BIDDING DOCUMENT
(Volume – I)
BIDDING DOCUMENTS
for
“CONTRACT FOR PRIMARY AND SECONDARY
COLLECTION OF MUNICIPAL SOLID WASTE AND
ITS TRANSPORTATION IN METROPOLITAN AREA,
ISLAMABAD, PAKISTAN”
August-2017
Directorate of Sanitation
Street No 49,
G-6/1-1, Islamabad
Phone: 051-9211555
Metropolitan Corporation Islamabad
(Directorate of Sanitation)
*******
Subject:- “CONTRACT FOR PRIMARY AND SECONDARY
COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA,
ISLAMABAD, PAKISTAN
2. Deputy Director QS
Member _______________________
3. Director Contracts
Member _______________________
4. Director MPO
Member _______________________
5. Director Account
Member _______________________
6. Director Sanitation
Member _______________________
RFP (request for proposal) of the subject services is submitted for approval please.
MAYOR, (MCI)
2|Page “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
TABLE OF CONTENTS
Description
3|Page “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
INSTRUCTIONS TO BIDDERS
A. General 04
B. Bidding Documents 05
C. Preparation of Bids 06
D. Submission of Bids 11
F. Award of Contract 16
IB.29 Award 16
IB.30 Employer’s Right to Accept any Bid and to Reject any or 16
all Bids
IB.31 Notification of Award 17
IB.32 Performance Security 17
IB.33 Signing of Contract Agreement 17
IB.34 General Performance of the Bidders 18
IB.35 Integrity Pact 18
IB.36 Instructions Not Part of Contract 18
4|Page “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
BIDDING DATA 19
FORM OF BID 25
Letter of Technical Bid
Letter of Price Bid
Appendix-A to Bid : Special Stipulations 27
Appendix-B to Bid : Foreign Currency Requirements 28
Appendix-C to Bid : Price Adjustment 29
Appendix-D to Bid : Bill of Quantities 30
Appendix-E to Bid : Proposed Schedule 41
Appendix-F to Bid : Method of Performing the Services 42
Appendix-G to Bid : List of Major Equipment – Related 44
Items
Appendix-H to Bid : Camp and Housing Facilities 45
Appendix-I to Bid : List of Subcontractors 46
Appendix-J to Bid : Estimated Progress Payments 47
Appendix-K to Bid : Organization Chart of the 48
Supervisory Staff and Labour
Appendix-L to Bid : Integrity Pact 49
Appendix-M to Bid : Financial Competence & Access to
Financial Resources
Appendix-N to Bid : Past Performance, Qualification &
Experience
Appendix-O to Bid : Evaluation Criteria
Appendix-P to Bid : Current Commitments
FORMS 50
BID SECURITY 51
PERFORMANCE SECURITY 53
CONTRACT AGREEMENT 55
CREDIT LINE FACILITY
MOBILIZATION ADVANCE GUARANTEE/BOND 57
5|Page “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
Instructions
to
Bidders
6|Page “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
INSTRUCTIONS TO BIDDERS
(Note: These Instructions to Bidders along with Bidding Data Sheet will not be part
of the Contract and will cease to have effect once the contract is signed.)
A. GENERAL
1.1 The Employer as defined in the Bidding Data Sheet hereinafter called “the
Employer” wishes to receive bids for the completion of Sanitation services as
described in these Bidding Documents, and summarized in the Bidding Data
Sheet hereinafter referred to as the “s.
1.2 The successful bidder will be expected to complete the services within the
time specified in Appendix-A to Bid.
2.1 The Employer has applied for/received a loan/credit from the source (s)
indicated in the Bidding Data Sheet in various currencies towards the cost of
the project specified in the Bidding Data Sheet and it is intended that part of
the proceeds of this loan/credit will be applied to eligible payments under the
Contract for which these Bidding Documents are issued.
3.1 This Invitation for Bids is open to all bidders meeting the requirements as
described in the bidding data sheet:
4.1 Each bidder shall submit only one bid either by himself, or as a partner in a
joint venture. A bidder who participates in more than one bid (other than
alternatives pursuant to Clause IB.16) will be disqualified.
5.1 The bidders shall bear all costs associated with the preparation and submission
of their respective bids and the Employer will in no case be responsible or
liable for those costs, regardless of the conduct or outcome of the bidding
process.
6.1 The bidders are advised to visit and examine the Site of Sanitation Services
and its surroundings and obtain for themselves on their own responsibility all
information that may be necessary for preparing the bid and entering into a
contract for Sanitation Services. All cost in this respect shall be at the bidder’s
own expense.
7|Page “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
6.2 The bidders and any of their personnel or agents will be granted permission by
the Employer to enter upon his premises and lands for the purpose of such
inspection, but only upon the express condition that the bidders, their
personnel and agents, will release and indemnify the Employer, his personnel
and agents from and against all liability in respect thereof and will be
responsible for death or personal injury, loss of or damage to property and any
other loss, damage, costs and expenses incurred as a result of such inspection.
B. BIDDING DOCUMENTS
7.1 The Bidding Documents, in addition to invitation for bids, are those stated
below and should be read in conjunction with any Addenda issued in
accordance with Clause IB.9.
1. Instructions to Bidders.
2. Bidding Data Sheet.
3. Particular Conditions of Contract.
5. Form of Bid & Appendices to Bid.
8. Bill of Quantities (Appendix-D to Bid).
9. Form of Bid Security.
10. Form of Contract Agreement.
11. Forms of Performance Security and Mobilization Advance Guarantee/
Bond.
12. Drawings.
7.2 The bidders are expected to examine carefully the contents of all the above
documents. Failure to comply with the requirements of bid submission will be
at the Bidder’s own risk. Pursuant to Clause IB.26, bids which are not
substantially responsive to the requirements of the Bidding Documents will be
rejected.
8.1 Any prospective bidder requiring any clarification (s) in respect of the Bidding
Documents may notify the Employer in writing at the Employer’s address
indicated in the Invitation for Bids. The Employer will respond to any request
for clarification which he receives earlier than 28 days prior to the deadline for
submission of bids.
9.1 At any time prior to the deadline for submission of bids, the Employer may,
for any reason, whether at his own initiative or in response to a clarification
requested by a prospective bidder, modify the Bidding Documents by issuing
addendum.
9.2 Any addendum thus issued shall be part of the Bidding Documents pursuant to
IB 7.1 hereof and shall be communicated in writing to all purchasers of the
Bidding Documents. Prospective bidders shall acknowledge receipt of each
8|Page “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
addendum in writing to the Employer.
C. PREPARATION OF BIDS
10.1 The bid and all correspondence and documents related to the bid exchanged by
a bidder and the Employer shall be in the bid language stipulated in the
Bidding Data Sheet and Particular Conditions of Contract. Supporting
documents and printed literature furnished by the bidders may be in any other
language provided the same are accompanied by an accurate translation of the
relevant parts in the bid language, in which case, for purposes of evaluation of
the bid, the translation in bid language shall prevail.
11.1 The Bid shall comprise two envelopes submitted simultaneously, one called
the Technical Bid and the other the Price Bid, containing the documents listed
in Bidding Data Sheet under the heading of IB 11.1 A & B respectively. Both
envelopes to be enclosed together in an outer single envelope called the Bid.
Each bidder shall furnish all the documents as specified in Bidding Data Sheet
11.1 A & B.
11.2 Bids submitted by a JV shall include a copy of the Joint Venture Agreement
entered into by all partners. Alternatively, a Letter of Intent to execute a Joint
Venture Agreement in the event of a successful bid shall be signed by all
partners and submitted with the bid, together with a copy of the proposed
agreement. The role to be played by each partner to be specified therein. Bids
submitted by a joint venture of two (2) or more firms shall comply with the
following requirements:
(a) The bid and in case of a successful bid, the Form of Contract
Agreement shall be signed so as to be legally binding on all partners.
(b) One of the joint venture partners shall be nominated as being in charge;
and this authorization shall be evidenced by submitting a power of
attorney signed by legally authorized signatories of all the joint venture
partners;
(c) The partner-in-charge shall always be duly authorized to deal with the
Employer regarding all matters related with and/or incidental to the
execution of Sanitation Services as per the terms and Conditions of JV
Agreement and in this regard to incur any and all liabilities, receive
instructions, give binding undertakings and receive payments on behalf
of the joint venture;
(d) All partners of the joint venture shall at all times and under all
circumstances be liable jointly and severally for the execution of the
Contract in accordance with the Contract terms and a statement to this
effect shall be included in the authorization mentioned under Sub-Para
(b) above as well as in the Form of Bid and in the Form of JV
Agreement (in case of a successful bid); and
9|Page “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
(e) A copy of JV agreement shall be submitted before signing of the
Contract, stating the conditions under which JV will function, its
period of duration, the persons authorized to represent and obligate it
and which persons will be directly responsible for due performance of
the Contract and can give valid receipts on behalf of the joint venture,
the proportionate participation of the several firms forming the joint
venture, and any other information necessary to permit a full appraisal
of its functioning. The JV Agreement shall be made part of the
contract. No amendments / modifications whatsoever in the joint
venture agreement shall be agreed to between the joint venture partners
without prior written consent of the Employer.
