Professional Documents
Culture Documents
Site Plan
Site Plan
Y X
1 : 26164.13 26021.98
+15.50
2 : 26144.26 26058.29
V 3 : 26144.24 26011.27
4 : 26140.79 26009.03
5 : 26136.63 26010.76
4.NORMAL FLOOR +12.50 6 : 26118.17 26043.83
V
K SECTION A-A
PARCEL PARCEL
7 8
B
SITE
926.40 BORDER
-1.53 925.60
2 --41.39-- -2.33
PARCEL 3 2 1 RAMP
1
CAR
9 SLOPE %15
ENTRENCE
4
6
ROOF SLOPE
1.NORMAL LEVEL
3.NORMAL LEVEL
2.NORMAL LEVEL
GROUND FLOOR
4.NORMAL LEVEL
BASEMENT
% 33
--22.59--
7
--29.83--
926.70
PARCEL 8 SIDE
-1.23
10 YARD
A A
9 +18.50 SIDE
ROOF SLOPE ROOF SLOPE
% 33 % 33 YARD
10 +15.50
SECTION B-B
eaves level
11
ROOF SLOPE 3
13 14 % 33
12
--4.11--
FRONT
RETAINING YARD
WALL BUILDING 4
V
770 lt ENTERENCE
R R
+0.50 (928.43)
770 lt
0 --
4.5
GARB. GARB.
6
V
CONT. CONT.
--
V
-2.50
V
±0.00 (927.93) -0.18 (927.75)
--37.87-- 5
+3.50
+6.50
+9.50
+12.50
+15.50
PEDESTRIAN
928.33 (SUB-BASEMENT) ENTERENCE
927.45 ±0.00 927.85
-0.48 927.93 -0.08
V
±0.00
RAIN WATER 927.75 (ROAD LEVEL)
-0.18
CITY WATER
SEWAGE === RECONSTRUCTION ROAD === 12.00 mt.
(FRONT ELEVATION)
B
PARCEL
1
SITE PLAN S:1/200