PEKERJAAN PENYIAPAN LAHAN

1. Urugan tanah dipadatkan 28,066.28 m2


2. Dinding penahan tanah (pas. batu kali) 557.45 m3
3. Sheet pile
- p 6m 44.00 m1
- p 12 m 75.00 m1
- p 16 m 47.00 m1
- p 24 m 47.00 m1
4. Balok pengikat 213.00 m1
PERHITUNGAN PEK. PENYIAPAN LAHAN
RUKO BALIKPAPAN
JL. SOEKARNO HATTA KM. 9.5 BALIKPAPAN

Cut n fill

sta ki tengah kanan p1 p2 A1 A2


0 5 (1.22) (1.12) (1.15) 52.89 52.25 (61.88) (59.30)
5 10 (0.67) (1.01) (3.00) 52.89 52.25 (44.43) (104.76)
10 15 0.10 (1.01) (4.00) 52.89 52.25 (24.06) (130.89)
15 20 0.38 (1.01) (5.61) 52.89 52.25 (16.66) (172.95)
20 25 0.51 (1.22) (8.09) 52.89 52.25 (18.78) (243.22)
25 30 0.55 (3.49) (10.01) 52.89 52.25 (77.75) (352.69)
30 35 0.74 (5.00) (12.50) 52.89 52.25 (112.66) (457.19)
35 40 1.50 (6.50) (13.00) 52.89 52.25 (132.23) (509.44)
40 45 1.13 (7.50) (14.50) 52.89 52.25 (168.45) (574.75)
45 50 1.50 (8.50) (16.00) 52.89 52.25 (185.12) (640.06)
50 55 1.22 (7.50) (15.00) 50.00 40.00 (157.00) (450.00)
55 60 0.09 (6.50) (13.00) 50.00 25.00 (160.25) (243.75)
60 65 (2.44) (7.00) (8.00) 46.00 12.00 (217.12) (90.00)
65 70 (5.00) (5.30) (5.47) 32.00 8.00 (164.80) (43.08)

sheet pile & balok pengikat

SISI TIPE L (M) P (M) TOT P (M)


A
B
C 1 6.00 12.00 72.00
2 12.00 48.00 576.00
3 16.00 21.00 336.00
4 24.00 27.00 648.00
C 1 6.00 32.00 192.00
2 12.00 27.00 324.00
3 16.00 26.00 416.00
4 24.00 20.00 480.00
213.00 3,044.00

pasangan batu
ELEVASI LEBAR P (M)
SISI TIPE BAWAH ATAS H (M) ATAS BAWAH RATA
A 1 (1.00) (0.70) 0.30 0.30 0.30 0.60 52.89
1 (1.44) (0.70) 0.74 0.30 0.30 0.60 52.25
B 2 (1.25) 5.00 6.25 0.30 2.50 2.80 15.00
2 (1.25) 5.00 6.25 0.30 2.50 2.80 15.00
Ar V
(121.19) (605.9)
(149.19) (745.9)
(154.95) (774.8)
(189.61) (948.0)
(262.00) (1,310.0)
(430.44) (2,152.2)
(569.84) (2,849.2)
(641.66) (3,208.3)
(743.20) (3,716.0)
(825.18) (4,125.9)
(607.00) (3,035.0)
(404.00) (2,020.0)
(307.12) (1,535.6)
(207.88) (1,039.4)
(28,066.3)

V (M3)

9.52
22.93
262.50
262.50

557.45