11.3 The Bidder shall furnish, as part of the Technical Bid, a Technical Proposal
including a statement of Sanitation Services methods, equipment, personnel,
schedule and any other information as stipulated Bidding Forms, in sufficient
detail to demonstrate the adequacy of the Bidders’ proposal to meet the
Sanitation Services requirements and the completion time referred to in Sub-
Clause 1.2 hereof.
12.1 Unless stated otherwise in the Bidding Documents, the Contract shall be for
the whole of the Sanitation Services as described in IB 1.1 hereof, based on
the unit rates and / or prices submitted by the bidder.
12.2 The bidders shall fill in rates and prices for all items of the Sanitation Services
described in the Bill of Quantities. Items against which no rate or price is
entered by a bidder will not be paid for by the Employer when executed and
shall be deemed covered by rates and prices for other items in the Bill of
Quantities.
12.3 All duties, taxes and other levies payable by the Contractor under the Contract,
or for any other cause, as on the date 28 days prior to the deadline for
submission of bids shall be included in the rates and prices and the total Bid
Price submitted by a bidder of PEC Bidding Documents.
12.4 The rates and prices quoted by the bidders are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 70 of
the Conditions of Contract. The bidders shall furnish the prescribed
information for the price adjustment formulae in Appendix C to Bid and shall
submit with the bids such other supporting information as required under the
said clause.
13.1 The unit rates and the prices shall be quoted by the bidder entirely in Pak
rupees. A bidder expecting to incur expenditures in other currencies for inputs
to the Sanitation Services supplied from outside the Employer’s country
(referred to as the “Foreign Currency Requirements”) shall indicate the same
13.2 The rates of exchange to be used by the bidder for currency conversion shall
be the TT & OD Selling Rates published or authorized by the State Bank of
Pakistan prevailing on the date 28 days prior to the deadline for submission of
bids. For the purpose of payments, the exchange rates used in bid preparation
shall apply for the duration of the Contract.
14.1 Bids shall remain valid for the period stipulated in the Bidding Data Sheet
after the Date of Bid Opening specified in Clause IB.23.
15.1 Each bidder shall furnish, as part of his bid, a Bid Security in the amount
stipulated in the Bidding Data Sheet in Pak Rupees or an equivalent amount in
a freely convertible currency.
15.2 The Bid Security shall be, at the option of the bidder, in the form of Deposit at
Call or a Bank Guarantee issued by a Scheduled Bank in Pakistan or from a
foreign bank duly counter guaranteed by a Scheduled Bank in Pakistan in
favor of the Employer valid for a period 28 days beyond the Bid Validity date.
15.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by
the Employer as non-responsive.
15.5 The Bid Security of the successful bidder will be returned when the bidder has
furnished the required valid Performance Security and signed the Contract
Agreement. Content deleted, see special stipulation page No 77
(c) In the case of successful bidder, if he fails within the specified time
limit to:
16.1 Should any bidder consider that he can offer any advantages to the Employer
by a modification to the designs, specifications or other conditions, he may,
in addition to his bid to be submitted in strict compliance with the Bidding
Documents, submit any Alternate Proposal(s) containing (a) relevant design
calculations; (b) technical specifications; (c) proposed Services methodology;
and (d) any other relevant details / conditions, provided always that the total
sum entered on the Letter of Price Bid shall be that which represents
complete compliance with the Bidding Documents. The technical details and
financial implication involved are to be submitted in two separate sealed
envelopes as to be followed in main bid proposals.
16.2 Alternate Proposal(s), if any, of the lowest evaluated responsive bidder only
may be considered by the Employer as the basis for the award of Contract to
such bidder.
17.1 The Employer may, on his own Option or at the request of any prospective
bidder(s), hold a pre-bid meeting to clarify issues and to answer any
questions on matters related to the Bidding Documents. The date, time and
venue of pre-bid meeting, if convened, is as stipulated in the Bidding Data
Sheet. All prospective bidders or their authorized representatives shall be
invited to attend such a pre-bid meeting.
17.2 The bidders are requested to submit questions, if any, in writing so as to reach
the Employer not later than seven (7) days before the proposed pre-bid
meeting.
17.3 Minutes of the pre-bid meeting, including the text of the questions raised and
the replies given, will be transmitted without delay to all purchasers of the
Bidding Documents. Any modification of the Bidding Documents listed in IB
7.1 hereof, which may become necessary as a result of the pre-bid meeting
shall be made by the Employer exclusively through the issue of an
Addendum pursuant to Clause IB.9 and not through the minutes of the pre-
bid meeting.
17.4 Absence at the pre-bid meeting will not be a cause for disqualification of a
bidder.
18.3 No alteration is to be made in the Letters of Price and Technical Bids nor in
the Appendices thereto except in filling up the blanks as directed. If any such
alterations be made or if these instructions be not fully complied with, the bid
may be rejected.
18.4 The Bidder shall prepare one original of the Technical Bid and one original
of the Price Bid comprising the Bid as described in Bidding Data Sheet
against IB 11 and clearly mark it “ORIGINAL - TECHNICAL BID” and
“ORIGINAL - PRICE BID”. In addition, the Bidder shall submit two (2)
copies of the Bid and clearly mark each of them “COPY.” In the event of any
discrepancy between the original and the copies, the original shall prevail.
18.5 The original and all copies of the Bid shall be typed or written in indelible ink
and shall be signed by a person duly authorized to sign on behalf of the
Bidder. This authorization shall consist of a written confirmation as specified
in the Bidding Data Sheet and shall be attached to the bid. The name and
position held by each person signing the authorization must be typed or
printed below the signature. All pages of the Bid, except for unamended
printed literature, shall be signed or initialed by the person signing the bid.
18.7 Bidders shall indicate in the space provided in the Letter of Technical and
Price Bids, their full and proper addresses at which notices may be legally
served on them and to which all correspondence in connection with their bids
and the Contract is to be sent.
18.8 Bidders should retain a copy of the Bidding Documents as their file copy.
(a) ORIGINAL and each copy of the Bid shall be separately sealed and
put in separate envelopes and marked as such.
(b) The envelopes containing the ORIGINAL and copies will be put in one
sealed envelope and addressed / identified as given in IB 19.2 hereof.
(c) The technical bid should comprise of documents listed in IB11.1 (A) &
the price bid should comprise of documents listed in IB 11.1 (B) which
shall be placed in separate envelopes in accordance with IB 11.1.
(b) Bear the name and identification number of the contract as defined in
the Bidding Data Sheet; and
(c) Provide a warning not to open before the time and date for bid
opening, as specified in the Bidding Data Sheet.
19.3 In addition to the identification required in IB 19.2 hereof, the inner envelope
shall indicate the name and address of the bidder to enable the bid to be
returned unopened in case it is declared “late” pursuant to Clause IB.21
19.4 If the outer envelope is not sealed and marked as above, the Employer will
assume no responsibility for the misplacement or premature opening of the
Bid.
20.1 (a) Bids must be received by the Employer at the address specified no later
than the time and date stipulated in the Bidding Data Sheet.
(b) Bids with charges payable will not be accepted, nor will arrangements
be undertaken to collect the bids from any delivery point other than
that specified above. Bidders shall bear all expenses incurred in the
preparation and delivery of bids. No claims will be entertained for
refund of such expenses.
(c) Where delivery of a bid is by mail and the bidder wishes to receive an
acknowledgment of receipt of such bid, he shall make a request for
such acknowledgment in a separate letter attached to but not included
in the sealed bid package.
20.2 The Employer may, at his discretion, extend the deadline for submission of
Bids by issuing an amendment in accordance with Clause IB.9, in which case
all rights and obligations of the Employer and the bidders previously subject
to the original deadline will thereafter be subject to the deadline as extended.
21. (a) Any bid received by the Employer after the deadline for submission of
bids prescribed in Clause IB.20 will be returned unopened to such
bidder.
(b) Delays in the mail, delays of person in transit, or delivery of a bid to
the wrong office shall not be accepted as an excuse for failure to
deliver a bid at the proper place and time. It shall be the bidder’s
responsibility to determine the manner in which timely delivery of his
bid will be accomplished either in person, by messenger or by mail.
22.2 The modification, substitution, or notice for withdrawal of any bid shall be
prepared, sealed, marked and delivered in accordance with the provisions of
Clause IB.19 with the outer and inner envelopes additionally marked
“MODIFICATION”, “SUBSTITUTION” or “WITHDRAWAL” as
appropriate.
22.3 No bid may be modified by a bidder after the deadline for submission of bids
except in accordance with IB 22.1 and 27.2.
22.4 Withdrawal of a bid during the interval between the deadline for submission of
bids and the expiration of the period of bid validity specified in the Form of
Bid may result in forfeiture of the Bid Security in pursuance to Clause IB.15.
23.1 The Employer will open the Technical Bids in public at the address, date and
time specified in the Bidding Data Sheet in the presence of Bidders`
designated representatives and anyone who choose to attend. The Price Bids
will remain unopened and will be held in custody of the Employer until the
specified time of their opening.
