and note down.
Sign
2 P
Check winding temperature,
oil temperature and compare Monthly A
with the given the same.
Sign
3 Check voltage and note P
down, also check primary and
Monthly A
secondary voltage and note
down. Sign
4 Check transformer oil level, P
bushing oil level, also check
Monthly A
abnormal noise if needed add
oil. Sign
5 P
Check moisture absorber like
silica jell, check colour if Monthly A
necessary change silica jell.
Sign
6 P
Check bushing for crack ,
dust and slug and also check Monthly A
vibration lightness of nut-bolt.
Sign
7 P
Check transformer oil cooling
system, cooling is being Monthly A
proper or note.
Sign
8 Check transformer insulation P
oil if there is moisture slug
Monthly A
than do di-electric strength
test of oil. Sign
9 P
Check cable box for electrical
Monthly A
connection, tighten them.
Sign
10 Check protective device like P
relay, alaram,circuit and its
Monthly A
wiring connection, check it is
working or note. Sign
11 Check earthing resistance, P
insulation resistance,
Yearly A
Measure than compare and
note down. Sign
12 P
Check oil conservation tank
Yearly A
internally.
Sign

P : Plan ; A : Actual

Format No: DIFD/MAINT/F/00 Rev : 0 Date: