IMPLEMENTING RULES AND REGULATIONS (IRR)
of the Department Administrative Order (DAO) NO. 04 Series of 2008
‘New Rules and Regulations Concerning the
Philippine Standard (PS) Quality and or Safety Certification Mark Schemo
‘of the Bureau of Product Standards (BPS)”
4. SCOPE
41 This implementing Rules and Regulations (IRR) provides guidelines on the
Implementation of the OAO 04 series of 2008, which prescnbes the rules and
regulations on the licensing of companies to use the Philippine Standard (PS) Quality
andlor Safety Certification Mark,
2. DEFINITION OF TERMS:
For the purpose of this IRR, the definition of terms provided by DTI's DAO 04 series of 2008
‘shall apply together with the following definition of terms:
2.1. ASEAN Association of Southeast Asian Nations
22 JPEPA- Japan Philippine Economic Partnership
23° Manufacturer or Assembler ~ an entity engaged in the manufacturing or assembly of
products
3. AUTHORITIES AND RESPONSIBILITIES
For the purpose of this IRR, the Authoiles and Responsbilties stated in DAO 04 series of
2008 causes 3.1 to 3.28 shall apply.
4, THE PHILIPPINE STANDARD (PS) QUALITY AND/OR SAFETY CERTIFICATION MARK
‘The provisions under clause 4 of DAO 04 series of 2008 including sub-clauses 4.1 to 43 shall
apply, The PS Certification Mark License No, shall be indicated at the bottom of the PS M:
See illustration at Annex C.
5. APPLICATION FOR PS CERTIFICATION MARK LICENSE
5.1. The provisions under clause 5.1 of DAO 04 series of 2008 shall apply.
5.2 The provisions under clause 5.2 of DAO 04 series of 2008 shell apply together with the
following documentary requirements:
5.2.1 Articles of incorporation or Business Name and Sub-Contracting Agreement (it
1e brand owner subcontracts the manufacture ofits produc).
22 Quality Manual (Controlled Copy)
6.2.3 Brief description of manufacturing process.
624 Reference no. of the Product Identification File to Include process flow,
‘materials, process control and drawings among others.
525 List of test and measuring equipment with nominal capacties and serial
frumbers at each Inspection point and final product testing together with the
‘evidence of ownership, such as oficial receipt.
Implementing Rules and Regulations of DAO 4:2008, Page 1 0¢353
54
58
56
87
58
59
10
528 Brief description of equipment maintenance and calibration program for all
testing and measuring equipment with their corresponding calibration
cerbficates,
6.2.7 Copies of labels, markings and logos etc, as per requirements of specific
standacd.
6.2.8 Vicinity map of the factory
6.2.9 Undertaking to abide by the terms and conditions of the PS License.
‘The provisions under clause 5.3 of DAO 04 series of 2008 shall apply together with the
following provisions:
8.3.1 In cases of subcontracts, the owner ofthe product and brand shall apply forthe
PS Quality andior Safety Certification Mark License.
5.32. An applicant company should submit all the required documents for BPS to
process its application accordingly. Incomplete application forms and
attachments shall not be processed.
5.3.3. Allapplications shall be processed by BPS.
‘The provisions under clause 6.4 of DAO 04 series of 2008 shal apply.
84.1 In case a certain specific standard applies to different products, separate
application shall be fied for each product. The eventual license and certificates
shall also be separately ssved for each product.
‘The provisions under clause §.5 of DAO 04 series of 2008 shall apply.
“The provisions under clause 5.6 of DAO 04 series of 2008 shall apply.
‘The provisions under clause 5,7 of DAO 04 series of 2008 shall apply. Please rafer to
‘Annex A for the details of the procedures
‘The provisions under clause 5.8 of DAO 04 series of 2008 shall apply together with the
following provisions:
5.8.1 The license js Issued to a company for a specific product and brand
manufactured in a specific plant site,
5.82, The license shall not be used on any product in a misleading manner.
“The provisions under clause 6.9 of DAO 04 series of 2008 shall apply,
‘The license shall be valé for three (3) years from the date of issuance and shall be ro-
lesued every three (3) years and thereafier without any further requirement for an
‘application and processing, on the condition that all the terms and conditions of the
License have been met and all the requirements of the DAO 04 series of 2008 have
been complied with during its valicty. Otherwise, the license 's deemed expired and the
‘company may fie new application for PS License it warrants,
6, TERMS AND CONDITIONS OF THE LICENSE
et
‘The provisions under clause 6 of DAO 04 series of 2008 including sub-clauses 6 1.1 to
6.1.11 shall appy.
implementing RUes and Regulations of DAO 4:2008 Page 2 0t37. QUALITY MANAGEMENT SYSTEMS REQUIREMENTS
7.4. The provisions under clause 7 of DAO 04 series of 2008 shall apply.
7.44 All existing PS Licensees” qualty management systems (QMS) shall be In
compliance with [SO 8001:2000 by the end of December 2008. Compliance
shall be verified during the survaiance visis starting January 2009.
7.42 For new PS License appicants, the quality managernent system shall be
aligned as per requirements of ISO 9001:2000.
8. PROHIBITED ACTS
8.1 The provisions under clause 8 of DAO 04 series of 2008 including sub-clauses 8.1, 8.2,
83,84 and 8 8 shall apply
‘98, SUSPENSION, WITHDRAWAL OR REVOCATION OF LICENSE,
8.1 The provislons under clause 9 of DAO 04 series of 2008 including sub-causes 8.1 to
9.3 shall apply.