23.2 First, envelopes marked “WITHDRAWAL” shall be opened and read out and
the envelope with the corresponding bid shall not be opened, but returned to
the Bidder. No bid withdrawal shall be permitted unless the corresponding
Withdrawal Notice contains a valid authorization to request the withdrawal
and is read out at bid opening.
23.5 Other envelopes holding the Technical Bids shall be opened one at a time, and
the following read out and recorded:
23.6 a) The Employer shall first examine qualification and experience Data as per
appendix M and N submitted by the Bidder. The technical proposal
examination of those bidders only shall be taken in hand who meet the
minimum requirement as mentioned in appendix M and N. Only
substantially responsive qualification shall be considered for further
evaluation.
b) The Employer shall examine the Technical Bid to confirm that all the
documents have been provided, and to determine the completeness of
each document submitted.
23.7 The Employer shall confirm that all the documents and information have been
provided for evaluation of Technical bid as required under these bidding
documents.
23.8 At the end of the evaluation of the Technical Bids, the Employer will invite
only those bidders who have submitted substantially responsive Technical
Bids and who have been determined as being qualified for award to attend the
opening of the Price Bids.
The date, time, and location of the opening of Price Bids will be advised in
writing by the Employer. Bidders shall be given reasonable notice for the
opening of Price Bids.
23.9 The Employer will notify Bidders in writing who have been rejected on the
grounds of their Technical Bids being substantially non-responsive to the
requirements of the Bidding Document and return their Price Bids unopened
before inviting others, who are determined as being qualified, to attend the
opening of Price Bids.
23.10 The Employer shall conduct the opening of Price Bids of all Bidders who
submitted substantially responsive Technical Bids, publically in the presence
of Bidders` representatives who choose to attend at the address, date and time
specified by the Employer. The Bidder’s representatives who are present shall
be requested to sign a register evidencing their attendance.
23.11 All envelopes containing Price Bids shall be opened one at a time and the
following read out and recorded:
16 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
(a) The name of the Bidder;
(b) Whether there is a modification or substitution;
(c) The Bid Prices, including any discounts and alternative offers;
and
(d) Any other details as the Employer may consider appropriate.
Only Price Bids and discounts, read out and recorded during the opening of
Price Bids shall be considered for evaluation. No Bid shall be rejected at the
opening of Price Bids.
23.12 If this Bidding Document allows Bidders to quote separate prices for different
contracts, and the award to a single Bidder of multiple contracts, the
methodology to determine the lowest evaluated price of the contract
combinations is that which is most economical to the Employer.
25.1 To assist in the examination, evaluation and comparison of bids, the Employer
may, at his discretion, ask any bidder for clarification of his bid, including
breakdowns of unit rates. The request for clarification and the response shall
be in writing but no change in the price or substance of the bid shall be sought,
offered or permitted except as required to confirm the correction of arithmetic
errors discovered by the Employer in the evaluation of the bids in accordance
with Clause IB.28.
25.2 If a Bidder does not provide clarifications of its Bid by the date and time set in
the Employer’s request for clarification, its bid may be rejected.
26.1 Prior to the detailed evaluation of bids, the Employer will determine whether
each bid is substantially responsive to the requirements of the Bidding
Documents.
26.2 A substantially responsive bid is one which (i) meets the eligibility criteria; (ii)
has been properly signed; (iii) is accompanied by the required Bid Security;
(iv) Includes signed Integrity Pact where required as per clause IB.35 and (v)
conforms to all the terms, conditions and specifications of the Bidding
Documents, without material deviation or reservation. A material deviation or
reservation is one (i) which affect in any substantial way the scope, quality or
performance of the Sanitation Services; (ii) which limits in any substantial
17 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
way, inconsistent with the Bidding Documents, the Employer’s rights or the
bidder’s obligations under the Contract; (iii) adoption/rectification whereof
would affect unfairly the competitive position of other bidders presenting
substantially responsive bids. Only substantially responsive bid shall be
considered for further evaluation.
27.2 The amount stated in the Letter of Price Bid will be adjusted by the Employer
in accordance with the above procedure for the correction of errors and with
the concurrence of the bidder, shall be considered as binding upon the bidder.
If the bidder does not accept the corrected Bid Price, his Bid will be rejected,
and the Bid Security shall be forfeited in accordance with IB.15.6 (b) hereof.
28.1 The Employer will evaluate and compare only the Bids determined to be
substantially responsive in accordance with Clause IB.26.
28.2 In evaluating the Bids, the Employer will determine for each Bid the evaluated
Bid Price by adjusting the Bid Price as follows:
(a) Making any correction for errors pursuant to Clause IB.27;
28.3 The estimated effect of the price adjustment provisions of the Conditions of
Contract, applied over the period of execution of the Contract, shall not be
taken into account in Bid evaluation.
28.4 If the Bid of the successful bidder is seriously unbalanced in relation to the
Employer’s estimate of the cost of Sanitation Services to be performed under
F. AWARD OF CONTRACT
IB.29 Award
29.1 Subject to Clauses IB.30 and IB.34, the Employer will award the Contract to
the bidder whose bid has been determined to be substantially responsive to the
Bidding Documents and who has offered the lowest evaluated Bid Price,
provided that such bidder has been determined to be eligible in accordance
with the provisions of Clause IB.3 and qualify pursuant to IB 29.2.
29.2 The Employer, at any stage of the bid evaluation, having credible reasons for
or prima facie evidence of any defect in bidder’s capacities, may require the
bidders to provide information concerning their professional, technical,
financial, legal or managerial competence whether already pre-qualified or
not:
Provided that such qualification shall only be laid down after recording
reasons in writing. They shall form part of the records of that bid evaluation
report.
IB.30 Employer’s Right to Accept any Bid and to Reject any or all Bids
30.1 Notwithstanding Clause IB.29, the Employer reserves the right to accept or
reject any Bid, and to annul the bidding process and reject all bids, at any
time prior to award of Contract, without thereby incurring any liability to the
affected bidders or any obligation except that the grounds for rejection of all
bids shall upon request be communicated to any bidder who submitted a bid,
without justification of grounds. Rejection of all bids shall be notified to all
bidders promptly.
31.1 Prior to expiration of the period of bid validity prescribed by the Employer,
the Employer will notify the successful bidder in writing (“Letter of
Acceptance”) that his Bid has been accepted. This letter shall name the sum
which the Employer will pay the Contractor in consideration of the execution
and completion of the Sanitation Services by the Contractor as prescribed by
the Contract (hereinafter and in the Conditions of Contract called the
“Contract Price”).
31.2 No Negotiation with the bidder having evaluated as lowest responsive or any
other bidder shall be permitted.
31.3 The notification of award and its acceptance by the bidder will constitute the
formation of the Contract, binding the Employer and the bidder till signing of
the formal Contract Agreement.
32.1 The successful bidder shall furnish to the Employer a Performance Security
in the form and the amount stipulated in the Bidding Data Sheet and the
Conditions of Contract within a period of 28 days after the receipt of Letter of
Acceptance.
32.2 Failure of the successful bidder to comply with the requirements of IB.32.1 or
IB.33 or IB.35 shall constitute sufficient grounds for the annulment of the
award and forfeiture of the Bid Security.
33.2 The formal Agreement between the Employer and the successful bidder shall
be executed within 14 days of the receipt of the Contract Agreement by the
successful bidder from the Employer.
The Bidder shall sign and stamp the Integrity Pact provided at Appendix-L to
Bid in the Bidding Documents for all Federal Government procurement
contracts exceeding Rupees ten million. Failure to provide such Integrity Pact
shall make the bidder non-responsive.
IB.36 Instructions not Part of Contract Bids shall be prepared and submitted in
accordance with are provided to assist bidders in preparing their bids, and the
Bid or the Contract Documents.
The following specific data for the Works to be bided shall complement, amend or
supplement the provisions in the Instructions to Bidders. Wherever there is a conflict,
the provisions herein shall prevail over those in the Instructions to Bidders.
Instructions to Bidders
Clause Reference
The information regarding ICT area, population, quantity and quality of MSW
etc. mentioned in this RFP has been provided on the basis of available sources
and may not be considered as final or conclusive. The Procuring Agency shall
in no way be responsible for any discrepancy.
Period of Contract
Seven (07) Years after issuance of Work Order extendable for further Three
(03)Year based on the performance and mutual consent (written) of the
Contractor and the Client on same terms &conditions of the Contract.
ii. The contractor will be responsible to keep these offices and other
workplaces in a neat, clean &well-maintained condition
throughout the Contract period.
The Employer is funding the project through funds available under non-
development head.
3. Eligible Bidders
This Invitation for Bids is open to all interested bidders who are
eligible under provisions of Pakistan (Public Procurement Rules-
2004) as mentioned below and the criteria given in the Notice
Inviting Tender (NIT)/ Bidding Document.
6. Site Visits
In continuation to IB.6
The Bidding Documents, in addition to invitation for bids, are those stated
below and should be read in conjunction with any Addenda issued in
accordance with Clause IB.9.
1. Instructions to Bidders.
2. Bidding Data Sheet.
24 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
3. Form of Technical Bid
4. Form of Price Bid
5. Appendices to Bid (A, C, D, E …P to Bid).
6. Form of Bid Security.
7. Forms of Performance Security.
8. Form of Contract Agreement, Credit Line Facility, Mobilization
Advance Guarantee.
