Utilization Chart
0.7 Activity Takt 2 52 20 920 Production
Min/Item
0.6
0.5
Activity Takt 1 Wk Day Min Control
Year Day Year Mth WACT
0.4
System
Units
A0010 1
Coil 20 Customer >6400 Item
Demand <12000 Mth
20
Activity Utilization By Product
Michigan Steel Co 110 A0140 1 20 OXOX
100 Hourly
Added Unit $
0.00 90
Cost Item 2
Cumulative $ 80
Unit Cost
0
Item
2
State Street Assembly
Added Period $ 70 20
0
Cost Wk 60 Customer >6400 Item Coil Batch Bin 20
%
2
Demand <12000 Mth
50
2
1x Daily
Daily (Milk Run)
40
1
30 1
A0020 1 A0030 1 A0040 1 A0050 1 A0070 1
20 1 1
A0060 1
10
Changeover Utilization Weekly Schedule
0
2
1
Legend Shipping
A0030 A0050 A0070 A0090 A0110 Stamping Weld + Assy
Staging
Product Product
0 Item Qty Per Cycle 1 Item 0 Item Qty Per Cycle 1 Item
Tue & Thu Inventory Inventory Product 0 Item
General General Inventory
1380 Item Cycle Time 1 Sec 840 Item Cycle Time 56 Sec
Inventory Inventory General 1840 Item
CO Process Lead Inventory
Daily Changeovers 1 168 Sec Z0010
Day Time #0
Time Per Min
Changeover
10
CO Time Summary
1.50 Day 0.91 Day 2.00 Day LTVANVA 4.42 Day
Total Value
1.00 Sec 168.00 Sec 169.00 Sec
Added Cycle Time / Takt Time Chart Activity Utilization By Product
Value Added 1 100
A0030 1 A0050 1 A0070 1 A0090 1 A0110 1 A0130 1 0.07 %
001 002 Percent CT
0.9 / TT Product 90
004 0.8Chart
Utilization
80 P2
A0020 1 A0040 1 A0060 1 A0080 1 A0100 1 A0120 1 Weld
Stamping S. Weld #1 S. Weld #2 Assembly #1 Assembly #2 Shipping Changeover Total Work
0.7 70
Changeover Activity Takt Time
Min/Item
0.6 60
Coils Inventory Inventory Inventory Inventory Inventory 168 sec
%
0.5 Activity Takt 2 50
Product >2400 Item Product >600 Item Product >850 Item Product >640 Item Product >1440 Item Added Unit $
Wait 5 Day Qty Per Cycle 1 Item Qty Per Cycle 1 Item Qty Per Cycle 1 Item Qty Per Cycle 1 Item Qty Per Cycle 1 Item 0.00 0.4 40
Inventory <4600 Inventory <1100 Inventory <1600 Inventory <1200 Inventory <2700 Cost Item Activity Takt 1
Cumulative $ Cumulative $ Cumulative $ Cumulative $ Cumulative $ Cumulative $ Cumulative $ 003 0.3 30 P1
Z0010
#0
Time Summary
5.00 Day 7.61 Day 1.85 Day 2.66 Day 2.00 Day 4.50 Day LTVANVA 23.62 Day
Total Value
1.00 Sec 39.00 Sec 46.00 Sec 62.00 Sec 40.00 Sec 188.00 Sec
Added
Value Added
0.01 %
Percent
(8) METRICS (6) IMPROVEMENT ACTION PLAN Not Started In progress Completed Past Due A0020
all
Pace
maker
Loop
Pacemaker Loop
A0102
all
Stamping
loop Stamping Loop
A0120
all
Supplier
loop Supplier Loop
A0010 #4 Z0010 #4
Establish Pull at Coil
Continuous flow from Establish Finish Good
Establish Stamping Pull supplier with daily
•
Single weld assembly Pull Single
Start delivery End
Lead Time: EPEI: Reduce the stamping change over from 1 hr to less than 10 min Time
Now
e VSM D a ta
Wi z Pro j e ct
1 1.6 2.0 0 0 3.
0
0 Day Duration 2 mth Duration 2 mth Duration 2 Mnth Duration 2 mth
•
A0040
CS: 23.6 days CS: 2 weeks Create continuous flow from weld to assembly to eliminate the WIP accumulation
Fig 2
Kaizen to 168 sec A0100 #2 A0110 #2
Implement Pull
Reduce stamping C/O
Duration 2 mth schedule for material
time below 10 min
Handler
•
Continuous flow from weld assembly
C/O Time Max Station Create supermarket after stamping to establish pull
Duration 1 mth
Utilization
•
Eliminate Weld C/O
CS: 60 Min Improve stamping change over Achieve 100% Uptime welder #2
Implement Pull schedule for material Handler
CS: 103 %
Year Year Week Day
Units
Reduce the stamping batch size from 300 to 150 Stamping loop
52 12 5 8 Gantt
FS: 93% • Implement pull at coil supplier with daily shipment and 1.5 days of RM inventory Supplier loop
Establish Pull at Coil supplier with daily delivery
Time Now
Start To End
0 1 2 3 4 5 6 7 8 9
Legend
Mnth
(1) Define Value Stream (2) Gain management (3) Review Lean (4) Define value (5)Draw current (6) Improvement (7) Design Future (8) Metrics (9) Cost benefits
commitment Principles stream goals state map Action plan state map