— Quality Toolbox Meeting (aFy-PwT-P0-0004_1) Petrofac 6 PetroChina |Report # : HFY-Toolbox-501 JPRID #: 3800 [pRID Description :Reinforcement tying technology confession lContractor :CPI rime start: 8:30 lFinish: 9:30 Points Observed & Discussed construction site, you mist wear safety protection equipment as When entering the required. The hoisting machinery must be avoided during operation. If it is necessary to 2 |work in the mechanical operating range, the mechanical operation must be jtemporarily stopped before lashing. IThe steel bars are placed neatly in accordance with the location, use location, land nunber code specified in the construction plan. lien the surface of the steel bar is rusted, renove it before lashing, and the rust will seriously affect the use of the steel bar. Faniliar with the construction drawings of the basic block, check the review 5 |records and specification requirements of the relevant drawings, and the inspection and evaluation standards for the construction, \Master the process flow and construction methods and technical requirenents of Ithe construction schene, the safety of the reinforcement team binding. Disclosure lof technology end quality, recheck the quantity end specification of finished lproducts in various parts, to ensure the snooth completion of the binding work. IElastic lines are used for the foundation construction parts, and the side lines lcan be used as support lines, Por the foundation mesh reinforcement, the line Inceds to be elasticated on the foundation cushion before construction. Make lobvious marks for key areas such as the colum insertion area, Ipay special attention to the difference between the upper and lower ribs in each 8 Jarea, mainly focusing on the differences in the specifications, positions and spacing of the steel bars. |Pay attention to the lap requirements of cach part. After completing a finished 9 Iproduct, you should invite the team leader to check and accept. If there are léeviations, correct then in time to void large-scale incorrect construction Comments of consultants Also ey attenheu 1 reinfcemank of Loltem lager neley Columns areas , betel [clarified eppinesd . Contractor PMCS PMT heislee you Jun woe: (2020/4) M ane > pte: 39 93-202] [ate Ksaratur ek —_sienaare EDR A MAM CRM) 5128 Elce OPEC (Halfaya) HSE Training Record TEER ecbien | EVEK Subject peinfarcement i fiolok 4 instructor SEVER i pie Location Pampies bustoli Chore. Date FRVIAR Attendees ¢ > eS A #607 bait SN Name Department Positon Ot NWN UE) ath dla oof siel tu p @ lweymyn | t¥F | WZ 4 Wiemgd | rhe | eas 95 lyy be lwa Fb L£ 6 fie fia ba ~ AA a phanghagadl tP a ae 08 pu sney en | 2B Ph BR 0 [meMephe | F Bir kz 1 [Vai anne, | Zh) £4 2 Wane we jy | eh) ee 13 |him Ae fang 2f 9) Yi 4 (wines | Lt ¢ ih pe 18 Wt chamfe; | tiga Az. 6 bhuh ow | ost ph sbi w (xi Sf chowt | £aPPA AL © ho in | err | 18 19 [2nd Lie| tee | oh let 2 bud Tag te Da, (RAFAT): HSE AiCRESHMR 34

You might also like