9. Conditions of Contract.
10. Drawings.
.
11.1
(A) The Bidder shall submit with its Technical Bid (Envelope A)the
following documents, here under as well as elaboratedin11.1 (C):
(f) Certified Audit Reports for the last three (3) years
(g) Joint Venture/ Operation Agreement; (if applicable)
(h) Pending litigation information and No Blacklisting Certificate;
(i) Special Stipulations (as filled by the Employer) (Appendix –A)
(j) Proposed Services Schedule (Appendix–E)
25 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
(k) Method of Performing the Sanitation Services (Appendix–F)
(B) The Bidder shall submit with its Price Bid(Envelop B) the
following documents:
The bidder has to submit last three (3) years Tax return duly
examined / Certified by the Chartered Accountancy firm also
demonstrating financial soundness of the firm to evaluate:
The bidder shall submit all information regarding its pending litigation and
undertaking of not having been blacklisted from any organization (government
/ non-government) in Pakistan. This information and undertaking shall be
submitted on firm’s letterhead (letterhead of joint operation in case of joint
venture).
Bidder shall list down the equipment which must support the schedule
of services to be provided.
The unit rates and prices shall be quoted by the bidder entirely in Pak Rupees
and will be paid in Pak Rupees only.
Bid shall remain valid and open for acceptance for a period of one hundred
and twenty (120) calendar days after the latest dead line for submission of bid.
Bidder/Contractor may be requested to extend the validity in writing, and
consent of the bidder shall be obtained. If applicants do not agree in such
extension bid security of the applicant will be returned.
a. The bidders are required to furnish a bid security along bid i-e., equal
to 1% (One percent) of total bid amount (bid offered) in the currency
in which the bid is priced/quoted for period of one year, which shall
remain valid for a period of 28 (twenty eight) days beyond the validity
period of the bid in the form of Bank-Draft /CDR in favor of MCI.
Each bidder shall prepare by filling out the forms completely and without
alterations one (1) original and one (1) copy of the bid and clearly mark them
“ORIGINAL” and “COPY” as appropriate. In the event of discrepancy
between them, the original shall prevail. The detail of the Envelopes is given
as under:
(B) Which affect in any substantial way the scope, quality or performance of the
works;
Adoption/rectification whereof would affect unfairly the competitive position of
other bidders presenting substantially responsive bids.
23.1 Employees right to accept any bid and to reject any or all bids.
The Procuring Agency shall have the right, at his exclusive discretion, to
increase / decrease scope required without any change in unit prices or other
terms and conditions, accept a Tender, reject any or all tender(s), cancel /
annul the Tendering process at any time prior to award of formal Contract,
without assigning any reason or any obligation to inform the Bidder and
without thereby incurring any liability to the Bidder and the decision of the
33 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
Procuring Agency shall be final.
i. It is substantially non-responsive; or
ii. It is submitted in other than prescribed forms, annexes, schedules,
charts, drawings, documents / by other than specified mode; or
iii. If it is incomplete, un-sealed, un-signed, printed, partial, conditional,
alternative, late;
iv. It is subjected to interlineations / cuttings / corrections / erasures /
overwriting; or
v. The Bidder submits more than one Tenders; or
vi. The Bidder fails to meet the minimum mandatory score of 50%
against each criterion in the Technical Evaluation Criteria (Annexure-
B); or
vii. The Bidder fails to meet the minimum passing score of 70% in the
Technical Evaluation Criteria; or
viii. The Bidder refuses to accept the corrected Total Tender Price; or
ix. The Bidder has conflict of interest with the Procuring Agency; or
x. The Bidder tries to influence the Tender evaluation/Contract award; or
xi. The Bidder engages in corrupt or fraudulent practices in competing for
the Contract award.
xii. There is any discrepancy between bidding documents and bidder’s
proposal i.e. any nonconformity or inconsistency or informality or
irregularity in the submitted bid.
xiii. The Bidder submits any financial conditions as part of its bid which
are not inconformity with tender document.
(i) Delete “28 days” in the third line and replace with “14 days”
(ii) Standard form and amount of Performance Security acceptable to the
Employer.
The purpose of this RFP is to invite all eligible, reputed and experienced
Waste Management Firms or Individuals whether National or International
in accordance with relevant provisions of Pakistan Laws, Rules& Regulations.
The Bidder has to submit their Technical and Financial proposal for “Front
End Collection, Sweeping, Transportation and Disposal of Municipal Solid
Waste of the Metropolitan Area Islamabad” under a Single Stage Two
Envelope procedure, in accordance with the Public Procurement Regulatory
Authority Rules (PPRA-2004).
m. the word “Tender” is synonymous with “Bid” and the word “tender
document” with “bidding document and proposal document”;
1.4. Abbreviations
As per Rule 12, this Tender is being placed online at CDA and PPRA's
websites, as well as being advertised in the print media. The bidding document
carrying all details can be downloaded from CDA and PPRA’s website:
www.ppra.org.pk OR www.cda.gov.pk.
All Sections of RFP and Annexure, Forms are integral part of RFP and
considered as tender / bidding documents.
The MCI is not bound to accept any proposal and reserves the rights to annul
the selection process at any time prior to agreement or award without thereby
incurring any liability to the bidder. The applicant will not be entitled to make
any claim from Procuring Agency due to cancellation of the tender.
Seven (07) Years after issuance of Work Order extendable for further Three
(03)Year based on the performance and mutual consent (written) of the
Contractor and the Client on same terms &conditions of the Contract.
2.3.1 Washing activity includes washing the areas like squares and
walkways within, Main Avenues, Highways, Markets, as and where
required or as per schedule provided by the Authority, with mechanical
vehicles. Water will be provided by the Authority.
2.3.2 Contractor shall realize the washing activity with the machinery
specified as per direction of officer incharge of MCI (Employer).
2.3.3 Contractor shall realize the washing activity during night once in a
week for each square in accordance with the program to be provided
by the Employer.
2.3.4 Contractor may revise the washing program with the consent of the
Employer depending upon the experience gathered.
2.3.5 Contractor shall provide necessary and enough warning signs in order
to prevent any accidents and injuries like slipping and falling during
the washing process of the walkways. Besides, the Contractor is also
responsible to place these warning signs in appropriate places in order
to prevent any incidents.
2.3.6 Employer may instruct the Contractor to add disinfecting agents to the
washing water. Without getting the written approval of the Employer
the Contractor shall not add any chemicals to the washing water.
Disinfecting agent to be used by the Contractor as a result of the
instruction of the Employer shall be included to the progress billing at
the end of the period.
As shown in the above Figure it’s Commercial Centre is known as the ‘Blue
Area’, named as such from it being annotated ‘blue’ on the city’s original
master plan. This area is considered to be the city’s central business district
(CBD). Comprising a 5-km long, east-west trending precinct along Jinnah
Avenue, it contains many of Islamabad’s corporate offices, banks,
Government buildings and retail areas. Overall, the city’s structure is well
defined, comprising essentially a uniform land use within square shaped
sectors. Each sector contains a Markaz, which is a local commercial precinct
and shopping area that serves surrounding residential areas.
Islamabad was built during the 1960s to replace Karachi as Pakistan's capital.
The city's master-plan divides the city into eight zones, including
administrative, diplomatic enclave, residential areas, educational sectors,
industrial sectors, commercial areas, and rural and green areas. The city is
known for the presence of several parks and forests, including the Margalla
Hills National Park and Shakarparian Park.The city is home several
landmarks, including the Faisal Mosque, the largest mosque in South Asia and
the fourth largest in the world. Other landmarks include the Pakistan's
National Monument and Democracy Square.
Zones in Islamabad
Area
Zone
Acres km2
I 54,958.25 222.4081
II 9,804.92 39.6791
III 50,393.01 203.9333
IV 69,814.35 282.5287
V 39,029.45 157.9466
Series A, B, and C are still underdeveloped. The D series has seven sectors
(D-11 to D-17), of which only sector D-12 is completely developed. This
series is located at the foot of Margalla Hills. In the revised Master Plan of the
city, CDA has decided to develop a park on the pattern of Fatima Jinnah
Park in sector E-14. Sectors E-8 and E-9 contain the campuses of Bahria
University, Air University, and the National Defence University. The F and G
series contains the most developed sectors. F series contains sectors F-5 to F-
44 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
17; some sectors are still under-developed. F-5 is an important sector for the
software industry in Islamabad, as the two software technology parks are
located here. The entire F-9 sector is covered with Fatima Jinnah Park.
The Centaurus complex is a major landmark of the F-8 sector. G sectors are
numbered G-5 through G-17. Some important places include the Jinnah
Convention Centre and Serena Hotel in G-5, the Red Mosque in G-6, and the
Pakistan Institute of Medical Sciences, the largest medical complex in the
capital, located in G-8.The H sectors are numbered H-8 through H-17. The H
sectors are mostly dedicated to educational and health institutions. National
University of Sciences and Technology covers a major portion of sector H-
12. The I sectors are numbered from I-8 to I-18. With the exception of I-8,
which is a well-developed residential area, these sectors are primarily part of
the industrial zone. Currently two sub-sectors of I-9 and one sub-sector of I-
10 are used as industrial areas. CDA is planning to set up Islamabad Railway
Station in Sector I-18 and Industrial City in sector I-17. Zone III consists
primarily of the Margalla Hills and Margalla Hills National Park. Rawal
Lake is in this zone. Zone IV and V consist of Islamabad Park, and rural areas
of the city. The Soan River flows into the city through Zone V.
