2 Contractor shall coordinate with the system manufacturer/supplier to provide SPL calculation to Noted. SPL calculations shall be provided accordingly.
ensure that the SPL at least 15db above the average ambient sound level or 5db above maximum
sound level, measured at 1.5m above the floor, new redistribution of the bells will be approved
accordingly.
3 Submit battery calculations as required in the specs {(St.by 48 hr. + alarm 15 min) x 1.5}. Noted. Battery calculations shall be provided as per manufacturer's
sheet accordingly.
4 Contractor shall coordinate with manufacturers/suppliers to ensure the interface with Nurse Call Noted. Interfacing shall be coordinated and additional modules or
System to provide visual & audible notification as per Engineer approval. devices shall be recommended accordingly (if applicable).
5 Contractor is responsible for submitting a complete cause and effect matrix used to define the Noted. Thimar shall prepare and submit the Cause/Effect matrix for
required sequence of operations & triggered actions, according to life safety requirements review/approval.
considering the approved architectural fire zones, and shall be reviewed/approved by the
Engineer.