You are on page 1of 10

H = 3.

40 m γw = 1 t/m3
H1 = 0.400 m q = 1 t/m2
H2 = 2.4 m α = 0 o

H3 = 0 m φ = 29 o

H' = 0.000 m n = 35 %
z1 = 1.2 m γbatu = 2 t/m3
z2 = 1.5 m Gs = 2.62
z3 = 0.7 m

γdry = 1.703 t/m3


γsat = 2.053 t/m3
γ' = 1.053 t/m3
ka = 0.347
kp = 2.882
σha1 = 0.347 t/m2 σhp1 = 2.124 t/m2
σha2 = 0.236 t/m2 σhp2 = 2.2 t/m2
σha3 = 0.877 t/m2 Pp1 = 0.744 t
σha4 = 2.4 t/m2 Pp2 = 2.420 t
Pa1 = 1.180 t σx = 0.225 t/m2
Pa2 = 0.047 t σy = 0.150 t/m2
Pa3 = 0.567 t σa = 0.633 t/m2
Pa4 = 1.052 t σb = 1.885 t/m2
Pa5 = 2.880 t
tinjau tegangan tanah di bawah konstruksi tidak terlampaui
φ = 29 o faktor bentuk faktor kedalaman
Nc = 27.96 Ϛsc = 1.0 Ϛdc
Nq = 16.55 Ϛsq = 1.0 Ϛdq
Nγ = 19.55 Ϛsγ = 1.0 Ϛdγ

karena muka air tanah di atas dasar pondasi


q = 0.737 t/m2
tinjau terhadap patah konstruksi qult = 9.804 t/m2
a = 0.571 m 0.57 m M = 6.073 t
b = 1.701 m b = 1.986 m
tinjau garis tekan berada dalam inti/kern
b = 2.116 m 2.12 m a = 0.57 m
b = 1.986 m
c = 1.070 m
G = 3.940 t/m
W = 2.184 t/m
PH = 4.282 t/m

W < PH (Turap Bergeser)


V1 V2
faktor kedalaman faktor inklinasi
= 1.132 Ϛic = 0.273 Vtotal = 9.135
= 1.097 Ϛiq = 0.317 H = 3.989
= 1.0 Ϛiγ = 0.317

asar pondasi

a 4.25

c 2.75

0
b

(Turap Bergeser)
t/m
H = 2.5 m γw = 1 t/m3
H1 = 0 m q = 1.1 t/m
H2 = 2.1 m α = 8 o

φ = 32 o

m n = 28 %
z1 = 0.9 m γbatu = 2 t/m3
z2 = 1 m Gs = 2.65
z3 = 0.6 m

γdry = 1.908 t/m3 σhp1 = 2.320 t/m2


γsat = 2.188 t/m3 σhp2 = 1.6 t/m2
γ' = 1.188 t/m3 Pp1 = 0.696 t
ka = 0.316 Pp2 = 1.280 t
kp = 3.255 σx = 0.225 t/m2
σha1 = 0.347 t/m2 σy = 0.150 t/m2
σha2 = 0.241 t/m2 σa = 0.938 t/m2
σha3 = 0.788 t/m2 σb = 2.102 t/m2
σha4 = 2.1 t/m2
Pa1 = 0.869 t
Pa2 = 0.048 t
Pa3 = 0.506 t
Pa4 = 0.827 t
Pa5 = 2.205 t

A1 = 2.40000 G1 = 4.800 t x1 =
A2 = 1.6 G2 = 3.200 t x2 =
A3 = 2.15 G3 = 4.300 t x3 =
A4 = 0.8 G4 = 1.750 t x4 =
A5 = 0.2 G5 = 0.382 t x5 =
∑A = 7.15000 ∑V = 14.432 t X =
Kontrol terhadap guling Kontrol terhadap geser Kontrol terhadap daya duk
MR 35.802 t FSsliding 2.492 > 1,5 FSbearing capacity
Mo 3.677 t B' =
FSoverturning 9.737 > 2

Kontrol terhadap uplift


kiri kanan
Puplift 3.44 4.515
xuplift 1.43333333 2.866667
Muplift 4.93066667 12.943
35.802 t > 20.461 t
tinjau tegangan tanah di bawah konstruksi tidak terlampaui
φ = 32 o faktor bentuk faktor kedalaman
Nc = 35.49 Ϛsc = 1.0 Ϛdc
Nq = 23.18 Ϛsq = 1.0 Ϛdq
Nγ = 30.22 Ϛsγ = 1.0 Ϛdγ

karena muka air tanah di atas dasar pondasi


q = 0.713 t/m2
qult = 63.853 t/m
2

2
2.5

0.5
0.60 2.40 0.8 0.50
3.00 0.8
3.80
4.300

A7+A8 A7 0.06 50.19443


0.066 A8 0.006
2.200 10.56 Patotal 4.412 Pptotal 1.976 X
3.400 10.88 X 0.833333 A7 1.796328 0.55
2.15 9.245 Mpa 3.677 A8 0.179633 0.566667
4.050 7.08912 M A7 0.987981 ∑ MPp
4.050 1.54548 M A8 0.101792 1.089773 e
2.481
Kontrol terhadap daya dukung tanah Kontrol terhadap patah
FSbearing capacity 21.281 > 3 qtoe 3.001 t/m 2
qheel 3.712
4.451936 m σ1 3.100 t/m 2
σ2 3.629
h4 0.782 t/m2 h6 2.147
h5 0.881 t/m 2
h7 2.064
D 0.499 t/m D 1.053
M 0.149 t M 0.261
W 0.01042 m3 W 0.01042
σtarik 3.567606 < 30 t/m2 σtarik 6.274588
τ 1.496 < 15 t/m2 τ 3.158
faktor kedalaman faktor inklinasi
= 1.054 Ϛic = 0.220
= 1.037 Ϛiq = 0.658 ¥ = 16.99928
= 1.0 Ϛiγ = 0.658

φ Nc Nq Nγ
28 25.79 14.7 16.700
30 30.13 18.4 22.4
29 27.96 16.55 19.55

2.724
X3 0.574
Gtotal 28.864
M3 16.582

-0.075968 < 0.716667 OK


t/m2
t/m2
t/m2
t/m2
t/m
t
m3
< 30 t/m2