Professional Documents
Culture Documents
HDPE
Scope Executed CORRUGATED ANCHORE CONE
Sl. Girder Grade of Girder Quantity CONCRETE
Type of Structure Location (Ch.) Quantity SHEATHING DUCT (TOTAL
No. Type Concrete Length (Nos.) Quantity (CUM)
(Nos.) 26.12.20 (TOTAL REQUIRED)
REQUIRED)
2.5 85
2.5 45
2.5 45
2.5 85
2.5 85
2.5 85
2.5 85
2.5 85
2.5 85
4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 195+733) (Package-I, from Aligarh - Bhadwas) of NH-91
Bharatmala Pariyojana Bharatmala Pariyojana
Brij Gopal Construction Company Private Limited
Girder Scope in Project Highway Aligarh Kanpur PKG-1
Balance
Executed Executed HDPE
Scope Girder HDPE CORRUGATED
Sl. Type of Location Girder Grade of Girder Quantity Quantity CORRUGATED
Quantity Quantity SHEATHING DUCT
No. Structure (Ch.) Type Concrete Length INNER G. OUTER G. SHEATHING DUCT
(Nos.) (Nos.) (Nos.) TOTAL (TOTAL REQUIRED) (USE )
(Nos.)
TYPE OF GIRDER RMT NOS 8 DIA 10 DIA 12 DIA 16 DIA 20 DIA 25 DIA 32 DIA
INNER GIRDER IG01 TO IG04 30 m 66 0.136 21.250 91.060 19.200 12.580 0.000 8.500
TOTAL STEEL REQ. AFTER 14/01/21 30 m 18 0.037 5.795 24.835 5.236 3.431 0.000 2.318
OUTER GIRDER OG 1 & OG 04 30 m 44 0.096 15.000 68.952 15.360 5.688 0.000 3.096
TOTAL STEEL REQ. AFTER 14/01/21 30 m 12 0.026 4.091 18.805 4.189 1.551 0.000 0.844
4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 195+733) (Package-I, from Aligarh - Bhadwas) of NH-91
Bharatmala Pariyojana Bharatmala Pariyojana
Brij Gopal Construction Company Private Limited
STRESSING Girder Scope in Project Highway Aligarh Kanpur PKG-1
Balance
Executed Executed
Sl. Type of Location Girder Grade of Girder Scope Quantity Quantity Girder LIVE WEDGE (TOTAL LIVE WEDGE
Quantity Quantity
No. Structure (Ch.) Type Concrete Length INNER G. OUTER G. REQUIRED) NOS (USE ) NOS
(Nos.) TOTAL
(Nos.) (Nos.)
(Nos.)
4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 195+733) (Package-I,
from Aligarh - Bhadwas) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojana Bharatmala
Pariyojana.
HDPE
ANCHORE ANCHORE
CORRUGATED ANCHORE
CONE (USE CONE Remark
SHEATHING DUCT CONE
(REQUIRED ) ) (REQUIRED )
0 80 80 0
990 240 0 240
0 240 240 0
0 80 80 0
0 80 80 0
0 0 0 0
0 80 80 0
0 80 80 0
990 880 640 240
1518 388 26.12.20
arh - Bhadwas) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under
SUB-TOTAL REMARKS
152.726
41.653
108.192
29.507
arh - Bhadwas) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under
KG-1
H T STRAND
LIVE WEDGE WIRE (TOTAL H T STRAND H T STRAND
WIRE (USE WIRE Remark
(REQUIRED ) NOS REQUIRED)
) MT (REQUIRED )
MT
Summary
TYPE OF GIRDER RMT NOS 8 DIA 10 DIA 12 DIA 16 DIA 20 DIA 25 DIA 32 DIA SUB-TOTAL REMARKS
PSC INNER 30 m 66 0.136 21.250 91.060 19.200 12.580 0.000 8.500 152.726
PSC OUTER 30 m 44 0.096 15.000 68.952 15.360 5.688 0.000 3.096 108.192
TOTAL - 110 0.232 36.250 160.012 34.560 18.268 0.000 11.596 260.918
TYPE OF GIRDER RMT NOS 8 DIA 10 DIA 12 DIA 16 DIA 20 DIA 25 DIA 32 DIA SUB-TOTAL REMARKS
PSC INNER 30 m 18 0.072 11.250 53.100 11.520 4.262 0.000 0.000 80.204
PSC OUTER 30 m 12 0.024 3.750 17.238 3.840 1.422 0.000 0.774 27.048
TOTAL - 30 0.096 15.000 70.338 15.360 5.684 0.000 0.774 107.252
4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 195+
of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojana Bhara
Brij Gopal Construction Company Private Limited
Girder Scope in Project Highway Aligarh Kanpur PKG-1
Sl. Girder
No. Type of Structure Location (Ch.) Type Grade of Concrete Girder Length
1 Major Bridge 161590 RCC M-35 23 m
2 VUP Grade 1 162280 RCC M-35 20 m
3 ROB 183453 RCC M-45 18 m
TOTAL
BALANCE
Summary
RCC 20 m
RCC 18 m
RCC 23 m
Total
Percentage achieved
Km. 186+000 (Design Chainage 195+733) (Package-I, from Aligarh - Bhadwas)
under Bharatmala Pariyojana Bharatmala Pariyojana
any Private Limited
Aligarh Kanpur PKG-1
Executed Quantity
Scope Quantity (Nos.) (Nos.) Remark
42 -
8 8
8 -
58 8
50 -
8 8
8
42
58 8
ntage achieved 13.8%
4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 1
(Package-I, from Aligarh - Bhadwas) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala P
Bharatmala Pariyojana
Brij Gopal Construction Company Private Limited
Girder Steel Scope in Project Highway Aligarh Kanpur PKG-1
TOTAL WEIGHT IN (MT).
TYPE OF GIRDER RMT NOS 8 DIA 10 DIA 12 DIA 16 DIA 20 DIA 25 DIA 28DIA
INNER GIRDER
IG01 TO IG04 20 4 0.012 0.115 1.667 0 0.055 0.087 0
TOTAL 0.048 0.460 6.668 0.000 0.220 0.348 0.000
OUTER GIRDER
OG 1 & OG 04 20 4 0.012 0.115 1.675 0 0.055 0.087 0
TOTAL 0.048 0.460 6.700 0.000 0.220 0.348 0.000
m. 186+000 (Design Chainage 195+733)
nuity Mode under Bharatmala Pariyojana
d
r PKG-1
3.135 5.071
12.540 20.284
3.072 5.016
12.288 20.064
4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 195+733) (Package-I, from Aligarh -
Bhadwas) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojana Bharatmala Pariyojana