4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km.

186+000 (Design Chainage 195+733) (Package-I, from Aligarh - Bhadwas) of NH-91 in


Annuity Mode under Bharatmala Pariyojana Bharatmala Pariyojana

Brij Gopal Construction Company Private Limited

Girder Scope in Project Highway Aligarh Kanpur PKG-1

HDPE
Scope Executed CORRUGATED ANCHORE CONE
Sl. Girder Grade of Girder Quantity CONCRETE
Type of Structure Location (Ch.) Quantity SHEATHING DUCT (TOTAL
No. Type Concrete Length (Nos.) Quantity (CUM)
(Nos.) 26.12.20 (TOTAL REQUIRED)
REQUIRED)

1 VUP Grade 1 153+350 PSC M-45 32.250 10 10 330 80 34


2 Major Bridge 161+590 RCC M-35 22.172 42 - - - 18
3 VUP Grade 1 162+280 RCC M-35 22.360 8 8 - - 18
4 Flyover 165+400 PSC M-45 32.250 30 990 240 34
5 Flyover 172+960 PSC M-45 32.250 30 12 990 240 34
6 VUP Grade 1 179+153 PSC M-45 32.250 10 10 330 80 34
7 VUP Grade 1 181+827 PSC M-45 32.250 10 10 330 80 34
RCC M-45 18 m 8 - -
8 ROB 183+453 Steel Composite 37 m 12 - -
PSC M-45 30 m 8 264 64
9 VUP Grade 1 184+200 PSC M-45 32.250 10 10 330 80 34
10 VUP Grade 1 189+098 PSC M-45 32.250 10 10 330 80 34
Summary
RMT NOS
PSC 32.250 110
RCC 23.360 8
RCC 22.172 42
arh - Bhadwas) of NH-91 in the State of Uttar Pradesh on Hybrid

Unit weight Weight (MT) Remark

2.5 85
2.5 45
2.5 45
2.5 85
2.5 85
2.5 85
2.5 85

2.5 85
2.5 85
4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 195+733) (Package-I, from Aligarh - Bhadwas) of NH-91
Bharatmala Pariyojana Bharatmala Pariyojana
Brij Gopal Construction Company Private Limited
Girder Scope in Project Highway Aligarh Kanpur PKG-1

Balance
Executed Executed HDPE
Scope Girder HDPE CORRUGATED
Sl. Type of Location Girder Grade of Girder Quantity Quantity CORRUGATED
Quantity Quantity SHEATHING DUCT
No. Structure (Ch.) Type Concrete Length INNER G. OUTER G. SHEATHING DUCT
(Nos.) (Nos.) (Nos.) TOTAL (TOTAL REQUIRED) (USE )
(Nos.)

1 VUP Grade 1 153+350 PSC M-45 30 m 10 6 4 0 330 330


4 Flyover 165+400 PSC M-45 30 m 30 30 990 0
5 Flyover 172+960 PSC M-45 30 m 30 18 12 0 990 990
6 VUP Grade 1 179+153 PSC M-45 30 m 10 6 4 0 330 330
7 VUP Grade 1 181+827 PSC M-45 30 m 10 6 4 0 330 330
8 ROB 183453 PSC M-45 30 m 0 0 0
9 VUP Grade 1 184+200 PSC M-45 30 m 10 6 4 0 330 330
10 VUP Grade 1 189+098 PSC M-45 30 m 10 6 4 0 330 330
TOTAL 110 48 32 30 3630 2640
Summary
PSC 30 m 110 80
Total 110 80
Percentage achieved 72.7% 22
16
4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 195+733) (Package-I, from Aligarh - Bhadwas) of NH-91
Bharatmala Pariyojana Bharatmala Pariyojana
Brij Gopal Construction Company Private Limited
Girder Steel Scope in Project Highway Aligarh Kanpur PKG-1
TOTAL WEIGHT IN (MT).