UC
Chief Town Villages within Jurisdiction
No.
01 Said Pur Said Pur, Gokina, Talhar
02 NoorpurShahan NoorpurShahan, RattaHutar
Mal Pur, Romali, Nariyas, Phadu, ShahdrahKhurd,
03 Mal Pur ShahdrahKalan, Mandala, Jang Begial, SubbanSyedan,
Mangial, Quaid-e-AzamUniversity
04 KotHathial (North) KotHathial
05 KotHathial (South) KotHathial
Phulgran, Shah Pur, Sikrila, DohalaSyedan,
06 Phulgran BobriPetha, Chattar, Karlot, Hotran (Be-Charagh),
Kathar, Chunari
PindBegwal, Athal, MairaBegwal, Mangal, RakhMaira
07 PindBegwal
A, RakhMaira B, Siali, Jandala, Jand Gran, Granthian
Tumair, Kijnah, Simbli, Dakhain, RakhTumair A,
08 Tumair
RakhTumair B, RakhTumair C, RakhTumair D
09 Charah Charah, HernoThandaPani
10 Kipa Kirpa, Dhaliala, Peja, Darwala, Khatril
Mughal, ChakKamdar, Nara Syeddan, JabbiGakhran,
11 Mughal SanduSyeddan, KangotaGujran, Hon Dhamial,
Chukaal, Har-Do-Gahr, Chitroh
Rawat, BhangreelKalan, BhangreelKhurd, Kortara,
12 Rawat TakhtPari, ShadiDhamial, Mohra Amir, SoodGangal,
MuriKhumbal, Sheikhpur
Humak, DHA-PH-2, GhoraSyeddan, Rajwal-
Humak (Swan
13 GhoraSyeddan, Rajwal, DhokeAwan-Fatima Town,
Camp)
DhokeMithoo, KothaKalan, KothaKalan
45 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE
AND ITS TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
Union Councils of Islamabad Capital Territory
UC
Chief Town Villages within Jurisdiction
No.
(MohraNigial), BamlaKanyat
14 Sihala Sihala, Gagri, Kangota, AariSyedan, Jandala
LoiBheri, Pakistan Town/Korng Town, Police
Foundation, PWD-A/Block, PWD-B/Block, PWD-
15 LoiBheri
C/Block, PWD-D/Block, CBR Housing Society, Swan
Garden, Jinnah Garden, Naval Anchorage
PahgPanwal, Choocha, Pahg, Panwal, Boora Bangial,
16 PahgPanwa
Bhookar, SherDhamial, PindDaia
Koral, Gangal, Ghora Sardar, Suhdar, TarlaiKhurd,
17 Koral Khadrapur, KartalBhakral, Grandian,Ghouri town all
phases
18 KhanaDak KhanaDak
19 TarlaiKalan TarlaiKalan, Chhappar Mir Khanal
20 Ali Pur Ali Pur, Farash, Punjgran, Tamma, Taramri
21 Sohan Dehati Sohan Dehati, KhanaKak, Shakrial, Shakrial (Sharki)
ChakShahzad, ChakBihraShigh, JabaTeli, Sohana,
22 ChakShahzad Pandori, ChhattaBakhtawar, Bohan, DhokeSharaf,
Mujuhan
23 Kuri Kuri, Malot, RakhBani Gala, Rihara, MohraJujan
24 Rawal Town
25 SectorF-6
26 G-6/1
27 G-6/2, 3 & 4
F-7, 8, 9 & Jinnah
28
Park
29 F-10-& F- 11
30 G-7/3 & G-7/4
31 G-7/1 & 2
32 G-8/3 & 4
33 G-8/1 & 2
34 G-9/1, 3 & 4
35 G-9/2
36 G-10/3 & 4
37 G-10/1 & 2
38 G-11/1, 2, 3 & 4
39 MairaSumbalJaffar
40 I-8
41 I-9
UC
Chief Town Villages within Jurisdiction
No.
42 I-10/1 & I-10/ 4
I- 10/2, 3 I-10/4-&
43
H-10
44 Bokra
45 JhangiSaydan
46 BadhanaKalan
47 Tarnol
48 SaraiKharbooza
49 Shah Allah Ditta
50 Golra Sharif
ii. Sweeping & Removal of Rubbish from all Streets, Footpaths / Walk
Ways, Pavements, Roads, Highways, Avenues, Medians, Commercial /
Market / Public Places / parks / play grounds and other open spaces etc
located within the premises of contractual limits, both manual &
mechanical means.
iv. Washing of Roads activity includes washing the areas like squares
and walkways within, Main Avenues, Highways, Markets, as per
schedule provided by the Authority, with mechanical vehicles.
3.2.1 The contractor shall render the following services within the scope of city
cleaning:
i. Removal of all type of Rubbish from all Streets, Footpaths / Walk
Ways, Pavements, Roads, Highways, Avenues, Medians, Commercial /
Market / Public Places / parks / play grounds and other open spaces
Undergrounds, tunnels, underpasses, overhead bridges, pedestrian
bridges, underground walkways etc located within the premises of
contractual limits.
ii. A squad consisting of at least twenty (20) workers with an Incharge,
vehicle & equipment will be standby at the disposal of Complaint
Management System to attend any emergency / urgent complaint /
requirement by the client after duty hours.,
iii. Waste / Rubbish to be collected from the dustbins installed within the
contracted area and disposal of same at designated waste disposal site,
as well as cleaning and maintenance of these dustbins in presentable
hygienic condition. Trash cans,
iv. Sweeping / Cleaning of all Streets, Footpaths / Walk Ways,
Pavements, Roads, Highways, Avenues, Medians, Commercial /
Market / Public Places / parks / play grounds and other open spaces,
Undergrounds, tunnels, underpasses, overhead bridges, pedestrian
bridges, underground walkways etc located within the premises / area
mentioned in the contract scope of work, both manually &
mechanically, using appropriate equipment
v. Cleaning of the Greenbelts and collection of leaves etc.
vi. Cleaning & Removal of all kind of Rubbish including leaves / green
waste / garbage etc from Green Belts / Open areas / nullahsetc located
within the area mentioned in the contract scope of work.
vii. Deployment of appropriate number of staff on Sundays / Holidays for
prompt cleaning & removal of rubbish from major roads, highways,
avenues, markets / commercial areas including weekly bazaars located
within the area mentioned in the contract scope of work
viii. Deployment of entire staff & machinery (additional, as per
requirement) as per normal routine on the days of National / Religious
importance i.e. Eids, Independence Day etc or as directed / notified by
the MCI.
a. Primary Roads/Avenues.
These are the main roads connecting two or more sectors of
Islamabad (usually dual carriageway), planned and
constructed on established Engineering practices with proper
road geometry of 3 or more lane carriageways.
c. Streets.
These are internal roads, connecting various residential
blocks, mostly 2 lane carriageways type with or without
sidewalks.
a. Scope of work
c. Tasks to be performed.
Door to door collection of garbage on daily basis (or as agreed
between Procuring Agency and Successful bidder depending on
ground situation).
g. Responsibilities of contractor
1. The contractor will perform the work and services under this
contract in respectful, honorable manner with desire to serve
people of the area.
G. Manual sweeping
Manual sweeping of roads shall be done by man/woman
sweepers using broom/brushes and sweeping waste is collected
through wheelbarrows and sweeping waste disposed of at
nearby container or bucket or compactor vehicles standing
nearby in the locality.
4.6 Uniform
All field sanitation staff of the contractor shall wear a proper uniform as
approved by the client. A logo of MCI shall be placed on the front pocket and
on the back of the uniform. The Supervisory staff shall also wear an approved
uniform bearing logo of MCI. The cost of uniform shall be included in the unit
price of work items mentioned in the price list.
A. The contractor shall submit the bill / invoice for the work and service
performed by 7th day of every month. Monthly bill shall be supported
by sector / area wise MSW weight slips along with detail of lifting of
MSW along with date, time and location. An inventory of roads on
which sweeping work is done with length and reference date, time and
location shall be provided by the contractor in support of their bill. In
addition details of Bio-Metric attendance of staff shall also be
provided. Contractor may use GIS System and other latest technology
to provide information in support of his monthly bill submission. In the
event of the failure of the Employer / Client to make payment within
sixty (60) days, the Employer shall pay to the Contractor compensation
at the one (01) month rate of KIBOR (Bid Side) + two (02) % per
annum upon all sums unpaid from the date by which the same should
have been paid.
The contractor will however be allowed to charge fee from the public
requesting for lifting / removal of such dismantled material and debris. The fee
/ charges for this service shall be fixed at the rates approved by the MCI.
The contractor is allowed to sell out dismantled construction / building
material dumped at the yard / designated site.
