You are on page 1of 1

V

R E
V EDE
D ISO A1 841mm x 594mm

N
TO OKKIYAM THORAIPAKKAM

ULC 12
TO SIPCOT-2

37+914.777
37+889.777

38+000

0
38+108.61
37+900

10
38+100

38+133.6
37+730.275

SC
SC 37+599.388

37+710.275

37+800

TS
BRIDGE

CS
37+579.388
ULC 11
FOR CONTINUATION REFER DRAWING NO: DDC-P2C3-ECV01-ALN-DR-C3E-50603-03

FOR CONTINUATION REFER DRAWING NO: DDC-P2C3-ECV01-ALN-DR-C3E-50603-05


ST
37+700
UP LINE

FOOT OVER

38+000
37+600

ST
37+500

SC
37+916.408
CS

37+900
TS
37+891.408

38+100
38+109.22
CS
TS

38+134.2
ST
37+800
DLC 11

ST
DOWN LINE

37+731.906
CS
37+711.906
37+700
SC 37+600.675
37+600
37+580.675
TS
37+500

24
DLC 10

CURVE DETAILS:-
UP LINE CURVE NO. ULC 11 ULC 12
EASTING 416105.325 416131.927
COORDINATE OF APPEX
NORTHING 1423897.681 1423541.403
DEFLECTION ANGLE 3°56'49.190" 11°39'48.490"
RADIUS 1900.000 1075.000
TRANSITION LENGTH 20.000 25.000
Curve LENGTH 110.887 193.833
CANT 110mm 0 0
CANT DEFFICIENCY 85mm 40 33
DESIGN SPEED 80 55
EQUILIBRIUM CANT 40 33
CANT GRADIENT - -
Time of Travel over
transition Length SEC 0.90 1.64
Rate of change of CANT MM/SEC 0.00 0.00 L=32.621m L=24.265m
K=22.000 K=25.000
PVC 37+533.690

PVT 37+947.132
PVC 37+922.868
PVT 37+566.310
Elev 14.992

Elev 14.868
Elev 14.750

Elev 14.750
-1.483% PROPOSED RAIL
PROPOSED RAIL LEVEL 0.971%
0.000%
LO 37+566.310

LO 37+922.868
PVI 37+550.000

PVI 37+935.000
Elev 14.750

Elev 14.750
Elev 14.750

Elev 14.750
EXISTING GROUND LEVEL
EXISTING GROUND LEVEL

±0.000m
Level Datum = ±0.000m

HORIZONTAL CURVATURE

VERTICAL ALIGNMENT

LEVEL DIFFERENCE

PROPOSED RAIL LEVEL

EXISTING GROUND LEVEL

CHAINAGE

DETAIL DESIGN CONSULTANT CLIENT CONTRACT


REFERENCE DRAWINGS / NOTES:- REVISIONS NO OBJECTION FROM CMRL
CHENNAI METRO RAIL LTD.
The design and drawings as certified and submitted by the Designer
have been reviewed and proof checked by CMRL.
ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI - 600107 (INDIA) C3/ECV01/RT-01
C O N S U L T I N G
No Objection Subject to the
+ ENGINEERS GROUP LTD. DRAWING TITLE DWG ISSUE RECORD
DWG
STATUS
No Objection
comments as noted HORIZONTAL AND VERTICAL TENDER ü
ALIGNMENT DRAWING (UP LINE)
Printed on ___% Post-Consumer

Revision and Resubmission Required


PROJECT TITLE ADDENDUM-01
subject to the comments as noted
CHENNAI METRO RAIL PROJECT PHASE 2, CORRIDOR-3, SHEET 04 OF 16
Recycled Content Paper

CHECKED BY REVIEWED BY APPROVED BY DATE ADDENDUM-02

CONTRACT NO. C3/ECV01/RT-01 ADDENDUM-03

DRAWING NUMBER REV. SCALE


BY DETAIL DESIGN CONSULTANT CONSTRUCTION OF ELEVATED VIADUCT (APPROXIMATE LENGTH OF 10.00 KM), NINE ELEVATED METRO
H 1:1000
A 10.12.21 SMG ISSUED FOR TENDER SUBMISSION NMN PG
DESIGNED BY CHECKED BY APPROVED BY DATE STATIONS AT SHOLINGANALLUR LAKE, SRI PONNIAMAN TEMPLE, SATHYABAMA UNIVERSITY,
SEMMANCHERI, GANDHI NAGAR, NAVALLUR, SIRUSERI, SIPCOT-1 AND SIPCOT-2 AND STABLING
DDC-P2C3-ECV01-ALN-DR-C3E-50603-04 A V 1:250
10.12.2021
REV. DATE BY DESCRIPTION CHKD APP. RPJ NMN PG VIADUCT AT SIPCOT. CAD File Name : DDC-P2C3-ECV01-ALN-DR-C3E-50601-01 TO C3E-50603-17-A.dwg

Filename: \\inmaa2pfpsw001\DATA2\Chennai_Metro_Phase2\900-CAD, GIS\910-CAD\910_09_Retender Drawings\ECV01\02 CAD\Part 2\A-HORIZONTAL AND VERTICAL ALIGNMENT DRAWINGS - UP LINE\ DDC-P2C3-ECV01-ALN-DR-C3E-50601-01 TO C3E-50603-17-A.dwg Feb 07, 2022 - 12:32pm SMG

You might also like