GOVERNMENT OF TELANGANA
IRRIGATION AND CAD DEPARTMENT
From To
The Advisor \sfi. B. Hari Ram,
Lift Irrigation Schemes, Engineer-in-Chief,
Irrigation & CAD Dept, I&CAD Department,
Govt. of Telangana, Gajwel,
Jalasoudha, Errummanzil, Siddipet(Dist)
Hyderabad.
Lr.No. ADV/LIS/Kaleshwaram /F.Approval/MGA/D.No!"#® 72021 Dt: 2/03 /2021
Sir,
Sub: Kaleshwaram Project- Link IV- Parallel conveyor system from Mid Manair
Reservoir to sri Komuravelli Mallana sagar Reservoir — Package -1 -Vetting of
Revised Mechanical General Arrangement drawings - Reg.
Ret: 1) Lr. No. ENC/KPH/EE-DESIGNS/DEE-2/Pkg-01/1883/2020 Dt: 31-12-2020
2) Minutes of Meeting held at ENC (Irrigation) chamber Dt: 14.12.2020
With reference to the letters cited above, the submitted Revised Mechanical General
Arrangement drawings pertaining to Kaleshwaram Project- Link IV, Package -1 Parallel
conveyor system are scrutinized, and found to be generally in order and cleared for
approval with the following condition.
> This approval is tentative and only for excavation purpose. The detailed
revised General Arrangement drawings shall be submitted after pump model
study and after finalization of detailed drawings of E&M equipment to be
procured.
Yours faithfully,
Encl: Drawings-2 Nos / Advisor, OF 92.252,
Lift Irrigation Schemes -
Irrigation & CAD Department.
Govt. of TelanganaGOVERNMENT OF TELANGANA
Irrigation & C A D Department
KALESHWARAM PROJECT
LINK - IV
PACKAGE NO. 1
MECHANICAL GENERAL ARRANGEMENT
DRAWINGS (Revised as per MOM on 14.12.2020)Report Accompanying the Mechanical General Arrangement Drawing
and Pump calculations of Kaleshwaram Project,Link-IV, Parallel
Conveyor System Package-1
The Mechanical General Arrangement Drawings of Forebay and Pump
House are revised as per the MOM dated 14.12.2020 to accommodate 4 x
125 MW Pumps and Motors with all other accessories so as to get
approvals. The revised drawings and pump calculations are here with
enclosed for approvals from competent authorities
Governing Levels (as per MOM Date: 14.12.2020)
Full Reservoir Level (FRL) of Mid Manair
318.00 |m
Reservoir
Full Supply Lev at which required di
re i 307.50 |m
to be drawn from Mid Manair Reservoir (I
Bed level at start of the approach channel (CBL) |: | 301.50 | m
i Forebay Maximum water level : | 305.275 | m
center line of Pumps : [272.5 |[m
Minimum Drawdown level (MDDL} : | 302.50 |m
FRL of Annapurna Reservoir % 397.00 |m
Delivery Level (Pipe center) at which 333.0
Cumecs flow is to be discharged into Annapurna |: | 400.90 |m
Reservoir
= ee { eirtrwe
GP Croteer eer bad : guisbOB2H)
‘Kaleshwaram Project-Hy cor ey genet \
‘ist Floor, Jelasoudhe Building, | uirt trigation Semen
Errum Manzil, a Govt. of Telans' \
ae e Exe wincer
4 ive E; i
Sub-Div, meinen, Const iv. No, 8,
No. 1 of Construction Div. No. & Kaleshy :
: : waram Project,
Ellanthakunta,Rofana SrcilaDistrt, Siddipet.
Superintenditg Engineer,
Kaleshwaram Project
Construction Circle. No.1
_ppitsivat Sicapet Dist.~ Dynamie head & Power calculations - Kaleshwaram Project ~ Link ~IV - Parallel conveyor system —
Package No.t
PUMP HEAD CALCULATIONS
Total Discharge 333m
No.of Pumps - 4 Nos.