TYPE OF GIRDER RMT NOS 8 DIA 10 DIA 12 DIA 16 DIA 20 DIA 25 DIA 32 DIA

INNER GIRDER IG01 TO IG04 30 m 66 0.136 21.250 91.060 19.200 12.580 0.000 8.500
TOTAL STEEL REQ. AFTER 14/01/21 30 m 18 0.037 5.795 24.835 5.236 3.431 0.000 2.318
OUTER GIRDER OG 1 & OG 04 30 m 44 0.096 15.000 68.952 15.360 5.688 0.000 3.096
TOTAL STEEL REQ. AFTER 14/01/21 30 m 12 0.026 4.091 18.805 4.189 1.551 0.000 0.844

4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 195+733) (Package-I, from Aligarh - Bhadwas) of NH-91
Bharatmala Pariyojana Bharatmala Pariyojana
Brij Gopal Construction Company Private Limited
STRESSING Girder Scope in Project Highway Aligarh Kanpur PKG-1

Balance
Executed Executed
Sl. Type of Location Girder Grade of Girder Scope Quantity Quantity Girder LIVE WEDGE (TOTAL LIVE WEDGE
Quantity Quantity
No. Structure (Ch.) Type Concrete Length INNER G. OUTER G. REQUIRED) NOS (USE ) NOS
(Nos.) TOTAL
(Nos.) (Nos.)
(Nos.)

1 VUP Grade 1 153+350 PSC M-45 30 m 10 10 1300 0


4 Flyover 165+400 PSC M-45 30 m 30 30 3900 0
5 Flyover 172+960 PSC M-45 30 m 30 30 3900 0
6 VUP Grade 1 179+153 PSC M-45 30 m 10 6 4 0 1300 1240
7 VUP Grade 1 181+827 PSC M-45 30 m 10 6 4 0 1300 1240
8 ROB 183+453 PSC M-45 30 m 0 0 0
9 VUP Grade 1 184+200 PSC M-45 30 m 10 10 1300 0
10 VUP Grade 1 189+098 PSC M-45 30 m 10 10 1300 0
TOTAL 110 12 8 90 14300 2480
STORE AVL 14350

4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 195+733) (Package-I,
from Aligarh - Bhadwas) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojana Bharatmala
Pariyojana.

Brij Gopal Construction Company Private Limited


STRESSING Girder Scope in Project Highway Aligarh Kanpur PKG-1
MECHANICAL SET UP
1 CHAIN PULLY
2 BOWL VALVE 3/4"
3 GATE VALVE 3/4"
4 SLIDE WRENCH 23"
5 WRENCH PANA 20/22
6 WRENCH PANA 20/22
7 ALANKEY BOX
TRAVELING TROLLY WITH CHAIN
8 DRIVE 2MT
9 MS HAMMER 1/2 KG
10 MS HAMMER 1 KG
11 MS HAMMER 5 KG
ELECTRONIC SET UP
METAL CLAD PROTECTED PLUG BP
1
30AMP 440/3PIN

METAL CLAD PROTECTED PLUG BP


2
20AMP 320/3PIN

METAL CLAD PROTECTED SCHOKET


3
30AMP 320/3PIN

METAL CLAD PROTECTED SCHOKET


4
20AMP 320/3PIN
5 MCB 4POLE 63 AMP
6 MCB 3POLE 32 AMP
7 BCB 2POLE 32 AMP
8 MCB BOX 4POLE
9 MCB BOX 3POLE
10 MCB BOX 2POLE
11 02 CORE ELECTRIC CABLE
CIVIL
1 G I PIPE
2 MS PIPE
3 MOM / CANDEL
4 STEEL SCALE
5 MESS (JALI 75 MIC)
6 CEBEX 100 (250GM)
7 CUTTING WHEEL 14"
8 CUTTING WHEEL 4"
9 COTTON WASTES
10 MEASSURING TAPE
11 PERMANENT MARKER (RED)
12 INSULATION TAPE
13 ELECTRONIC CABLE
14 GI SHEET 1MM
arh - Bhadwas) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under

HDPE
ANCHORE ANCHORE
CORRUGATED ANCHORE
CONE (USE CONE Remark
SHEATHING DUCT CONE
(REQUIRED ) ) (REQUIRED )

