You are on page 1of 4

b) Dimensional Inspection;

c) Electrical Resistance Test;


d) Dissipated Power Test (Losses) and Temperature Rise
e) Operation Characteristics Verification Test:
1. Determination Test of the conventional non-melting current;
2. Determination Test of the conventional melting current;
3. “gG” Fuses Time – Current Values verification
f) Melting Indicator operation verification;
g) Mechanical Resistance Test.

You might also like