The contractor is hereby warned that:
Dumping of demolition, construction/building material in the community
dustbins, on roads, streets, lanes, footpaths, central medians, roundabouts &
open places is strictly prohibited. Any violation in this regard will be dealt
strictly and penalized as per Law.
The Contractor shall have to setup his own Command and Control Centre
along with Control Room for effective monitoring and execution of the
scheme. Facility to be developed by the Contractor at any designated
space/facility provided and approved by the Client
The contractor shall be bound under this contract to comply with all
substantive and procedure laws of Islamic Republic of Pakistan which may
include but are not limited to the followings:
i) Labour Laws
Inability of successful bidder to comply with all laws, rules, regulation and
procedures will result in penalization, as per penalty clauses provided in this
contract.
INSTRUCTIONS TO BIDDERS
BIDDING DATA
FORM OF BID
Letter of Technical Bid
Letter of Price Bid
Appendix-A to Bid : Special Stipulations
Appendix-B to Bid : Foreign Currency Requirements
Appendix-C to Bid : Price Adjustment
Appendix-D to Bid : Bill of Quantities
Appendix-E to Bid : Proposed Schedule
Appendix-F to Bid : Method of Performing the
Services
FORMS
BID SECURITY
PERFORMANCE SECURITY
CONTRACT AGREEMENT
CREDIT LINE FACILITY
MOBILIZATION ADVANCE GUARANTEE/BOND
All Sections noted above and the clauses contain therein are part and parcel of
RFP Document and are integral part of the agreement and shall be binding
upon the client and contractor.
(b) The Mobilization Advance will be deducted from the monthly bill /
invoice in Nine (09) equal installments, commencing from the
3rd Month of Commencement of Services.
5.8 Payment of Bid Security
“It would be released after expiry of contracts periods, finalization of account
and subject to the condition that there is no audit observation, audit Para, draft
Para, and advance Para, litigation and etc. involving recovery from the
Contractor is outstanding against this Services after closing and contract
defective liability period”
5.9 Increase or Decrease of Cost
The amounts payable to the Contractor, pursuant to Appendix-C, shall be
adjusted in respect of the rise or fall in the cost of POL & Labour (Unskilled)
against inputs to the services, as highlighted in Appendix-C by applying to
such amount the formula prescribed for bill amount of Part – I of BOQ only,
as under:
5.10 Basis of current date prices& Adjustment
Ln Mn En
Pn= A + b ------ + C--------- + d ------- + -------------------
Lo Mo Eo
Where:
Ln, Mn En, etc., are the current cost indices or reference prices of the cost
elements for month “n” determined pursuant to Sub-Clause 70.1(d).
Calculations.
A) Applicability as mentioned above.
c. Procedure.
The monthly bill statement (monthly running bill) as submitted by the
contractor, will be
ii. Considering the base date price and current date price, the price
adjustment in the billed amount (BOQ Part – I only shall be considered
in accordance with procedure of PEC.
Ln Mn En
Pn= A + b ------ + C--------- + d ------- + -------------------
Lo Mo Eo
Where:
Ln, Mn En, etc., are the current cost indices or reference prices of the
cost elements for month “n” determined pursuant to Sub-Clause
70.1(d).
The contractor shall provide rate analysis for each item of BOQ
mentioned in the price sheet. The rate analysis should indicate breakup
of Unit Cost by activities involved in an item. The consumption of fuel
at current rates, factored cost of machines, cost of litterbins, buckets,
containers, tools, labour cost, managing and monitoring and other cost
breakup while evaluating unit price for the items of works and services
and shall also provide breakup of cost of other items that are inbuilt in
items of works, and the way of evaluation the unit prices. The details
are required to assist the reasonability of rates quoted by the contractor.
5.12 Approval of Sub-Contractors List
Where a list of sub-contractors is provided by the Contractor under Appendix
to Tender, the sub-contractors in that list shall be subject to the prior approval
of the Employer and acceptance of bid does not imply approval of sub-
contractors list. The extent and nature of the works to be sub-contracted shall
5.15 Correspondences-Communications-Notices
All correspondence, communication and notices required or permitted under
this contract shall be in writing and in English language and shall be given (to
and from contractors & client) at official address provided in this contract
document. Change of address shall be duly notified by the relevant parties.
The Contractor shall exercise care to protect the natural landscape and shall
conduct his operations so as to prevent any unnecessary destruction, scarring
or defacing of the natural surroundings in the vicinity of the Sanitation
Services, except where clearing is required for permanent works, approved ,
temporary works and for excavation operations. All trees and native
vegetation shall be preserved and shall be protected from the damage which
may be caused by the Contractor’s operations and equipment. On completion
of the Sanitation Services, all work areas shall be levelled and graded in a
manner to confirm the natural appearance of the landscape. Where
unnecessary destruction, scarring damage or defacing may occur as a result of
the Contractor’s operations, it shall be repaired, replanted or otherwise
corrected as directed by the Employer at Contractor’s expense.
During the performance of the Sanitation services required under the Contract,
the Contractor shall carryout proper and efficient measures often a necessary
to reduce the dust/noise nuisance and to prevent dust originating from his
operations.
5.18 Engagement of Staff and Labour
The Contractor shall, make his own arrangements for the engagement of all
The source of water will be indicated by the Authority from water mains
passing along areas where the Sanitation Services is required to be carried out
and the contractor shall pay the cost of water to the authority at 0.5% of the
total cost of work/ Sanitation Services. The contractor will bear all charges for
laying his water line from the mains to the site of his underground tanks which
may require and construct for storage purposes at his own cost.
The contractor shall submit running bill within the first week / seventh (07th)
day of every month for the work and services performed by him. The monthly
performance shall be checked and determined by the client subject to
verification through client representatives and on the basis of such verified
determinations {4.13 (a)} by the client payment shall be made within sixty
(60) days after submission of monthly performance bill / running bill by the
contractor.
The contractor shall be responsible for safeguarding of work and work places
the contractor shall take all insurances required by pertinent legislations and
submit the policies thereof to the client. The contractor shall be responsible for
any damages caused by him or his Subcontractor’s personals in respect of
work performed under this contract.
Contractor shall indemnify, defend and hold harmless the client (MCI), its
members, officers, directors, employee and representatives from and against
any and all claims arising out of or in any way connected with gross
negligence, fraud, or willful misconduct of the contractor or any one acting
on contractor’s behalf or under his instructions in connection with this
contract and contractor’s obligations there under. Any cost or expenses
incurred by the contractor pursuant to its indemnity obligation under this
clause shall be the sole responsibility of the contractor.
AND
The contractor / bidder shall indemnify the MCI, its employees against all
losses and claims in respect of:
The contractor shall be directly responsible for the choice or use of defective
or noncompliant tools or machineries deficiencies of performance in works
and services, mistakes in sufficient supervision or any failure to fulfill his
obligation in accordance with the provisions of this contract and specification
and any other losses and damages that my occur due to similar reasons. The
contractor shall indemnify such losses and damages in accordance with
pertinent legislation.
f. Failure to operate machinery and manpower and vehicles Rs.250,000/- Per Day
during emergency conditions
g. Improper collection of Solid Waste from dustbins and Rs.1000/- Per Day Per
collection point including roadside collection. collection point
h. If debris are found mixed with MSW while taking weights Rs.5000 Per
of MSW at designated weighbridge. Trip
i. Number of Garbage Containers, litterbins, tipper bins are Rs.50000/- Per Day
found less than the requirement as proposed by bidder in
their proposal.
j. Failure to clean public areas and removal of waste there Rs.10000/- Per Day
from.
k. Sweepers personals not wearing uniform (Identifiable to Rs.500/- Per
procuring agency) Person Per
Day
l. Failure to collect domestic waste on road sides, footpath Rs.1000/- Per Day
and streets in 24hours.
m. If garbage containers are not cleared properly and timely Rs.5000/- Per Day
as required under the contract
n. Repeat violation of cleaning and street sweeping services Rs.20000/- Per Day
The contractor shall act objectively and trust worthy in accordance with rules
of business ethic. It should avoid making public announcement regarding the
works and services without prior permission and authorization of the
procuring agency.
The contractor and its staff shall not act in inconsistent way towards his
obligation against the procuring agency and they shall not accept any type of
the contributions that may effect their decisions at execution, performance,
reporting at the works and services.
The contractor shall not be liable for any failure or delay in performance of
his obligation under the contract, which is caused by circumstances beyond
his control under force majeure.
Time extension shall be granted to the contractor in case where the procuring
agency fails to fulfill its obligation regarding performance of the contract due
to any reason not related with the contractor.
ii) Procuring agency may terminate the contract immediately upon the
bankruptcy of the contractor or in other conditions as specified in the
various clauses of the contract.
Date:
Bid Reference No:
(Name of Contract/Works)
To:............................................................................................................................
(c) Our Bid consisting of the Technical Bid and the Price Bid shall be valid
for a period of ……… days from the date fixed for the bid submission
deadline in accordance with the Bidding Documents, and it shall remain
binding upon us and may be accepted at any time before the expiration of
that period;
(d) As security for due performance of the under takings and obligations of
our bid, we submit here with a Bid security, in the amount specified in
Bidding Data Sheet, which is valid (at least) 28 days beyond validity of
Bid itself.