40, PENALTIES
40.1 The provisions under clause 10 of DAO 0s series of 2008 shall apply.
11, FEES AND CHARGES
411.4. The provisions under clause 11 of DAO 04 series of 2008 including sub-clauses 11.1 to
115 shall apply. Please refer o Annex B forthe time frames of payment
12, SEPARABILITY CLAUSE
12.1. The provisions under clause 12 of DAO 04 series of 2008 shall apply
13, REPEALING CLAUSE
18.1 This IRR replaces the previously Issued Implementing Guidelines for DAO 1: 1907 ~
Rules and Regulations concerning the Philippine Standard (PS) Quality andior Safety
Certification Mark Scheme dated 11 August 1997.
14, ERFECTIVITY
14,1. This IRR shall take effect immediately.
Bureau Director fl
JUL 25 2008
implementing RUes and Regulations of DAO 42008 Page Sof
fir‘Annex A
Procedure on the Conduct of Factory and Product Audit
1) Ropointment of Aust Team
at
12
13
‘The BPS Product Certification shall maintain an updated list of Product and QMS
Auditors,
Auditors with corresponding scope and quaifications will be appointed by the BPS
Product Certification fram the pool of Product and QMS Ausitors to conduct factory and
product audit
Foreign auditors shall submit their qualification documents to BPS prior to the conduct
of audit
2 Factory Audit
a4
22
23
24
‘The audit teanvauditor shall assess the quality management system of a company
based on ISO $001:2000 and applicable Implementing guidelines.
‘The auditors shall check the company's perinent documents to determine whether
actual quality activities are undertaken In accordance with the documented quality
system.
If there are non-contormities noted during the audit, the auditors shall infor the
company and require them to undertake corrective actions. The auditors shall
accomplish the non-conformity report for the non-conformities observed which shal be
‘acknowledged by the company’s authorized representative,
In case of application for extension of the scope of existing certification, the BPS
Product Certifcation may decide not to carry out the audit of production process or
quality system but to require test samples of the additional types of products for
independent testing to determine that they comply with the specie PNS.
3. Product Audit
3a
32
33
34
35
Annex A~|
Evaluation of available test records (test record on initial production run, prototype, and
routine test records) shall be made by the auditors 2s per requirements of specific
standard and its implementing guidelines.
Product sampling shall be made by the auditors as stated in the specific standard
‘and/or its implementing guidelines. Samples maybe drawn from the factory or in the
‘open market, a8 appropriate.
‘Samples should be representative of the entre line or group of production to be
cerlfied and be manufactured from the same tools and assembly using the same
methods established for the production run
‘When testing is based on intial production run or prototype sample, as in the case of
new company, monitoring shall be made on commercial production run,
Inplant and/or independent product testing is carried out in accordance with the
specific standard and its implementing guidelines,
Procedure on the Conduct of Factory & Product Audit Page tof4 Corrective Action and Follow-up Visit
4.1 The original copy of the non-conformity report duly signed by the company
representative shall be given to the company wherein its proposed corrective action
shall be indicated, The auditors shall keep photocopies of the non-conformity reports.
42 Corrective actions to be undertaken by the company maybe classified as follows:
4.2.1 Corrective actions that can be completed within the audit period.
4.22 Corrective action that requires changes in documentation.
4,23 Corrective action that needs a follow-up visit by the auditors such as in the
‘case of completion of faciities and testing of product
43 The company shall implement and complete the corrective actions within three (3)
months for initial audit and one (1) month for surveilance audit If the company fails to
implement the corrective actions within the specified period, it should be a cause for
denial of PS application or suspension of the PS License.
‘Annex A ~ Procedure on the Conduct of Factory & Product Audit Page 2of2oem —
2 Gualy Hanus Review
(Payal wun #8 ays afer bting
US Datar Egan Toca ces BRST ——— 8 ys ai ica ol lg samen
‘ander a¢ cared by Dearand evant parton Roy
al ePsore 18 ays ato eon of by stam
Designated pectin Boy
aes +5 pe soc ot lig wate
‘Desigrat mapecton Body
BPSOTT Taps rw ing Hala
Designo iepecian Body
tr ar
US Dots of ost Chogee
se cexees i onimss | — Bret ——T 1 a snr apa
__ [erst | ssp torre
weoT Ta RTT RS RT
US Dota ae ttt Cages erst ‘sistas oars same
acmned by OPS Seen ‘Soyo aco ben) soent
ta
TTS | par anoene
Tee bapccon 9 ‘apr agent
| fiawesey, | H z
acaba y ros eg Tat Tac a oa
2 son a aaa TGR ToTERT Tht nar aE
Tr Same ‘eer Olea fecopitos | Aspe Oeil Reais ici | 1S stir” | art contut of mane sig
ome
‘Annex 6 — Time Frames of Payment Paget oftAnnex
PS Certification Marks
(PS Certification Mark Logo with License No.)
BPS BPS
CERTIFIED CERTIFIED
Product Safety Product Quality
License No. Q-XXXX License No. Q-XXXX
‘Annex C— PS Mark Logo
DTI MC 20-17 - Extension of The Validity of The Philippine Standard Quality and or Safety Certification Mark Licenses Due To The Enhanced Community Quarantine Over Luzon
DTI MC 20-20_Prescribing the Guidelines on the Interruption of the Periods Related to the Filing of the Appeals Before the Office of the Secretary and Suspension of Rendition of Judgements and Other Actions
DTI MC 20-11 - Prescribing Guidelines For Additional Business Activities Allowed To Operate To Ensure The Steady Supply of Basic Necessities and Essential Commodities Supplementing MC 20-08