Agenda
• Electromagnetic Fields, ESD and Laser Protection
• General Requirements for Packing and Transportation and
Environment
• IP-20G Rack Installation
• Rack Installation
• Grounding the IP-20G
• Replacing SM-Card
• Power Cable
• Mechanical Specifications
• Earth Bonding of Equipment
• IP-20G to RFU-C connection
• Antenna Installation
• RFU-C Installation
The equipment is prepared for public transportation. The cargo must be kept dry
during transportation.
Keep items in their original boxes till they reach their final destination.
When unpacking –
Check the packing lists, and ensure that the
correct part numbers and quantities of
components arrived.
General Requirements
1. Environmental specification for IDU: -5C (23F) to +55C (131F)
2. Environmental specification for RFU: -33C (-27F) to +55C (131F) high reliability
3. -45C (-49F) to +60C (140F) with limited margins
10. The DC supply system is to be local, i.e. within the same premises as the equipment
11. A disconnect device is not allowed in the grounded circuit between the DC supply
source and the frame/grounded circuit connection.
• IP-20G chassis 1x
• 19” rack/ sub rack 1x
• SM-Card Cover 1x
Tools:
Philips screwdriver
Flat screwdriver
3. Gently place the SM-Card Cover in its place and tighten the screws, using a Phillips screwdriver.
• Local Supply System: The DC supply system is to be local, i.e. within the same
premises as the equipment.
15
15 Proprietary and Confidential
Power Interface
• FibeAir IP-20G receives an external supply of -48V current via one or
two power interfaces (the second power interface is optional for power
redundancy). The IP-20G monitors the power supply for under-voltage
and includes reverse polarity protection, so that if the positive (+) and
negative (-) inputs are mixed up, the system remains shutdown.
• The allowed power input range for the IP-20G is -40V to -60V. An under
voltage alarm is triggered if the power goes below the allowed range,
and an over voltage alarm is triggered if the power goes above the
allowed range.
• Make sure to use a circuit breaker to protect the circuit from damage
by short or overload. In a building installation, the circuit breaker shall
be readily accessible and incorporated external to the equipment. The
maximum rating of the overcurrent protection shall be 10 Amp, while
the maximum current rating is 5 Amp.
Power cables
Copyright © 2009 – 2013 Nera Networks AS All rights reserved. I-79113-EN rev. A
Typical Earthing Network
Note 1: Structure or cable riser directly connected to Station
Earth Network.
Note 2: Main Earth Bar in equipment room, connected to
Station Earth Network.
Note 3: Earth Bus Bar/Cable connected to main earth bar.
Note 4: Coax Signal Cable.
Note 5: Over voltage protection integrated in units.
Note 1
2. Jumper Leads from the kit should be bonded to Never intermix components from different
the Tower Structure: Manufacturers.
- directly (bolted connection)
- via a earth termination plate (if provided)
- stainless steel angle adaptor (ANDREW)
3. Earth Kit on the feeder should be positioned
so that each jumper lead has a uniform smooth
transition down to the point of bonding – this may
mean staggering their position as shown here.
RSSI
EARTH TERMINAL
• If the weather seals are not provided as part of the main Earthing Kit, they must be
ordered
• Always follow the advice given in the instruction to achieve the best possible
installation
TNC
N-type female
N-type male
TNC male
TNC females
29 Proprietary and Confidential
http://www.youtube.com/watch
?v=Mo9LwdHe39M
http://www.youtube.co
m/watch?v=XfA0JVR
JSxU
Self sealing vulcanized tape The vulcanized tape must Failure to follow every detail of
weather kit should be be overwrapped with PVC the installation instructions will
applied to the connector at tape tied off at the top and result with water damage to the
the ODU to make it fully bottom with cable ties. connector and cable
water tight.
• For Ethernet cables, the cable should be grounded to the antenna tower
every 50m using the kit CAT5E_gnd_kit.
RSSI Curve
1,9V
1,6V
1,3V
AZIMUTH
MAIN BEAM
SIDE LOBE
SIDE LOBE
ELEVATION
HORIZONTAL
MAIN BEAM
Note:
SIDE LOBE
It should not always be expected to establish the strongest receive signal at
first attempt to align an antenna
Antenna may need to be panned several times before the optimum signal
strength is established
1+0 direct
1+0 remote
1+1 direct
1+1 remote
Agenda
Electromagnetic Fields, ESD and Laser Protection
General Requirements for Packing and Transportation and
Environment
IP-20G Rack Installation
Rack Installation
Grounding the IP-20G
Replacing SM-Card
Power Cable
Mechanical Specifications
Earth Bonding of Equipment
IP-20G to RFU-C connection
Antenna Installation
RFU-C Installation
53