Professional Documents
Culture Documents
Installation Procedure
Cold Shrink Outdoor Termination
for 1 Core, XLPE Copper Wire or Copper
Tape Screen Cables, up to 36kV
Preliminary Considerations Before starting Work
The installations must be carried out by operators qualified for the use of high voltage electrical equipment.
The personnel must also be trained regarding the applicable safety regulations in the workplace, with particular
reference to the realization and work in open pit excavations, and electrical substations for maintenance of
electrical infrastructure networks.
Prepare the cable, properly raised above the ground level, in a suitable manner for the execution of the termination.
Check the suitability of the kit with respect to cable types and screen sections.
Check the availability of all tools necessary for the proper execution of the joint.
If there is any doubt on the suitability of the material or any aspect of the installation, clarify and confirm before
starting works.
Spiral
Spiral
Grey
Mastic
Abrade for
Clean for 50mm
100mm Wire binder
1 2 3
Straighten and align the cable to the Apply a layer of grey sealant mastic Carefully bend the copper screen
termination point. with 50% overlap around the sheath, wires and lay them equally spaced on
Remove the cable sheath to the immediately below the sheath cut. the grey mastic layer.
dimension A shown above. Clean the The mastic layer should cover a length Apply a wire binder approximately
sheath below the cut for 100mm and of 40mm from the sheath cut. 65mm below the sheath cut.
abrade for 50mm below the cut.
ISTCSOT370ENG Page 2 of 4
Lug depth
+ 5mm
Grey Sealing
Mastic
Insulation
Silicon grease
Semi-con
PVC Tape
40mm
Wire binder
4 5 6
Using an appropriate tooling, remove Apply a layer of grey sealing mastic Fill the gap between the end of the
the semi-con screen leaving 40mm around the copper wires, just below the insulation and lug barrel with grey
of screen before the sheath cut. outer sheath cut, continue downwards sealing mastic overlapping the insulation
Remove the insulation to a depth covering the screen wires for 40mm. and cable lug by 5mm to obtain a smooth
equivalent to Lug depth + 5mm. Install the cable lug following the profile.
manufacturer instructions, smooth Ensure the lug fixing holes are filled
any sharp edges. with mastic.
Apply a layer of PVC tape over the Smear silicon grease from the lug barrel
mastic as shown in step 6 until the end of the PVC tape.
Lug depth
+ 5mm
A
1
50
25
Grey 40
Abrade Mastic
1 2 3
Connect the earth lead to the Bind a temporary binder around the core
Straighten and align the cable to the at 25mm above the jacket cut. Tear off
copper tape screen using the roll spring
termination point. the copper tape against the binder.
provided, bend back the end of the braid
Remove the cable sheath to the Remove the semiconductive screen 50
braid and cover it with the roll spring
dimension A shown in table in pag. 1. mm above the sheath cut.
(see sequence 1-2 above.)
Clean the sheath below the cut for Apply a thin layer of grey mastic with
Ensure that the moisture block of the
100 mm and abrade for 50mm below 50% overlap around the sheath, for
braid seats below the outer jacket cut
the cut. level 40mm.
ISTCSOT370ENG Page 3 of 4
Grey Sealing
Mastic
Silicon grease
Grey
Mastic
PVC
40 Tape
Wire binder
4 5 6
Apply a thin layer of grey sealant mastic Starting from the copper tape screen cut, Fill the gap between the end of the
with 50% overlap covering the braid ans apply a layer PVC tape covering the roll insulation and lug barrel with grey sealing
solder moisture block and the mastic spring and braid and over the Grey mastic overlapping the insulation and ca-
wrap applied previously. The mastic mastic. ble lug by 5mm to obtain a smooth profile.
layer should cover a length of 40mm Install the cable lug following the Ensure the lug fixing holes are filled
from the sheath cut. manufacturer instructions, smooth any with mastic.
Apply a wire binder approximately .sharp edges that may be left after Smear silicon grease from the lug barrel
55mm below the sheath cut. .shearing off the screws. until the end of the PVC tape.
25-35
Wire Binder
6
7 8 9
Slide over the termination body ensuring After collapsing few centimetres of the Fully collapse the termination onto the
the pull cord is at the lug end of the termination body, ensure that the lower cable insulation and cable lug. Ensure
termination. there is a tight seal over the cable lug.
Pull and unwrap the spiral core to allow the end of the termination is level with
Gather the shielding wires together to
the termination body to start to collapse. the wire binder, then continue to twist
form an earth core.
and pull the spiral ensuring it does not
catch on the mastic below. Insert the copper wires into the earthing
lug and tighten the bolt until shear of the
bolt head. Of a crimping lug is supplied,
crimp the lug to the screen wires.
ISTCSOT370ENG Page 4 of 4