Name .......................................................................................................................
In the capacity of .....................................................................................................
Signed .....................................................................................................................
.................................................................................................................................
Duly authorized to sign the Bid for and on behalf of ................................................
Date .........................................................................................................................
Address……………………………………………………………………………
…………..
Date:
Bid Reference No:
(Name of Contract/Works)
To:............................................................................................................................
(b) The total price of our Bid, excluding any discounts offered in item (c)
below is:___________
(c) The discounts offered and the methodology for their application
are:____________________
(d) Our Bid shall be valid for a period of 120 days from the date fixed for the
bid submission deadline in accordance with the Bidding Documents, and
it shall remain binding upon us and may be accepted at any time before
the expiration of that period;
(f) We understand that this bid, together with your written acceptance
thereof included in your notification of award, shall constitute a binding
contract between us, until a formal contract is prepared and executed and
we do hereby declare that the Bid is made without any collusion,
comparison of figures or arrangement with any other bidder for the
Works.
(g) We understand that you are not bound to accept the lowest evaluated bid
or any other bid that you may receive.
(i) If awarded the contract, the person named below shall act as Contractor’s
Representative.
Name .......................................................................................................................
In the capacity of .....................................................................................................
Signed .....................................................................................................................
Duly authorized to sign the Bid for and on behalf of ................................................
Date .........................................................................................................................
Address……………………………………………………………………………
……..
SPECIAL STIPULATIONS
Clause Conditions of Contract
Registration with SECP is mandatory in case of local or JV firms / Companies
Appendix-B to Bid
Rate would be quoted in pak rupees and payment would also be made in Pak. Rupees.
The source of indices and the weightages or coefficient for use in the price adjustment
formula under Clause 4.5 shall be as follows:
Cost
Description Weight ages Applicable index
Element
1 2 3 4
Non Adjustable Portion
Official price from public sector
organization or statistical bulletin
published by Federal Bureau of
(i) Fixed Portion 0.50 Statistic (FBS), Statistical Division
Govt. of Pakistan Statutory
Notification.
Adjustable portion
PSO consumer Price
(i) POL (HSD) 0.20
Notes:
1. The rates (28 days prior to bidding for base rate and 28 days prior to date
of measurement for current rate) would be considered for any price
adjustment.
2. Any fluctuation in the indices or prices of materials other than those given
above shall not be subject to adjustment of the Contract Price.
3. Adjustment of increase / decrease shall only be admissible as listed above.
4. All amount in Pak Rupees only.
5. The basic prices of materials are inclusive of all kind of taxes and duties
that can levied at source.
Current Date
Srl No. Description Source
Price
1 2 3 4
As given under Clause
(i) POL (HSD)
No.4.5-i
As given under Clause
(ii) Labour (unskilled)
No.4.5-ii
Item
Description of Item Qty Rate Unit Amount
No
1 Manufacturing / Supplying Large Garbage Containers
(Skips) as per approved sample attached and drawing /
design and specifications as under:-
Height of Skip: 72 inches
Width of Skip: 66 inches
Length of Skip.
i) Base: 90 inches
ii) Top: 138 inches
iii) Middle: 162 inches
The Skip will be made up using 7mm thick MS Sheet
for base & 5mm thick MS Sheet for all 4 sides.
Channels 2”x2” at top & 3”x2” on sides will be welded
using 3mm thick MS Sheet. Angle 4”x2’ at bottom of
long sides will be welded using 3mm thick MS Sheet.
MS Channels 3”x1 ½” x ¼” shall be provided under the
base / floor of Skip with cross channels of same size 4
lifting hooks, as per drawing will be fixed with 2” Ǿ
MS Rod reduced to 1 ½” Ǿ at half length by lathe
machine and shall be welded with the side by making
2” Ǿ bore in the channel. 2 Jack Grips will be provided
as per drawing using MS Sheet 7mm thick and 1 ½”
MS Rod i/c making 1 ½” bores in the side supports. 2
supports on near side made with 5mm thick MS plate
shall be made as per approved design. MS hooks shall
be provided using 3/8” MS base as shown on the 380 Ton
drawing MS sheets & sections etc shall be welded both
sides continuously throughout the length. 3mm MS
sheets shall be moulded to required sections / shapes
with press machine etc i/c cutting complete with and i/c
the cost of 2 coats of synthetic enamel paint of
approved make and shade over a coat of red oxide paint
to all internal and external surfaces of the skip, carriage
of material, loading and unloading at approved sites.
All to be done as per approved sample, drawing /
design and instructions of Sanitation-in-charge (total
weight of skip not less than 1264 kg x 300= 379200kg=
380Ton).
The skip will be delivered at premises / sites as
indicated by Director Sanitation, anywhere in
Islamabad, as and when required basis.
(In Word)___________________________________________________________
_____________________________________________________________________
__________________________________________________________
Note:
a) Minimum 700 Tons / day of MSW have been guaranteed.
b) 20 % rebate shall be applied on item # 5 & 6 (Secondary Collection
Items), Part-I of BOQ, on quantity exceeding 700 Tons / day.
Address: _________________________________________________
Fax #: ____________________________________________
No. Description of the Activities Unit Unit Quantity Cost in Pak Cost in
in the Item Cost Rupees US$
1
2
3
4
5
The Bidder shall provide as Appendix-E to Bid, the Services Schedule in the bar
chart (CPM, PERT or any other to be specified herein) showing the sequence of work
items and the period of time during which he proposes to complete each sanitation
service item in such a manner that his proposed programme of sanitation services of
the whole of the Works and parts of the Works may meet Employer's satisfactory
completion targets in daily times.
The Bidder is required to submit a narrative outlining the method of performing the
Work. The narrative should indicate in detail and include but not be limited to:
1. Organization Chart indicating head office and field office personnel involved
in management and supervision, engineering, equipment maintenance and
purchasing.
[The Bidder will provide on sheet 2 of this Appendix a list of all major equipment and
related items, under separate heading for items owned, to be purchased or to be
arranged on lease by him to carry out the Sanitation Services. The information shall
include make, type, capacity, and anticipated period of utilization for all equipment
which shall be in sufficient detail to demonstrate fully that the equipment will meet all
requirements of the Specifications].
Note:
All the vehicles / machinery & equipment required for the project shall be in good /
operational condition. (Not more than three (03) years old ).
The Contractor shall be responsible for pumps, electrical power, water and electrical
distribution systems and sewerage system including all fittings, pipes and other items
necessary for servicing the Contractor’s camp.
The Bidder shall list or explain his plan for providing these facilities for the services
of the Contractor as follows:
1. Site preparation (cleaning, land preparation, etc.
2. Provision of services.
a) Power (expected power load etc.)
b) Water (required amount and system proposed).
c) Sanitation (sewage disposal system etc.)
3. of Facilities on temporary basis.
a) Contractor’s Office, Workshop and Work Areas (areas required
and proposed layout, purely temporary type of of site offices.)
LIST OF SUBCONTRACTORS
Bidder’s estimate of the value of work which would be executed by him during each
of the periods stated below, based on his Programme of the Works and the Rates in
the Bill of Quantities, expressed in thousands of Pakistani Rupees:
Amounts
Period in Months
(Rs.)
1 2
st
1 Month
2ndMonth
3rdMonth
4th Month
5th Month
6th Month
7th Month
8th Month
9th Month
10th
Month
11th
Month
12th
Month
Bid Price
ORGANIZATION CHART
FOR THE
SUPERVISORY STAFF AND LABOUR
Without limiting the generality of the foregoing (Name of Bidder) represents and
warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not
given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either
directly or indirectly through any natural or juridical person. Including its affiliate, agent, associate,
broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification,
bribe, finder’s fee or kickback, whether described as consultant fee or otherwise, with the object of
obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit
in whatsoever form from GoP except that which has been expressly declared pursuant hereto.
(Name of Bidder) certifies that it has made and will make full disclosure of all
agreements and arrangements with all persons in respect of or related to the transaction with GoP and has
not been taken any action or will not take any action to circumvent the above declaration, representation
or warranty.
(Name of Bidder) accepts full responsibility and strict liability for making any
false declaration not making full disclosure, misrepresenting facts or taking any action likely to defeat the
purpose of this declaration, representation and warranty. It agrees that any contract, right, interest,
privilege or other obligation or benefit obtained or procured as aforesaid shall without prejudice to any
other right and remedies available to GoP under any law contract or other instrument be voidable at the
option of GoP.
The financial position of the bidder shall be checked as per following details:
“The Bidder must demonstrate access to, or availability of, financial resources such as
liquid assets, unencumbered real assets, lines of credits, and other financial means, other
than any contractual advance payments, to meet the financial requirements of the contract
in the amount of his bid. As a minimum the Bidder must show that his resources, in term
of at least his latest year’s working capital and line of credits, will be adequate to cover
an amount equivalent to his bid price and current work commitments i.e.
*Any line of credit indicated for this (tendered) project needs to have been certified by
the Bank and the said certificate(s) be enclosed with this Appendix.