0 80 80 0
990 240 0 240
0 240 240 0
0 80 80 0
0 80 80 0
0 0 0 0
0 80 80 0
0 80 80 0
990 880 640 240
1518 388 26.12.20

arh - Bhadwas) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under

SUB-TOTAL REMARKS

152.726
41.653
108.192
29.507

arh - Bhadwas) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under

KG-1

H T STRAND
LIVE WEDGE WIRE (TOTAL H T STRAND H T STRAND
WIRE (USE WIRE Remark
(REQUIRED ) NOS REQUIRED)
) MT (REQUIRED )
MT

1300 20.459 0.00 20.460


3900 61.379 0.00 61.380
3900 61.379 0.00 61.380
60 20.459 20.46 0.000
60 20.459 20.46 0.000
0 0.00 0.00 0.000
1300 20.459 0.00 20.460
1300 20.459 0.00 20.460
11820 225.0538 40.91 184.14
4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 195+733)
(Package-I, from Aligarh - Bhadwas) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojana
Bharatmala Pariyojana
Brij Gopal Construction Company Private Limited
Girder Steel Scope in Project Highway Aligarh Kanpur PKG-1
TOTAL WEIGHT IN (MT).
TYPE OF GIRDER RMT NOS 8 DIA 10 DIA 12 DIA 16 DIA 20 DIA 25 DIA 32 DIA SUB-TOTAL REMARKS
153+350 VUP
INNER GIRDER
30 6 0.004 0.625 2.95 0.64 0.37 0 0.25 4.839
IG01 TO IG04
TOTAL 0.024 3.750 17.700 3.840 2.220 0.000 1.500 29.034
OUTER GIRDER 30 4 0.004 0.625 2.873 0.64 0.237 0 0.129 4.508
OG 1 & OG 04
TOTAL 0.016 2.500 11.492 2.560 0.948 0.000 0.516 18.032
179+153 VUP
INNER GIRDER
30 6 0.004 0.625 2.95 0.64 0.37 0 0.25 4.839
IG01 TO IG04
TOTAL 0.024 3.750 17.700 3.840 2.220 0.000 1.500 29.034
OUTER GIRDER
30 4 0.004 0.625 2.873 0.64 0.237 0 0.129 4.508
OG 1 & OG 04
TOTAL 0.016 2.500 11.492 2.560 0.948 0.000 0.516 18.032
181+827 VUP
INNER GIRDER
30 6 0.004 0.625 2.95 0.64 0.37 0 0.25 4.839
IG01 TO IG04
TOTAL 0.024 3.750 17.700 3.840 2.220 0.000 1.500 29.034
OUTER GIRDER
OG 1 & OG 04 30 4 0.004 0.625 2.873 0.64 0.237 0 0.129 4.508

TOTAL 0.016 2.500 11.492 2.560 0.948 0.000 0.516 18.032


184+200 VUP
INNER GIRDER
30 6 0.004 0.625 2.95 0.64 0.37 0 0.25 4.839
IG01 TO IG04
TOTAL 0.024 3.750 17.700 3.840 2.220 0.000 1.500 29.034
OUTER GIRDER
30 4 0.004 0.625 2.873 0.64 0.237 0 0.129 4.508
OG 1 & OG 04
TOTAL 0.016 2.500 11.492 2.560 0.948 0.000 0.516 18.032
189+098 VUP
INNER GIRDER
30 6 0.004 0.625 2.95 0.64 0.37 0 0.25 4.839
IG01 TO IG04
TOTAL 0.024 3.750 17.700 3.840 2.220 0.000 1.500 29.034
OUTER GIRDER
30 4 0.004 0.625 2.873 0.64 0.237 0 0.129 4.508
OG 1 & OG 04
TOTAL 0.016 2.500 11.492 2.560 0.948 0.000 0.516 18.032
183+450 VUP
INNER GIRDER
30 4 0.004 0.625 2.95 0.64 0.37 0 0.25 4.839
IG01 TO IG04
TOTAL 0.016 2.500 11.800 2.560 1.480 0.000 1.000 19.356
OUTER GIRDER
OG 1 & OG 04 30 4 0.004 0.625 2.873 0.64 0.237 0 0.129 4.508