Discharge per Pump - 8325 m3is
Nos. of rising mains per each pump - 2 Nos
Dia. of Rising Main ( M.S.) 3800. mm
Length of Rising main - 400m
Flow through each Rising main 4163 mils
A |CakulationofSiatic Head
‘Max. Level of the Rising main at Disch, Point, “009 m
Max. Water level in Forebay 308.275 mm
Min, Water level in Forebay 302.50 m
Static Head maximum - 9840
Tolet area of draft tube (4.5 MH X 8.5 MW) 42.50 m2
Outlet area of drat tube (3.5 MH X 8.5 MW) (assumed) - 29.75 m2
Velocity at inlet of Draft tube vi = 1.96 mis
Velocity at outlet of Deatt ube v2 2.80 mis
Spiral outlet Dia = 35m
Spiral outlet Area 9.52 m2
Spiral outlet velocity vs 8.66 mis
Velocity ia Raising Main(each) v4 = 3.67 mis
8 |Rviction esd Loss at Silctionside orPump =)
- 1 ade i ash Faia ent of raf Tube! me K(v1"228)
t= Loss cosficint for tash rack - 055 m
velocity of flow through draft tube vi 1.96 mis
Loss through Trash rack ht - 0.108
Vel of low in the Draft tube liner 196 mis
Height of Dra Tube (assumed) som
vidi of Draft Tu som
3)D.T Gate losses:
Gate loses hg =
Kg= loss coofficiont for gate - o4
V> velocity, and 196 mis
Hg=D.T Gate lasses - 0020 m
O30?
t Advisor ort ®
- sigation Schet
{uit Tanga?
Pe. tot2through draft tube 2
ow) = 42.50 m2
et area of draft tabe (5 MH X
Outles ares of draft abe (3.5 MX 85 MW) (assumed) - 2975 m2
Velocity at inlet - 1.96 mis
‘Velocity at outlet 2.80 mis
coffcer af fition k (Theory ot hydraulics) - 002
Fiction loss in draft tbe 0.004 m
Total head oss theough Dra Tube wenel - 0431 im
fi livery side of Pap)
1 Fiction head in Pump rising main (MS Pipe) sLiDy (W229)
F = fet factor whichis dependent on
Ks = absolute roughness (M.S. Pipes) - ol mm
dia of rising tin - 3800 ram
L= Length of Pipe 6100
1» relative roughness-Ks/D - 2.63158-05
Ve=DiKs 38000
Re renol’s mimber= V¢Di :
Va= Velocity in the pipe va - 3467 miSee
44 = kinematic viscosity of water (at 27°C ) ogg 10%
Re= renolds mimber - 16603531
oot
(rom Fi 3, page 10 of I 2951 - 2003 ) =
hie 11564 m
(Satineev22g)
Buterlly Valve HOPD) 2=|
‘Velocity through BF valve of dia 2500 mm - 865 mis
Losses in HOPD Valve ss 1s
Dismantling joint n=1, k=0.1 nae
‘Velcitythrouch dismantling joint dia 3500 mm oy) 865 mis
Losses in dismantng jor: Rete 0382 m
3 Hoses ibends of rai me . nave onene
6) deg Elbow n=8, k-0.2 aga an’
Velocity through dia 3800 mm bends Late OOS Tetons 367 mis
Losses in bends - 1.100
Engineer-| bad o
nwaram Project-HySat 0313 m
ee Jaiasoudna BuTsiNg, 0.687 m
is Manzil, Hyderabad.
g = 1519
sella - 161m
Henée Total Head” - sit
Orsay Maxinium Dynamic Head * 116% m
Pump input Power at Maximum dynanne head Ze 108261 KW
Motor input power required with 20% margin - 126314 KW,
(Or Say rating of the motor Sunsiintewiiniy Engineer,
Kaleshwaram Project
Construction “=! Not
pddivet, Side. .ec Dist,
Qo i
(Qu. => gine,
fy Py. Executive Egineen, —constryetion Dv. No. 6
Sub-Div. No.1 of Construction Div, No.8 Kal Project,
Ellanthakunta, Rajanna Sircilla Dietrct Siddivet.