Professional Documents
Culture Documents
”Carrier Objective
To secure a position where I get an opportunity to utilize my talents/ skills in a company where there
is ample scope and growth for organizational as well as individual development.
Professional review:
Over 14 years’ experience in the field of construction jobs such as installation calibration,
commissioning,loop check ,equipment processing plant, automation of control and instrumentation
system equipment at oil and gas based chemical, petrochemical ,fertilizer industries, oil
refinery.Compliance with organizational safety regulation with regard to work permit and high quality
of work on repair and maintenance of the emergency shutdown and control system.Working as
instrument supervisor.
Personal Details~
NAME Mohammad
Fahad
Passport Details
Passport No. : K-6401206(ECNR)
Place of Issue : Ranchi
Date of Issue : 21.08.2012
Date of Expiry : 20.08.2022
Computer Skill
MS Office , Excel Word Internet, Emailing, Surfing and Browsing
TOTAL EXPERIENCE : 14 YEARS
NATURE OF WORK
Inspection and responsibilities works for the instrumentation and electrical work for new
control room and inspection of all loop and instrument as a QA/QC Inspector. The applicable
was fully responsible for all QA/QC activities for instrument and electrical work, preparation
of method statements, ITPS handover package were some of the responsibility the project
scope involved installation, testing, calibration and pre-commissioning of field instrument
installation testing and pre-commissioning of DCS, ESD, system relocation, testing,
precommissioning of fire detection system (UV/IR), vibration monitoring, RDS telemetry
system and HF radio system.
Excellence exposure to various system like DCS, PLC, RTU, fire and gas system, ESD,
turbine and compressor system etc. associated with refinery, gas process petrochemical,
offshore production platform, fertilizer plant, oil and gas well heads.
Various calibration installation and testing procedures safety rules and regulation as per
international standards and instrumentation code e.g. API, ANSI, NEMA, ISA, QA/QC,
documentation like inspection and plant, method statements, report forms, completion
dossier, design and materials approval statements etc as per ISO Project and schedule, design
and engineering procurements, construction and commissioning application development,
customer supports services.
JOB DESCRIPTION
Responsibility for :
Calibration of pneumatic electronics transmitter smart transmitter (HONEYWELL,
ROSEMOUNT) like FT, PT, TT, DPT, level troll, types of gauges, controller recorder and
repairing of instrument overhauling of pneumatic instrument, rotating instruments.
INSPECTION FOR :
Installation, modification, testing, loop checking identify troubleshooting, continuity testing,
signal checking, commissioning and pre-commissioning, sequence checking, meggering,
glanding and termination.
Performed inspection covering phases of instrumentation installation of field instruments,
junction boxes, conduit and cable tray, grounding, instrument installation, instrument tubing,
fire and gas detection system and control system, also performed quality control inspection
covering of calibration, loop checking of field instrumentation (LT, PT, PI, FT, FS, TE etc),
MOV, H2S, gas detector etc.
RESPONSIBILITY Prepare Check and review, also verify the method statement
and Inspection test plan for Instrument work, also submit to client authorized
person to approval the Instrument.
To ensure all method statements, Inspection & test plan have been updated &
approved and are Progressing as Planned.
Established field inspection & Testing Procedure for instrument work. Preparing
QCP&ITP and inspection check sheet, also approved drawing for inspection
Procurement and according to project quality plan.
Trained to Person, who involved in instrumentation job on site, to mention a
good quality work, as a meet with client standards & Project specification.
Prepared the Procedure for QC list & inspection Documentation, for handling
over the QC dossier, as well as initiate or recommends corrective action (CAR&
NCR) check item during the Process of inspection & report to concerned
authorities for final inspection.
Review Sub-contractor’s quality plan, material and drawing submittals.
Familiarity with API, BS, ISA, ISO, NEMA, ANSI Standard and cods.
Read and refer hazardous area classification of instrument location plan, P & ID
and hook up drawing.
To make daily, weekly and monthly work report. Follow the QCP (Quality
Control Procedure) & ITP (Inspection Test Plan).
QMP (Quality Management Procedure) under making NCR (Non-Conformance
Report) at the site/ware house.
Equipment and material incoming goods inspection & if any damage making
OSD (Over & in Operational and calibrated condition, which will be utilized.
Also aware of safety rules regulation conducted monthly safety auditing and
reporting Participated monthly safety meeting and familiar with all relevant
safety inductions like in Working on height100% tie off, 100% fall protection,
and confined entry.
Inspection for the installation of field mounted instruments (PT, TT, FT, and LT
& PDT, PG, TG, FG, LG etc.)
Inspection of the Pneumatic Leak Test for airline tubing/ Impulse Line Tubing,
analyzers sampling tubing, and all kinds of Instrument connection tube line.
Cable trench inspection before pulling & after back filling the trench, for
Instrument Main cable, and secondary Cable also F/O cable Installation.
Inspection for instrument Main cable and secondary Cables.
Also check and monitor for loop check and pre and commissioning and work.
Place
Date Signature of Applicant