TOTAL 0.016 2.500 11.492 2.560 0.948 0.000 0.516 18.032

Summary

TYPE OF GIRDER RMT NOS 8 DIA 10 DIA 12 DIA 16 DIA 20 DIA 25 DIA 32 DIA SUB-TOTAL REMARKS

PSC INNER 30 m 66 0.136 21.250 91.060 19.200 12.580 0.000 8.500 152.726
PSC OUTER 30 m 44 0.096 15.000 68.952 15.360 5.688 0.000 3.096 108.192
TOTAL - 110 0.232 36.250 160.012 34.560 18.268 0.000 11.596 260.918

TYPE OF GIRDER RMT NOS 8 DIA 10 DIA 12 DIA 16 DIA 20 DIA 25 DIA 32 DIA SUB-TOTAL REMARKS

PSC INNER 30 m 18 0.072 11.250 53.100 11.520 4.262 0.000 0.000 80.204
PSC OUTER 30 m 12 0.024 3.750 17.238 3.840 1.422 0.000 0.774 27.048
TOTAL - 30 0.096 15.000 70.338 15.360 5.684 0.000 0.774 107.252
4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 195+
of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojana Bhara
Brij Gopal Construction Company Private Limited
Girder Scope in Project Highway Aligarh Kanpur PKG-1
Sl. Girder
No. Type of Structure Location (Ch.) Type Grade of Concrete Girder Length
1 Major Bridge 161590 RCC M-35 23 m
2 VUP Grade 1 162280 RCC M-35 20 m
3 ROB 183453 RCC M-45 18 m
TOTAL
BALANCE
Summary
RCC 20 m
RCC 18 m
RCC 23 m
Total
Percentage achieved
Km. 186+000 (Design Chainage 195+733) (Package-I, from Aligarh - Bhadwas)
under Bharatmala Pariyojana Bharatmala Pariyojana
any Private Limited
Aligarh Kanpur PKG-1
Executed Quantity
Scope Quantity (Nos.) (Nos.) Remark
42 -
8 8
8 -
58 8
50 -

8 8
8
42
58 8
ntage achieved 13.8%
4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 1
(Package-I, from Aligarh - Bhadwas) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala P
Bharatmala Pariyojana
Brij Gopal Construction Company Private Limited
Girder Steel Scope in Project Highway Aligarh Kanpur PKG-1
TOTAL WEIGHT IN (MT).
TYPE OF GIRDER RMT NOS 8 DIA 10 DIA 12 DIA 16 DIA 20 DIA 25 DIA 28DIA

INNER GIRDER
IG01 TO IG04 20 4 0.012 0.115 1.667 0 0.055 0.087 0
TOTAL 0.048 0.460 6.668 0.000 0.220 0.348 0.000
OUTER GIRDER
OG 1 & OG 04 20 4 0.012 0.115 1.675 0 0.055 0.087 0
TOTAL 0.048 0.460 6.700 0.000 0.220 0.348 0.000
m. 186+000 (Design Chainage 195+733)
nuity Mode under Bharatmala Pariyojana

d
r PKG-1

32 DIA SUB-TOTAL REMARKS

3.135 5.071
12.540 20.284

3.072 5.016
12.288 20.064
4- Lanning of Aligarh -Kanpur section from Km. 140.200 (Design Chainage 149+900) to Km. 186+000 (Design Chainage 195+733) (Package-I, from Aligarh -
Bhadwas) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojana Bharatmala Pariyojana

Brij Gopal Construction Company Private Limited


Girder Scope in Project Highway Aligarh Kanpur PKG-1
Sl. Girder Grade of Executed Quantity
Type of Structure Location (Ch.) Girder Length Scope Quantity (Nos.) Remark
No. Type Concrete (Nos.)
1 ROB 183+453 Steel Composite - 37 m 12 -
TOTAL 12 0
BALANCE 12 -
Summary
Steel 37 m 12 0
Total 12 0
Percentage achieved 0%