Note: The firms/contractor shall provide bank statement along with Income Tax Statement and
audited financial statement for the last 03 years for evaluation of their average annual turn over.
97 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
Appendix-N to Bid
1) General Experience
Important Notes:
1) The similar experience of bidder(s) in the role of sub-contractor shall not be
considered for eligibilty criterion against the requirement of Contract of Similar
Size and Nature.
98 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
Appendix-O to Bid
Evaluation Criteria:
Criteria, sub-criteria and point system for evaluation of technical proposal are as under:
(Annexure – A)
Note:- i. 50% passing marks are mediatory to obtain for each component of criteria.
99 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
Appendix-P to Bid
Total Value of
Sr. Name of Date of Date of Average
Client Work
No. Project Start Completion monthly invoice
(Rs in Millions)
100 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
BS-1
BID SECURITY
101 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
PS-1
Guarantee No.____________________
Executed on _____________________
Expiry date _____________________
[Letter by the Guarantor to the Employer]
NOW THEREFORE, if the Principal (Contractor) shall well and truly perform and fulfill all the
undertakings, covenants, terms and conditions of the said Documents during the original terms of
the said Documents and any extensions thereof that may be granted by the Employer, with or
without notice to the Guarantor, which notice is, hereby, waived and shall also well and truly
perform and fulfill all the undertakings, covenants terms and conditions of the Contract and of
any and all modifications of said Documents that may hereafter be made, notice of which
modifications to the Guarantor being hereby waived, then, this obligation to be void; otherwise
to remain in full force and virtue till successful completion of assigned services and Condition of
Contract are fulfilled.
Our total liability under this Guarantee is limited to the sum stated above and it is a condition of
any liability attaching to us under this Guarantee that the claim for payment in writing
102 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
PS-2
shall be received by us within the validity period of this Guarantee, failing which we shall be
discharged of our liability, if any, under this Guarantee.
_______________
Guarantor (Bank)
Witness:
1. _______________________ Signature _______________
2. _______________________
_______________________ _______________________
Name, Title & Address Corporate Guarantor (Seal)
103 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
CA-1
FORM OF CONTRACT AGREEMENT
WHEREAS the Employer is desirous that certain Works, viz _______________ should be
executed by the Contractor and has accepted a Bid by the Contractor for the execution and
completion of such Works and the remedying of any defects therein.
1. In this Agreement words and expressions shall have the same meanings as are
respectively assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents after incorporating addenda, if any, except those parts relating
to Instructions to Bidders shall be deemed to form and be read and construed as part of
this Agreement, viz:
4. The Employer hereby covenants to pay the Contractor, in consideration of the execution
and completion of the Works as per provisions of the Contract, the Contract Price or such
other sum as may become payable under the provisions of the Contract at the times and in
the manner prescribed by the Contract.
104 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
CA-2
IN WITNESS WHEREOF the parties hereto have caused this Agreement to be executed on the
day, month and year first before written in accordance with their respective laws.
Witness: Witness:
________________________ ______________________________
105 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
CL-1
CREDIT LINE FACILITY
To,
ISLAMABAD
This is to certify that M/s ________________ (Name & address of the client) is maintaining
their Account No. ____________________________ from ____________________.
We also certify that our bank (Bank name & address) has committed a credit line facility upto
Rs. _____________ to M/s (Name of the bidder) for the project (Project Name) from
_____________ to _________ on this basis of their financial strength, market reputation and
securities with us.
Note: Contractor has to submit original letter of bank against the services offered. Else marks
will not be awarded.
106 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
MG-1
MOBILIZATION ADVANCE GUARANTEE
WHEREAS ______________(hereinafter called the 'Employer') has entered into a Contract for
___________________________________________________________
(Particulars of Contract)
with _________________ (hereinafter called the "Contractor').
AND WHEREAS, the Employer has agreed to advance to the Contractor, at the Contractor's
request, an amount of Rupees _________________________ (Rs _________ ) which amount
shall be advanced to the Contractor as per provisions of the Contract.
AND WHEREAS, the Employer has asked the Contractor to furnish Guarantee to secure the
mobilization advance for the performance of his obligations under the said Contract.
NOW, THEREFORE, the Guarantor hereby guarantees that the Contractor shall use the advance
for the purpose of above mentioned Contract and if he fails and commits default in fulfilment of
any of his obligations for which the advance payment is made, the Guarantor shall be liable to
the Employer for payment not exceeding the aforementioned amount.
Notice in writing of any default, of which the Employer shall be the sole and final judge, on the
part of the Contractor, shall be given by the Employer to the Guarantor, and on such first written
demand, payment shall be made by the Guarantor of all sums then due under this Guarantee
without any reference to the Contractor and without any objection.
This Guarantee shall remain in force until the advance is fully adjusted against payments from
the Interim Payment Certificates of the Contractor or until
_______________________________________whichever is earlier.
(Date)
The Guarantor's liability under this Guarantee shall not in any case exceed the sum of Rupees
_______________________________________(Rs _______________________).
This Guarantee shall remain valid up to the aforesaid date and shall be null and void after the
aforesaid date or earlier if the advance made to the Contractor is fully adjusted against payments
from Interim Payment Certificates of the Contractor provided that the Guarantor agrees that the
aforesaid period of validity shall be deemed to be extended if on the above mentioned date the
advance payment is not fully adjusted.
107 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
MG-2
GUARANTOR
1. Signature _________________
2. Name _________________
3. Title _________________
WITNESS
1. ______________________
______________________
Corporate Secretary (Seal)
2. _______________________ __________________________
(Name Title & Address) Corporate Guarantor (Seal)
108 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
Metropolitan Corporation Islamabad
(Directorate of Sanitation)
***********
FOR
a. The proposal / bid will be received till 11.00 am (PST) on September 28th, 2017
and Technical bids will be opened at 12:00 NON (PST) on same day in the
presence of bidder’s authorized representatives who choose to attend by the
Tender Opening / Evaluation Committee in the office of The Director General
(Civic Management), Directorate of Sanitation, MCI, Street No. 49, Sector G-6/1-
4, Islamabad.
b. The Interested firms / Companies can obtain Request for Proposal (RFP) from the
office of the Deputy Director Sanitation, MCI, Street No. 49, Sector G-6/1-4,
Islamabad on any working day during office hours up to 22 September, 2017,
upon payment of document fee through Pay Order or Bank Draft of PKR.2,000/-
(non-refundable) in favour Metropolitan Corporation Islamabad (MCI).
c. Further clarification, if required, can be obtained from the Director Sanitation
(Phone No. +92-051-9211555) and Deputy Director Sanitation (Phone No.+92-
051-9206102) or visit Directorate of Sanitation, MCI, Street No. 49, Sector G-
6/1-4, Islamabad on any working day during office hours or email:
sanitation@mci.gov.pk
2) The bid shall comprise a single Stage two envelopes (containing two separate envelopes.)
Each envelope shall contain separately the financial proposal and the technical proposal;
the envelopes shall be marked as “TECHINICAL PROPOSAL” and “FINANCIAL
PROPOSAL” in bold and legible letters to avoid confusion [PPRA- Rule 36(b)]; Initially,
only the envelope marked “FINICAL PROPOSAL” shall be opened; the envelope
marked as “TECHNICAL PROPOSAL” shall be retained in the custody of the procuring
agency without being opened. Second envelope containing Financial Bids will be opened
later, the date of which will be communicated to the successor bidder of technical bids
and financial bid of non prequalified will be return unopened after evaluation of the
Technical Bids.
109 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
a. Pre-Bid meeting will be conducted amongst the bid participated firms on dated
12 September 2017 at 1500 hours in office of
3) All interested firms are advised in their own interest to carry out a comprehensive on-
ground survey of project / work and accordingly, submit Technical Proposal with
practical strategy in order to minimize the complication during implementation /
execution stage.
4) Directorate of Sanitation / MCI will not be responsible for any cost or expenses incurred
by bidding firm(s) for survey, couriers etc.
5) The firms providing unsubstantiated and / or incorrect information are liable to legal
action and /or disqualification.
6) The same advertisement can also be seen at the PPRA’s website www.ppra.org.pk and
CDA’s website www.cda.gov.pk.
7) The Sanitation Directorate / MCI reserve the right to reject all bids at any time prior to
acceptance of a bid or proposal [PPRA- Rule 33(1)].
CHIEF OFFICER
Metropolitan Corporation Islamabad
Room No. 112, Executive Block,
CDA Headquarters, Sector G-7/4,
Islamabad – Pakistan
Tel: (+92 – 51) 9252620
Fax: (+92 – 51) 9252621
110 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
INSTRUCTIONS
TO
BIDDERS
111 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
BIDDING DATA
112 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
FORM OF BID
AND APPENDICES
113 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
FORMS
BID SECURITY
PERFORMANCE SECURITY
CONTRACT AGREEMENT
114 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”
CONDITIONS OF CONTRACT
115 | P a g e “CONTRACT FOR PRIMARY AND SECONDARY COLLECTION OF MUNICIPAL SOLID WASTE AND ITS
TRANSPORTATION IN METROPOLITAN AREA, ISLAMABAD, PAKISTAN”