HALFAYA PROJECT SURFACE FACILITY

QA/QC PHASE FOUR


Department PROVISION OF EPCC FOR CPF2 TRANSFER
PUMP STATION

TPI Inspector CV Assessment Form

Name of Inspector: Victor Wang


PO Number : HFY4-5030-VED-019-ELE-PO-0001
Material : 11KV Switchgear inspection

Education

[ ] excellent
[X] meets job requirements
[ ] does not meet job requirements

Relevant Job Experience

[ ] excellent
[X] meets the requirements
[ ] does not meet the requirements

Technical Skills

[ ] excellent
[X] meets the requirements
[ ] does not meet the requirements

Certification:

[ ] excellent
[ ] meets the requirements
[X] does not meet the requirements

Overall Ranking

[ ] excellent
[X] meets the requirements
[ ] does not meet the requirements